Home / Allianz Australia / Determination 931152
Determination 931152
Insurer declined external storm damage (staircase, patio slab, shed, block wall, driveway, retaining wall) citing exclusions for wear and tear, gradual deterioration and uninsured items
Summary
The complainant claimed for external damage to the home after a severe storm on 27 February 2022; the insurer had cash settled internal damage but declined external damage. AFCA found for the insurer, finding the damage was due to gradual deterioration, wear and tear or defects, and the driveway and retaining wall were not covered.
The storm was not the proximate cause of the external damage, which was most likely gradual deterioration, wear and tear or poor workmanship excluded by the policy, and unpaved driveways and retaining walls are not covered.
Issues
- Claim denial primary · not upheld
“The insurer is entitled to rely on the terms and conditions of the policy to deny liability for the external damage.”
- Poor claim handling secondary · unclear
“Complainant says the insurer's failure to complete a make safe has caused further damage to the home.”
- Inadequate claim investigation secondary · not upheld
“The panel does not accept the allegation of collusion and has determined this matter based on the information exchanged.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 931152
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 931152 Page 1 of 14
Case number: 931152 24 November 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the insurer and lodged a
claim for storm related damage following a severe storm on 27 February 2022.
Following assessment of the damage, the insurer accepted liability for the internal damage to
the spare bedroom, internal staircase, tiles and skirting boards. The insurer has cash settled
this part of the claim.
The insurer denied liability for external damage. The insurer says the damage was caused by
wear and tear, gradual deterioration, lack of maintenance, poor workmanship, faulty design,
soil movement, and insects. The insurer declined the claim for damage to the driveaway
because the driveway is unpaved and is not insured. The insurer also declined the claim for
damage to the retaining wall which is excluded under the terms of the policy.
The complainant is seeking for the insurer to accept all the claimed damage to the property.
1.2 Issues and key findings
Is the insurer liable for the external damage?
No. The panel is satisfied that most likely the external damage claimed was caused by wear
and tear, gradual deterioration, inherent defects, faulty design, or poor workmanship. Such
damage is excluded from cover under the terms of the policy. The policy also excludes claims
for damage to the unpaved driveway and retaining wall.
Why is the outcome fair?
While the panel accepts the complainant’s property was impacted by a significant storm with
rainwater runoff, the available information does not support the complainant’s claim for the
external damage.
The insurer has demonstrated the proximate cause of the damage was not a single storm
event. Most likely the damage in dispute had occurred over time and due to gradual
deterioration, which is excluded from cover under the terms of the policy.
It is fair in the circumstances for the insurer to rely on the terms of the policy to decline liability
for the external damage claimed.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to rely on the terms and conditions of the policy to deny liability for the
external damage.
Determination | Case number: 931152 Page 2 of 14
2 Reasons for determination
2.1 Is the insurer liable for the external damage?
No. The panel is satisfied that most likely the external damage claimed was caused by wear
and tear, gradual deterioration, inherent defects, faulty design, or poor workmanship. Such
damage is excluded from cover under the terms of the policy. The policy also excludes claims
for damage to the unpaved driveway and retaining wall.
Complainant has initial onus to prove claim falls within terms of policy
It is established insurance law that the insured has the initial onus to prove on the balance of
probabilities (that is more likely than not) that the loss or damage claimed falls within the
terms of the policy. Once established the onus shifts to the insurer to establish the operation
of a condition or exclusion should it wish to deny liability.
The complainant ’s home and contents policy is an insured events policy that provides cover
for a series of insured events including storm subject to various conditions and exclusions.
The relevant terms and conditions of the policy are set out in section 3 of this determination.
Circumstances of claim
There is no dispute that the complainan t’s property was impacted by a severe storm and
rainwater runoff on 27 February 2022.
