Home / QBE / Determination 933361
Determination 933361
Partial denial of storm water damage claim due to construction defects and lack of maintenance exclusions, plus claim delay
Summary
A unit owner complained that QBE partially denied a strata policy storm water claim, covering only resultant damage, and delayed its decision. AFCA upheld the partial denial but required $500 non-financial loss compensation for delay.
The insurer showed on the balance of probabilities that exclusions for construction defects, wear and tear and lack of maintenance applied to rectification, but it took too long to make its claim decision.
Issues
- Claim denial primary · not upheld“insurer has established that the water ingress was due to construction defects, wear and tear, and lack of maintenance; rectification excluded”
- Complaint handling failure secondary · not upheld“not satisfied that the insurer's IDR process was undertaken not in accordance with the Code or was otherwise unreasonable or deficient”
- Delay secondary · upheld“five and a half months was too long to make a claim decision and the reason for the delay has not been adequately explained”
- Poor communication secondary · not upheld“she accepted that the insurer had been communicating with CI; CB mostly to blame for perceived communication issues”
Subjects and remedies
broker or intermediaryhome or building damagepay non financial loss
Related
Text of the determination
Determination
Case number 933361
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 933361 Page 1 of 8
Case number: 933361 18 May 2023
1 Determination overview
1.1 Complaint
The complainant is a beneficiary under a residential strata plan insurance policy issued by the
financial firm (insurer). The policy is issued to the body corporate of the building in which the
complainant owns a unit. The complainant is the secretary of the body corporate.
On 18 March 2022, the body corporate through its insurance broker, CI, lodged a claim with
the insurer. The claim related to water damage to unit one (owned by the complainant), unit
two and unit four following a storm event in late February 2022.
The insurer agreed to repair the resultant damage to the units only, once the body corporate
had attended to maintenance the insurer said was required to prevent further water ingress.
The complainant disagrees with the insurer’s assessment that the water ingress was the
result of excluded construction defects and lack of maintenance. She is also dissatisfied with
the insurer’s claim and complaint handling.
1.2 Issues and key findings
Is the insurer entitled to partially deny the claim?
Yes. On balance, the insurer has established that the water ingress was due to construction
defects, wear and tear, and lack of maintenance. Rectification of those issues is excluded
from cover under the policy terms. The insurer is only obliged to cover the resultant damage.
Is non-financial loss compensation payable?
Yes. While the insurer was not responsible for all the delay experienced, it took too long to
issue its claim decision. This contributed to the complainant ’s stress and inconvenience. The
insurer is required to pay her $500 in non-financial loss compensation. However, I am not
satisfied that the insurer’s complaint handling has been deficient.
Why is the outcome fair?
The insurer has on balance shown that the water ingress occurred due to excluded
construction defects and lack of maintenance. It would not be fair to require the insurer to
cover the cost to rectify those matters as the policy does not respond in relation to them.
However, it is fair that the insurer pays compensation for stress caused by its delay.
1.3 Determination
This determination is substantially in favour of the insurer.
Within 14 days of acceptance of this determination, the insurer is required to pay the
complainant $500 in non-financial loss compensation.
The insurer is otherwise only required to attend to repair of the resultant damage to the
complainant’s ensuite and balcony, in accordance with its previous claim decision.
Determination | Case number: 933361 Page 2 of 8
Determination | Case number: 933361 Page 3 of 8
2 Reasons for determination
In an email dated 26 March 2023, the complainant stated that she had ‘received permission
from the Committee to handle the dispute on behalf of the Body Corporate’. However, in the
complaint submitted to AFCA, she confirmed that she was lodging the complaint for herself.
No authorities from the body corporate or the other affected unit owners have been provided.
Accordingly, this determination is limited to the complain ant’s complaint as a unit owner.
Further, this determination does not affect any rights the complainant may have against CI or
the body corporate’s manager, CB.
The parties provided numerous submissions to AFCA. While this determination does not refer
to them all, I have taken each submission into account in reaching my decision.
2.1 Is the insurer entitled to partially deny the claim?
Yes. On balance, the insurer has established that the water ingress was due to construction
defects, wear and tear, and lack of maintenance. Rectification of those issues is excluded
from cover under the policy terms. The insurer is only obliged to cover the resultant damage.
A claimable loss has been established
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that there has been a claimable loss under the policy. This means she must show the
loss was caused by a risk to which the policy responds.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
policy covers the insured property against ‘Damage’. The PDS defines Damage as ‘ any
partial or total accidental physical loss of, or destruction of property from any sudden and
accidental cause not otherwise excluded by this Policy’.
On 27 February 2022, the complainant’s unit and two other units wi thin the insured property
experienced rainwater ingress following a severe storm. A claim was lodged with the insurer
on 22 March 2022. The insurer has accepted the claim for resultant damage so, to that
extent, has accepted that a loss claimable under the policy has been established.
