Home / Auto & General / Determination 932436
Determination 932436
Denial of loss of rent claim on basis property was not unliveable, and delay in repairs
Summary
The complainant's rental property was damaged by an escape of liquid and the insurer repaired it but declined loss of rent. AFCA found the property unliveable, required the insurer to pay loss of rent (reduced rent gap to June 2022 and full rent to end October 2022) and $1,000 compensation for delays.
The damage and repairs made the property unliveable under the policy definition, read in light of its being a rental property, so loss of rent cover responded, and the insurer's claim handling delays warranted compensation.
Issues
- Claim denial primary · upheld
“The insurer is partially liable for the loss of rent. I am satisfied the extent of the damage would deem the property unliveable as defined by the policy.”
- Poor claim handling secondary · upheld
“insurer relied heavily on its repairer and did not have an insight into the progress; delayed assessing the loss of rent claim”
- Delay secondary · upheld
“I accept the insurer has unreasonably delayed the repairs of the property.”
- Misleading conduct secondary · not upheld
“Given the policy responds to the loss of rent claim, I am not satisfied this argument advances the complainant's position.”
Subjects and remedies
home or building damagepay claimpay compensation
Text of the determination
Determination
Case number 932436
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 932436 Page 1 of 6
Case number: 932436 21 June 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under his home insurance
policy for the damage sustained to the property following an escape of liquid event.
The insurer repaired the internal damage. The complainant is seeking indemnity for the loss
of rent he suffered following the exit of his tenant due to the extent of the damage.
The insurer says the extent of the damage did not deem the property unliveable. The
complainant disagrees and says the insurer has misled him about the loss of rent coverage.
The complainant says the insurer has unreasonably delayed the repairs.
1.2 Issues and key findings
Is the insurer liable for the loss of rent?
Yes. The insurer is partially liable for the loss of rent. I am satisfied the nature and the extent
of the damage would deem the property unliveable as defined by the policy.
Is the insurer liable for compensation?
Yes. The insurer is required to pay the complainant $1,000 in compensation.
1.3 Determination
This determination is in favour of the complainant.
The insurer is required to settle the loss of rent claim as outlined in section 2 of this
determination.
Determination | Case number: 932436 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer liable for the loss of rent?
The policy provides cover for loss of rent
There is no dispute the complainant established a claimable loss under the policy for damage
sustained to the property because of an escape of liquid event.
The policy provides cover for loss of rent during the repairs or the rebuild of the home if the
home is unliveable because of an insured event.
The policy defines unliveable as
When a home is so damaged that:
• normal domestic activities like cooking and sanitation cannot be performed; or
• local authorities will not provide permission for the home to be inhabited; or
• we otherwise agree that you can’t live in the home.
The insurer says the tenants had access to the required amenities and there was no advice
from local authorities to suggest the property could be uninhabited. The insurer’s builder (JF)
deemed the property a category C where no accommodation is required at any stage of the
repairs.
The complainant says the tenant left because of the damage
The complainant says the tenants left as the repairs were taking too long. Further, before the
termination of the tenancy, the complainant reduced the rent payments due to the damaged
status of the property. The insurer does not dispute that. The insurer says this is an issue
between the complainant and the tenants.
It is not in dispute that:
the monthly rental is $1,564
the complainant reduced the monthly rent by $564 due to the damaged status of the
property
the tenant vacated the property in June 2022 and it remained vacant until February 2023.
On balance, the extent of the damage rendered the property unliveable
The insurer repaired the water damage sustained to the property however denied indemnity
for the loss of rent on the basis the extent of the damage does not render the property
unliveable.
I disagree with the insurer’s position.
The exchanged information shows the following areas were water damaged:
carpet
doors to bathroom cupboard
toilet
Determination | Case number: 932436 Page 3 of 6
2 x bedrooms
open plan/kitchen.
JF says carpets and joinery were saturated following the event. The photographs show two
holes in the ceiling directly above the kitchen.
The insurer undertook make safe repairs to mitigate further damage to the property.
I accept the repairs would affect the habitability of the property. I note the repairs mainly were
to the bathroom and kitchen. During the repairs, the complainant would not have access to
the bathroom and the kitchen.
