Determination 930727

Insurer declined cost of rectifying fire safety defects present since construction after storm damage claim

FirmChubb
Decided2023-10-26
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A strata body claimed for storm damage; the insurer paid most of it but declined the cost of rectifying fire safety defects existing since construction. AFCA found for the insurer.

The defects were not damaged by an insured event, the faulty workmanship exclusion and extra cost limitation applied, and section 46 of the Insurance Contracts Act did not assist.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Chubb determinations · Find similar determinations

Text of the determination

Determination Case number 930727 Financial firm Chubb Insurance Australia Limited Determination | Case number: 930727 Page 1 of 6 Case number: 930727 26 October 2023 1 Determination overview 1.1 Complaint The complainant is a beneficiary under a residential strata insurance policy issued by the financial firm (insurer). The policy is issued to the body corporate of the building in which the complainant owns a unit. As such, any reference in this determination to the complainant, includes the body corporate. On 27 February 2022, the complainant lodged a claim after storm damage at the insured building. The storm caused damage to all 22 units at the property. The insurer accepted and settled most of the claim. The insurer declined to cover the costs to rectify defects to ensure compliance with fire safety requirements. The insurer says the building did not comply with the relevant fire safety requirements at the time of construction. The complainant does not dispute that the fire safety requirements were omitted at the time of construction, however says the lot owners were not aware of the defects until after the storm event. The complainant wants the insurer to cover the additional costs to rectify the fire safety defects. 1.2 Issues and key findings Is the insurer required to pay additional costs for reinstatement? No. The available information establishes the insurer is not required to pay additional costs. Why is the outcome fair? The outcome is fair as the exchanged information confirms that the defects were not caused by an insured event covered by the terms of the policy. It would not be fair for the insurer to pay the additional costs, when there is no policy requirement to do so. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action. Determination | Case number: 930727 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer required to pay additional costs for reinstatement? No. The available information establishes the insurer is not required to pay the additional costs to rectify the fire safety defects. Policy coverage The complainant’s Residential Strata Insurance policy provides cover for physical loss or destruction of or damage to insured property caused by an event occurring during the period of insurance. The complainant is a beneficiary under this policy. The full details of the coverage are contained within the Product Disclosure Statement (PDS) and Certificate of insurance. The coverage provided by the policy is subject to conditions, limitations and exclusions. This means that not all loss and damage is automatically covered, rather, only physical loss or destruction of or damage to insured property, by an event during the period of insurance and subject to the policy conditions, limitations and exclusions, is covered. The complainant lodged a claim under the policy after a severe storm caused damage to the ground level of the 22 units at the property. The insurer accepted the claim and paid for costs to remediate and repair the property and provided temporary accommodation. The insurer has denied that part of the claim that related to Fire Safety Defects it says have existed since construction of the property. The issue in dispute is whether the insurer is liable for additional costs to rectify fire safety defects that were present at the time the building was constructed. The parties agree the building was not compliant at the time of construction The parties agree that at the time of construction the property was not built in line with approved design and required fire compliance. The insurer says the building did not comply with the Building Code of Australia 1988 or the Building Code of Australia 1990 (BCA), which was in place at the time the building was constructed. The relevant sections are identical in both BCA 1988 and BCA 1990. Building Code of Australia 1990 C2.7 Separation by fire walls A part of a building separated from the remainder of the building by a fire wall is treated as a separate building if (a) ý the fire wall (i) ý extends through all storeys and spaces in the nature of storeys that are common to that part and any adjoining part of the building; (ii) ý is carried through to the underside of the roof covering; and Determination | Case number: 930727 Page 3 of 6 (iii) ý has the relevant FRL prescribed by Specification C1.1 for each of the adjoining parts, and if these are different, the greater FRL; and …. C3.14 Openings for service installations An electrical, electronic, plumbing, mechanical ventilation or air-conditioning, or other service that penetrates a building element (other than an external wall or roof) that is required to have an FRL for a resistance to the incipient spread of fire, must be installed so that the fire- resisting performance of the building element is not impaired. …. T he insurer’s builder id entified the following as defective:  installation of mineral wood insulation under roof tiles was omitted  electrical general purpose outlets were not installed into intumescent boxes and did not comply with BCA Part C3.14  incorrectly screwed plasterboard in the ceiling space, therefore not adequately sealing the space  the space within the eaves was not sealed off where the eaves meet the party wall and did not comply with BCA Part 2.7(a). There is no dispute that the above items were not damaged by the storm. A building approval, certification and compliance company identified additional works required to bring the building into line with current requirements. Noting that the non-compliant items were not damage in the storm, I am not satisfied that the complainant has established that there has been physical loss or destruction of or damage to the insured property caused by an event occurring during the period of insurance. The defect in the items occurred at construction and prior to the period of insurance. If the complainant had established loss caused by an event during the period of insurance, which I do not accept she has, the onus transfers to the insurer to establish the application of an exclusion upon which it seeks to rely to deny the claim. The PDS, at page 18, details; 3. Exclusions Applying to this Section The following exclusions apply to Section 1 in addition to the General Exclusions. 