However, the insurer says that the water was able to enter the property due to construction
defects and lack of maintenance. It says it is not required to rectify those issues as they are
excluded under the policy terms.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer says the claim is partially excluded
Following claim lodgement, the insurer appointed builder NS to undertake restoration and
mould remediation to the affected lots and to report on damage causation.
NS inspected the property on 28 June 2022. In its report dated 19 August 2022, NS said:
the site conditions and resulting damage were consistent with damage caused by water
entry through non-compliant and poorly installed components
t he complainant’s unit had a substantial amount of water ponding on the high side of the
dektite for the vent pipe and possible failure of the front balcony’s waterproofing membrane
Determination | Case number: 933361 Page 4 of 8
all the water affected units had compressed fibre cement (FC) sheeting installed as a roof
structure over their stairwells. FC sheeting was not an appropriate roofing material. Also,
the FC cladding was fixed with nails not meeting manufacturers specifications
the mouldings on the external cladding of the affected units were poorly built and could
allow water ingress into wall cavities
the units did not have window and door flashings, in breach of building code requirements
the damage appeared to have been occurring for 12 months or longer
the ‘customer’ would have been reasonably aware of the property’s condition
‘building damages are consistent with damages from a one off rain event along with the
potential of ongoing ingress issues, poor maintenance along with poor installation and
construction methods being a large contributing factor’.
NS provided a scope of works (SOW) to repair what it said was the resultant damage. The
works outlined for the complainan t’s unit related to the ensuite ceiling and balcony underside.
NS confirmed those works were based on an external inspection and photos the complainant
had provided, as it had been u nable to inspect the complainant’s unit as she was unavailable.
On 29 August 2022, the insurer provided a copy of NS’s report to CI. On 1 September 2022,
the insurer sent CI an email advising that rectification of the issues identified by NS was not
covered under the policy. The insurer said it accepted the resultant damage from the storm
event but could not commence repairs until the abovementioned issues were rectified.
CB asked the insurer to confirm the essential maintenance items to be addressed before
claim-related repairs could proceed. On 3 November 2022, the insurer told CB and CI the
following were ‘the priority as it is specific to the proximate cause of the resultant damages’:
complainant’s unit and unit four - water ponding on the dektite high side for vent pipes
complainant’s unit - possible waterproofing membrane failure
unit two - water ingress through window frame, no window flashings present
all three units – non-roofing material over stairwells.
The insurer indicated that the other items should be addressed within a timely fashion noting
that further water ingress could occur in the future, resulting in further damage.
In partially denying the claim, the insurer relies on exclusions set out on pages 20 and 21 of
the PDS, pursuant to which the policy does not cover:
damage caused by or arising directly or indirectly from:
> matters including lack of maintenance, wear and tear, developing flaws, gradual
deterioration or, failure to maintain the insured property in a reasonably good state of
repair
> inherent defect or latent defect
damage caused by non-rectification of an insured property defect, error or omission that an
insured was aware of, or should reasonably have been aware of
the cost of rectifying faulty or defective materials or faulty or defective workmanship,
design or specification
wear and tear.
Complainant disagrees with insurer
The complainant acknowledges that the body corporate may have had maintenance to attend
to but says that NS highlighted every potential issue it could find. She says NS ‘have failed to
link the maintenance issues to each point of water entry and to what unit and back it up’.
In relation to the comments NS made concerning her unit, the complainant says:
Determination | Case number: 933361 Page 5 of 8
she had owned the unit for nearly 12 months before the February 2022 storm. There were
no signs of historic water entry or occasions when water entry occurred prior to the storm
she is only claiming for damage to her ensuite ceiling and balcony
the suggestion that the front balcony waterproofing membrane had possibly failed is
speculative, particularly given that NS did not perform any spray testing of the balcony
NS has not explained how the alleged incorrect installation of dektite for the vent pipe on
her roof or the other alleged deficiencies affecting all three units were relevant to her claim.
In addition, the complainant has suggested the storm was so severe that:
there`s no guarantee the waterproofing would have held out anyway even if that
was the cause. The rain was so heavy for 3 days straight that water was running
off my balcony like a waterfall so it is possible water could have got into the
internal of the balcony via some other method and water built up inside the
balcony cavity and caused the underneath to start to sag as water was pooling
inside.
The complainant has declined to obtain an expert report of her own. She says she was not
informed that was an option until a year after the claim event. Further, she says it is
unreasonable to expect her to do so in circumstances where NS’s report is flaw ed.
Insurer is entitled to partially deny the claim
The insurer has agreed to repair the resultant damage from the water ingress, as set out in
NS’s SOW. The specified repairs to the complainant’s unit are to the ensuite ceiling and the
underside of the balcony (a ceiling above the complainant’s barbeque and outdoor furniture).
The insurer also says that it is not required to rectify the roofing issues and possible balcony
waterproofing membrane failure NS identified as the cause of the water ingress affecting the
complainant’s unit. It says those causes are excluded from cover under the policy terms.
The complainant says she is only claiming for damage to her ensuite ceiling and balcony
(seemingly, it’s underside). In the circumstances, it may be that the complainant has
misunderstood the extent of the resultant damage the insurer has agreed to repair.
