Home / Suncorp Group / Determination 933184

Determination 933184

Denial of storm damage claim for balcony, rear patio and wall render, attributed by insurer to wear and tear

FirmSuncorp Group
Decided2023-10-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home insurer denied a storm damage claim for a balcony, rear patio and wall render as wear and tear. AFCA found the balcony and patio damage was covered and the render was not, and ordered the insurer to settle the covered damage, pay $2,000 for non-financial loss and reimburse engineer costs up to $5,000.

On the balance of conflicting, inconclusive expert evidence and the timing of the damage, the balcony and patio damage was caused by the February 2022 storm and covered, while the render damage came from lack of movement joints; the insurer mishandled the claim.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 933184 Financial firm AAI Limited Determination | Case number: 933184 Page 1 of 12 Case number: 933184 28 September 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (the insurer). He lodged a claim for damage caused by heavy rain in February 2022. He says the rain damaged the front balcony, the rear patio, and the wall render on the west side of the house. The insurer has denied the claim because it does not accept the damage was caused by rain. It says the damage was caused by wear and tear. 1.2 Issues and key findings Is the damage covered under the policy? The front balcony and the rear patio ceiling were damaged by heavy rain in February 2022. This damage is covered under the policy. The wall render was damaged because it was installed without movement joints. The rain did not contribute to this damage. This damage is not covered under the policy. Is the complainant entitled to other compensation? The insurer said it would accept the claim, but later denied it, and did not keep the complainant informed of how it was assessing the claim. This led to a poor claim experience for the complainant. The insurer must pay $2,000 compensation for non-financial loss. Why is the outcome fair? The policy covers damage caused by the rain of February 2020. The experts came to different conclusions about the cause of the claimed damage. The best available information indicates the rain of February 2020 caused the damage to the front balcony and the rear patio, but not the damage to the west wall. It is fair for the insurer to pay for the damage covered under the policy. It is also fair for the insurer to pay compensation for the stress and inconvenience it caused the complainant by mishandling the claim. 1.3 Determination This determination is mostly in favour of the complainant. Within 14 days of being advised of the complainant’s acceptance of this determination, the insurer must:  advise the complainant of how it intends to cover the damage to the balcony, damage caused by water leaking through the balcony, and damage to the rear patio ceiling (including whether it intends to repair the damage or pay a cash settlement)  pay the complainant $2,000 compensation for non-financial loss. Upon receipt of a relevant invoice, the insurer must reimburse the complainant for the cost of appointing the complainant’s engineer, up to a maximum of $5 ,000. Determination | Case number: 933184 Page 2 of 12 2 Reasons for determination 2.1 Is the damage covered under the policy? The front balcony and the rear patio ceiling were damaged by heavy rain in February 2022. This damage is covered under the policy. The wall render was damaged because it was installed without movement joints. The rain did not contribute to this damage. This damage is not covered under the policy. Policy covers flood and storm damage In late February 2022, heavy rainfall occurred in Queensland and New South Wales. Widespread storms and floods gave rise to many insurance claims. The event was declared an Insurance Catastrophe by the Insurance Council of Australia. The complainant’s home is near the Brisbane River, which flooded during the event. The complainant’s policy covers damage caused by floods and storms. It says it only covers damage caus ed by ‘ a single event, accident or occurrence ’. However, it says: ‘ A series of incidents attributable to one source [or] originating cause is deemed to be the one incident. ’ The heavy rainfall in February 2022 may have occurred as multiple storms, but they were attributable to one originating cause. The insurer does not dispute that damage caused by this rainfall is covered under the policy. Complainant says damage caused by heavy rain The complainant says his home experienced two weeks of heavy rain. He says the balcony filled with water, and water from the balcony poured into the house even though the doors were closed. The complainant lodged a claim on 28 February 2022. According to the insurer’s records, he said: Due to flood, the property is out of power and phone reception since yesterday. We have to leave and rent a place. The complainant later said he did not leave his home because he was trapped by flood water. The flood water does not appear to have reached the house. However, the complainant says the rain damaged the front balcony, the rear patio ceiling, and the wall render on the west side of the house. Experts disagree on cause of damage The insurer appointed a builder (AM), who attended the property to perform make-safe work on 14 March 2022 . AM’s make -safe report said:  the property was about 30 years old, and was in good condition  most of the balcony tiles had separated from the glue, and the waterproofing under the balcony tiles had rotted. This allowed water to pass under the balcony tiles and enter the ceiling below  the cause of this damage was ‘heavy rain’. AM inspected the property on 30 March 2022. AM ’s assessment report said: Determination | Case number: 933184 Page 3 of 