Home / Chubb / Determination 930467

Determination 930467

Insurer declined claim for upper level mould and moisture damage after flood and storm, relying on the flood exclusion

FirmChubb
Decided2024-01-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$28,000
Non-financial loss—
Amount claimed$777,132
SourceAFCA PDF

Summary

A salon owner's upper level was damaged by mould after storms and ground floor flooding; the insurer declined on the flood exclusion. AFCA found partly in favour of the complainant, requiring payment of 30% of upper level losses, all refrigerated stock, 30% of claim preparation costs, plus interest.

On the balance of probabilities storm water ingress contributed to the upper level damage, the insurer did not establish the flood exclusion for all of it or the electricity failure, so a fair apportionment of 30% applies.

Issues

Subjects and remedies

business interruptionhome or building damagenatural disastersmall businesspay claimpay compensationpay interest

Related

All Chubb determinations · Find similar determinations

Text of the determination

Determination Case number 930467 Financial firm Chubb Insurance Australia Limited Determination | Case number: 930467 Page 1 of 13 Case number: 930467 29 January 2024 1 Determination overview 1.1 Complaint The complainant conducts a wellness/beauty therapy business. She held a business pack insurance policy with the financial firm (insurer) covering contents and stock at the premises. The complainant’s salon was impacted by a severe and sustained low pressure weather system in February 2022. Both parties accept that the ground floor of the property was damaged by flood. The complainant had not selected the optional flood cover. However, the complainant primarily operated her business from the upper level, which was found to have suffered mould and moisture-related damage (including to carpets, stock, furniture and equipment). There is now a dispute regarding the cause of damage to the upper level floor and contents. The complainant believes heavy rain and strong winds caused water ingress via glass sliding doors into the upper level, but the insurer declined cover on the basis the damage was from humidity/increased moisture levels from the flooding below. 1.2 Issues and key findings What is the insurer’s liability for the claim ed upper level damage? The lower level flooding did contribute to increased moisture/humidity in the premises, and therefore to some of the claimed mould-related damage on the upper level. The flood exclusion applies to that damage. However, the available evidence indicates it is more likely than not there was also water ingress through the upper level balcony doors from storms during the extreme weather event. That means a proportion of the upper level damage is, on balance, attributable to storm. On the available evidence, and having regard to the likely affected floor area, the insurer is liable for 30% of the loss and damage on the upper level, subject to applicable policy provisions and limits, and otherwise in accordance with section 2.1 below. Separately and in addition, the insurer is liable for all refrigerated stock lost when the electricity failed, since the insurer has not provided evidence which establishes the electricity failure was the result of flood, as distinct from storm. Is the insurer liable for the complainant’s claim preparation costs? The policy provides cover up to $25,000 in claim preparation expenses where the insurer has accepted liability. As the insurer is liable for 30% of the claimed damage, it is fair that it covers 30% of the complainant’s claim preparation costs incurred in engaging LMI (up to the policy limit). It is also required to pay statutory interest (pursuant to section 57 of the Insurance Contracts Act 1984 ) on that amount, calculated from the date the costs were paid by the complainant up to the date of settlement. Why is the outcome fair? The insurer has not established it is entitled to decline the claim in full based on the flood exclusion, and so it is not fair that it avoids all liability. Determination | Case number: 930467 Page 2 of 13 While it is not possible to precisely quantify the extent to which the claimed damage was the result of storm or flood respectively, in the circumstances it is fair that the insurer be liable for 30% of the upper level damage. On the available evidence, it is also fair that the insurer be liable for all the stock loss attributable to electricity failure since that has not been shown to be from an excluded cause. That means it is also fair that the insurer pays 30% of the complainant’s claim preparation costs, which were reasonably incurred and assisted in resolution of the claim and complaint. 1.3 Determination This determination is partly in favour of the complainant. The insurer is required to promptly:  pay 30% of the complainant’s claim preparation costs incurred (up to the policy limit) based on LMI’s invoices provided/to be provided by the complainant  pay statutory interest on those claim preparation costs for which it is liable, calculated from the date the complainant incurred the costs up to the date of settlement  pay for all damaged refrigerated stock from the upper level (estimated to be around $28,000, but subject to the complainant providing reasonable evidence of the value), plus statutory interest on the relevant amount, calculated from the date the insurer initially declined the claim up to the date of settlement  subject to applicable policy limits (and otherwise in accordance with the policy terms and as set out in section 2.1 below), cash settle for 30% of the other losses/damage to the upper level (including for remaining stock, contents, ‘general property’ , flooring in the reception area, mould remediation). Again, statutory interest is to be added to that amount, calculated from the date the claim was declined up to the date of settlement. Determination | Case number: 930467 Page 3 of 13 2 Reasons for determination 2.1 What is insurer’s liability for claimed upper level damage? Complainant has onus to establish claim falls within terms of the policy It is established insurance law that the complainant bears the initial onus to show, on the balance of probabilities (ie. that it is more likely than not), that the loss or damage claimed falls within the scope of cover under the terms of the policy. Only once this is established does the onus shift to the insurer to establish, on balance, the application of an exclusion, or to show that it is otherwise entitled to decline the claim. Complainant’s policy did not cover flood, and other exclusions The complainant held a Business Pack insurance policy with the insurer, for the period 23 August 2021 to 23 August 2022. Under Section 1 Property, the policy provided cover for property damage (to contents and stock , as well as specified and unspecified ‘general property’ ) in her leased premises, with a sum insured of $604,000. The complainant did not take out the optional flood cover or business interruption cover. There are also specific policy exclusions under Section 1, including as follows: 2. Excluded Causes Section 1 of this Policy does not cover Damage directly or indirectly caused or occasioned by or arising from: … 2. (b) i. moths, termites or other insects, vermin, rust or oxidation, mildew, mould, actual, alleged or threatened release, discharge, escape or dispersal of Pollutants, wet or dry rot, corrosion, change of colour, dampness of atmosphere or other variations in temperature, evaporation, disease, inherent vice or latent defect, loss of weight, change in flavour or texture or finish, smut or smoke from industrial operations; … provided that Exclusions 2.(b)(i) to (vii) shall not apply to subsequent Damage to the Property Insured occasioned by a Defined Peril (not otherwise excluded) resulting from any event or cause referred to in this Exclusion. (Emphasis added) Storm is one of the ‘ defined perils ’ identified in the policy . Circumstances surrounding the loss/damage not in dispute South East Queensland and Northern New South Wales were severely impacted by storms and heavy rainfall in the period from 23-28 February 2022. The event caused catastrophic damage throughout that part of the country, including to the compla inant’s business premises . On 28 February 2022, water inundated the ground floor of the complainant’s salon. The water level is reported to have reached to about the second top tread of the internal stairwell, approximately 300mm below the height of the upper floor. Determination | Case number: 930467 Page 4 of 13 Second Claim is in dispute (damage to upper floor level contents) The complainant lodged two claims under her policy following the inundation event:  First Claim: submitted on 28 February 2022, following the flooding of the ground floor  Second Claim: submitted on 15 March 2022, for damage to the contents and carpet on the upper level floor from black mould, as a result of saturated carpet. It is not in dispute that the damage in and to the ground floor of the salon was caused by the flood. The First Claim is not the subject of this dispute or determination. The dispute is in relation to the Second Claim, and whether the loss and damage from damp and mould observed on the upper level is covered under the policy. Assessor AA said no evidence of water ingress into upper level After the First Claim was lodged, assessor AA attended on 10 March 2022. The insurer says that during this inspection, the complainant indicated there was no damage to the upper level floor and that water had not entered there. The evidence does not show that AA himself went into the upper level to inspect it on that occasion. It was only after AA’s first attendance that the complainant reported mould had been found throughout the property, which she believed was from the carpet which had become wet from water ingress through the sliding upper level balcony doors. The carpet was removed and disposed of by the complainant on the advice of a specialist, to minimise the risk of further mould/moisture damage. AA then inspected the property a second time (13 April 2022). AA noted mould on the complainant’s contents, but when inspecting the upper level sliding doors AA said they were unable to identify any obvious areas/openings sufficient to cause water ingress, or signs of recent water damage. By the time of AA’s second attendance, the carpet had already been removed and new flooring laid by the complainant. Based on the complainant’s photos of the carpet as it was being removed, AA indicated that ‘in the absence o f further evidence, we suggest most likely the carpet/underlay is severely deteriorated from normal wear and tear’. They also said ‘[equally] it is possible the carpet may have been affected by rising damp of the concrete slab’. AA considered that ‘ [in] light of the height of the water inundation, we suggest it is most likely the concrete slab will have become wet from the event with rising damp possible.’ AA ultimately concluded, given the close proximity of the upper level floor structure to the flooded area below and the absence of structural drying, that the cause of the damp and mould observed on the upper level floor was from the original inundation of the premises on 28 February 2022. Complainant maintains water entered through balcony doors The complainant submits water had entered through gaps between the glass sliding doors, from before the actual flooding, given the force and extended period of the storms leading up to the inundation. She is reported as saying the masonite flooring, underlay and carpet was saturated to approximately 1m from the doors and was wet/moist for a further 2m. The complainant’s expert LM (engaged to assist in the preparation and progress of the claim) says the complainant had already complained to the property manager about the doors on a number of occasions, although the evidence does not identify her specific concerns. Determination | Case number: 930467 Page 5 of 13 AA engaged engineer/hydrologist JB who inspected the site and reported on 3 April 2022. JB reported ‘very rare, extreme rainfall’ had caused the flooding of the property. While identifying the flood and flood damage to the lower level (which i s not in dispute), JB’s report did not assist with regard to the cause of the upstairs damage. On 13 April 2022, hygienist HC (engaged by the complainant) inspected and reported significant ‘visible mould growth and mould odour’ on the upstairs level, with the complainant’s contents heavily affected. HC recommended removal and disposal of all electrical equipment, and all other porous items. HC ’s report recounts that water had entered through the glass balcony doors, water had pooled and could not then escape. They stated that water had travelled into the room about 3m, along the length of the room (about 10m), saturating the carpet and underlay which could not be removed for about 2 weeks. HC explained that type of water event (‘high moisture, …high humidity and no air movement’) was conducive to extreme mould growth. CE, the insurer’s mould remediation expert, attended at the property on 11 May 2022, and inspected the upper floor level for the cause of the mould proliferation. CE noted that there was significant mould growth throughout the site, apparently present through the majority of rooms. However, at the time, no visual mould was identified since mould cleaning on the upper level had been conducted (by the complainant’s restorer CH) prior to CE’s inspection of the site. While noting some minor water ingress, CE stated that photographs and information provided to it by the assessor indicated that significant water ingress from severe wind-driven rain was ‘very unlikely’ to have occurred through the balcony sliding doors on level 1. Again, relying on photos only, CE said the carpet appeared dry while noting staining and discolouration on the rubber underlay, but said it was not consistent with recent water ingress, and was in any case minor and contained to an area of about 50cm from the sliding door opening. CE said that having such a large volume of water saturation through the ground level of the site would have resulted in higher than normal relative humidity levels for the entire upper level; and this would also have caused higher than normal surface moisture levels of all building materials and other physical items within level 1. CE did, however, also acknowledge ‘ sources of mould would have been likely to be present within level 1 of the site prior to the flood event ’. CE concluded that it was highly likely that mould proliferation was primarily due to the flood event at the site, in combination with the disruption of normal HVAC operating processes. (CE noted that, due to a power outage at the site for several weeks, the normal HVAC operation of the building was compromised, further increasing the relative humidity and moisture levels throughout level 1.) CE said they ‘believed under normal HVAC operating conditions at the site significant mould proliferation would not occur from the identified water ingress (rain event specific) issue ’ . The complainant noted CE did not attend until 11 May 2022 (almost 2.5 months after the first extreme weather event), which had been around 28 February 2022. She said that during the second extreme weather event at the end of March 2022, no further floodwater had entered the premises. Determination | Case number: 930467 Page 6 of 13 The complainant argues that the saturation of the carpet from the rainwater ingress would have commenced at least 2 days before the floodwaters entered the premises. She points to clear photographic evidence of water staining to the underlay. Hydrologist JB noted the data shows ‘ very rare, extreme rainfall ’ for long and short durations. The panel considers this does support the complainant’s position that rainwater entered via the balcony doors and, on balance, that it occurred/started to occur prior to the flood itself (given that JB’s summary of rainfall intensity table shows the maximum rainfall occurring on 25 February 2022, which was before the reported flooding on 28 February). The complainant advised that saturated carpet then remained in situ for over six weeks, before it was found so damaged that it had to be replaced. In support of her position, the complainant has provided several witness statements from people who attended her premises once access was possible. They refer to the extent of the mould, signs of water ingress into the upstairs level from the balcony doors, and the moisture of the carpet and underlay. The complainant herself observed that when she attended on 14 March 2022 ‘ the carpet was warped behind the lounge in front of the glass doors to the veranda and throughout the reception area ’ and when she felt the carpet near the lounge it was wet. She also referred to the difficulty of removing the heavy ‘saturated carpet’. She did note that the (commercial vinyl) flooring in the treatment