Denial of mould damage claim, rectification of damage by insurer's trades, and compensation for poor claim handling
Text of the determination
Determination
Case number 931762
Financial firm AAI Limited
Determination | Case number: 931762 Page 1 of 7
Case number: 931762 7 August 2023
1 Determination overview
1.1 Complaint
The complainant and AD hold home building and contents insurance with the financial firm
(insurer). On 9 March 2022, they lodged a claim for mould damage affecting their home,
which they attributed to rainwater ingress during a recent storm event.
The insurer commenced make safe repairs including partial strip out of walls and flooring and
paid temporary accommodation (TA) costs. On 16 November 2022, the insurer denied the
claim as the mould was a long-term issue, not due to the storm. Given its delays, the insurer
paid out the contents sum insured and said it would rectify damage caused by its trades.
The complainant says the mould was caused by the storm, so the claim should be covered.
She also says the insu rer’s proposal for rectification of damage by its trades is unreasonable.
Further, she seeks compensation for the major stress the insurer’s poor handling has caused.
1.2 Issues and key findings
Is the insurer entitled to deny the mould claim?
Yes. Based on the provided information and on balance, the mould problem was pre-existing
and due to excluded causes rather than the storm event.
Is the insurer required to pay more for rectification?
Yes. Given the delays experienced and the prior conduct of its trades, it is unreasonable for
the insurer to pay a partial cash settlement and otherwise attend to repairs. The insurer holds
valid quotes by WN for rectification costs. It is pay the quotes plus a 20% contingencies uplift.
Is non-financial loss compensation payable?
Yes. The insurer handled the claim poorly and caused extensive delays. This has resulted in
the complainant and her family having to live in a shed for more than a year. The insurer has
caused the complainant significant stress and inconvenience. It is to pay her $5,400.
Why is the outcome fair?
The insurer has established the mould damage is excluded. It would not be fair to require the
insurer to cover the claim when the policy does not respond. However, it is fair that the
insurer cash settles the rectification repairs in full based on its valid quotes plus an uplift. It is
fair that the insurer pays $5,400 to compensate the complainant for the major stress caused.
1.3 Determination
This determination is partially in favour of the complainant. Within 14 days of the complainant
providing written notice she accepts this determination the insurer is to pay her:
$42,709.21 for rectification (WN’s quotes dated 27 April 2023 and 8 May 2023 , plus 20%)
$1,000, the home building excess it charged the complainant, and
$5,400 in non-financial loss compensation.
Determination | Case number: 931762 Page 2 of 7
2 Reasons for determination
The parties provided several submissions to AFCA. While this determination does not refer to
each submission, I have taken them all into account in reaching my decision.
The complainant has recently approached the insurer about receiving a refund of premiums
paid for contents insurance, saying almost all contents were disposed of by or with the
approval of the insurer nearly a year ago. The insurer should provide the complainant with a
detailed written response within seven days.
2.1 Is the insurer entitled to deny the mould claim?
Yes. Based on the provided information and on balance, the mould problem was pre-existing
and due to excluded causes rather than the storm event.
Complainant must show a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that she suffered a claimable loss under the policy. This means she must show the loss
was caused by a risk for which she is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
policy the complainant and AD hold covers damage to their home caused by a listed insured
event. Those events include ‘Storm’. They also added optional accidental damage cover to
the policy, covering ‘ loss or damage that [they] did not intend or expect to happen ’.
On 9 March 2022, the complainant lodged the mould damage claim. She said her infant son
had been hospitalised with respiratory issues several times in the prior three months. On the
most recent occasion, a doctor suggested she check the home for mould. On doing so, she
found mould in the roof space.
The complainant says the mould was due to rainwater ingress during storm activity in late
February 2022.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer obtained multiple expert reports
Following claim notification, the insurer arranged make safe mould cleaning. However, it
seems that did not occur until late April 2022. In the meantime, the insurer organised TA for
the complainant and her family. This subsequently involved hiring a campervan to be kept on
the insured property.
On 31 May 2022, the insurer’s appointed restore r FE inspected the property. FE reported that
water had entered through the home’s roof during a storm. There was mould damage
affecting the floor coverings, ceiling, furniture and contents items. FE also noted the home ’s
foundations had become compromised and the flooring was starting to come away.