According to the insurer ’ s claim notes the complainant reported that on 27 February 2022
during a significant storm, rainfall runoff ran down the slope of the property from the rear of
the house into various areas. The complainant says the central external stairs were twisted
from the rain. The slab on the front patio area moved from the runoff, one of the timber shed
supports became twisted and moisture was noticed in the lower section of the house that
backs up against the external walls. The retaining wall in the front garden started to lean.
Large pot holes started forming in the driveway. The complainant submits that there were no
issues with the house when he bought it and these areas of damage have only appeared
since the subject storm. Further the complainant says the insurer ’ s failure to complete a make
safe has caused further damage to the home for which the insurer should be liable.
Following assessment of the claim, the insurer accepted liability for internal damage to a
spare bedroom, internal staircase, tiles and skirting boards. The insurer has cash settled this
part of the claim. This matter is not in dispute.
The dispute arises as the insurer has denied liability for the external damage. The insurer
maintains the external damage was not caused by a one-off storm event or insured event.
The insurer says the damage to the driveway and retaining wall is not covered under the
policy. The insurer maintains the remaining external damage was most likely caused by wear,
tear, gradual deterioration, inherent defects, faulty design, or poor workmanship which is
excluded under the terms of the policy.
The insurer relies on its experts, assessor S, building consultant SB and engineer SE. The
complainant relies on a report from a builder BI. The reports are summarised in section 3 of
this determination.
The complainant has also alleged collusion between the insurer’s agents, which is denied by
the insurer. This allegation was noted by BI, based on the similarities and timing of the
experts’ reports. The panel accepts there are similar findings, although the reports,
Determination | Case number: 931152 Page 3 of 14
particularly from the assessor, seek to bring together the findings of SB and SE (all of which
are in fact related companies – but these are well known experts in the field). The panel does
not accept the allegation of collusion and has determined this matter based on the information
exchanged.
Policy does not cover unpaved driveways
The insurer denied the claim for damage to the driveway as the policy does not cover
unpaved driveways.
The policy covers damage to buildings. At page 26 the policy sets out an exhaustive list of
what is defined as a building and what is not. While the policy covers damage to paved paths
and driveways, it does not cover unpaved paths or driveways including those made of loose
or compacted soil, gravel, pebbles, rocks or sand.
The complainant ’ s driveway is described by the insurers building expert SB as a gravel/dirt
driveway showing visible erosion of soil down the sides of the driveway with stormwater runoff
erosion damage evident.
While there is no dispute that there was storm related damage to the driveway, the panel
accepts the insurer is entitled to deny any claim for damage to the driveway as the gravel
driveway is not insured under the terms of the policy.
Policy does not cover retaining walls
The insurer ’s engineer SE and loss adjuster S, identified two gravity linke d retaining walls and
the front eastern side of the house with the outer retaining wall leaning outwards significantly.
SE and SB did not consider the storm as the proximate cause, that is the dominant or
effective cause, of the damage to the retaining walls but attributed the damage to defective
design, poor workmanship and gradual deterioration. The insurer says in any event damage
to a retaining wall is specifically excluded from storm cover.
The panel is satisfied the policy excludes, under the storm event, damage to retaining walls.
The expert evidence confirms the damaged wall is a retaining wall. The complainant does not
dispute this. The panel is satisfied the insurer has established the exclusion for retaining walls
applies and is entitled to deny the claim.
Insufficient evidence to establish storm damaged the patio slab
The concrete patio slab was found to have moved laterally in an easterly direction. The
complainant says the movement was caused by the rainwater runoff.
The insurer says the movement of the slab is directly related to the slumping of the backfill
behind the concrete link retaining wall. SB suspected that due to the slope of the land a cut/fill
methodology was used, and uncontrolled fill placed behind the retaining wall. Over the life of
the property and multiple storm events, the soil has gradually compacted resulting in a lower
ground level. Without adequate drainage behind the retaining wall hydrostatic pressure has
resulted in reduced capacity of the wall to support the land behind it.
There is no persuasive evidence to dispute SB’s findings. The panel is satisfied the
movement of the patio slab is directly linked to the slumping of the backfill behind concrete
link block retaining wall. The panel is satisfied this most likely is the result of gradual
deterioration and a maintenance issue not covered under the terms of the policy.