rooms did not appear to be affected. Insurer’s experts say inundation was the cause of upper level damage SW (the insurer’s builder/engineer) undertook a site visit and reported on 11 May 2022. SW considered that ‘significant’ water ingress through the (upper level) balcony sliding doors from intense wind-driven rain was not plausible and could be discounted as the cause of the claimed moisture and mould damage. The panel notes, however, that SW did not discount the possibility of any water ingress at all. SW reached their conclusion on the basis of hose testing and assessment of the area, along with inspection of the roof and minor ceiling staining of the level 1 areas. SW was of the view that the significant flooding event would have resulted in complete saturation of all timber, masonry and concrete building elements up to the 1 st level, with subsequent high moisture and humidity conditions about ‘all internal areas of the property’. SW said that such moisture and humidity issues would have been exacerbated by the phenomenon of rising damp via capillary action, and inadequate provision of ventilation to internal areas. On that basis, SW’s view was that the claimed moisture and mould issues were attributable to saturation of the building materials from the flood, with subsequent high humidity throughout internal areas as building materials dried out. With regard to what they described as the implausibility of water having entered through the sliding doors, SW noted:  the balcony slab slopes outwards and therefore directs water away from the internal areas of the salon. Image 7 in SW ’s report shows a floor level, which shows that the balcony slopes outward, but only slightly.  t he balcony door sill and the salon’s internal floor level is approximately 100mm above the external balcony level. The door sill also slopes outwards and directs water away from internal areas. Determination | Case number: 930467 Page 7 of 13  the upper level sliding door components were in good condition without any significant deterioration or voids. However, the panel accepts that the video the complainant supplied shows the sliding door was capable of significant horizontal movement. The complainant submits that this movement made the probability of wind-borne rain gaining ingress to the inside of the premises, in the conditions that existed during the prolonged and significant weather event , ‘a virtual certainty’. The panel notes the video also does show some weathering to the sliding doors, as well as evidence the doors could be manually prised apart when locked. So although the balcony doors were closed during the significant weather events, the panel does not accept it is totally implausible or impossible that water entered over that period. SW’s report and spray test results do not establish there was no water ingress S W explained that to simulate ‘exposure of the balcony sliding doors to intense wind -driven rain, we carried out hose testing of the sliding door components with a pressurised sprayer’. They said they directed pressurised water at the 5mm vertical space between the sliding door and the door frame in the far end of the upper level siding door; this resulted in water pooling in the area, but that the water was prevented from moving into internal areas by the door track, and drained back outside due to the outward slope of the door sill. SW’s view was that there would need to be cyclonic winds before a significant amount of ingress could occur, and said the available weather data does not show there were winds at that level. They also did not consider it possible that differential pressure could have sucked rainwater through the upper level sliding door as suggested by the complainant and her expert. SW also said that differential pressure does not explain the spread of damp and mould observed. SW concluded that their water testing confirms there was no major point of ingress. The panel notes, however, SW did acknowledge there was ‘m inor splashing ’ onto the internal side of the door track, consistent with the pressurized water stream being directed through the space and subsequent turbulence. The complainant said in her own witness statement that the sprayer used by SW was a ‘small 5 litre domestic weed spray type bottle’. She noted being concerned with water coming through onto their newly laid vinyl flooring during the testing, and had placed towels to catch some water (which is shown in her photographs). With regard to SW ’s and CE’s reports, the complain ant says:  the assessor did not inspect the upper level floor during his attendance on March 2022, and so is not able to say there was no damage to the upper level floor at that time.  SW failed to detect and test the considerable movement in the far end of the upper level sliding door.  SW used a small sprayer that would be unable to replicate the extreme weather conditions (torrential and wind-driven rain) into the balcony over many hours which would have caused the sliding door to rock back and forth in its tracks. She maintains that as the water spray test was carried out with the door static, it was not reflective of the wind loading on the door at the time of the extreme weather event.  