Determination 931260

Cash settlement amount for flood damage to home, temporary accommodation and non-financial loss

FirmHollard
Decided2023-11-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$5,000
Amount claimed$1,149,500
SourceAFCA PDF

Summary

The insurer accepted a flood claim but cash settled only the flood-related damage, and the complainant wanted her home rebuilt. AFCA found the insurer not liable for the footings or a rebuild but required new quotes, a cash settlement based on them with 25% uplift, extended temporary accommodation and $5,000 non-financial loss.

Footing defects pre-dated the flood so a rebuild was not owed, but the quote was outdated and the insurer's poor handling of a vulnerable complainant warranted compensation.

Issues

Subjects and remedies

financial hardshiphome or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 931260 Financial firm Hollard Insurance Partners Limited Determination | Case number: 931260 Page 1 of 9 Case number: 931260 24 October 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy underwritten by the financial firm (insurer). She lodged a claim for damage to her property by a flood on 8 March 2022. The insurer accepted the claim. However, it says some of the damage was not related to the flood and it is not liable for this. It obtained a scope of works (SOW) to repair the damage it accepted as covered and paid this amount with a 20% contingency uplift to the complainant. The complainant does not accept this. She wants her home rebuilt. She also wants temporary accommodation until her home is repaired and compensation for non-financial loss. 1.2 Issues and key findings Is the insurer required to do anything further? Yes. Whilst the insurer is not required to change its SOW, the obtained quote is out of date. The parties are required to obtain further repair quotes in accordance with section 2.1 of this determination. The insurer is to then settle the claim as outlined in that section, including an allowance for temporary accommodation costs. Is an award of compensation required? Yes. The insurer has not handled the matter well and the complainant and her family are extremely vulnerable. The insurer must pay compensation for non-financial loss of $5,000. Why is the outcome fair? The support piers of the home are not in good condition and had significant pre-existing damage. The insurer is not responsible to repair the piers. However, it is fair that the parties both obtain new, actionable quotes, based on the complainant addressing the foundations issue. The insurer is to settle based on the parameters set out below. It is also fair that the insurer pays significant compensation for its poor handling of the claim. 1.3 Determination This determination is mostly in favour of the insurer. Within 14 days of the complainant accepting this determination, the insurer must contact her to begin the process of implementing it. The insurer and the complainant must obtain new repair quotes for the repair of the home and the insurer is to use these as a basis for settlement. This must be done in accordance with the steps set out in section 2.1. The insurer may then cash settle the complainant as set out in this section, including an allowance for temporary accommodation, as specified. There is no need to include interest. The insurer is required to pay the complainant compensation for non-financial loss of $5,000. Determination | Case number: 931260 Page 2 of 9 2 Reasons for determination The complainant is represented by a solicitor, MB. For convenience, unless indicated otherwise, reference to „the complainant‟ will include both. 2.1 Is the insurer’s offer for the building damage fair? Yes. Whilst the insurer is not required to change its SOW, the obtained quote is out of date. The parties are required to obtain further repair quotes in accordance with section 2.1 of this determination. The insurer is to then settle the claim as outlined in that section, including an allowance for temporary accommodation costs. Complainant seeks cover for building damage and temporary accommodation The complainant‟s home was initially constructed in or around 1890, with renovations and additions (including in 2017) added thereafter. It was flooded as part of a major inundation event on 8 March 2022. The home was inundated about 500mm above floor level. The insurer acknowledges there was extensive damage to the home, which requires repair. It says some of this damage pre-dated the claim event and is not covered by the policy. The insurer says this damage was due to a combination of construction defects, poor workmanship, deterioration and wear and tear. Whilst agreeing to cover the loss, the insurer limited its cover to only the damage it considers was caused by the flood event. The insurer‟s nominated repairer (AJ) considers the repairs cannot be warranted. The insurer therefore offered a cash settlement of $247,792.47 based on AJ‟s repair quote and a 20% contingency uplift ($49,558.49). This meant a final settlement offer of $297,350.96. The insurer paid this amount to the complainant on 30 March 2023. The insurer also arranged temporary accommodation for the complainant and her family, pending the resolution of the claim. The complainant is unhappy with the settlement and does not accept it. She considers the offer is not sufficient to address the damage. She wants to have the