Extent of covered damage, cash settlement amount and claim delays after insurer reversed coverage of roof trusses

FirmSuncorp Group
Decided2023-08-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted then withdrew cover for sagging roof trusses after further inspection and offered $4,257.28 to cash settle ceiling repairs. AFCA upheld the truss denial but required a new desktop quote plus 20% uplift to be paid and $2,000 for non-financial loss.

The complainant did not prove the EOL damaged the trusses so the insurer could revise its position, but a cash settlement must rest on a current retail quote with a contingencies uplift and the insurer's delays and poor communication warranted compensation.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 930719 Financial firm AAI Limited Determination | Case number: 930719 Page 1 of 7 Case number: 930719 14 August 2023 1 Determination overview 1.1 Complaint The complainant holds home building insurance with the financial firm (insurer). In July 2019, he lodged an escape of liquid (EOL) claim for damage caused by a leaking water heater. The insurer accepted the claim. A dispute developed as to the extent of claim related repairs. On 23 May 2022, the dispute resolved after the insurer agreed to repair sagging roof trusses, as well as damage to ceiling cornices and plaster. However, after further investigation, the insurer concluded the trusses had not been damaged by the EOL and did not require repair. It offered $4,257.28 to cash settle ceiling repair costs. It also agreed to rectify a hole in the ceiling its builder had created. The complainant wants the insurer to attend to all the repairs it agreed to cover on 23 May 2022. He also says the rectification of the hole in the ceiling was substandard and he is dissatisfied with the insurer’s claim handling and delays. 1.2 Issues and key findings Is the insurer to cover more of the claimed damage? No. Based on the provided information, I am not satisfied that the trusses sustained claim related damage requiring repair or that the ceiling rectification was substandard. Is the insurer to pay a higher cash settlement amount? Yes. It is reasonable for the insurer to cash settle the covered aspects of the claim. However, its offer is not based on an actionable repair quote and does not include a contingencies uplift. The insurer is to obtain a desktop quote reflecting current retail prices from a builder not previously involved in the claim and is to pay the quoted amount plus a 20% uplift. Is non-financial loss compensation payable? Yes. The insurer’s altered coverage position and extensive delays have unreasonably caused the complainant stress and inconvenience. It is to pay him $2,000 in compensation. Why is the outcome fair? The complainant has not shown the trusses were damaged by the EOL or that the ceiling hole repair was substandard, so it would be unfair to require the insurer to cover more of the claim. However, it is fair that the insurer ’s cash settlement is based on a valid retail quote plus an uplift. It is fair that the insurer pays $2,000 in compensation for the stress it has caused. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of the complainant providing written notice he accepts this determination the insurer is to take the steps outlined in section 2.2 of this determination and pay him $2,000 in non-financial loss compensation. Determination | Case number: 930719 Page 2 of 7 2 Reasons for determination The complainant is represented by builder ME. In this determination, the complainant and ME are referred to as ‘the complainant’, unless context requires otherwise. The parties provided several submissions to AFCA. While this determination does not refer to each submission, I have taken them all into account in reaching my decision. 2.1 Is the insurer to cover more of the claimed damage? No. Based on the provided information, I am not satisfied that the trusses sustained claim related damage requiring repair or that the ceiling rectification was substandard. Complainant must show a claimable loss under the policy The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the complainant’s policy covers damage to his home caused by a listed insured event. Those events include ‘Escape of liquid’. In July 2019, the complainant lodged a claim for water damage to his ceiling and walls, which he attributed to a recent hailstorm. Subsequent investigations established that the damage was not from the storm but due to EOL from a water heater in the roof space. The insurer accepts that some of the damage claimed is due to the EOL. Accordingly, at least to that extent, I am satisfied that the complainant has shown a loss claimable under the EOL insured event. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer has altered its position on the trusses Initially, the insurer concluded that the sagging of roof trusses was due to building defects and weight bearing issues within the home, unrelated to the EOL. The complainant disputed that finding and lodged a complaint with AFCA. The insurer agreed to reassess its position. On 2 May 2022, the insurer received reports from engineer CS and builder JW. CS concluded that the cornice cracks were likely due to the roof trusses sagging and putting pressure on the hallway wall. The sagging was likely due to the trusses getting wet from an earlier leak, leading to timber creep. The trusses would need to be jacked up and stiffened. JW agreed with CS and provided a scope of works (SOW) for the truss and cracking repairs, totalling $23,533.73. JW issued two revised SOWs, and by 4 July 2022, the quoted repair cost was $30,684.78 On 23 May 2022, the