Partial decline of storm damage claim; roof, sarking and building movement declined; mould remediation and cash settlement amount disputed
Text of the determination
Determination
Case number 931746
Financial firm Strata Community Insurance Agencies Pty Ltd
Determination | Case number: 931746 Page 1 of 9
Case number: 931746 5 October 2023
1 Determination overview
1.1 Complaint
The complainant holds a Strata insurance policy with the insurer including cover for Unit 1, 2
and 4 and lodged claims for damage caused by a storm event on 25 February 2022.
The insurer partially accepted the claim based on the expert reports obtained. The items now
in dispute include:
cracking to the external brick wall and damage to the roof tiles and sarking of unit 1
Mould remediation, internal repairs for unit 1 and the associated temporary
accommodation for its owner
non-financial compensation due to their claims experience.
1.2 Issues and key findings
Is the insurer liable for damage to the roof and sarking of Unit 1?
No. I am satisfied the insurer is entitled to decline liability for the roof and sarking damage
Is the insurer liable for damage caused to Unit 1 by building movement?
No. I am satisfied the building movement was long term and not caused by the storm event
Is the insurer liable for further mould remediation?
Yes. The insurer did not complete the mould remediation as recommended. Further
remediation and temporary accommodation is now required.
Should the cash settlement offer be increased?
Yes. The insurer is to increase the cash settlement to cover the cost of the recommended
mould remediation and temporary accommodation costs while the works are completed.
Is the complainant entitled to non-financial compensation?
No. I am not satisfied the errors in claims handling were sufficient to justify compensation.
Why is the outcome fair?
It is fair, given the available information, to increase the cash settlement to meet the cost to
complete the mould remediation and cover temporary accommodation costs. It is also fair for
the insurer to rely on the terms of the policy to decline the balance of the claim.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of notification of the
complainant ’ s acceptance of this determination the insurer is to pay the complainant:
$37,426.01 in settlement of the claim as set out in section 2.4 of this determination.
The insurer is otherwise entitled to deny liability for the remaining damage.
Determination | Case number: 931746 Page 2 of 9
2 Reasons for determination
2.1 Is the insurer liable for damage to the roof and sarking of
Unit 1?
No. I am satisfied the insurer is entitled to decline liability for the roof and sarking damage
Complainant has the onus to establish damage falls within terms of policy
It is established insurance law that an insured has the onus to establish on the balance of
probabilities (that is, more likely than not) that the loss or damage claim falls within the terms
of the policy.
The complainant holds a strata insurance plan that provides cover for loss or damage during
the period of insurance subject to various terms and conditions. Loss or Damage is defined
under the policy to mean direct physical loss of, destruction of, or damage to property from
any sudden and accidental cause not otherwise excluded by this policy.
There is not dispute that heavy rain/storm impacted the complainant’s units from 22 February
2022 until 28 February 2022 causing widespread damage throughout the area. Both the
complainant and insurer accept that the property was impacted by the storm event. The issue
in dispute relates to the extent of cover with the primary items in dispute being:
Damage to the roof tiles and sarking of unit 1
Cracking to the external brick wall of unit 1
Mould remediation, internal repairs for unit 1 and the associated temporary
accommodation for its owner.
Complainant ’ s expert reports do not relate damage to roof tiles and sarking to
storm event
The complainant relies on a pre-purchase inspection report from PSC, maintenance reports
from plumbers FP and MP and a sinking fund report from WA to argue that the damage to the
roof tiles and sarking of Unit 1 occurred in the February 2022.
PSC provided a report for unit 1, dated 13 December 2021. The report outlines the following
issues with Unit 1:
Patched ceiling in bedroom interior
Surface mould growth on laundry ceiling
Damp smell in second bedroom wardrobe
No major defects in roof space
Roof tiles cracked and sealed with silicone. Roof maintenance should be attended to as
soon as possible.
