The complainant disputed a $2,482.52 cash settlement for loungeroom ceiling water damage, saying repairs would cost about $20,000. AFCA found the settlement unfair and required the insurer to obtain an updated scope and quote and pay 70% of it (plus 10% for contingencies) less the amount already paid.

Both parties contributed to the increased damage (insurer's conflicting consultant reports and delay; complainant's failure to mitigate and bathroom leaks), so repair costs are fairly shared 70/30.

Issues

Subjects and remedies

home or building damagepay claimreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 931101 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 931101 Page 1 of 7 Case number: 931101 11 May 2023 1 Determination overview 1.1 Complaint The complainant held a home building insurance policy (policy) with the financial firm (insurer). On 17 January 2020, the complainant lodged a claim for water damage to the insured building said to have occurred on 19 October 2019. The complainant advised that a tap was left running (in the bathroom) resulting in water leaking and causing damage in the bathroom, garage and loungeroom ceiling. The insurer declined cover for the damage in the bathroom and garage. However, it accepted damage to loungeroom ceiling was consistent with rainwater ingress and arranged repairs to the roof tiles. The insurer in acknowledgment of the complainant’s concerns with its management of the claim, waived the $1,000 policy excess. It cash settled the complainant $2,482.52 for the loungeroom ceiling repairs in June 2020, and the claim was closed. On 15 March 2022, the complainant contacted the insurer to express concerns regarding its cash settlement for the lounge room ceiling and says his repairer ‘S’ had quoted repairs to be approximately $20,000. The complainant wishes to return the cash settlement and for the insurer to arrange the repairs to the loungeroom ceiling. The complainant asserts the insurer has not been truthful and has failed to provide a full understanding of the matter to AFCA. 1.2 Issues and key findings Is the insurer required to increase its settlement under the claim? Yes. Although the insurer is not required to settle the claim based on the complainant’s expected repair cost of over $15,000, its settlement in the amount of $2,482.52 is not fair. The available information shows both parties have contributed to an increase in the damage to the loungeroom ceiling. Accordingly, the claim is to be settled as set out in section 2.1 below. Why is the outcome fair? The outcome is fair as it is not in dispute that the damage to the loungeroom ceiling is due to an event covered under the policy. However, it is clear that both parties were in in a position to mitigate further loss by managing the matter in a more efficient and responsible fashion but failed to do so. It is fair that both parties are required to contribute towards the cost to repair the current damage to the loungeroom ceiling. 1.3 Determination This determination is partially in favour of the complainant. The insurer is to increase its settlement of the claim. Within 14 days of receiving notice of the complainant’s acceptance of this determination, the insurer is to settle the claim as set out in section 2.1 below. Determination | Case number: 931101 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer required to increase its settlement under the claim? Yes. The available information shows both parties have contributed to an increase in the damage to the loungeroom ceiling. Accordingly, it is fair that the insurer be required to increase its settlement under the claim in line with this determination. The policy is an insured events contract of insurance The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the property against loss or damage caused by one or more of the listed insured events, including ‘Storm’ . Cover under these benefits is subject to the conditions, limitations and exclusions specified in the PDS. There is no dispute the building suffered damage from an insured event The complainant is first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. The insurer says the damage to the bathroom and garage is not due to circumstances covered under the policy. The insurer accepts the damage to the loungeroom ceiling noted in 2020 is likely to be due to rainwater ingress from damaged roof tiles, which is an insured event. The insurer repaired the roof tiles and cash settled the complainant for the damage to the loungeroom ceiling. In addition to his concerns regarding the insurer’s settlement payment for the damaged loungeroom ceiling, the complaint asserts:  he was unable to arrange the repairs or for a consultant to attend for a few years due to COVID-19  the damage to the loungeroom ceiling is not related to the upstairs bathroom and he is not seeking cover for the bathroom repairs/renovations  all the loungeroom ceiling damage, as confirmed by the first consultant sent by the insurer, is due to rainwater ingress  the insurer and this first consultant had a disagreement resulting in the consultant leaving the services of the insurer and taking the complainant’s assessm ent report/file with it  the insurer apologised for this and arranged for a different consultant to attend and who provided a different assessment outcome  the damage to the loungeroom ceiling has not got worse and is all due to rainwater ingress in line with what the first consultant advised him  the insurer is trying to escape responsibility for the higher cost of repairs. Also, the insurer has lied about waiving of the excess, first saying it was a gesture of kindness and now says this was waived in acknowledgement of losing his file The complainant says he will accept being allowed to return the cash settlement received, he will arrange the bathroom repairs after which the insurer should arrange and complete