After inspecting the home in April, o n 7 June 2022, the insurer’s builder WN reported that:
due to the block’s sloping gradient and design iss ues, large amounts of water had laid
under and around the house over a long period
the stagnant water had compromised the foundations
Determination | Case number: 931762 Page 3 of 7
a roof report and a remediation report were required to determine whether the mould was
caused over a long period or in a one-off event, and how much ceiling had to be replaced
The insurer’s remediator, ZA, inspected the h ome a few weeks after WN. In its report dated 7
June 2022, ZA confirmed the presence of mould and high moisture readings. It cleaned and
sanitised the mould affected areas. ZA recommended removal of all internal linings and the
installation of dryers. It a ppears dryers were installed soon after ZA’s inspection.
In mid-June 2022, the insurer authorised WB to commence strip out work.
Due to concerns about the home’s foundations, the insurer arranged for engineer CR to
inspect the property. On 5 September 2022, provided a report in which it said the heavy
rainfall in February 2022 had not caused structural movement. The stump cracking was due
to long term dilapidation.
The insurer’s roofer RR inspected the property on 9 June 2022 but did not provide its report
until 7 September 2022. In its report, RR said:
There is no ingress being caused by the roofing system. However, upon further
inspection we noticed that the ceiling cavity was inundated with mould growth to
all ceiling bats, rafters and battens. This mould has also spread underneath the
roof sheeting. We believe this is being caused by no insulation underneath the
sheeting, resulting in high amounts of condensation in the ceiling space.
RR recommended ‘ someone attend site immediately and remove all ceiling bats, as well as
cleaning all mould from the ceiling cavity’.
On 10 October 2022, restorer RX, who had been engaged to assess the contents claim, and
the insurer’s internal assessor attended the property. No visible damage to the internal
aspects of the home was identified. The assessor concluded that the mould in the ceiling
cavity would have occurred over an extended period and was not related to a single event.
On 3 November 2022, the insurer received a report from hygienist HS. Having inspected the
property on 29 September 2022, HS reported that:
the complainant said her son’s respiratory problems started in October 2021
the building was dry due to the use of dryers and the dryers were adequately managing
the indoor environment
the moisture source for the mould contamination was likely the roof, based on the
previously obtained reports
while condensation was unlikely in the current environment, it ‘ could be of potential within
the unregulated environment ’.
On 11 April 2023, the insurer’s internal assesso r again inspected the property. According to
the assessor, there was ‘no evidence of mould to the internals of the property’.
Insurer says the damage is due to excluded causes
On 16 November 2022, the insurer denied the claim. It says the complainant has not
established that the mould was due to the storm or some other one-off insured event.
The insurer also relies on general exclusions set out on pages 31 and 33 of the PDS
precluding cover for loss or damage to, caused by, connected with or arising from:
mould or mildew unless it is directly caused by an incident covered by the policy and there
is no evidence of pre-existing mould, and
Determination | Case number: 931762 Page 4 of 7
wear, tear, atmospheric or climatic conditions or gradual deterioration.
In addition, the insurer notes that page 78 of the PDS confirms the accidental damage
coverage section does not cover loss or damage caused by ‘ wear, tear, rust, fading, rising
damp, mould, mildew, corrosion and rot’.
Complainant says the storm caused the mould
The complainant maintains that the high volume of storm-related rain that fell in late February
2022 is the cause of the mould within her home.
The complainant refers to Bureau of Meteorology rainfall data obtained from a weather station
approximately 7km from her home. That data indicates 510mm fell in the period 25 to 28
February 2022.
The complainant has not provided any expert reports. However, she says that the insurer’s
reports are contradictory. Further, she considers that HS’s report supports her position.
She also submits that the insurer is responsible for the mould worsening, given its delays.
Insurer is entitled to exclude the mould claim
Based on the provided information, I am satisfied that it is more likely than not that the mould
problem at the home was pre-existing and due to excluded causes rather than the storm. This
is because:
while FE says in its single page preliminary report that water had come through the roof
during a storm, it does not appear to have inspected the roof. In any event, expert roofer
RR has definitively said that was not the case after inspecting the roof
I find RR’s opinion that the mould was caused by condensation build up (over time) due to
lack of insulation under the roof sheeting persuasive, in the absence of expert evidence to
the contrary
WN raised as a possibility that the mould was a long-term issue. The reports of RR, HS
and (tangentially) CR support a finding that is the case
the fact that from October 2021 the complainant’s son experienced respiratory problems
serious enough to require hospitalisation and which have subsequently been attributed to
mould, suggests the mould growth was significant well before the storm in February 2022.
I accept that the insurer’s delays may have contributed to some wors ening of the mould.
However, the lack of insulation under the roof sheeting has not been addressed. Taking into
account the available expert opinions, I consider it more likely than not the primary cause of
the mould worsening is the lack of insulation.