home repaired and the temporary accommodation extended until this is complete. Loss caused by flood is covered subject to policy terms and conditions The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. Further, there is no dispute the home was significantly inundated and the claimed loss (flood) is covered under the terms of the policy. The insurer partially accepted the claim for building damage but says it can limit this cover as much of the claimed damage pre-dated or was not related to the flood event. The complainant denies this. Given there is obvious flood damage throughout the home, I am satisfied the onus rests with the insurer to explain why some of this damage should not be covered. Insurer must exercise policy discretion to cash settle fairly Under the terms of the policy, the insurer says it will decide whether to: Determination | Case number: 931260 Page 3 of 9  repair or rebuild the lost or damaged part of your building ;  replace your building ;  … ; or  pay you the amount we determine to be the reasonable cost or repairing or rebuilding the lost or damaged part of your building up to the sum insured stated on your [COI] . In this case, the insurer has opted to cash settle the claim. The discretion to settle by way of a cash settlement is not absolute. It must be exercised fairly. As the purpose of the policy is to insure the building and contents, it is always preferable that damage to the building is repaired, unless it is not viable to do so. Where a claim is settled by way of a cash settlement, the insurer is required to pay the reasonable cost to repair the damage to the property. The cash settlement should be sufficient to ensure that the complainant is able to engage her own contractors to complete the claim-related repairs. Engineer says renovations to home not compliant with building code The insurer engaged a consulting engineer, SC to review the damage. SC attended the home on 23 June 2022, confirming there was extensive flood damage. It also identified significant pre-existing damage and maintenance issues. SC wrote that the rear pergola was converted into a bedroom and bathroom in 2017. The converted bathroom area ‟ s ceiling was 1.8m. SC says this is less than the 2.1m height required under the Building Code of Australia (BCA) at the time. It considers the conversion of the rear extension into a bedroom/bathroom was not compliant with requirements of the BCA. Further, SC found:  the footing system consists of a combination of sandstone piers with loose bricks propping up the floor framing  the home was founded on „loose – very loose silty sand material ‟  the flooding of this sandy material does „not have a significant influence on the footings‟, unless there is erosion, which can undermine them and cause subsidence  no influence from the flood on these footings was found  the sandy material was „ poorly graded, and typically experiences long-term subsidence as a result of long-term consolidation and settlement of the foundation material ‟ . SC ‟s report concludes the home is repairable as it only requires „non - structural repairs‟. Any footing movement is „ consistent with long-term consolidation and subsidence of the footing system ‟ . It provided a SOW for repairs related to the flood damage. Based on this SOW, the insurer sought repair tenders. It received three quotes from local builders:  AJ quoted for $247,792.47  SH quoted $438,275.50, and  MC quoted $161,283.98. The insurer decided to settle the claim based on the AJ quote. This was on the basis the quote was more competitive. It says the SH quote includes repair/upgrade to the rear extension and the policy does not cover costs associated with the defects. Determination | Case number: 931260 Page 4 of 9 Noting SH also did not individually itemise its costings, I am not satisfied this quote should be preferred. MC did not visit the home. None of the repairers were prepared to warrant the work (or undertake it ). However, AJ‟s quote was used by the insurer as a basis for settlement. Complainant says insurer’s cash settlement offer is inadequate The complainant says that the insurer‟s cash settlement was inadequate . She believes the AJ quote is not a reasonable assessment of the cost of repairing the claimed damage. The complainant provided a report dated 24 March 2023 from consulting engineer CS. CS attended the property on 24 January 2023, concluding: I confirm the existing dwelling structure was never repairable and that the best solution, was always to “knock - down and rebuild”. CS says the footings were incorrectly described by SC as „concrete pad footing‟, which is not correct. There are no pads and no sandstone piers. It is best described as an „ unstable fo undation system‟, which is due to the „passage of flood waters‟ through the property. CS also notes SC did not address the drop in the flooring after the event, which it acknowledges was one of the complainant‟s concerns. As the home was inundated 500mm above floor level (and about 500mm above ground level, due to the piers), this doubles the pressure load from the flood on the home. CS disagrees with SC‟s view that flooding would not typically impact this type of footing. It considers the level of flooding caused: differential settlement and has then affected the bearers, joists, walls and roof, all of which are no longer stable. Once the flooring, wall and