The is evidence of water ingress in the laundry through the mould growth, and evidence of
cracked roof tiles with roof maintenance issues. This is evidence of water and mould damage
prior to the insured event. PSC does not comment of any issues with the sarking.
FP attended the property on 4 December 2021 to clear the overflowing gutters. FP says the
blockage caused water to overflow into the eaves and down the walls. This is evidence of
possible water damage months before the claimed event.
MP attended the property on 1 February 2022 and found a small crack in a tile that was
silicone repaired. MP considered the roof tiles quite porous and recommended resealing by a
Determination | Case number: 931746 Page 3 of 9
roof restoration company. He also found the guttering on both sides rusted and should be
replaced.
The sinking fund report from WA is dated 8 February 2023 states that the following works
which should be undertaken in the short include:
Reseal/repoint/repaint concrete tile roofing
Engage engineer to report on building movement and repoint to brickwork where disturbed
Maintain/replace gutters and downpipes
The complainant also obtained a report from a roofing specialist UNO. The report dated 6
August 2022 found:
Damage present to the property in the kitchen, bedrooms, laundry and lounge room.
Cracked/broken tiles caused water entry into the roof cavity, water ingress through the tile
clips
Ridge/hip pointing weep holes blocked
Photos show the internal damage and deterioration of the sarking is evident.
The complainant supplied a statement from PRS dated 7 February 2023. PRS had completed
the roof restoration in March-April 2022. It states:
Tree branches likely fell and cracked the tiles on the roof below
When concrete tiles crack, materials can fall through the roof and tear the sarking below
20 tiles required replacement after the storm event, all due to the storm event.
It is clear from the reports that there were significant pre-existing issues requiring
maintenance with damage to roof tiles and external brick work on Unit 1 present prior the
event on 25 February 2022. While PRS provides a plausible explanation for the sequence of
events, the weight of the complainant’s reports do not support the claim that the roof or
sarking was damaged in the event.
Insurer reports persuasive that damage to roof and sarking not caused by
insured event.
The insurer has relied on five reports from its appointed loss adjustor, EXG. EXG has
engaged trades to assist with its assessments. A report has been provided from BC and an
engineer DBS.
EXG attended the property on 31 March 2022. The roof on Unit 2 had been fully restored by
that time. EXG there were pre-existing issues as stated in pre-purchase report but found
there was event related internal damage to Unit 1 and Unit 2.
The second report from EXG dated 1 July 2022 confirms the appointment of BC to conduct
an inspection to determine moisture levels and mould contamination. It does not provide any
information relevant to the damage to the tiles and sarking.
The third report from EXG dated 13 August 2022 confirms BC conducted a further
assessment in July 2022 and notes the complainant had advised of water ingress in Unit 1
occurring during periods of heavy rain, suggesting that roof issues are still present after the
March/April 2022 restoration. EXG considered the liability limited and provided a quote from
ISB for the accepted damage to Unit 1 and Unit 2.
The fourth EXG report comments on the findings of the UNO roof report. It notes the issues
reported by UNO should be addressed by the complainant to eliminate potential for ongoing
water ingress. An engineer DBS had been appointed to provide a further assessment.
Determination | Case number: 931746 Page 4 of 9
The report from the engineer DBS is dated 22 September 2022. DBS in summary considered
the age deteriorated damage illustrated that the moisture damage to the plasterboard had
been ongoing for years. There was evidence of previous water leaks due to strains on the
truss hardwood top chords. Review of photos of the roof space provided by the complainant
showed tearing in the under-roof sarking, which accounts for the water entry. DBS considered
the tears and defective lap in sarking due to long term deterioration and requires replacing to
avoid further water ingress.
While the statement from PRS outlines a logical sequence of events, the available information
clearly outlines that the cracking to the roof tiles was present and water ingress issues were
being experienced at the property prior to the storm event. Further, the photos of the sarking
show deterioration that would have occurred prior to the event.
Given the available information I am satisfied that the insurer is entitled to decline liability for
the roof and sarking repairs.
2.2 Is the insurer liable for damage caused to Unit 1 by
building movement?
