Home / IAG / Determination 933551

Determination 933551

Partial decline of storm and landslip claim, temporary accommodation and delay

FirmIAG
Decided2023-06-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant disputed the insurer's partial acceptance of a storm and landslip claim, temporary accommodation limits and delay. AFCA found the insurer assessed the claim correctly but required a 20% uplift on the cash settlements for the septic tank and October 2022 damage.

The policy covers only defined building and contents, excluding soil and ground, so landslip damage was not covered, but cash settlements should fairly include a 20% uplift for risk transfer and contingencies.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensation

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 933551 Financial firm Insurance Australia Limited Case number: 933551 8 June 2023 Determination | Case number: 933551 Page 2 of 10 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with IAL for building and contents with cover for insured events. The complainant says that a storm event in February 2022 caused damage to his building and property. The complainant says further damage occurred in October 2022. The insurer has partially accepted the claim for damage to the complainant ’ s septic tank but says that there is no other damage as a result of the storm. To resolve this complaint the complainant is seeking:  the insurer to fully accept the claim for damage as a result of storm, including damage sustained in October 2022  the insurer to extend the period of temporary accommodation being provided  compensation as a result of delays in the assessment of the claim for landslip  compensation due to the previous complaint agreement not being fully enacted by the insurer. 1.2 Issues and key findings Has the insurer correctly assessed the claim for landslip? Yes. The insurer has correctly assessed the claim for landslip. Has the insurer delayed the assessment of the landslip claim? No. I am not satisfied that any unreasonable delays in the insurer ’ s assessment of the claim have occurred. Has the insurer correctly assessed the claim for the damage from October 2022? Yes. I am satisfied that the claim has been assessed correctly. Has temporary accommodation been assessed correctly? Yes. The insurer has provided the complainant with the correct temporary accommodation benefit. Has the insurer actioned the prior AFCA complaint correctly? Yes. Both parties have confirmed that the payment of $1,500 has been finalised. The contents claim has since been settled as advised by the complainant on 21 April 2023 and there is no further action required from the prior complaint. Why is the outcome fair? The policy is clear and specifically details what it will and will not cover in the case of an insured event of storm and what is considered building or contents. The insurer has assessed the claim for landslip, the damage from October 2022 and temporary accommodation within Determination | Case number: 933551 Page 3 of 10 its policy definitions and it would not be fair to require the insurer to assess the claim outside of the policy requirements. As the insurer has not been found to delay the assessment of the landslip claim or that it has incorrectly actioned the previous complaint, it would not be fair to require further compensation to be paid. 1.3 Determination The determination is substantially in favour of the insurer. The insurer has correctly assessed and not delayed the claim for landslip, whist also correctly assessing the claim for damage from October 2022. The insurer has provided temporary accommodation within the terms of its policy and has correctly assessed this component of the claim. Furthermore, based on the evidence provided, the insurer has actioned the outcome from the prior complaint appropriately. While I accept that the insurer is entitled to cash settle for the septic tank and the damage recommended by MC, I am satisfied that it should do so fairly. In my view it is fair that the insurer adds a 20% uplift to the cash settlement amounts to account for the transfer of risk and potential contingencies. 2 Reasons for determination 2.1 Has the insurer correctly assessed the claim for landslip? Insurer has partially accepted the claim When making a claim, an insured party has the onus of establishing they suffered a loss for which their insurance policy provides cover. The insured party must establish this on the balance of probabilities (i.e. that it is more likely than not). Determination | Case number: 933551 Page 4 of 10 If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or to deny the claim. The complainant’s policy provides cover for loss or damage t o their property caused by the insured events listed in the policy, subject to the conditions and exclusions. To establish a claimable loss, the complainant must establish that a loss to which the policy responds has occurred. In February 2022, a storm occurred in New South Wales, in the area of the complainant’s property. The exchanged information shows heavy rainfall caused a landslip on ground higher than the complainant’s building which caused damage to the septic tank. The insurer has partially accepted a claim for the damage to the septic tank but has declined the claim for landslip as it says the damage did not form a part of the insured building. What damage has occurred? As part of the assessment of the claim, the insurer engaged engineers (JK and K&A) to attend the property to determine the cause of the damage. Both engineers attended the property on 30 March 2022. The JK site report dated 30 March 2022 specifically noted that:  The only potential damage to a structure which we observed, and which was pointed out to us by the insured, was to the septic tank and associated pipework. JK ’s other report dated 1 April 2022, also noted that:  Of geotechnical significance is the evidence of the scar of a localised landslip immediately behind the crest of the western end of the Gabion wall. The landslip debris has been removed, but it apparently impacted the septic tank and pipework, which are located beyond the toe of the Gabion wall.  Another localised landslip is evident near the western site boundary. A third much larger landslip is evident beyond the western site boundary. This latter landslip has uprooted at least one tree upslope of the landslip debris.  Finally, there is an area behind the crest of the western end of the Gabion wall, closer to the house, where tension cracking and/or erosion is visible.  Other than the septic tank, the only directly affected property, or element of the property, which is evident, is restricted to the two localised landslips on the site and the area of visible tension cracking/erosion. K&A’s report dated 1 April 2022 , noted that:  Despite the partial collapse of the hillside, none of the soil impacted the residence and, accordingly, no damage has occurred to the residence.  