insurer wrote to the complainant advising that CS and JW had concluded that the sagging roof trusses and the damage to ceiling cornices and plaster were caused by the leaking water heater. Accordingly, it agreed to repair that damage, in line with the policy terms. As a result, the complaint lodged with AFCA resolved. Determination | Case number: 930719 Page 3 of 7 Given the technical nature of the proposed truss repair work, the insurer requested a review by its building co-ordinator. The co-ordinator raised concerns that CS had not adequately inspected the trusses due to the bottom chord not being visible due to particle board flooring (as CS had noted in its report). On 3 August 2022, JW reported that its carpenter had entered the roof space to reinspect the trusses. The carpenter said that to determine whether they had warped due to water ingress and had caused the ceiling cracking, the plaster from the ceiling in the affected area would have to be removed. JW noted the plaster installation throughout the house was very poor. Following ceiling section ’s removal , CS reinspected on 31 August 2022. It reported that:  the trusses generally appeared to be in good condition with no signs of visible damage to the nailing plates or timber  there was a deflection gap between the bottom chord and the internal load bearing walls, as per standard practice  however, there was no deflection allowance between the bottom chord and the ceiling and cornice. This meant normal roof truss deflection (about 10mm mid-span) was putting pressure directly on the ceiling plaster and cornice, causing them to deflect and crack  ‘t o provide tolerance, for truss deflection and a better overall finish for the ceiling, it is recommended the ceiling plaster be attached to ceiling battens in lieu of directly fixing to the bottom chord of the truss ’ . JW also reinspected the property after the ceiling section had been removed. JW reached the same conclusion as CS, saying ‘it was again evident that the trusses were not damaged and that the likely fault was in the construction of th e plaster on the ceilings and walls’. The insurer says JW subsequently advised that ‘ there is no building code as such in respect to the trusses, but [the proposal to attach ceiling plaster to battens] is a recommendation from their truss manufacturer and our engineer in order to prevent cracking’. The plastering JW said was likely faulty had been undertaken by the insurer’s builder, JL, as part of prior EOL repairs. The insurer accepted that work had been done poorly. It asked JW to provide an SOW to enable cash settlement of the cost of rectifying the ceilings in the hallway, bedroom and bathroom. On 5 October 2022, JW submitted its SOW, quoting the cost at $4,257.28. On 14 November 2022, the insurer offered to cash settle the ceiling repair costs only, for that amount. The insurer submits that: upon a thorough inspection, it has been determined that there is no repairable damage to the trusses and no evidence of water ingress to the trusses caused by th e insured event…[It] initially accepted the damage on the original reports which advised that the event ‘likely’ caused the damage, however, the new information demonstrated that the event had not caused damage to the trusses. Complainant says damage to trusses should be covered The complainant relies on the opinion of ME. In addition to acting as the complainant’s representative and advocate, ME operates a demolition business and is a registered builder. ME says:  prior to the EOL, there were no sagging roof trusses Determination | Case number: 930719 Page 4 of 7  in its first report, CS had confirmed tha t ‘the wet sagging trusses from the claim were in fact an issue and need repairs ’. Further, CS did not refer to any deflection issues. CS’s second report is contradictory and unreliable  JL did not commence repairs until October 2019, at which time a large amount of mould was growing, including in the roof cavity. As shown in a provided photo, said to have been taken from an assessment report, the roof truss above bedroom one was wet and mouldy  there is no building code requirement for ceiling plaster to be ‘battened out’ in a domestic dwelling, contrary to what the insurer said  a photo of the internal walls and ceiling in bedroom one, taken by the insurer’s assessor post claim but pre-repair, showed no existing issue with the roof truss cornice or ceiling apart from water damage  ‘T he photo from the assessor clearly shows there was no truss sag, or previous damage to cornice prior to the escape of liquid claim. The assessor ’ s photo clearly indicates a straight ceiling and cornice’. Insurer is entitled to deny the claim for damage to trusses Based on the provided information, I am satisfied that it is reasonable for the insurer to deny the claim for damage to the roof trusses. This is because:  t he insurer’s acceptance on 23 May 2022, that the trusses were saggin g due to the EOL was based on CS’s findings of what was likely but in circumstances where a full inspection could not be undertaken without removal of a section of ceiling  after the ceiling section was removed, both CS and JW determined that there was no damage to the trusses or required repairs  as it has not been shown that the complainant relied to his detriment on what the insurer said on 23 May 2022, it is reasonable that the insurer be permitted to have reassessed its coverage position as further relevant information became available  to the extent that the altered coverage position has caused the complainant frustration, that is best considered in the context of his entitlement to non-financial loss