The scope of work shows extensive repairs are required to the bathroom including the
removal of the bath, shower screen and other elements. The repairs included applying a
waterproofing membrane and retiling.
The carpet was replaced on the landing and the stairs. The exchanged evidence shows the
carpet was not re-laid until October 2022. This is approximately four months after the tenants ’
exit.
The scope of work shows the kitchen required major repairs including the disconnection of
the kitchen sink, tapware and cooktop. The insurer replaced the laminate benchtop as well.
I accept the repairs solely would render the property unliveable as defined under the policy.
The property occupier would not be able to access the bathroom or kitchen during the repairs.
In considering the loss of rent aspect of the claim, one needs to consider the commercial
intent of the policy. The term unliveable and its definition of the policy should be considered
with regard to the home being a rental property.
I accept following the exit of the tenants, the complainant would not have been able to rent
the property due to its damaged condition. I accept the complainant continued to suffer loss of
rent.
The insurer is required to meet part of the loss of rent claim
I accept the insurer has unreasonably delayed the repairs of the property. I accept there were
delays due to the frustrations of the tenants and their refusal to allow for the repairs to
proceed until they vacate the property. I consider these delays to be minimal, approximately a
couple of weeks.
Given the policy provides cover for loss of rent if the property is unliveable because of an
insured event, I accept the insurer is required to partially meet the loss of rent claim.
The repairs would have affected the tenants ’ normal domestic activities like cooking and
sanitation.
The complainant provided a rental ledger showing the tenant was paying a reduced rent due
to the damaged status of the property. I accept the reduced rent mitigated the early exit of the
tenants. I am satisfied the insurer is liable for the gap in rent from December 2021 until June
2022 when the tenants vacated.
Further, I accept the insurer is liable for the full rental amount from 16 June 2022 (exit date)
until the end of October 2022. The exchanged information shows the last major part of the
repairs was the relaying of the carpet which was completed in October. Further, the
outstanding repairs were minor in nature such as the replacement of the kickboard. I accept
Determination | Case number: 932436 Page 4 of 6
from this point in time; the property was deemed liveable and the complainant was able to
place the property on the rental market.
The insurer is required to reimburse the complainant for the reduced rent as per the ledger
until the exit of the tenant. Further, it is required to meet the loss of rent from the date of the
tenant’s vacating the property until the end of October 2022.
The complainant is seeking indemnity for the costs associated with the releasing of the
property such as marketing costs. I am not satisfied the insurer is liable for these costs given
the complainant would have been required to incur these costs in the event the property is
being relet.
The complainant’s main argument is that the insurer misled him about the loss of rent and he
has relied on the insurer’s misrepresentation to his detriment.
Given the policy responds to the loss of rent claim, I am not satisfied this argument advances
the complainant’s position.
2.2 Is the insurer liable for compensation?
AFCA can award compensation for non-financial loss
AFCA will award compensation for non-financial loss (capped at $5,400) if there has been an
unusual degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and delays. AFCA
expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
Amongst other things, the complainant says:
there was a lack of communication and updates from the insurer regarding the progress of
the claim
the insurer kept referring him back to the builder who could not provide a realistic update.
The insurer is required to pay the complainant $1,000 compensation
I have carefully reviewed the exchanged evidence and I accept there were delays in finalising
the repairs.
The insurer did not commence repairs until 22 March 2022, approximately 3 months after the
loss. The insurer has not provided any explanations as to why there were delays.
I note the tenants caused delays due to an illness. The tenants refused for repairs to proceed
until they vacate the property. I accept these delays were outside the insurer’s control.
In saying that I note the repairs took place between March and October 2022. This has
disrupted the tenants and subsequently, they exited the property.
The claim ’ s notes show most of the contact was initiated by the complainant rather than the
insurer. The notes show that the insurer relied heavily on its repairer to manage the repairs
and did not have an insight into the progress of the claim.
Determination | Case number: 932436 Page 5 of 6
The insurer delayed assessing the loss of rent claim despite the complainant providing all the
relevant information.
The insurer is required to pay the complainant $1,000 in compensation for the delays in
handling the claim.
Determination | Case number: 932436 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.