12  the complainant reported the following damage, and said it was not present before the storm: > water leaking through the ceiling at the front of the house > lifted balcony floor tiles > bubbled paint on the rear patio ceiling > delaminated/popped render on the west side of the house  AM’s assessment of the damage was: > the front entry ceiling was damaged by water leaking through the tiled balcony floor > they were ‘unable to confirm’ why the balcony floor tiles had lifted, because ‘ tiles installed externally should be able to get wet for an extended period of time without failing ’ > the bubbling paint and delaminated render were probably caused by leaks through the roof (AM’s subsequent roof report indicated this was not the case) > in addition to being delaminated, the render was also cracked along all the sheet joints. This was a ‘pre - existing movement issue’. AM inspected the roof on 14 April 2022. AM’s roofing report said  the roof was ‘in ok condition for its age’  the roof had some rust and sun damage, but there was no evidence it had leaked. AM concluded the claimed damage was caused by a storm, and there were no maintenance issues or building defects that contributed to the damage. The insurer appointed an engineer (JH), who inspected the property on 11 August 2022 and 18 August 2022. JH said:  the relevant Australian Standard required the termination of waterproofing membranes under tiles to run up the wall and flash over. JH did not say whether the complainant’s balcony complied with this requirement, or if breaching the requirement contributed to the damage. JH said balcony leaked because of a ‘ lack of or deterioration in the waterproofing membrane ’. This indicates JH did not know whether the balcony had a waterproofing membrane, so they could not say how it was installed  the relevant Australian Standard required the balustrade posts to be connected to the balcony. JH said the balustrade posts were not connected to the balcony, but did not say whether this contributed to the damage.  rust was visible inside the balcony. JH said this showed the damage ‘occurred over time’. A t the time of JH’s inspection, the balcony had been lea king for more than five months. JH did not say whether this was enough time for the rust to form  mortar was missing from between at least two tiles. The mortar had deteriorated over time, allowing water to seep through and delaminate the tiles from the waterproofing membrane  they could not determine the cause of the popped render on the side of the house. Further inspections would be required to determine this. The complainant appointed an engineer (CSE), who inspected the property on 29 November 2022. CSE said:  the balcony and wall had been ‘overwhelmed and impacted by a heavy rain event over a period of about 7-10 days, from the last heavy storm in Brisbane during February/March 2022’. CSE did not explain how they could tell when the rain occurred, or how long it lasted  the grout between the balcony tiles had been weakened and washed out by storm water, allowing water to enter the balcony  the damage to the wall was ‘most likely due to a major stormwater overflowing from the gutters’. Determination | Case number: 933184 Page 4 of 12 The insurer ’s internal building coordinator (BC) produced a report dated 13 January 2023. BC did not inspect the property, but reviewed the other expert reports and photographs of the property. Regarding the balcony, BC said:  the relevant Australian Standard says: ‘ Particleboard sheeting shall not be used as a substrate for external waterproofing systems. ’ The balcony contained particleboard. BC did not say whether this contributed to the damage.  the relevant Australian Standard says there should be a movement joint or a 3mm gap between a tile and a column. The tile next to the eastern column of the balcony did not have a movement joint or a 3mm gap  because of the lack of a movement joint: > the tile next to the eastern column of the balcony cracked (a tile next to another column had a movement joint, and was not cracked) > balcony tiles lifted > the lifting of the tiles dislodged the grout between the tiles > the lifted tiles and dislodged grout allowed water to leak through the balcony  photographs taken on 1 March 2022 (two days after the storm) show mould on the underside of the balcony. This mould looks ‘ well established ’, and would not have formed in two days. This indicates the balcony was leaking before the storm  photographs taken on 2 March 2022 (three days after the storm) show dislodged grout and water stains on the balcony tiles. This damage occurred before the storm. Regarding the wall, BC said:  the wall render was dark grey. It was exposed to direct sunlight and extreme heat, which caused it to expand and contract. It was installed without movement joints (against the manufacturer’s recommendations), so the movement caused cracking and delamination  AM initially said the damage to the wall was from water leaking through the roof. Later, however, AM inspected the roof and found no evidence of a leak  CSE said the damage to the wall was from stormwater overflowing from the gutters. However, photographs show the top of this wall has no gutter  if water was seeping through the render, it would leave ‘very noticeable’ staining a nd efflorescence. Photographs of the wall do not show this. Water did not damage the wall, and did not worsen pre-existing damage. BC concluded no damage was caused by the storm, and all damage recorded at the home was caused by wear and tear. Expert reports not conclusive on balcony AM said the balcony was outside, so it should be able to get wet without being damaged. Despite this, they concluded the balcony damage was caused by heavy rain. They did not explain how they came to this conclusion, and did not explain how the rain caused the