Determination | Case number: 931152 Page 4 of 14
Insufficient evidence of storm damage to shed
The insurer denied the portion of the claim relating to shed arguing that the cause of damage
was maintenance related issues which are excluded from cover and not the storm.
SE and SB say the damage to the shed is gradual in nature and a maintenance related issue.
The shed was missing a downpipe which led to the erosion of the foundation concrete below.
This caused the foundation movement.
The complainant has not provided any information to dispute the expert reports which
conclude the damage is due to maintenance issue.
The panel is persuaded that the exclusion applies. Given this the insurer is not required to
cover the costs to repair the shed.
Complainant has not established storm damaged the external staircase
The insurer denied the claim for the staircase citing gradual deterioration and wear and tear.
The complainant maintains the damage to the staircase has only been caused by the storm
event.
SE identified the external staircase showed evidence of pervious termite activity and general
wear and tear over the life of the stairway leading to significant deterioration and rot of some
of the structural timbers. The reports from SE and SB are supported by photographs showing
the termite damage and wood rot. The complainant’s builder BI has not addressed this.
S confirms that additional damage including partial dislocation and movement of the butterfly
timber staircase and balustrading has been contributed to by the storm event. This however
was not considered the proximate cause of the damage.
Having the reviewed the information exchanged, the panel is satisfied the proximate cause of
the damage to the staircase is most likely from gradual deterioration, wear and tear. Wood rot
is clearly identified in the photographs. The panel is not satisfied the wood rot identified in the
photographs was caused by a single storm event as the external stairs are designed to
withstand extreme weather events.
As the policy excludes claims for damage due to gradual deterioration and wear and tear, the
panel is satisfied the insurer is not required to cover the costs to repair the external staircase.
Complainant has not established storm caused the cracks in the central
concrete block wall
The insurer denied the claim for cracks in the central concrete block wall citing building and
maintenance issues.
SB and SE identified waterproofing issues across the footing or up the concrete block. They
also identified high reactivity in the soil on which the property was built on which causes the
soil to swell upon wetting and shrink upon drying. The experts say this results in foundation
movement, resulting in the crack of the concrete block wall.
BI does not agree with the above expert opinion and says these cracks have only been
caused by the one-off storm event. BI says all the excluded items were in a serviceable
condition with no evidence of water damage or rotation prior to the storm event. Further BI
says the experts have relied on codes which were published after the building was
Determination | Case number: 931152 Page 5 of 14
constructed in 1981 and as such should not be applicable in this case. BI disagrees with the
findings of water ingress or soil build up against the wall.
There is difference in opinion on when the building was constructed, and no party has
provided any information to establish the actual build date. The relevant building codes have
not been established.
The complainant maintains the reports from SB and SE are not independent and should not
be considered. While both reports may have been finalised on the same day, there is no
dispute SE and SB inspected the property separately. As these reports have been done by
two experts in their field and independently to the insurer.
The reports from SB and SE are logical and consistent. The reports provide detailed
reasoning of the view that the damage was consistent with gradual deterioration and
maintenance issues. In contrast the report from BI is limited. While BI rejected the expert
reports and the conclusions, no reasoning to support this rejection has been given. No
explanation has been given for how the identified damage could be due to the one-off storm
event.
After reviewing the information provided from both parties, the panel is persuaded by the
reports from SB and SE. While the storm event may have identified the damage, it did not on
its own cause the damage. The panel accepts the complainant may not have been aware of
these issues and may not have had any issues since purchasing the property, however, on
balance the storm event was not the proximate cause of the damage.
2.2 Why is the outcome fair?
While the panel accepts the complainant ’ s property was impacted by a significant storm with
rainwater runoff the available information does not support the complainant’s claim for the
external damage.
The insurer has demonstrated the proximate cause of the damage was not a single storm
event. Most likely the damage in dispute had occurred over time and gradual deterioration
which is excluded from cover under the terms of the policy.