the repairs to the loungeroom ceiling. Determination | Case number: 931101 Page 3 of 7 No persuasive information to show the insurer lost original assessment file I acknowledge the complainant’s assertion that the insurer’s original consultants advised the complainant the damage to the loungeroom ceiling was due to rainwater ingress. Further, that a disagreement between this consultant and the insurer took place resulting in the consultant leaving with the complainant’s assessment file. The complainant has not provided any information which may assist in establishing who the claimed original consultant was, when they attended or of any information they may have provided the complainant. Having reviewed the claim file notes, I am satisfied it is clear the first consultants appointed to the claim were ‘T’, who then appointed plumbing consultant s ‘TW’. These consultants have both provided reports of the ir assessments dated 22 January 2020 and 7 February 2020, which have been provided by the insurer for consideration. Without compelling supporting information, I am not satisfied the complainant has shown his assertion regarding the insurer losing the original consultant ’s report or of any disagreement between the insurer and its consultant. Information from the several consultants appointed by the parties The claim file notes show after claim lodgement on 17 January 2020, the insurer appointed T on 20 January 2020 to attend the insured property to assess the cause and extent of the damage. The claim file notes also show the complainant was transferred through to T (over the phone) on 20 January 2020, to discuss the details of T ’s and TW’s planned attendance. In its report dated 22 January 2020, TW concludes that the shower screen was leaking on to the bathroom floor causing the floor tiles to become loose. There was no water proofing to the floor and overtime this has resulted in damage to the flooring and eventually the ceiling (loungeroom) below. TW says this is all due to the leaking shower screen not being sealed . In TW’s opinion, the other part of ceiling damage noted was separate from the bathroom and caused by flashings to the roof directly above. In its report dated 7 February 2020, T says the complainant told him that after leaving the bathtub running, water overflowed and ran down the staircase and to the lower floor. Also, that water seeped through the floor tiling and damaged the loungeroom ceiling. T’s report states in part:  its inspection confirmed that the damage noted has been caused by waterproofing failure from the upper floor shower recess. The shower recess was leaking substantial amounts of water  the leaking appeared to be an ongoing issue of which the complainant was aware and there was evidence of prior attempts to repair and prevent water leaking. This included several tiles which had been incorrectly recemented to the floor and were no longer flush  there were several areas with grout missing between the tiles  the complainant should engage a consultant to complete maintenance works to the bathroom including the compromised waterproofing, shower screen and tiles replacement. T estimated these works to cost from $8,000 to $10,000  T concluded that all the damage noted is inherent and structural defects with unsatisfactory workmanship and not due to a single insurable event. The insurer appo inted building consultants ‘F’ who provided a report dated 7 May 2020. F says the complainant directed it to the damaged loungeroom ceiling and advised he had arranged for a contractor to re-position one slipped tile and seal another damaged tile. In F ’s opinion, the damage to the ceiling was due to the rainwater ingress arising from issues with the tiles. F provided a scope of works and quote ($2,482.52) for the loungeroom ceiling. Determination | Case number: 931101 Page 4 of 7 F says it appointed ‘PB’ to attend the property on 7 May 2022 and provide a roof report. PB says the roof, flashings, guttering, silicon, penetrations and lead flashings were found to be serviceable. In PB’s professional opinion, the water damage, staining and cracking is due to the slipped tile and one other cracked tile. PB provided a second report dated 26 May 2022. In this report PB says the damage to the loungeroom ceiling is not due to a roof leak and that a leak detection test should be carried out in the bathroom above. PB raises concern regarding the height of the box gutter installed at the insured property. The insurer arranged for F to re-attend the insured property after which it has provided a report dated 30 May 2022. F says inspection of the loungeroom ceiling plaster showed signs of water damage but no mould or long-term damage. On inspecting of the bathroom F noted water and mould damage to the wall plaster outside and to the side of the shower recess. In F’s professional opinion, the damage to the loungeroom was consistent with rainwater ingress. F says the damage to the bathroom and garage are unrelated to the rainwater ingress damage. Further, that the complainant was aware of the issues resulting in the damage to the garage ceiling plaster. The insurer arranged a specialist leak detection assessment by cons ultants ‘N’. N has provided a report dated 25 June 2022, which says:  a spray test to the shower wall failed  a spray test to shower screen failed  a pressure test to shower breach failed Further, that the toilet pipe is leaking onto the floor and tracking towards the bathroom doorway, this appeared to have been leaking for some time. N concludes that the source of water ingress damage is due to:  deteriorated seals behind the shower spindles  leaking shower spindles  gaps between the wall and shower screen allowing large amounts of water to escape onto the floor which is then leaking through to the ceiling below  the toilet flush pipe is leaking onto the floor causing damage to the floor and