Determination 931269

Complainant sought further payment for mould remediation and asbestos removal after flood damage, said to fall under make safe works or removal of debris benefit

FirmQBE
Decided2023-05-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After flood and storm damage, the insurer paid the sum insured and additional benefits, but the complainant sought further cover for mould remediation and asbestos removal. AFCA found the determination in favour of the insurer and required no further action.

The insurer had no policy obligation to arrange make safe works, the complainant said the property would be demolished, mould and asbestos costs fall outside the removal of debris benefit, and maximum entitlements were already paid.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disasterno remedy

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 931269 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 931269 Page 1 of 5 Case number: 931269 30 May 2023 1 Determination overview 1.1 Complaint The complainant held a home building and contents policy (policy) with the financial firm (insurer). On 28 February 2022, the insured property suffered significant flood and storm damage, for which a claim was lodged under the policy. At the time of the loss the insured building held a sum insured of $116,000 and the contents $47,000. The policy allows for some additional benefits over and above the policy sum insured amounts. The insurer has accepted the claim and has paid out the above noted sum insured amounts. The insurer has also paid $23,200 (20% of the building sum insured) being the maximum entitlement for temporary accommodation (TA), an uplift of $24,360 (21% of the building sum insured) under the Home Sum Insured Safeguard Benefit (HS) and $171.62 as CPI inflation. The complainant remains dissatisfied and is seeking further cover for the cost of mould remediation and removal of asbestos, which he says the insurer failed to arrange as part of make safe works or under the removal of debris benefit (ROD). The complainant is re presented by his broker ‘D’. Reference to the complainant in this determination will include both D and the complainant unless specified otherwise. 1.2 Issues and key findings Is the insurer’s assessment of its liability fair? Yes. The insurer’s assessment and associated claim settlement payments made to the complainant fulfil its obligations under the policy. The insurer is not required to arrange further payment to the complainant. Why is the outcome fair? The outcome is fair as the available information shows the insurer has paid the complainant equal to his maximum entitlements under the policy. It would be unfair to require the insurer to make further payments to the complainant towards mould remediation and/or possible asbestos removal expenses in the circumstances. 1.3 Determination This determination is in favour of the insurer. The insurer’s settlement of the claim is fair and consistent with its obligations under the policy. The insurer is not required to take any further action under the claim. Determination | Case number: 931269 Page 2 of 5 2 Reasons for determination I note at the time the complainant brought his complaint to AFCA there were several matters in dispute between the parties. I am satisfied, with the assistance of AFCA, the concerns relating to the complainant’s TA and HS entitlements have been resolved and cash settled by the insurer. In providing this determination, consideration has been limited to the issues that remain in contention between the parties, these being mould remediation costs and costs associated with removal of asbestos. The complainant believes these should have been covered as make safe works or under the ROD. 2.1 Is the insurer’s assessment of its liability fair? Yes. The insurer’s assessment and associated claims s ettlement payments made to the complaint fulfil its obligations under the policy. The insurer is not required to arrange further payment to the complainant. The policy covers the insured property against accidental loss or damage The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against accidental loss or damage. Cover is subject to the conditions, limitations and exclusions specified in the PDS. The complainant is seeking further cover under the policy There is no dispute the insurer has accepted the claim and paid the complainant his maximum entitlements under the policy for the building and contents damage as well as TA entitlements. The insurer has also accepted, at its discretion, to pay the complainant an additional $24,360 under the HS benefit, which the complainant has accepted. The complainant, however, says the insurer should make further payment towards mould remediation and asbestos removal costs. This is on the basis the complainant feels the insurer failed to fulfil its make safe obligations and that these works reasonably fall under the ROD benefit, which are in addition to the policy sum insured amounts. The insurer is not obliged to arrange make safe works under the policy I have reviewed the relevant policy documentation and am satisfied there is no reference to the insurer being contractually obliged to arrange make safe works on lodgement of a claim or otherwise. However, in saying that, I acknowledge the complainant’s