compensation  the complainant has not provided any expert reports in response those of CS and JW  while ME is a builder, he has not provided a formal report. Further, the weight to be placed on his opinion is a ffected by his role as the complainant’s advocate  the photos ME has provided are of limited assistance. The photo of a roof truss with mould on it is undated and does not confirm the truss was sagging. The photo taken within bedroom one is not sufficiently clear to definitively establish the state of the ceiling/trusses. Complainant has not established ceiling rectification was substandard In August 2022, JW cut a hole in the hallway ceiling for the purpose of further assessing the trusses. The insurer agreed to attend to rectification repairs and has done so. In an email dated 31 May 2023, ME said that the hole had only recently been fixed, but to a substandard finish. However, no details, images or independent assessments have been provided. In the circumstances, I am not satisfied that the complainant has established that the ceiling rectification work was substandard. 2.2 Is insurer to pay a higher cash settlement amount? Yes. It is reasonable for the insurer to cash settle the covered aspects of the claim. However, its offer is not based on an actionable repair quote and does not include a contingencies Determination | Case number: 930719 Page 5 of 7 uplift. The insurer is to obtain a desktop quote reflecting current retail prices from a builder not previously involved in the claim and is to pay the complainant the quote plus a 20% uplift. Reasonable for the insurer to cash settle The complainant wants the insurer to attend to repairs so that he has an entitlement to the lifetime guarantee that applies to lifetime guarantees. The insurer notes that under the PDS, it has the right to decide whether to attend to claim related repairs or to pay the insured the cost of those repairs (cash settling the claim). AFCA expects that in deciding whether to attend to repairs or pay a cash settlement, an insurer must act reasonably. The insurer says it is reasonable that it cash settles as JW says it cannot warrant the ceiling plastering works set out in its SOW dated 5 October 2022. JW says this is because until the ceiling attachment issue is addressed, further damage to the plastering will likely occur. JW has also confirmed the ceiling attachment issue is present throughout the house. In the circumstances, I agree with the insurer that it is reasonable for it to cash settle the covered aspects of the claim. Insurer must take further steps then pay a higher cash settlement amount A cash settlement must be based on a reasonable quote for repairs, actionable by a retail customer. An uplift is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. I am not satisfied that the insurer’s $4,257.28 cash settlement offer is sufficient because:  while the work items it has included appear reasonable, JW has acknowledged its SOW dated 5 October 2022 was prepared solely for cash settlement purposes rather than as an actionable retail quote  the SOW includes items that would be payable by a consumer but has costed them at $0  the SOW is now over ten months old so is unlikely to reflect current prices  the insurer has not included a contingencies uplift. I am mindful that the claim event occurred four years ago. I am satisfied that it is in the best interests of the parties to resolve the matters between them as soon as is reasonably possible. In the circumstances, if the complainant provides written notice he accepts this determination, the insurer is to take the following steps:  within 14 days of the notice, the insurer is to engage a builder not previously involved in the claim to prepare base d on JW’s SOW dated 5 October 2 022, a desktop quote for the covered repairs reflecting current retail prices  within 14 days of receiving the quote, the insurer is to provide the complainant with a copy of it and pay him the quoted amount plus a 20% contingencies uplift. 2.3 Is non-financial loss compensation payable? Yes. The insurer’s altered coverage posi tion and extensive delays have unreasonably caused the complainant stress and inconvenience. It is to pay him $2,000 in compensation. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of: Determination | Case number: 930719 Page 6 of 7  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer has unreasonably caused stress and inconvenience The complainant says that the claim has taken way too long and has been very poorly handled by the insurer. He says he has been very patient but is completely over the whole process and the stress and inconvenience it has caused him. The provided information makes clear that the insurer has caused unreasonable delays and communicated poorly with the complainant. Not only did the insurer advise in May 2023 that it would be covering repairs to roof trusses only to deny that aspect six months later, it did not tell him in the intervening period it was actively investigating and reconsidering its position. I am satisfied that the insurer has caused the complainant stress and inconvenience. It is to pay him $2,000 in compensation. 2.4 Why is the outcome fair? The complainant has not shown the trusses were damaged by the EOL or that the ceiling hole repair was substandard, so it would be unfair to require the insurer to cover more of the claim. However, it is fair that the insur er’s cash settlement is based on a valid retail quote plus an uplift. It is fair that the insurer pays $2,000 in compensation for the stress it has caused. Determination | Case number: 930719 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.