Home / Hollard / Determination 933307

Determination 933307

Partial decline of storm/lightning damage claim for master bedroom and garage ceilings, mould, and fascia brackets

FirmHollard
Decided2023-10-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$330
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Complainants claimed for lightning and storm damage to their home; the insurer declined some items as pre-existing or wear and tear. AFCA required the insurer to cover the master bedroom and garage ceilings and the $330 engineer's report, but not the mould, paint and fascia brackets, and awarded no non-financial loss.

The complainants' engineer's evidence was preferred, showing on balance the lightning strike caused the master bedroom and garage ceiling damage, while the other items were unrelated to the storm and excluded.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 933307 Financial firm Hollard Insurance Partners Limited Determination | Case number: 933307 Page 1 of 5 Case number: 933307 15 September 2023 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy underwritten by the financial firm (insurer). They lodged a claim for storm damage to their home which occurred on or about 7 March 2022. The complainants say their home was struck by lightning, which punched a hole in the ceiling and partially collapsed it. The insurer accepted some aspects of the claim. It covered most of the claimed damage, however it says some was not related to the event. The insurer also says the declined damage was caused by wear, tear and gradual deterioration, which the policy excludes. The complainants consider the decision unfair and seek indemnity for the full sum of their loss. They also seek compensation for non-financial loss, due to what they consider is the insurer’ s poor handling of their claim. 1.2 Issues and key findings Is the insurer’s settlement offer fair? No. The insurer must cover the claimed loss to the master bedroom ceiling and the garage ceiling, in addition to the areas it has already covered. The insurer is not required to cover the balance of the claimed damage as it was not caused by the lightning strike/storm events. Is an award of compensation appropriate? No. On balance, the insurer’s handling of the matter was not unreasonable . It is not required to pay compensation for non-financial loss. Why is the outcome fair? There is persuasive evidence the lightning strike severely impacted the home. On balance, it is reasonable to conclude this included causing damage to the master bedroom and garage ceiling. The balance of the damage is not related to the lightning strike or the storm event and it would not be fair to require the insurer to cover this damage. The insurer generally handled the claim well and it also would not be fair to require it to pay compensation. 1.3 Determination This determination is substantially in favour of the complainants. The insurer is required to indemnify the complainants for the master bedroom and garage ceiling damage, as well as the cost of their engineer’s report . It is not required to cover the other damage. The insurer must repair the damaged areas unless this has already been done by the complainants. If a cash settlement is required, the insurer must pay the invoiced amounts, together with interest, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from the date of any invoice until the date of settlement. Determination | Case number: 933307 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer’s settlement offer fair ? No. The insurer must cover the claimed loss to the master bedroom ceiling and the garage ceiling, in addition to the areas it has already covered. The insurer is not required to cover the balance of the claimed damage as it was not caused by the lightning strike/storm events. Complainants seek cover for lightning/storm damage It is not in dispute the complainants ’ home was struck by lightning during a storm event and incurred significant damage. The insurer says it has agreed to cover all the claimed loss, except three items:  external mould growth and paint discolouration above the windows  loose fascia hanger brackets at the southeast side of the roof  peaking of the master bedroom ceiling. It says these items were not caused by the lightning strike or the storm and are otherwise excluded by the policy. Onus on the complainants to show the policy covers the loss The complainants have the onus of establishing they suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability. For both the complainants and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not). If the complainants can establish they suffered a claimable loss, the onus shifts to the insurer to show, on balance:  it is entitled to rely on an exclusion under the policy, or  it is otherwise entitled to decline the claim. Policy covers storm damage subject to terms, conditions and exclusions The terms of the policy include the Renewal Notice and the Product Disclosure Statement (PDS). The Renewal Notice also had policy alterations for the current term detailed in a supplementary PDS (SPDS). There is no dispute the insurer sent these documents to the complainants. The policy covers damage caused by one of the listed events. It does not provide cover for all damage. Amongst these events is cover for damage caused by a direct lightning strike, a power surge which arises from a lightning strike and damage caused by a storm. The insurer does not cover loss, damage or liability caused directly or indirectly by, or connected with: 