position that it is common and consistent with good industry practice for an insurer to complete make safe works where deemed necessary. I am satisfied that make safe works are a temporary fix in circumstances where immediate preventative works are deemed necessary to ensure the safety of the occupants of a property and/or to mitigate further loss or damage. Determination | Case number: 931269 Page 3 of 5 The available information shows the complainant had left the property before the flood event and was not residing there at the time the claim as lodged. Further, that the complainant advised the insurer’s representatives that he did not wish for loss adjusters to attend given he intended on demolishing the property. I note the insurer did complete electrical make safe works to the property. I accept the complainant may have subsequently changed his mind and is now seeking to repair the property. However, this was not his position at the time the insurer’s first representatives attended the property. I accept it was reasonable for the insurer not to have proceeded with arranging the make safe works given the complainant’s advice and the fact the property was going to be demolished. Given the nature and purpose of make safe works, this being immediate emergency temporary works, it would not be fair to now require the insurer to make any payments under the claim over a year after the flood event. On balance, it appears the mould infestation was discovered after the complainant had been paid the total building and contents sum insured amounts. I am not satisfied the complainant has been successful in showing a failure on the part of the insurer with respect to issue of make safe works or that the insurer is liable for the mould remediation works now required. I accept the responsibility to ensure the safety of the home and to mitigate further loss or damage rests with the complainant and not the insurer. Any additional damage or issues that arise from the complainant’s delay in commencing repairs, rests with complainant. I acknowledge the compla inant’s position that he was waiting on the claim to be finalised including the HS settlement, so he would know what the availability of funds would be to complete the repairs. However, the information from the parties shows the insurer was transparent and upfront in this regard, having informed the complainant payment under the HS would not be available immediately. Further, that this benefit is at the insurer’s discretion and is based on data that is sourced after a catastrophic event, which takes time. Therefore, I do not accept the complainant’s failure to commence repairs/mitigation works on this basis is reasonable or consistent with the advice received from the insurer in this regard. Removal of asbestos and mould remediation do not fall under ROD I acknowledge the complainant’s opinion that mould remediation and removal of asbestos are generally accepted to fall under the ROD policy benefit. Alternatively, that the insurer’s first responders to a claim will usually arrange these works as part of completing the make safe works. As discussed above, the insurer is not obliged to arrange make safe works under the policy. However, I would expect if the complainant had allowed for the make safe works to be completed in the initial stages of the claim, these works could possibly have included removal of walls, floors, fitting etc as well as some form of mould preventative measures. Also, that the debris from these emergency works would have been removed by the insurer or council. However, the works were not undertaken by the insurer’s representatives at the time for reason already considered above. Given this, it would not be fair or consistent with the purpose of make safe works, to now hold the insurer liable for the cost of such works, which never took place. I do not accept that mould remediation works, or removal of debris fall under the ROD, unless such removal of asbestos is completed as part of make safe works undertaken shortly after Determination | Case number: 931269 Page 4 of 5 the event giving rise to the damage. I am satisfied, unless forming part of an initial make safe, these works reasonably form part of the scope of works to be completed by consultants appointed to repair/rebuild the property. The insurer has assessed, and cash settled the complainant for his maximum entitlements under the policy, and therefore all costs associated with the repairs to the property including mould remediation and asbestos, rest with the complainant. The insurer is not required to make further payments under the claim I am satisfied the insurer has shown it has cash settled the complainant equal to his maximum entitlements under the claim. In doing so, the insurer has fulfilled its policy obligations and it would be unfair to require it to make further payments. 2.2 Why is the outcome fair? The outcome is fair as the available information shows the insurer has paid the complainant equal to his maximum entitlements under the policy. It would be unfair to require the insurer to make further payments to the complainant towards mould remediation and/or possible asbestos removal expenses in the circumstances. Determination | Case number: 931269 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.