damage. JH said the balcony damage was caused by a ‘lack of or deterioration in the waterproofing membrane’. They did not know whether the balcony had a waterproofing membrane. They observed the balcony was leaking, and concluded it did not have a working waterproofing membrane. This is obvious. I give very little weight to JH’s findings. CSE said the balcony damage was caused by storm water weakening and washing out grout. They did not explain how they concluded the grout was weakened by the rain event in February 2022, rather than deteriorating slowly over time. Determination | Case number: 933184 Page 5 of 12 BC said the balcony damage was caused by several factors, all of which ultimately stemmed from a lack of sufficient movement joints. This indicates the building moved, and the lack of sufficient movement joints mean the balcony could not cope with the movement. BC did not say what could have caused the movement. BC only identified one tile with a missing movement joint, on the right side of the balcony. The damage is not centred around this tile. There is damage on and around the tile, but there is similar damage on the left side of the balcony, almost 10 metres away. CSE took a photo showing a row of water stains along the underside of the balcony. Several photos show the water damage to the underside of the balcony is most severe in the middle. I accept the tile on the right side of the balcony was missing a movement joint. However, I am not satisfied this was the main cause of the damage. The four experts provided different opinions on the cause of the balcony damage. In my view, none of the expert reports are conclusive. Balcony damage appeared shortly after rain The complainant said the balcony damage was not present before the storm, but was present immediately afterwards. AM accepted this, and said the damage was caused by the storm. This indicates the damage looked recent when AM inspected it. AM inspected the property several times, and first inspected the property about two weeks after the claim was lodged. No other experts inspected the property until more than five months after the claim was lodged. Therefore, AM is the expert best placed to comment on how recent the damage was when the claim was lodged. BC said the mould and water stains on the balcony looked too old to have been caused by the storm. BC based their opinion on photographs taken two or three days after the storm. However, BC did not physically inspect the property. Generally, a report based on a physical inspection is more reliable than a similar report based on photographs. Based on the complainant’s statements and AM’s reports (and despite BC’s report) , I am satisfied the balcony damage appeared shortly before the claim was lodged. Balcony damage covered under policy Having considered the information provided by both parties, I believe the balcony damage was caused by the heavy rain that occurred in February 2022. This is because:  two of the four experts said the balcony damage was caused by heavy rain (though the other two experts said it was not, and none of the expert reports were conclusive)  the home experienced extremely heavy rain in February 2022  as stated above, I am satisfied the damage appeared at around the same time as the heavy rain. The insurer must cover the damage to the balcony, and damage caused by water leaking through the balcony. Rear patio damage covered under policy AM’s assessment report said the rear patio was damaged by a storm. None of the other expert reports commented on the cause of damage to the rear patio. Based on the available information, I accept the rear patio was damaged by the heavy rain that occurred in February 2022. The insurer must cover the damage to the rear patio. Determination | Case number: 933184 Page 6 of 12 Render damage not covered under policy The expert reports indicate:  the render had pre-existing cracking along all sheet joints  the render was installed without movement joints, which explains the cracking and the delamination  the damage was not caused by a leak through the roof (because the roof did not leak)  the damage was not caused by water overflowing from gutters (because there are no gutters above the delaminated render)  if the damage was caused by water, it would have left noticeable stains. The complainant says the render was not delaminated before the rain of February 2022. Two of the four experts said the rain caused the damage, but they did not explain how the rain could have caused the damage. BC explained how lack of movement joints could have caused the damage. This explains both the pre-existing cracking and the delamination. It is the only explanation consistent with all available information. The available information indicates the render was not damaged by rain. The insurer is not required to cover the damage to the render. Insurer must settle claim in accordance with policy terms The policy says the insurer will settle a claim for building damage as follows:  if possible, the insurer will appoint a builder to repair the damage  if it is not possible for the insurer to appoint a builder to repair the damage, the insurer will ask the complainant to appoint a builder, then pay the amount of an assessed quote by the complainant ’ s builder. Within 14 days of being advised of the complainant’s acceptance of this determination, the insurer must advise the complainant of how it intends to settle the claim. If the complainant is not satisfied with the insurer’s proposed settlement of the claim, he may lodge another complaint with AFCA. 2.2 Is the complainant entitled to other compensation? The insurer said it would accept the claim, but later denied it, and did not keep the complainant informed of how it was assessing the claim. This led to a poor claim experience for the complainant. The insurer must pay $2,000 