1. defects, structural or design faults, faulty workmanship or faulty design; … 4. wear and tear and lack of maintenance, including rust, corrosion and deterioration… Determination | Case number: 933307 Page 3 of 5 … 35. gradual loss or damage of any kind Insurer’s experts say some of the damage not caused by claimed events The insurer appointed several experts to inspect the damage. Builder AJ attended the home on 26 April 2022. It noted there were wave ‘undulations’ in the master bedroom ceiling that it considered pre-existing and not due to the claimed event. AJ recommended an engineer review this damage and the roof. Roofer CN attended on 10 May 2022. It noted the complainants arranged for their own roofer to replace tiles on the roof. CN said:  there were ‘signs of storm [damage], maintenance and defect issues’  water leaked over the lead flashing into the kitchen and this was a maintenance issue. Engineer CL attended the property on 24 June 2022. CL found:  the peaking of the master bedroom ceiling was due to poor installation, atmospheric conditions and condensation  ‘peaking’ occurs due to increases in temperature and changes in relative humidity  long-term cyclic movement and poor installation caused the damage, not the storm  external mould growth, paint discolouration above windows and loose fascia hanger brackets at the southeast corner of the roof are pre-existing damage and unrelated to the storm event. Complainants ’ engineer says there is additional damage due to lightning strike In response to the reports obtained by the insurer, the complainants elected to retain their own engineer, NH. NH confirmed: the majority of the plasterboard lining in the upper level was damaged due to the impact and vibrations from the lightning strike. In a diagram of the affected areas, NH included the master bedroom within this scope of damage. It considered the plasterboard lining was ‘installed properly and as per industry standards’. The lightning strike ‘caused the ceiling to vibrate and the lining to separate from the joists’. NH noted the garage ceiling was also affected and is bowing. Insurer is required to cover the master bedroom garage ceiling damage The insurer says NH did not address the cause of damage to the declined parts of the claim. I acknowledge NH does not address all the disputed damage, however it clearly addresses the issues in the master bedroom. It is also the only expert to review damage to the garage ceiling. I am satisfied the damage to the master bedroom is, on balance, related to the lightning strike. This is because a lightning strike is an extraordinary event and the experts generally agree it caused significant and extensive damage at the home. I am persuaded by NH ’s view that the master bedroom falls within the general affected area of this lightning strike. CL acknowledges the event had a significant impact on the home and this extended to affecting numerous areas of the roof. I accept the impact of the lightning strike was the dominant or effective cause of the ceiling damage generally, including the master bedroom damage. Determination | Case number: 933307 Page 4 of 5 I am not persuaded to CL’s opinion about the master bedroom damage, as the home is mostly in good condition. The poor installation of the roof/ceiling and atmospheric conditions affecting the master bedroom appears to be at odds with most of the rest of the home. On balance, I am persuaded NH’s opinion of this damage is more persuasive. Given this, I am satisfied the insurer is liable for the ceiling damage to the master bedroom. I am further persuaded the insurer must attend to the ceiling issues in the garage. This is damage identified by NH as being related to the lightning strike event. It is not addressed by any other expert. I accept, on balance, this damage was caused by the lightning strike and storm event as well. I am not persuaded the insurer bears any responsibility for the remainder of the claimed damage. I accept the external mould growth, paint discolouration and loosening of the fascia hanging brackets are not issues related to the lightning strike, storm or any other claimable event. The insurer is not responsible for this damage. The insurer is required to repair or cover the cost to repair the damage to the master bedroom and the garage ceiling only. The insurer is also required to reimburse the complainants for the amount incurred for NH’s report ($330). 2.2 Is an award of compensation appropriate? No. On balance, the insurer’s handling of the matter was not unreasonable . It is not required to pay compensation for non-financial loss. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. No need to pay compensation for non-financial loss The complainants say the insurer failed to assess the claim in a timely manner and unreasonably delayed the repair of the home. On balance, I accept the time taken to resolve the claim was reasonable. I acknowledge there were some delays. However, this is not unusual in dealing with an event that affected a large number of people. I also acknowledge I have reached a different opinion than the insurer in respect of some of the damage. This is not of itself reason to award compensation for non-financial loss. I am satisfied the insurer’s handling of the claim was not unreasonable , even if I did not agree with all its findings. I do not consider the insurer is liable to pay any compensation for non- financial loss in this instance. Determination | Case number: 933307 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.