There are currently no structural engineering issues with the residence (as a consequence of the landslip) and, accordingly, we recommend that the septic tank be reinstated, any contaminated ground be removed and/or re-mediated and the hillside be made safe in accordance with Mr Z’s (JK Geotech) recomme ndations. The complainant arranged for another engineer (JLG) to review the property and in their report dated 17 November 2022, it was again noted that:  The site has been impacted by a landslide. The property has not suffered any damage as a result of flood waters and the Structural engineer report confirms that there are no apparent structural issues that have been caused by the landslide. These reports do not support that any damage, outside of the damage to the septic tank, has occurred to any of the buildings within the property. Determination | Case number: 933551 Page 5 of 10 Policy defines building The Product Disclosure Statement (PDS) specifically details the buildings that are insured under the policy and notes that the complainant’s insured home includes:  Domestic and residential buildings at your site that can be locked up.  Home improvements at your site – for example, garage, carport or in-ground pool  Fixtures or items permanently attached or fixed to your home – for example, light fixtures, built-in wardrobes, kitchen cupboards and floating floorboards. As the various engineers reports from JK, K&A and JLG all indicate no evidence of damage to the building as defined within the policy, I am satisfied that the complainant has not suffered a claimable loss under the policy, outside of the accepted damage to the septic tank. I understand that the insurer has cash settled the complainant for the repairs to the septic tank. While I accept that the insurer is entitled to cash settle this aspect of the claim, I am satisfied that it should do so fairly. In my view it is fair that the insurer adds a 20% uplift to the cash settlement to account for the transfer of risk and potential contingencies. Complainant has not established a claimable loss for contents. Whilst the complainant has not established a claimable loss under the building insurance, apart from the septic tank, consideration has been given to the complainant being covered for the landslip under his contents insurance. The report from JK dated 1 April 2022, recommended the installation of a catch fence which would result in the property being safer than it was prior to the storm. This was agreed to within the report from JLG dated 17 November 2022, which included a Forensic Engineer report from FES dated 18 September 2022. FES says that there was a high chance to encounter landslide and fall of rock on the house, which might destroy the entire property. FES was of the opinion that the property should be barricaded and declared as unsafe for habitation until the geotechnical investigation, assessment and recommendations are implemented. A further review was conducted by DP Geotechnical who attended the site on 29 August 2022, 23 September 2022 and 14 October 2022, for geological inspection. In their report dated 11 November 2022, DP noted:  The gabion retaining wall appeared to be in relatively good condition. No distress in the wall was observed in any of DP’s site visits. Debris flows from landslips appears to have flowed over the top of the wall. The retaining wall appears to be founded on sandstone bedrock ( DP’s observations were supported by photographs ).  The previous instability appears to have occurred through loss of shear strength of the surface soils following water saturation. The instability appears to have occurred in the surface soils above the bedrock. These reports note that damage has occurred to the ground on the property which poses a risk to the building, but neither has established damage to either the building or contents as defined within the policy. It should also be noted that when addressing which contents are insured under the policy, the PDS specifically states that the contents which are not insured include:  Plants, trees or shrubs growing in the ground  Grass, rocks and soil on your site. Determination | Case number: 933551 Page 6 of 10 Given this, I am not satisfied that the complainant has established a claimable loss for contents within the meaning of the policy. It is acknowledged that damage has occurred to the complainant’s property with regard to the soil and ground around the insured building. However, there is no damage sustained to any portion of the property to which this policy responds. Insurer has correctly assessed the claim for landslip Given all the above, I am satisfied that the insurer has correctly assessed the claim for landslip based on the terms and conditions contained within the policy. 2.2 Has the insurer delayed the assessment of the landslip claim? The insurer has not delayed the claim The complainant has stated that by not accepting the claim for the landslip and damage being claimed, the insurer has delayed the assessment. The complainant has provided a history of onsite reviews between the lodgement of the claim on 4 March 2022, and the partial decline letter dated 27 July 2022. The complainant has confirmed that the site was attended by JK and K&A on 30 March 2022, MC on 29 April 2022 and NCPI on 17 May 2022, to assess the damage. It was also noted that the claim decision on the landslip claim was communicated within a period of 5 months. This supports that the claim for landslip has been fully assessed and communicated to the complainant within a reasonable timeframe. I am not satisfied that this history of assessments, reviews and decision communication by the insurer indicates any delays in the insurer ’ s assessment of the claim. 