ceiling linings are removed „the timber structure will become completely unstable‟ and could collapse . Structural certification of the building would need to be confirmed before any repair work could be undertaken. This is not in the SOW. The complainant later provided a quote from CR for $1,149,500.00 to rebuild the home. Evidence of long-term footing movement which SC says is not flood related SC reviewed the CS report. It considers there is: clear evidence of long-term deterioration and historic replacement of original sandstone footings with loosely stacked brickwork, This sandstone portion of the pad footing was about 75mm below natural ground level. SC says there was no collapse of the footings observed at the time of inspection. There is no evidence they were affected by the flood. The footings are unstable due to the „original defective construction‟ of the footing system and prior repairs, not the flood. I accept the photos show an unstable and apparently imprecise use of bricks to support the piers under the home. It does not look stable. SC notes there were no cracking or movement-related cracks in the home. I accept this would likely be expected if there was foundation movement from the flood event. Determination | Case number: 931260 Page 5 of 9 SC challenges CS‟s findings about the pressure brought to bear by the water flow. It says there is no evidence the foundations were affected. Any difference in the floor levels is due to long-term settlement and consolidation of the footings. This is a pre-existing defect. CS maintained its view. Given the extent of damage and the flood, CS considers there is no other reasonable alternative other than to rebuild the home. Exchanged material does not show insurer is liable to replace the footings The insurer cites two major reasons it cannot repair the home:  problems with the footings which it says are not related to the flood event  renovations in 2017 not being conducted in accordance with the building code, leaving the ceiling spaces in some rooms too low. The respective engineers disagree over the state of the footings. Photos from under the home show the piers have been supported in some areas using bricks. When this work was conducted is not known, however it clearly pre-dated the flood event. I acknowledge this method has been successful, if unorthodox. The photos inside the home (after the flood event) show no persuasive evidence of significant footing movement. Such movement would reasonably be expected to cause issues with the flooring and cracks in the walls. These are not evident. AJ undertook a thorough examination of the home and the damage when it was preparing a repair quote. It noted the issues with the foundations and agreed with CS that these: are consistent with long-term subsidence as a result of long-term consolidation and settlement of the foundation material. AJ also confirmed: The existing footing system is consistent with the combination of a sandstone pier with loose bricks installed and propping of the existing floor framing structure. There was no flood related lateral movement, floatation or dislodged bricks observed at the time of our inspection. Based on this, I accept any footing movement, on balance, pre-dated the flood event. Whilst this may have been exacerbated by the flood event, I am satisfied it can be primarily attributed to the unusual nature of the footing system. I am not persuaded the severity of the flooding event was the dominant or effective cause of any issues. The complainant and CS highlight issues accepted by the insurer at a nearby property as evidence that the home requires a rebuild. Each claim and the damage to each home must be considered on merit. I am not satisfied that because another home requires a rebuild, that the situation is automatically replicable to the complainant‟s home. On balance, I not satisfied the evidence is persuasive that the flood caused damage to the footings which requires their replacement. I acknowledge the footings likely should be replaced. However, I consider this is more due to the haphazard nature of their construction and maintenance, rather than the claimed event. Given this, I accept the insurer is not liable to rebuild the entire home. Determination | Case number: 931260 Page 6 of 9 Whilst I have not considered the issue with the ceiling heights, I note CS did not detail the exact BCA areas which were not complied with. I am also not convinced by this evidence that any such breach is necessarily an impediment to repairing the home. Unfair to rely on quotes obtained as a basis for settlement I acknowledge none of the insurer‟s repairers have quoted with the intention of completing the work at the complainant‟s property. There is no actionable quote which has been prepared on behalf of the insurer. I accept this is largely due to the footings and their likely unsuitability for a rebuild. This does not mean the insurer is liable for the footings. As noted above, there is no persuasive evidence they were damaged by the event. To the extent they were, this is due to the manner of their construction and maintenance. I also accept this might be due to concerns over the viability of the structure once it is stripped. This was noted by CS. The repair of the home will be extensive and almost total. I dismissed consideration of the MC quote (too low), the CR quote (too expensive) and