It is fair in the circumstances for the insurer to rely on the terms of the policy to decline liability
for the external damage claimed.
Determination | Case number: 931152 Page 6 of 14
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in insurance
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 931152 Page 7 of 14
3.2 Relevant policy terms
The Product Disclosure Statement
Page 17
Determination | Case number: 931152 Page 8 of 14
Page 55
Determination | Case number: 931152 Page 9 of 14
Record Key points
Determination | Case number: 931152 Page 10 of 14
Financial Firm’s Expert
Builder’s report (SB) –
1 July 2022
External Staircase
Evidence of previous termite activity as per the channels/tubes
contained within structural members and general wear & tear over
the life of the structure leading to significant deterioration/ rot of
some structural elements.
Insufficient clearance of the newel posts from the ground.
Measured to be approximately 45mm and not 75mm.
The footing system supporting the lower newel posts and posts
supporting the landing are not tied in with the adjoining exposed
aggregate patio slab.
An inspection of the concrete link block retaining wall directly in
front of the staircase revealed that it too is leaning towards the
main road. The wall is approximately 0.9m high and there was no
evidence of subs urface drainage outlets at either end of the
retaining wall. There is a line of a trees/shrubs that effectively runs
the lengt h of the retaining wall.
There is evidence to indicate that there is pre - existing damage to
structural elements of the tim ber staircase prior to the claimed
event.
Additional damage including partial dislocation and movement of
the butterfly timber staircas e and balustrading is considered to
have been contribut ed by the claimed storm event.
The area of land between the stairc ase and concrete link block
retaining wall has dropped and slid in an easterly direction, placing
pressure on the wall, causing it to lean towards the main road and
contributing to the movement of the staircase.
The failure and/or omission to install adequ ate subsurface
drainage behind the concrete link block retaining wall has resulted
in hydrostatic pressure being placed on the wall and reduced its
capacity to support the land behind it. This has contributed to the
slumping of the backfill and partial dis location of the timber
butterfly staircase.
The issues with the staircase are considered gradual in nature and
to be maintenance issue and not related to the event of February
2022 (Although the event has likely caused some further
deterioration).
Patio Sl ab
An exposed aggregate conc rete slab (with dividing clay paver
borders) is positioned across the front eastern elevation and
returns down both sides of the ground floor level of the residence.
The eastern portion of the slab measures approximately 9.35m
l ong x 2.4m wide and an air conditioning motor is positioned under
a window towards the northern end of the slab. The slab is not
directly tied into the main residence slab and is considered
“floating”.
It is estimated that there is approximately 6.5m dista nce between
the eastern edge of the patio slab to the retaining wall with the
timber staircase occupying nearly the first three (3) metres.
The concrete slab has moved laterally (sideways) in an easterly
direction and there is now
approximately a 40mm wide gap between the slab edge
and building at both the northern and southern ends of the
slab.
A section of black coloured damp proof course (DPC) at the base
of the weatherboard (towards the north - eastern corner of the
building) and connected to the slab has torn due to the substrate
movement.
With the aid of a digital level, It was recorded that the patio slab
Determination | Case number: 931152 Page 11 of 14
Record Key points
Financial Firm’s Expert
Engineer’s report (SE) –
6 June 2022
On the basis of the above observations and discussion, our
conclusions are as follows:
The late February 2022 rain event is not the proximate cause of
the cracking and movement - related damage to the house, the
leaning front retaining wall, out of aligned front stairs, or the
movement - related damage to the front ground slab.
Instead, it is engineer’s opinion that this damage has been caused
by the combination of the following reasons:
‒ Long term and on - going foundation movements due to
underlying reactive clay foundation soils;
‒ Settlement of inadequately compacted fill mat erial at the
front eastern end of the house;
‒ Possibly contributed to by a lack of depth to the house
footings and the footings possibly founded in the fill
material at the front;
‒ Outwards leaning ret aining wall causing slumping of
backfill material possibly contributing to damage to the
front of the house/stairs/front patio ground slab;
‒ Inadequate back of wall drainage to behind the gravity
block link retaining walls;
‒ Unreinforce d and non - core filled load - bearing blockwork
walls considered inherently susceptible to cracking and
movement - related damage.