2.3 Has the insurer correctly assessed the claim for the damage from October 2022? Complainant claimed for additional damage in October 2022 The complainant has indicated that he returned to his property in October 2022 following a storm event and identified that a boulder had dislodged from the hill next to his building and struck the building, causing damage. In the complainant’s response to AFCA dated 15 March 2023, he confirmed that he was seeking to claim the damage because of the storm in October 2022, and not the previous storm on March 2022. The complainant expanded in his response that he was claiming for this damage following his attempts to remediate the landslip as detailed in the letter from the insurer dated 27 July 2022. The complainant indicated that the damage which occurred in October 2022 was as a direct result of the insurer not assessing the original claim for landslip correctly. Insurer provided a cash settlement Builder, MC attended on site on 19 October 2022, to investigate the damage sustained in October 2022. In their report of the same date, MC observed that a large rock had impacted the northern elevation wall which presented with cracking consistent with impact from a heavy Determination | Case number: 933551 Page 7 of 10 object. MC noted that the northern embankment appeared to be unstable and that further remediation action was required to prevent further landslip. MC also provided a scope of works in which they recommended remediation for the boulder damage would cost $6,734.81. MC were unable to warrant the works on the property at the time as the site was considered unsafe and therefore works could not proceed. On 16 March 2023, the insurer provided a cash settlement to the complainant. While I accept that the insurer is entitled to cash settle this aspect of the claim, I am satisfied that it should do so fairly. In my view it is fair that the insurer add a 20% uplift to the cash settlement to account for the transfer of risk and potential contingencies. Insurer has correctly assessed this damage AS MC was unable to warrant the works based on an inability to complete the repairs, the insurer provided a cash settlement for the claimed damages caused by the boulder. This finding that the property was not safe yet to complete works, was consistent with the findings of JK on 1 April 2022, where the following was recommended:  We consider that a catch fence, which is founded in bedrock just behind the Gabion wall, presents a suitable treatment option which will result in reduced risk to the property.  The installation of the catch fence will result in the property being safer than it was pre- event. We are not aware of a solution that will restore the property to a similar level of safety as existed pre-event. These recommendations were also in line with the earlier stated recommendations of FES and DP Geotechnical who had recommended installation of a catchment fence on the higher ground within the property to prevent further landslip. Whilst the complainant had not yet installed the catchment fence, the insurer has accepted the resultant damage caused by the boulder and cash settled the claim. As the insurer has accepted the claim for the damage caused by the boulder and cash settled the claim in line with the scope of works provided, I am satisfied that the claim has been assessed correctly. 2.4 Has temporary accommodation been assessed correctly? Insurer has provided temporary accommodation The insurer has provided temporary accommodation to the complainant up to at least 26 April 2023 to cover the repairs for the septic tank and site contamination. The cash settlement was agreed to by the complainant for the repair of the septic tank and the insurer advised in their letter dated 19 August 2022, that the temporary accommodation had been extended by six months. This extension was provided to cover the period of the repairs to the septic tank and the erection of the catch fence. It should also be noted that the erection of a catchment fence was recommended maintenance and was not accepted damage under the claim. Insurer has correctly assessed temporary accommodation For the insurer to provide compensation for temporary accommodation, there must first be a listed event which caused damage to the home preventing the complainant from being able to live in the home. Determination | Case number: 933551 Page 8 of 10 It had been confirmed by various engineers that the site was not safe to occupy due to the potential for further landslips to occur, the risk of further rockfall or landslip and not the effects of the insured event. As the insurer has previously advised the complainant of the requirement to erect a catch fence on the property as part of the required maintenance, further temporary accommodation did not fall within the coverage for an insured event. The insurer confirmed on 19 April 2023, that it has not accepted the claim for site contamination as it is not covered due to the general exclusions listed in the policy. As the proximate cause of the building being unsafe was no longer the resultant damage from the insured event, the insurer was no longer required to provide temporary accommodation to the complainant. 2.5 Has the insurer actioned the outcome from the prior AFCA complaint correctly? Insurer has actioned prior AFCA complaint correctly Both parties have confirmed that the payment of $1,500 as outlined under the prior AFCA complaint has been finalised. The further actions listed in the complaint outcome relate to the progression of the contents claim which has continued to occur since the previous complaint was resolved. Whilst there were delays at certain points which the insurer has acknowledged, they have progressed the assessment of the contents claim, provided copies of the contents list reports and provided ongoing accommodations as per the previous complaint. The contents claim has since been settled as advised by the complainant on 21 April 2023 and there is no further action required from the prior complaint. Given this, I am satisfied that the insurer has actioned the prior complaint correctly. 2.6 Why is the outcome fair? The outcome of this complaint is considered fair in all the circumstances as although there was damage noted because of the storm event in February 2022, not all the damage sustained was considered to be for buildings or contents for which the complainant was insured. Whilst the policy responded to damage to the complainant’s building in the form of the septic tank, no other damage was identified to other parts considered to be classified as building or contents because of the landslip. Furthermore, the policy clearly excluded damage to earth, soil or ground, under the contents policy. As a result, it would not be fair for the insurer to have to cover the claim when there is no policy requirement to do so. The policy is clear and specifically details what it will and will not cover in the case of an insured event of storm and what is considered building or contents. The insurer has assessed the claim for landslip, the damage from October 2022 and temporary accommodation within its policy definitions and it would not be fair to require the insurer to assess the claim outside of the policy requirements. As the insurer has not been found to delay the assessment of the landslip claim or that it has incorrectly actioned the previous complaint, it would not be fair to require further compensation to be paid. Determination | Case number: 933551 Page 9 of 10 Determination | Case number: 933551 Page 10 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairn ess AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.