SH quote (it did not itemise the individual costings). Therefore, I consider the best analysis of the required damage is likely the (unactionable) AJ quote. However, I note this quote was compiled on 9 September 2022. I accept the home has likely deteriorated further since this quote was prepared. The costs to repair it have likely increased. To this end, I consider the fairest way to resolve this matter is to get additional repair quotes to use as a basis for settlement. Parties to work cooperatively to arrange new quotes to settle the claim The parties must each engage an independent builder to prepare up-to-date quotes to repair the home. The insurer may use AJ again, if it chooses. Each builder must visit the site and prepare a new quote. The repair quotes must be itemised and costed, based on the SC SOW. The quotes obtained and considered must be actionable on the basis that the complainant agrees to independently address and repair the issues with the footings. This will include ensuring they are commensurate with current building standards. The insurer is to cash settle the claim based on the average of the two quotations with a 25% contingency uplift, less the amount it has already paid to the complainant. This is on the basis the average of the two quotes does not exceed the building sum insured applicable at the time of the loss. The contingency uplift serves to address the transfer of risk passing to the complainant to complete the work. It will also compensate her for the loss of the lifetime guarantee and caters to the possibility there may likely be variations required during the works. An allowance must also be made for further mould treatment and asbestos removal at the property if it proves necessary. Given any cash settlement will be based on an up-to-date estimates with a contingency uplift, I am satisfied there is no need to award interest. Insurer to extend te mporary accommodation to cater for repair work There is no dis pute that until the repairs are completed the complainant‟s home remains uninhabitable. Determination | Case number: 931260 Page 7 of 9 Whilst the insurer has already paid more than the policy limit for temporary accommodation, this is due to the delays involved in reviewing and determining the extent of the loss. I am satisfied the insurer should continue to provide cover for temporary accommodation until it is ready to settle the claim. As part of the quoting process, each repairer is to estimate a fair repair period to undertake the necessary claim related repair work. Once it is ready to propose settlement, the insurer is to:  average the amount of the respective time estimates and use this as a basis for calculating an extended period applicable for temporary accommodation  allow an additional 12 weeks for the time it will reasonably take to permit the repairer to commit to the work  further allow additional time for mould treatment and/or asbestos removal timeframes, should it extend the repair delay  add a 15% contingency to this estimate to account for any additional and reasonable delays which may occur. 2.2 Is an award of compensation required? Yes. The insurer has not handled the matter well and the complainant and her family are extremely vulnerable. The insurer must pay compensation for non-financial loss of $5,000. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer is to pay compensation for non-financial loss of $5,000 The insurer acknowledges there were significant delays with the claim and communication issues with the complainant. It offered to pay compensation for non-financial loss of $2,000 on 8 December 2022. I accept the complainant was extremely vulnerable, with two dependent children, including one with significant personal challenges. The complainant detailed numerous instances where her correspondence to the insurer went unanswered. The insurer also contacted her bank about a mortgage payout unnecessarily. It did not obtain an actionable quote to repair the home or adequately explore options to assist the complainant, noting her vulnerable state. I consider these issues considerably and significantly upset the complainant over and above the trauma of the damage caused to her home. I accept she suffered an unusual degree of stress, delay and inconvenience in the handling of this matter. Whilst the insurer apologised for not handling the matter as well as it should have, I am not satisfied it has adequately acknowledged or accounted for its failures. I am further concerned about the significant impact this has had on the complainant. Determination | Case number: 931260 Page 8 of 9 To this end, I consider a substantial compensatory payment for non-financial loss is warranted. I am satisfied the insurer should pay $5,000 to the complainant. 2.3 Why is the outcome fair? The support piers of the home are not in good condition and had significant pre-existing damage. The insurer is not responsible to repair the piers. However, it is fair that the parties both obtain new, actionable quotes, based on the complainant addressing the foundations issue. The insurer is to settle based on the parameters set out above. It is also fair that the insurer pays significant compensation for its poor handling of the claim. Determination | Case number: 931260 Page 9 of 9 3 Supporting information 3.1 The AFCA processes AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.