No. I am satisfied the building movement was long term and not caused by the storm event
Expert report indicate damage not related to insured event
As outlined above, the sinking fund report dated 8 February 2022 outlines the need to engage
an engineer to assess the building movement and the associated cracking requires
remediation. The report does not clarify which unit was experiencing the cracking. However,
the complainant’s dispute response dated 22 December 2022 confirms that the cracking
shown in the report is unit 1.
The UNO roof report outlines that:
Unit 1 owner states that since the rain event the wall has experienced severe cracking
A structural engineer should be engaged to assess the damage.
DBS reports:
Significant movement observed to the brickwork of the kitchen window
Isolated evidence of movement cracking in external brickwork
Previous re-pointing repair to movement in external brickwork, indicated by brick bed width
and isolated variance in brick mortar colour
the site is class ‘M’ (clay and/or silt), which is likely to experience significant ground
movement caused by soil volume due to change in moisture conditions
Gardens in reactive soil adjacent to footings are not recommended, due exacerbation of
ground movement as the plants compete for moisture
DBS concludes that movement cracks in the brickwork are likely due to seasonal movements
of moderately reactive soil over a long period of time.
DBS did not conduct soil testing at the site to verify its assumption regarding the site class.
However, given the evidence of prior ground movement and the presence of cracking prior to
the event, I am satisfied, on balance, that this assumption is reasonable.
DBS conducted its assessment on 6 September 2022. The event took place on 25 February
2022. The complainant has raised issue with the delay. I accept that the insurer was made
aware of the building movement after the UNO roofing report had been submitted in August
Determination | Case number: 931746 Page 5 of 9
2022, six months after the insured event. As such, it is reasonable that the assessment of the
cracking damage occurred seven months after the event took place.
I acknowledge the complainant says the cracking at Unit 1 became worse after the storm
event. However, based on the information above, I am not satisfied that this cracking can be
attributed to the 25 February 2022 storm event. I find the report from the engineer persuasive
that:
Cracking to the external brick walls of unit 1 was present in the weeks prior to the event
previous maintenance repairs for cracking and build movement issues had been
conducted prior to the event
the unit has experienced a history of ground movement cracking
the damage was noted and submitted to the insurer six months after the event took place.
I am satisfied that most likely the damage occurred over an extended period, rather than the
result of water inundation from a single storm event. I am satisfied the insurer is entitled to
decline liability for this damage.
2.3 Is the insurer liable for further mould remediation?
Yes. The insurer did not complete the mould remediation as recommended. Further
remediation and temporary accommodation is now required.
Insurer did not complete mould remediation
The complainant says the mould remediation conducted by BC on 17 May 2022 and 1 – 5
July 2022 did not eliminate the mould issues. The complainant says the insurer should be
liable for the subsequent return of the mould and additional damage
The insurer says that based on the reports from EXG and BC, it fulfilled its liability to conduct
the required mould remediation for the building and any subsequent mould growth and loss
was due to the complainant not conducting the outlined maintenance requirements.
The initial mould remediation occurred on 17 May 2022. BC reported:
Water ingress from has caused water damage throughout property, roof has been repaired
since the event.
Damage present due to storm/flooding, microbial growth
Microbial growth evident on ceiling, behind stove in kitchen, within the built-in cupboards in
bedroom 2 and the master bedroom. Water stains present in rooms as well
In the kitchen, ceiling, wall linings and kitchen cabinetry have elevated moisture levels
present, with a hole in the ceiling where water dripping from the roof
Microbial growth behind the stove
Built-in cupboards in laundry are rotted, which is not claim related. However, surrounding
gyprock wall linings have been affected from the event and now have microbial growth
present
Bathroom has elevated moisture levels within wall linings and tiled skirting boards
Adjoining wall to vanity unit is bedroom 2 and there are elevated moisture levels present,
vanity removal is required with further inspection and sanitation.