compensation for non-financial loss. AFCA can award compensation for non-financial loss Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim. We do not award compensation for the usual amount of inconvenience involved in making a claim. We do not award compensation for delays caused by the complainant, or other factors outside the insurer’s control. Determination | Case number: 933184 Page 7 of 12 Insurer mishandled claim The complainant lodged the claim on 28 February 2022. AM attended the property between 14 March 2022 and 14 April 2022. AM’s reports sa id the home was damaged by a storm. The insurer’s notes from May 2022 indicate it had accepted the claim. AM gave the complainant documents indicating the insurer had authorised it to repair damage. These documents included a scope of works for repairs to the front balcony and the rear patio ceiling (but not the west wall). The insurer’s notes from 8 June 2022 said it needed to reassess the dam age to the front balcony tiles, because AM could not confirm the cause of this damage. The insurer does not appear to have told the complainant it was considering denying cover for the balcony. The insurer’s notes from 3 July 2022 said the complainant did not understand why it was taking so long to start repairs to the balcony. On 27 September 2022 (after JH’s inspection), the insurer told the complainant it would not cover the damage to the balcony. Complainant entitled to compensation From about April 2022, insurer indicated it would accept the claim. About six months later, it said it would deny the claim. In the meantime, it did not keep the complainant informed about how it was assessing the claim. This led to a poor claim experience for the complainant. In my view, the insurer’s handling of the claim caused the complainant to suffer an unusual degree of stress, inconvenience, and delay. This warrants compensation for non-financial loss in the sum of $2,000. Insurer must pay cost of appointing complainan t’s engineer Under the AFCA Rules, we can require an insurer to contribute to legal costs, other professional costs, or travel costs a complainant incurred in making a complaint. AFCA cannot award professional costs of more than $5,000 unless there are special circumstances. In considering whether an insurer should contribute to a complainant’s costs, we consider whether they were reasonably incurred, and whether they helped resolve the complaint. The insurer denied the claim based on the report by its engineer (JH). In the circumstances, it was reasonable for the complainant to appoint his own engineer (CSE). CSE provided information that was relevant to the complaint and helped me prepare this determination. Upon receipt of a relevant invoice, the insurer must reimburse the complainant for the cost of appointing CSE, up to a maximum of $5,000. 2.3 Why is the outcome fair? The policy covers damage caused by the rain of February 2020. The experts came to different conclusions about the cause of the claimed damage. The best available information indicates the rain of February 2020 caused the damage to the front balcony and the rear patio, but not the damage to the west wall. It is fair for the insurer to pay for the damage covered under the policy. It is also fair for the insurer to pay compensation for the stress and inconvenience it caused the complainant by mishandling the claim. Determination | Case number: 933184 Page 8 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy terms Product Disclosure Statement Important things to know upfront (pages 11 – 18) Your re sponsibilities …  keep the home structurally sound, watertight, secure and well maint ained (e. g. remove mould, fix any holes in floors, walls and ceilings, fix loose, missing or rusted steps, gutters, flooring);  fix any inherent defect, faulty design, structural defect, structural fault and/or faulty/poor workmanship a t the home as soon as possible aft er you identify it or are told about it; …  ensure that the home and contents are kept in good condition (e.g. there are no blocked gutters, the roof is not rusted, the home is not infested with vermin and there is no termi te damage); … Not meeting your responsibilities Your policy may not provide cover if you have not met your responsibilities and it may lead us to reduce or refuse to pay your claim and/or canc el your policy. Determination | Case number: 933184 Page 9 of 12 Things we don’t cover (pages 27 – 38) Things we don’t cover Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from: … Home, unit or contents that are not in good condition any part of the home, unit or contents not being in good condition, such as, but not limited to:  there are blocked gutters  the roof leaks when it rains;  there are areas of the roof that are rusted through;  there is wood rot, termite or ant damage;  there are holes in floors, walls, ceilings or any other parts of the home or unit (e.g. external wall cladding, internal plaster, floorboards);  there are boarded up or broken windows;  there are steps, gutters, flooring, walls, ceilings, gates, fences or wall fences or any other areas of the home or unit that are loose, falling down, missing or rusted through or ot herwise in disrepair;  previous damage including damage caused by flood has not been repaired;  the home or unit is infested with vermin;  plant matter is growing into the home or unit (e.g. walls, windows and gutters);  the home or unit (including all sheds, outbuildings and other structural improvements at the insured address) is not structurally sound or is unsafe or unfit to live in;  rings (i.e. jewellery) where the claw (surrounding the stone) is obviously d amaged or worn. … Wear, tear and gradual deterioration any part of the home, unit or contents that has wear, tear, rust, fading, rising damp, corrosion, rot, action of light, atmospheric