In any event, I am satisfied based on the exchanged information that the insurer is entitled to
decline to cover the cost to repair the causes of the water ingress. The only expert opinion on
those causes is NS’s report. NS says the water ingress was due to construction defects, wear
and tear and maintenance issues. Those are excluded causes under the policy terms.
I also note that even if the complainant is correct in saying the balcony waterproofing has not
failed (or been proven to have failed), work on the waterproofing would not be covered. This
is because it would not have been shown to have been damaged (accidentally or otherwise).
Accordingly, the insurer is only required to attend to repair of the resultant damage to the
complainant’s ensuite and balcony, in accordance with its previous claim decision.
2.2 Is non-financial loss compensation payable?
Yes. While the insurer was not responsible for all the delay experienced, it took too long to
issue its claim decision. This unreasonably caused the complainant stress and
inconvenience. The insurer is required to pay her $500 in non-financial loss compensation.
However, I am not satisfied that the insurer’s comp laint handling has been deficient.
Determination | Case number: 933361 Page 6 of 8
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer’s claim delay has caused stress and inconvenience
Initially, the complainant raised considerable concerns about lack of communication from the
insurer during the course of the claim.
However, in an email to AFCA dated 8 March 2023, she accepted that the insurer had been
communicating with CI. She said CB was mostly to blame for the perceived communication
issues. However, s he maintained that the insurer had unreasonably delayed ‘ issuing a formal
decline, which is a breach of the General Insurance Code of Practice [Code]’.
The Code says an insurer is to make a claim decision within four months of receiving the
claim (unless specified unusual circumstances apply, in which case the time frame is 12
months). If the insurer does not make a decision within the timeframe, it is to advise the
claimant in writing of its complaints process.
The claim was lodged with the insurer on 18 March 2022. On 18 August 2022, the insurer
wrote to the body corporate via CI and CB advising that more than four months had passed
since the claim was lodged and it was unable to make a claim decision. The letter outlined the
insur er’s internal dispute resolution (IDR) process and provided details about AFCA.
On 1 September 2022, the insurer sent CI an email stating it accepted the claim for resultant
water damage but declined to cover the maintenance and construction defect issues NS
identified as the policy did not respond to them. It said covered repairs could not be
undertaken until the required maintenance work was completed.
I acknowledge that the insurer did not issue a formal claim decision letter until 2 December
2022. It appears likely this was prompted by the complainant lodging her complaint with
AFCA on 21 November 2022. Before then, the insurer had been communicating with and
following up CI and CB about the status of the required maintenance work.
Nevertheless, I am satisfied the email the insurer sent on 1 September 2022 to CI was a
claim decision. It was issued about five and a half months after the claim lodgement. That
was in circumstances where the insurer had previously advised in writing that it was outside
the standard four month timeframe, needed more time and set out its complaint process.
Based on the exchanged information, some of the delay experienced was not the fault of the
insurer but the result of communication issues for which it was not responsible. However, I
accept that five and a half months was too long to make a claim decision and note the reason
for the delay has not been adequately explained.
I am satisfied the complainant has experienced delay related stress and inconvenience. It is
reasonable that the insurer pays her $500 in compensation for its contribution to that delay.
Insurer’s complaint handling has been reasonable
In her email to AFC dated 8 March 2023, the complainant said the insurer’s IDR process was
‘a failure’ and not undertaken in accordance with the Code. She subsequently clarified that
Determination | Case number: 933361 Page 7 of 8
she considered that the IDR process was managed poorly and lacked thoroughness. She
said all she received was an IDR acknowledgement then the IDR decision letter soon after.
The Code relevantly requires an insurer to:
acknowledge receipt of a complaint
provide the complainant with the name and contact details of the person dealing with the
complaint, with that person to be appropriately qualified and not to be the person who
made the decision the subject of the complaint
only ask for and rely on information relevant to the complaint and its decision on it
make a decision on the complaint within 30 days.
The complainant lodged her complaint with AFCA on 21 November 2022. An IDR process
had not been completed. The insurer was informed of the AFCA complaint on 24 November
2022. The complainant accepts that an IDR acknowledgement was sent to her. On 8
December 2022, the IDR decision letter was issued.
I accept that the IDR decision letter was issued quickly. That of itself does not indicate that
the IDR process lacked thoroughness or was poorly managed. To the contrary, prompt
complaint handling is in line with the objectives of the Code. Further, the IDR decision letter
set out a detailed response to the concerns the complainant had raised.
In the circumstances, I am not satisfied that th e insurer’s IDR process was undertaken not in
accordance with the Code or was otherwise unreasonable or deficient.
2.3 Why is the outcome fair?
The insurer has on balance shown that the water ingress occurred due to excluded
construction defects and lack of maintenance. It would not be fair to require the insurer to
cover the cost to rectify those matters as the policy does not respond in relation to them.
However, it is fair that the insurer pays compensation for stress caused by its delay.
Determination | Case number: 933361 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.