Denial of claim for internal water damage alleged to be caused by 2017 hail event

FirmIAG
Decided2024-04-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for internal water damage he attributed to a 2017 hail event; the insurer accepted only some roof damage and denied the rest. AFCA found no causal link so the denial stood, but ordered $1,500 compensation for poor claim handling and communication.

The complainant did not establish on the balance of probabilities that the hail event proximately caused the internal damage, which was cumulative and linked to roof maintenance defects, but the insurer's delay and poor communication warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 932307 Financial firm Insurance Australia Limited Determination | Case number: 932307 Page 1 of 7 Case number: 932307 8 March 2024 1 Determination overview 1.1 Complaint In August 2022, the complainant lodged a claim with the financial firm (insurer) under his home insurance policy. This is for the internal water damage sustained to his property. The complainant says a hail event in 2017 damaged the roof tiles and subsequently caused internal water damage to the ceilings and walls of his property. The insurer accepted hail damage to some parts of the roof, however denied indemnity for the internal damage on the basis the damage is long term and is not caused by the hail event. The complainant disagrees and maintains internal damage was caused by the hail event. 1.2 Issues and key findings Is the insurer liable for the disputed damage? No. This is because the exchanged evidence does not establish a causal link between the 2017 hail event and the disputed damage. Is the insurer liable for compensation? The insurer is required to pay the complainant $1,500 in compensation. Why is the outcome fair? The parties are bound by the terms and conditions of the policy. The exchanged evidence does not assist the complainant in establishing the disputed damage was caused by an insured event under the policy. The insurer is entitled to rely on the terms and conditions of the policy in assessing the extent of its liability. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to deny the claim for the disputed damage. However, the insurer is required to pay the complainant $1,500 in compensation. Determination | Case number: 932307 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer liable for the disputed damage? No. This is because the exchanged evidence does not establish a causal link between the 2017 hail event and the disputed damage. The complainant must establish a claimable loss When making a claim, an insured party has the onus of establishing they suffered a loss for which their insurance policy provides cover. The insured party must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability. The complainant’s policy covers loss or damage to the building as a result of several insured events including storm. The policy states: Storm We will cover you for loss or damage caused by: • violent wind or thunderstorm (including a tornado or cyclone), • heavy rain, hail or snow. There is no dispute:  there is resultant water damage to different areas of the property  the water entered the property through the roof. Parties dispute the proximate cause of the water entry. The complainant says a hail event in 2017 damaged the roof tiles, causing the water to enter. The insurer says the roof is damaged as a result of wear, tear and faulty design, allowing the water to enter. I accept the insurer’s liability depends on the proximate cause of the damage. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. If there are several causes operating at the same time, AFCA will consider each one to determine which cause set the train of events in motion. Exchanged evidence shows maintenance issues with the roof The insurer does not dispute there was a hail event in 2017. The complainant says following the hail event he replaced the damaged tiles on the roof. However, due to the damaged roof tiles water entered the property causing the disputed damage. The complainant provided a number of news materials showing the severity of the hail event. The insurer’s building consultant and engineering report (CF) notes deflection through the plaster board ceiling linings across the property. CF says this type of deflection presenting along the longitudinal joints is due to age, wear and tear. It is not in dispute the roof has several defects including: Determination | Case number: 932307 Page 3 of 7  the absence of the sarking  valley tiles not clipped in place  no weepholes in the ridge pointing  previous repairs  the installation of the roof penetrations not allowing the free flow of the roof drainage  debris reducing the intended flow design of the gutter  roof flashing not moulded into the roof tiles. There is no persuasive evidence to show that these issues were caused by an insured event. CF notes that the roof is not weather tight, allowing the water to enter the cavity during storm events. This is evident from the cracked and broken tiles. Importantly, CF notes that the absence of the sarking may cause moisture ingress and damage to the building. I accept the installation of the sarking is a maintenance issue rather than an insurable loss that the insurer is liable for. While I