BC recommended that builders:
remove all kitchen cabinetry to facilitate the removal of gyprock wall linings floor to ceiling.
Removal of half of the gyprock ceiling and insulation.
Lounge: removal of N and W gyprock wall linings floor to ceiling to facilitate remediation
and structural drying.
Determination | Case number: 931746 Page 6 of 9
Laundry: removal of N, E and S wall linings (including N wall lining within the built-in
cupboard) floor to ceiling to facilitate remediation and structural drying.
Bathroom: remove vanity unit to facilitate drying of the cavity.
Bedroom 2: removal of N, E and S gyprock wall linings (including all the built-in cupboard)
floor to ceiling to facilitate remediation and structural drying. Remove the affected section
of gyprock ceiling and insulation as it is non-restorable.
Master bedroom: removal of the S wall linings within the built-in cupboard to facilitate
remediation and structural drying. Remove the affected section of gyprock ceiling.
Removal of all glue tags, nails and debris from the site.
The report from EXG dated 15 August 2022 states:
BC attended across 1 – 5 July 2022 and carried out an inspection using thermal imaging
and moisture detection equipment and found no elevated moisture levels, aside from a
small area in the kitchen cornice reading at 20%
Microbial growth present on the top side of the ceiling in the kitchen area which will be
removed during the repair.
The insurer was asked to provide all reports from each BC attendance. It only supplied the
initial report and correspondence from BC stating:
All affected materials have achieved dry standard accept for a 12 by 6-inch section along
the external wall at skirting height which is reading 20%
Property is habitable; however, the bed is affected and someone from the unit 1 owner’s
contents insurance will attend to inspect
The property is habitable from a structural perspective.
There is no clearance certificate submitted by BC to confirm that the mould remediation was
completed to an appropriate standard. There is also no report from BC to confirm what work
was conducted across 1 – 5 July 2022.
It is clear from the report that the mould and water damage present at the property (aside
from the cupboard damage in the laundry) had arisen from the insured event.
Based on the available information:
The mould remediation including the building works associated with the water damage was
not completed as recommended by BC
the costs associated with this remediation including additional temporary accommodation
costs were not considered by the insurer when is chose to offer to cash settle
I am of the view that the insurer is therefore liable for:
any costs incurred by the complainant to complete the mould remediation work
temporary accommodation costs incurred by the unit 1 owner during the time the mould
remediation work.
2.4 Should the cash settlement offer be increased?
Yes. The insurer is to increase the cash settlement to cover the cost of the recommended
mould remediation and temporary accommodation costs while the works are completed.
The insurer’s offer does not cover recommended building works as part of
mould remediation
The insure has offered $12,447.28 plus temporary accommodation based on a quote and
scope of works provided by ISB. The scope of works does not provide an itemised breakdown
Determination | Case number: 931746 Page 7 of 9
of costs or include the recommended building remediation works submitted by BC for the
rectification of the event related damage.
It is unclear from the available information why the mould remediation recommendations have
been omitted from the scope of works. Possibly this is based on the insurer’s view that any
ongoing mould issue was related to faulty roof repairs rather than the original storm event.
The quote is not consistent with the reports from BC that the damage was caused by the
event. I do not consider it fair to rely on this quote in these circumstances.
Complainant’s assessed costs more consistent with likely repairs required .
The complainant ’ s estimated cost for repair of all units was $49,562.65.25 plus $220 for the
Uno report and an estimated $3,026.20 for mould mitigation. The quotes include items that I
agree are not covered under the claim including roof repairs and damage caused by ground
movement. Included in the estimated repair costs are quotes from APR and ABCM for the
plastering and cabinet work required for the mould remediation of Unit 1 as recommended by
BC as follows:
$1,662 – Bed1 robe
$1,760 – Bed 2 robe
$682 – laundry cabinet
$11,945 – kitchen cabinets
$12,748.65 – plastering kitchens bedrooms, laundry (electrical extra)
Insurer is to increase cash settlement offer
I am satisfied that the invoices from APR and ABCM are more reflective of the recommended
works from BC. This is because:
The invoices from APR outline plastering work in line with the recommended builders work
in the BC report
The ABCM invoices outline the costs associated with the cabinetry replacement outlined in
the builder’s work in the BC report.