or climatic cond itions or gradual deterioration such as, but not limi ted to:  tiles and their adhesive or grouting breaking down;  weat hering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete;  wear and tear of carpets, furniture and furnishings;  fading of curt ains and drapes;  gradual weathering of pot plants. We do not cover: … Defects, faults, workmanship  loss or damage caus ed by, connected with or arising from, or liability caused by, connected with or arising from inherent defects, faulty design, structural defects, structural fault or faulty/poor workmanship (e.g. structural posts, beams or load bearing walls have been removed without taking into account structural engineering requirements), if you knew or should have reasonably known about it (e.g. becaus e the defec t or fault was able to be observed by you or because it was identified in a pre - purchase building inspection report);  any loss or damage to the part of the home or contents with an inherent defect, faulty design, structural defect or faulty/poor workmanshi p, whether or not you knew or should reasonably have known about it. For details about ‘How we deal with defects, faults and poor workmanship’ as part of the repair or rebuilding process see page 95. Determination | Case number: 933184 Page 10 of 12 What we cover – the details (pages 39 – 5 0 ) What you are covered for – Insured events L oss or damage to the building and common contents We cover If you have home cover We cover loss or damage to the home at the insured address caused by an insured event in the period of insurance. If you have con tents cover We cover loss or damage to your contents at the insured address caused by an insured event in the period of insurance. The insured events we cover are set out on pages 41 to 48. We don’t cover We don’t cover anything in section 3 ‘Things we don’t cover’ on pages 2 7 to 38. ! We do not insure wear, tear or gradual deterioration. For full details, see page 33. ! When making a claim you must be able to prove that an incident covered by your policy took place. An incident is a single event, accident or occurrence which you did not intend or expect to happen (e.g. it means a single storm event, it does not mean rain over time). Flood We cover Loss or damage caused by flood. We don’t cover [No relevant exclusions.] Storm We cover Loss or damage caused by a storm. We don’t cover [No relevant exclusions.] Determination | Case number: 933184 Page 11 of 12 Making a claim (pages 87 – 98) How we settle home claims We will aim to use a member of our builder supplier network to repair or rebuild the damage to the home. Sometimes this is not always possible e.g. if there is pre - existing damage. This will determine how the home claim will be settled. When a member from our supplier network can complete the repair or rebuild When your claim for loss or damage to the home is covered, we will engage a builder from our supplier net work to prepare a scope of works and provide a quote on the cost to repair or rebuild the home on a ‘new for old’ basis. Once the scope of works and quote is provided to us, we will arrange for it to be assessed. This will involve reviewing the quote to make sure that the quote is appropriat e and reasonable for the scope of works. This includes a consideration of the appropriateness of materials, repair method, labour and mat erial costs and overall cost. If the amo unt of the assessed quote to repair or rebuild is less than the home sum insured, we will offer you the choice to have the home repaired or rebuilt (bas ed on the recommendation of our builder).   If the amount of the assessed quote to repair or rebuild is equal to or more than the home sum insured, the damage will not be repaired or rebuilt.  If you accept the offer  If you choose to not accept the offer  You will be paid the home sum insured The builder we engage will complete the repair or rebuild on a ‘new for old’ basis. You will be paid the amount of the assessed quot e to repair or rebuild on a ‘new for old’ basis. Note: this amount may be less than what it would cost you to arrange the repairs or rebuild wit h your own builder. We are able to secure supplier discounts from within our supplier network. When a member of our supplier network is unable to complete the repair or rebuild When your claim for loss or damage to the home is covered and a member of our supplier network is unab le to complete the repair or rebuild, we will ask you to engage a builder to provide a scope of works and provide a quote on the cost to repair or rebuild your home on a ‘new for old’ basis. Once the scope of works and quote is provided to us, we will arra nge for it to be assessed. This will involve reviewing the quote to determine it is appropriate and reasonable for the scope of works. This includes a consideration of the appropriateness of materials, repair method, labour and material costs and overall c ost effectiveness. If the quote is appropriate and reasonable for the scope of works, we will then pay you the assessed amount. If it is not, the quote may be adjusted. This may include adjusting the scope of Determination | Case number: 933184 Page 12 of 12 works or the quote. We will then pay you the adjusted amount of the quote. If we pay you for the repair or rebuild, the Lifetime guarantee for home repairs does not apply, see page 96. Words with special meanings (pages 113 – 118) Some words in this policy have a special meaning. It’s important to read this section because it can impact how your policy is interpreted. Incident means a single event, accident or occurrence which you did not intend or expected to happen that is covered by your policy. A series of incidents attributable to one source of [ sic ] originating cause is deemed to be the one incident.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.