On balance, mould within the home has been a long-term issue, not directly caused by storm
(or another insured event). In the circumstances, and as the accidental damage coverage
section does not respond to mould damage, the insurer is entitled to deny the claim.
The insurer previously collected the $1,000 home building policy excess. As it has denied the
claim, it must refund the excess to the complainant.
2.2 Is insurer required to pay more for rectification?
Yes. Given the delays experienced and the prior conduct of its trades, it is unreasonable for
the insurer to pay a partial cash settlement and otherwise attend to repairs. The insurer holds
valid quotes by WN for rectification costs. It is pay the quotes plus a 20% contingencies uplift.
Determination | Case number: 931762 Page 5 of 7
Insurer’s trades caused damage
The complainant says the insurer’s trades caused additional damage to her home. She refers
to cracked floor tiles, removal of plaster walls in two bedrooms and removal of vinyl flooring.
The insurer accepts it is responsible to rectify the damage.
Insurer’s rectification proposal is insufficient
The insurer obtained a quote from WB dated 27 April 2023 for the replacement of the vinyl
and tile flooring. The quoted amount was $27,187.50. On 8 May 2023, WB provided a
$8,403.51 quote to replace the bedroom plaster walls.
The insurer subsequently determined that full replacement of the tiles was not warranted and
that minor repairs would restore the floor to its pre-damage state. The insurer asked WB to
remove the tiling work from its 27 April 2023. On 16 May 2023, WB provided its updated
flooring quote, totalling $6,771.85.
The insurer proposes to pay the complainant $15,175.36 (the total of WB’s quotes dated 8
and 16 May 2023) and to engage a builder not previously involved in the claim to attend to
the tiling repairs.
The complainant says WB informed her that the tile flooring would have to be replaced
because it was not possible to obtain matching tiles given the age of tiles. Unsurprisingly, the
complainant does not want to have live with mismatched tiling in her home due to damage
ca used by the insurer’s trades .
Further, the complainant says she is no longer willing to allow the insurer’s trades to attend
her property. She says ‘w e have given enough of our time to this matter and having
appointments made for trades to attend and then not show at all. All at a cost to us having to
take extra time off work. This will not be happening any longer ’ .
I am satisfied that the complainant’s position is justified. Given the lengthy delays
experienced and the prior poor conduct of its trades, it is unreasonable for the insurer to pay
a partial cash settlement and otherwise attend to repairs.
Based on the i nformation provided, WB’s quotes dated 27 April 2023 and 8 May 2023 appear
to be a valid and reasonable basis on which to cash settle the rectification damage. As a cash
settlement is to be paid, an uplift is to be applied to take into account contingencies. I
consider 20% to be a fair uplift.
Accordingly, the insurer is to pay the complainant $42,709.21 (WN’s quotes dated 27 April
2023 and 8 May 2023, plus 20%).
2.3 Is non-financial loss compensation payable?
Yes. The insurer has handled the claim poorly and has caused extensive delays. This has
resulted in the complainant and her family having to live in a shed for more than a year. The
insurer has caused the complainant significant stress and inconvenience and adversely
affected her mental health. It is to pay her $5,400 in compensation.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
Determination | Case number: 931762 Page 6 of 7
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer is required to pay non-financial loss compensation
The complainant has provided detailed submissions outlining the significant adverse impact
the insurer’s poor claim handling and delays have had on her and her family. She has
described and provided a video of their distressing living conditions in an uninsulated shed
without heating or running water. They sleep in the campervan parked in the shed.
The complainant also says she has had to take time off work to ‘ try to manage depression,
anxiety and panic attacks, all of which were not present before this claim process ’ .
The insurer accepts that it has caused delays. It has apologised and offered the complainant
$1,000 in compensation.
Even though the insurer is in my view entitled to deny the claim, it should not have taken eight
months to do so. That is twice the timeframe for a claim decision referred to in the General
Insurance Code of Practice. From the insurer ’s claim notes, it is clear the complainant had to
follow up the insurer repeatedly. Further there were many delayed attendances by its trades.
It is readily apparent that insurer has caused the complainant significant stress and
inconvenience and adversely affected her mental health. In the circumstances, I am satisfied
that it is reasonable to require the insurer to pay the complainant $5,400 in compensation.
2.4 Why is the outcome fair?
The insurer has established the mould damage is excluded. It would not be fair to require the
insurer to cover the claim when the policy does not respond. However, it is fair that the
insurer cash settles the rectification repairs in full based on its valid quotes plus an uplift. It is
fair that the insurer pays $5,400 to compensate the complainant for the major stress caused.
Determination | Case number: 931762 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.