I consider it fair to delete the laundry cabinet ($682) from the quote as this was seen to have
significant wood rot. This is unlikely to have been caused in the storm event. This brings the
total to $28,115.65
The complainant has also provided quotes for temporary accommodation of $1,355 and
$3,957 (total $5,312). The first quote related to the temporary accommodation during BC
initial mould remediation when the house was uninhabitable. The second quote is the lower of
quotes obtained by the complainant for proposed temporary accommodation that will be
required during the additional repairs. I consider both quotes fair.
The complainant has allowed $396 to repair, repaint damage to Unit 2 and Unit 2. This seems
fair. This brings the total for the repairs and mould remediation to $33,823.65.
I note the complainant has included a contingency claim for electrical, plumbing, waste
removal and insurance. The are no quotes for these items.
Given the age of the quotes and lack of details as to the further costs (mould remediation,
electrical, plumbing etc) I consider it fair to increase to settlement by 10% ($3,382.36) to
cover these contingencies. This brings to total cash settlement to $37,206.01. In addition, the
insurer should pay the $220 for the Uno report as agreed, bringing the final cash settlement to
$37,426.01.
Determination | Case number: 931746 Page 8 of 9
2.5 Is the complainant entitled to non-financial compensation?
AFCA will only award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience or time taken to resolve a situation or interference with the
complainant’s expectations of enjoyment or peace of mind.
In assessing whether to award compensation for non-financial loss AFCA expects
complainants to be moderately robust and bear the normal degree of inconvenience
experience when a problem occurs.
Compensation not applicable
While I accept the insurer failed to properly complete the mould remediation, based on the
available information, the insurer has otherwise handled the claim reasonably and
appropriately.
The complainant, a body corporate, has argued that the insurer delayed the assessment of
the claim unreasonably. I do not agree. The insurer had its loss assessor attend the property
shortly after the claim was lodged. It arranged for the initial mould remediation shortly after
the roof on Unit 1 had been repaired.
The insurer has generally responded to the complainant’s emails in a timely manner. It
appointed an engineer DBS after receiving the Uno report. It did not unreasonably delay
obtaining an engineer’s report. The insurer’ s decisions relating to the sarking roof repairs and
damage caused by ground movement were reasonable.
The complainant says the delays were contributed by the insurers trades advising the roof
should be replaced with a colorbond roof. I note the roof on Unit 2 had been replaced by 31
March 2022 just over a month after the event. The roof on Unit 1 was replaced in April 2022.
There is no indication any delay occurred because of the insurer’s trades comments.
The complainant also says the owner of Unit 1 decided to sell her Unit due to lack of funds to
complete repairs. The complainant says she incurred an extra $4,000 in legal cost to have
special conditions placed in the sale contract. While this is no doubt distressing, the owner
had chosen to sell the Unit. The sale was not caused by the insurers mishandling of the case
but by the delays as the extent of damage was settled.
The delays have arisen largely due to the dispute as to the extent of damage rather than poor
claims handling. In the circumstances, I do not consider the insurers claims handling justifies
an award of compensation for non-financial loss
2.6 Why is the outcome fair?
The outcome is fair and reasonable
This determination is based on a consideration of all the available material. While the parties
dispute the extent of the insurer ’ s liability and cost of repairs, I consider it fair the insurer
covers the cost of the mould remediation. It is fair, given the available information, to increase
the cash settlement to meet the cost to complete the mould remediation as recommended by
BC and cover temporary accommodation costs.
Otherwise, the exchanged information indicated the units had significant pre-existing damage
to the roof, sarking and external wall movement. It is fair for the insurer to rely on the terms
of the policy to decline liability for this damage.
Determination | Case number: 931746 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’ s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.