3.1…. 3.2 We will not cover physical loss, destruction or damage caused by or arising directly or indirectly from: q) i) defect, error or oversight in design, plan or specification or failure of design; or ii) defective or faulty materials or faulty workmanship, but We will pay for resultant loss, destruction or damage to Insured Property resulting from any Event not otherwise excluded by this Section 1, provided that You were not aware of, or could not reasonably have been expected to be aware of, exclusion q) i) or ii). Determination | Case number: 930727 Page 4 of 6 I am satisfied that the exchanged material establishes that the items in question were not damaged by an event occurring during the period of insurance. In my view, the exception in circumstances where the complainant was not aware does not apply as the resultant loss, destruction or damage does not result from the insured event (the storm) but rather from the defective and faulty workmanship at the time of construction of the property. I am satisfied that even if the complainant could demonstrate loss from an insured event, which I do not accept that she can, the insurer has established the application of this exclusion for which the exception to the exclusion does not apply. Section 46 of the Insurance Contracts Act 1984 (the Act) The complainant says the lot owners were not aware of the fire safety defects until the claimed event and therefore the insurer should not to be entitled to rely on the policy exclusion. The insurer says section 46 of the Act does not assist the complainant. Insurance Contracts Act 1984 Section 46 Pre-existing defect or imperfection (1) This section applies where a claim under a contract of insurance (other than a contract of insurance that is included in a class of contracts declared by the regulations to be a class of contracts in relation to which this section does not apply) is made in respect of a loss that occurred as a result, in whole or in part, of a defect or imperfection in a thing (2) Where, at the time when the contract was entered into, the insured was not aware of, and a reasonable person in the circumstances could not be expected to have been aware of, the defect or imperfection, the insurer may not rely on a provision included in the contract that has the effect of limiting or excluding the insurer's liability under the contract by reference to the condition, at a time before the contract was entered into, of the thing. This section prevents an insurer from denying a claim on the basis of a policy exclusion which operates by reference to a defect which existed before the policy was taken out, in circumstances where the insured was not aware of the defect at the time the policy was taken out. I acknowledge that the complainant did not know of the fire safety defects until after the storm event. However, sub-paragraph (1) confirms that the loss must occur as a result of a defect or imperfection in a thing. The complainant’s loss is two -fold;  damage caused by the storm and  the Fire Safety Defects. These two losses are not connected. The first loss is not the result of second and the second was not caused by an event occurring during the period of insurance. I accept that section 46 does not assist the complainant. Determination | Case number: 930727 Page 5 of 6 Policy does not provide cover for reinstatement to comply with standards The policy provides cover for extra costs of reinstatement. However, the policy excludes any costs incurred to meet compliance requirements which were in place prior to the claimed incident. The PDS, at page 25, details; 8.2 Extra Cost We will also pay the extra cost of reinstatement including demolition or dismantling of Your Insured Property necessarily incurred to comply with the requirements, operative at the time of reinstatement, of: a) any Act of Parliament or regulation made under it; or b) any by-law or regulation of any municipal or other statutory authority, provided in either case that: i) the work of reinstatement (which may be carried out wholly or partially upon another site if the Act, by-law or regulation so necessitates and subject to Our liability not being increased) must be commenced and carried out as soon as practicable, failing which We may be entitled to reduce or refuse a claim to the extent that We are prejudiced by any delay; and ii) the amount recoverable will not include the additional cost incurred in complying with any Act, by-law or regulation which You had been required to comply with prior to the happening of the physical loss, destruction or damage. There is no dispute between the parties that the building was not compliant at the time of construction and the builder omitted the fire safety requirements that were outlined in the building’s original design. Accordingly, the insurer is not required to cover the additional costs. I acknowledge the complainant’s position that the lot owners were not aware of the fire safety defects until after the claimed event, however this is not relevant to the applicable exclusion. I acknowledge the complainant’s position that the lot owners have been unsuccessful in pursuing the original builder, however AFCA can only assess the insurer’s obligations under the policy. Based on the available information, I am satisfied the insurer is entitled to limit its liability. It is not required to cover additional costs incurred to meet building compliance standards which were in place prior to the claimed event. 2.2 Why is the outcome fair? The outcome is fair as the insurer has met its onus of proof in showing that it is not required cover the additional costs under the terms of the policy. It would not be fair to require the insurer to pay for costs to rectify the defects when the policy does not require it to do so. Determination | Case number: 930727 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.