door jamb The complainant has provided information from consultants S in the form of a repair quote totalling $15,400 for ‘Water damage bathroom renovation and ceiling plaster’. S says water runs through the timber battens, but it cannot confirm how extensive the damage may be with the quote limited to fixing the plaster. S refers to having to do new waterproofing, however, does not provide any details, comments or opinion that assists with determining the cause for the damage to the loungeroom ceiling. Conflicting information from the consultants Having considered the information from the various consultants, including photos, I am satisfied this shows there exist various long-term issues within the bathroom waterproofing and plumbing, resulting in multiple leaks. However, this is not the issue subject of this complaint and I note the complainant is not seeking cover for the issues with the bathroom. The quote from S refers to bathroom renovation works, this being the significant part of the quote. The damage to the bathroom is not subject of this complaint or has it been shown this is covered under the policy. With respect to the loungeroom ceiling damage, the information from S provides no comment, opinion or assessment. I am not satisfied the information from S assists in establishing the cause and extent of the damage to the loungeroom ceiling. Determination | Case number: 931101 Page 5 of 7 In saying that, I note the insurer’s appointed consultants have provide d conflicting information regarding the cause for the damage to the loungeroom ceiling. This includes the same consultant (PB) providing two conflicting opinions in its reports dated 7 May 2020 and 26 May 2020. Further, F in its report dated 30 May 2022, says there is no evidence of long term water damage to the loungeroom ceiling. This appears inconsistent with all the information which shows damage had existed for at least two years at the time of its assessment in 2022. I note TW’s assessment in January 2020 (the first consultant on site) notes damage to the loungeroom ceiling, separates the damage from the bathroom and says it was due to issues with the roof flashing directly above. I am satisfied this is consistent with the complainant’s recollection and position that he was told by the first consultants the damage is due to rainwater ingress. I am of the view, it is reasonable to accept that the conflicting information from the insurer’s appointed consultants has resulted in unreasonable delays and necessitated having to appoint and re-appoint several consultants, extending the assessment process. Further, that these delays have, on balance, caused or significantly contributed to further water damage to the loungeroom ceiling over time. In addition to the above, I accept the insurer’s position that the complainant failed to take reasonable steps to arrange the recommended maintenance works to the bathroom above or arrange repairs to the loungeroom ceiling. I acknowledge the complainant’s reference to COVID-19, however, he has not provided any information to show any attempts were made to appoint a repairer or mitigate the damage over two years. I am of the opinion the available information shows it is possible water was also leaking onto the loungeroom ceiling from leaks in the bathroom above, which would not be covered under the policy. This will have contributed to additional damage to the loungeroom ceiling, however, to what extent has not been shown by the insurer. Both parties are to contribute to the cost of the loungeroom ceiling repairs Given the above, I am not satisfied the insurer’s final claim settlement for the damage to the loungeroom ceiling is fair. Also, it would be unfair to require the insurer to cover the cost of repairs in their e ntirety given the complainant’s contributions discussed above. There is insufficient information to come to an informed view as to what the extent of the damage to the loungeroom ceiling is or the fair cost to repair this damage. Therefore, I am satisfied it is fair in the circumstances that:  within 14 days of receiving notice of the complainant’s acceptance of this determination, the insurer is to arrange for an updated scope of works and associated actionable quote to repair the loungeroom ceiling  within seven days of receiving this scope of works and quote, the insurer is to pay the complainant an amount equal to 70% of this quote less the $2,482.52 it has already paid the complainant  the complainant is required to contribute 30% of the cost to repair the damaged loungeroom ceiling. The insurer is to increase the final claim settlement payment by a further 10% to allow for contingencies and the transfer of risk to the complainant in arranging the repairs. In the interest of completeness, I ack nowledge the complainant’s concerns regarding the reason(s) for the insurer waiving the $1,000 excess and his assertion the insurer has been dishonest. On review of the claim file notes, it is clear the complainant requested for a cash settlement and that on recognising poor communication and possible delays, the insurer Determination | Case number: 931101 Page 6 of 7 elected to waive the excess. Although, this issue has no bearing on the outcome of this complaint, I accept the insurer’s decision to waive the excess was reasonable and adequate in the circumstances. 2.2 Why is the outcome fair? The outcome is fair as both parties accept the damage to the loungeroom ceiling is due to circumstances that trigger cover under the policy. However, both parties were in in a position to either mitigate further loss by managing the matter in a more efficient and responsible fashion. Therefore, it is fair that both parties are required to contribute towards the cost to repair the current damage to the loungeroom ceiling. Determination | Case number: 931101 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.