note the parties dispute the roof’s pitch measurement, I am not satisfied that this is detrimental to the outcome of this complaint. This is because CF says the pitch is within the building tolerances and there is no persuasive evidence to show that the roof was not compliant with the relevant building code at the time of its construction. I do not consider anything will turn on this point. I note the complainant’s builder (MB) has commented only on the pitch of the roof. MB did not provide any comments or analysis on the roof condition as noted and assessed by CF. On balance, no causal link between the hail storm and the internal damage In addressing the cause of the internal damage to the ensuite, the dining room, the kitchen and the lounge, CF says:  the impact of the moisture in the ceiling appeared to be staining the ceiling and adhesive failure  the roof being without sarking allowed wind-driven moisture and strong winds to enter the ceiling space through the tiles  the strong winds will apply forces to the roof sheets through vibrations and wind load causing the ceiling sheets fixing and adhesive to fail. CF says the presence of elevated moisture levels through water vapour and wind in the ceiling will cause the ceiling sheets to vibrate and endure wind load. Overtime exposure to the wind and high moisture levels will cause the ceiling sheet fixings and/or adhesives to fail. CF concludes due to the age of the house, condition of the roof, the exclusion of roof sarking and the period of time since the hail event, the cause of the damages to the ceiling over time are building defects. Importantly, CF says the expansion nature of the open plan ceiling results in the linings being more susceptible to long term movement due to general atmospheric conditions within the roof cavity. Further, CF contends that any damage directly attributable to a single hail event would be obvious and localised to the area where the cracked tiles were. On balance, I accept the internal damage was not caused by the hail event but occurred during the normal course of events. Determination | Case number: 932307 Page 4 of 7 Firstly, I do not accept it is plausible that water will enter the property in 2017 and damage will be manifested in 2022. If I were to accept a large volume of water or moisture entering the property in 2017, on balance, damage would have manifested sooner. Secondly, CF notes large gaps allowing water to enter during rain events. These gaps are caused by the loosely fitted tiles on the roof. CF also notes cracking and deteriorating coating of the roof tiles allowing water to enter the roof void during large rain and wind events. The complainant did not provide any persuasive evidence that this noted cracking and gaps did not contribute to the damage in dispute. I accept the roof is not weather tight, and it will allow wind and water to enter the roof cavity during storm events. Thirdly, I note the damage is widespread to the ceiling linings within the property. I accept this is consistent with long term moisture build-up to the roof space rather than an isolated event or area. CF says hail damage generally is presented as localised water damage in areas that align with the cracked or broken tiles. I accept this is not the case here. The complainant did not provide any persuasive evidence to show the extent of the roof tiles (if any) which were affected by the hail damage. Further, it is unclear as to why the complainant did not There is no plausible explanation as to how the internal moisture damage and sagging is related to the hail storm in 2017. CF notes no mould present in the property. I accept had the water entered the property in 2017 as suggested by the complainant, mould would have manifested at the time of the assessment in 2022. CF says mould would have been evidenced on the batt insulation. However, this is not the case here. Fourthly, arguably the wind driven moisture and strong wind entering the property could be regarded as storm damage. Importantly, CF noted the strong winds applying forces to the roof sheets through vibrations and wind load caused the ceiling sheets fixing and adhesive to fail. The policy covers storm and does not specifically require a single storm event to be causative to the loss for the policy to respond. In saying that, CF says this damage to the ceiling occurred overtime due to the long-term exposure of moisture and wind. I accept the damage has accumulatively occurred. The exchanged evidence shows the insurer has not been continuously on risk since 2017. Lastly, I note there is a time gap of approximately five years between the subject event and the resultant damage. On balance, there has been many weather events during this time which would have contributed to the disputed damage. I have carefully considered the exchanged evidence and the parties’ arguments. I am not satisfied the available information establishes a causal link between the 2017 hail event and the disputed damage. Further, I accept the damaged has occurred cumulatively over an extended period of time. The insurer is entitled to deny the claim There is no dispute that there was a hail event in 2017. Further, there is no dispute that the whirly birds suffered hail damage, which the insurer accepted. In saying that, I am not satisfied the