It is our opinion that the se ttlement - related movements and
cracking damage to load - bearing blockwork walls to the house are
of s tructural concern and require prompt rectification.
The front timber stairs are unsafe and are recommended not used
by occupants of the house.
It is our opinion that if the lack of drainage provisions and
waterproofing to the sub - floor and blockwork wall at the junction to
the ground floor level of the house are not addressed, continued
water ingress into the building envelope will re - occur during future
rainstorm events.
The leaning eastern elevation timber posts of the rear shed roof is
the result of a combination of the reasons outlined by paragraph
6.15 and is considered a maintenance relat ed issue.
The house will remain susceptible to normal seasonal moisture -
related reactive clay foundation movements.
Following any repairs undertaken to the house, further cracking
and movement - related damage is to be expected due to the
presence of underlying reactive foundation soils.
Determination | Case number: 931152 Page 12 of 14
Record Key points
Determination | Case number: 931152 Page 13 of 14
Complainant’s Builder’ s
report ( B I ) -
Not dated
COMs builder concludes
The insurer’s assessor did not provide a make safe to prevent
further damage.
The insurer’s assessor did not offer to provide temporary
protection to prevent access to the external staircase.
Failure of the assessor and the insurer to undertak e a make safe
and stabilising the building h as resulted in further movement and
jeopardised the safety of the complainant’s family.
The builder and the engineer from the insurer submitted their
reports on the same date, which raised concerns impartiality
concerns.
The builder summarises the conclusion from the engineer’s report,
this raises further concerns wit h collusion. How can this take place
knowing the reports have been submitted on the same date.
Many items in both reports are identical which indicate a clear lack
of impartiality with this assessment.
Prior to the complainant’s building being exposed to some 600mm
of water over a short period of time the retaining wall, deck and
ground floor was in a serviceable condition wit h no evidence of
water damage or rotation.
The reports from th e builder and the engineer make regular
reference to the building soil being a M or H1 soil reactivity in
accordance with AS2870 - 2011. This code was published 30 years
after the building’s construction, thus, I am uns ure as to how the
design and soil react ivity could be assessed retrospectively
against a document that did not exist in 1981.
The builder and the engineer (they have actually plagiarised one
another) advises that a wat erproofing membrane has been omitted
from the masonry wall on the sub - floor t hat is common to the
ground floor living area. I note that this is the condition of the wall
that has been in this manner since completion, wit h no reported
water ingress.
It is stated that soil has gradually built up against the wall due to
ongoing storm s. I categorically refute this comment as these has
never been any evidence of water ingress or soil build up against
this wall.
As such, a waterproof membrane had never been required here
as this has never ret ained any soil.
The builder and the engineer state that the block wall is not core -
filled, yet, they have not sig hted nor referred to reviewing the
original engineering design to assert such comments that core -
filling was required as they have stated.
The SE advises that the Building Code of Austra lia (BCA)
applicable at the date of construction outlined that section P2.2.1.
Surface water is relevant to the subject building. I find it difficult to
ascertain how the building was to comply with a code that was first
published 7 years aft er constructio n was completed with is verified
in the below extract from the National Construction Code website.
“The first edition of the Building Code of Australia was published in
1988. The BCA is a uniform set of technical provisions for the
design and construction of buildings and other structures
throughout Australia; it is referenced in all State and Territ ory
building Legislation”
I find such comments inaccurate and stated for the Insurers
benefit. Another indication of the collusion and fabrication that
has take n place with this assessment.
The engineer has alluded that the movement can be contributed
to a possibility of a lack of depth in the footings to the main
Determination | Case number: 931152 Page 14 of 14