exchanged evidence assists the complainant in establishing that the resultant damage which he claims for in 2022, was caused by the hail event in 2017. Determination | Case number: 932307 Page 5 of 7 The policy covers loss or damage to the building caused by storm. I am not satisfied that the mechanism of the disputed damage is consistent with a one-off event but rather, damage that has occurred progressively over a period of time. I note the insurer accepted the hail damage to the whirly birds following MB’s assessment. Further, the insurer agreed to reimburse the complainant for the costs of MB’s initial report. I accept this is reasonable. MB says, in his opinion, rainwater penetrated through the roof, through the cracked tiles during the hail event. I am not satisfied MB’s conclusion is either persuasive or supported by the available evidence. This is because:  MB did not comment on the current status of the roof mainly the gaps and the crack in the tiles allowing moisture and wind  MB did not explain how the water damage and sagging manifested five years post the event rather than sooner given the extent of the cracked tiles as asserted by the complainant  MB says his opinion is based on the complainant’s instructions which h e assumed are correct. MB did not provide analysis based on his own findings or observations  while MB says it is not possible for the insulation batts to contribute to the water penetration through the roof, he did not substantiate his assertion. I accept CF’s analysis that the insulation is in contact with the underside of the roof and can bridge moisture into the ceiling cavity. The photographs in CF’s reports show the sunlight entering through the gaps in the roof. I accept this explanation is plausible. The complainant says that he replaced the damaged roof tiles after the hail event. In his report, MB says there are between 40 to 50 damaged roof tiles. I acknowledge this is a significant number of tiles. However, the complainant did not provide any persuasive evidence to substantiate this assertion. If I were to accept this number of tiles, I would expect the internal water damage to manifest in a shorter time period rather than approximately five years after the event. The insurer is seeking to rely on a number of exclusions in denying the claim. However, the complainant did not discharge his onus in establishing a claimable loss under the terms and conditions of the policy. Amongst other things, the complainant says:  the 2017 hail storm was significant and severe  the building code CF refers to came into effect several years after the house was constructed  CF missed the whirly bird damage which the insurer accepted later  the insurer accepted a lot of storm claims in the area  CF assessment was inconclusive. I accept each claim is assessed based on its own merits. While the hail event was significant, I am not satisfied the documented severity of the storm solely assist the complainant’s position. The exchanged information does not establish a causal link between the hail event and the resultant damage. I acknowledge parties provided several arguments and submissions regarding the applicable building code to different areas of the roof. The exchanged evidence shows the insurer has offered to re-attend and re-assess if any of the internal damage was caused by a storm created openings. However, the complainant says he has completed some of the repairs. Determination | Case number: 932307 Page 6 of 7 I have carefully considered the exchanged evidence and I am satisfied the insurer is entitled to deny the claim and is not required to take any further action. 2.2 Is the insurer liable for compensation? The insurer is required to pay the complainant $1,500 in compensation. AFCA can award compensation for non-financial loss AFCA will award compensation for non-financial loss (capped at $5,400) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and delays. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The insurer is required to pay the complainant $1,500 compensation The complainant is dissatisfied with the manner in which the insurer handled the claim. The exchanged information shows:  the hail event was in 2017  the complainant lodged the claim in August 2022  the insurer organised several assessments by different experts. I have reviewed the claim notes and I accept there were delays in communicating the insurer’s denial of the claim with the complainant. Further, I accept there was a lack of communication with the complainant. The claim notes show the insurer did not effectively communicate with the complainant regarding the progress of the claim. I note the insurer has finalised its position after the complainant contacted the Authority. I accept the insurer was not proactive in the handling the claim. The insurer is required to pay the complainant $1,500 compensation. 2.3 Why is the outcome fair? The parties are bound by the terms and conditions of the policy. The exchanged evidence does not assist the complainant in establishing the disputed damage was caused by an insured event under the policy. The insurer is entitled to rely on the terms and conditions of the policy in assessing the extent of its liability. Determination | Case number: 932307 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.