SW failed to take into account the phenomenon of ‘ differential pressure ’ (as explained by her expert): that is, that external water can be sucked into a building through cracks due to the pressure inside the premises falling well below that of the outside pressure, and that differential pressure usually causes severe interior damage. The complainant’s partner, KS, referred to his background in the construction industry for 16 years, and said that there was no way that the small test conducted reflected anywhere near Determination | Case number: 930467 Page 8 of 13 the sheer volume of water that had been forced onto the doors given the conditions experienced. This was also supported by the complainant’s expert , (retired) builder SH, who inspected the premises on 4 July 2022 and noted: The testing carried out with the pressure spray shows that water does penetrate into the building… The missing point is the volume of water that is able to enter the building, during continuous rain being driven by high/severe winds and over the entire front of the building for many hours. SH noted the right balcony door showed movement of up to 8mm away from the fixed frame when handled, and said this movement would occur with wind. Having considered the available evidence, the panel is not persuaded that SW’s testing scenario of short-term pressurised water spraying onto the doors would be sufficient to replicate the volume, force, consistency and cumulative impact of rainwater from the extreme weather events leading up to and likely continuing during the flooding of the lower level of the premises. The panel considers it is more likely than not that water did enter the upper level of the premises during the extreme storms. Builder SH advised of tin layer between timber and concrete The complainant’s expert SH (a retired experienced building contractor) noted from his inspection that there was a tin layer overlaying the timber floor on the upper level. He advised this tin layer is a barrier that would block the capillary action and rising damp of the floodwater from below (which had been suggested by SW). SH said: At the time of my inspection part of the ceiling below the first floor was removed, adjacent the stairs. I viewed the construction of the first floor, steel universal beams, timber joists, 150x30mm flooring with sheet tin overlaying the timber then the concrete floor. The tin layer between the concrete and timber was placed during construction to protect the timber floor from water damage during the placement of the concrete. This tin layer is a barrier that blocks the suggested capillary action and rising damp of the flood water below the floor. SH also said: I have inspected many similar incidents over many years and absolutely have no doubt that water entered the building during the severe weather event causing the saturation of the carpet and underlay. The panel finds this evidence persuasive as to the likely minimising effect of the tin layer on any capillary action and rising damp into the upper level, and notes the insurer has not compellingly refuted it. Determination | Case number: 930467 Page 9 of 13 On balance, a proportion of upper level damage was from storm The panel accepts the moisture and humidity levels on the upper level would have been increased by the significant flooding on the ground floor, exacerbated by the lack of ventilation over several weeks. However, having considered all the available evidence, the panel is also satisfied it is more likely than not there was water ingress into the upper level through the glass balcony doors during storm(s), and that in itself caused moisture in the carpet and resulting mould in that upper level. The insurer’s experts CE and SW both acknowledge signs of some water ingress, and CE notes the likelihood of sources of mould in the upper level even before the flood event. The evidence shows the complainant promptly took what steps she reasonably could in the circumstances, as soon as she became aware of the issues on the upper level: she removed wet carpet and arranged for CH to clean and remediate the area to minimise the impact of the upstairs water ingress and further spread of mould. The non-functional HVAC (with the consequence of inadequate ventilation over which the complainant had no control) meant the adequacy of that work on the upper level was compromised. Even if that might arguably be seen as an indirect result of the downstairs flooding, that does not mean that the defined peril of ‘storm’ was not the cause of damage in the first place. On the available evidence, it is not possible to precisely apportion responsibility for the upper level damage between stormwater ingress and flood. However, the panel accepts, on balance, that the upper level carpet had water damage for a distance of 3m into the reception area from the balcony doors and along a distance of 10m. Based on the floorplan provided, that broadly represents about 30% of the upper level reception area. On that basis, the panel considers it fair that the insurer be liable for 30% of the upper level damage (except for the damaged refrigerated stock considered below, for which the insurer is liable in full). Insurer liable for all damaged stock from upper level refrigerators As part of her claim, the complainant has included $28,000 for refrigerated stock which was damaged when the electricity failed during the weather events. While restorer CE did refer to the power outage having been from the flood, there is no evidence which specifically establishes that it was the flood, as distinct from the storm events, which caused that electricity failure. Since the panel is not satisfied the insurer has shown an exclusion applies to entitle it to decline that component of the claim, it is liable for that lost stock. The complainant is required to provided reasonable evidence of the value of that loss, and the insurer is required to cover that in accordance with the policy terms. It is also required to add statutory interest to the cash settlement payable, calculated from the date the claim was declined up to the date of settlement. Parties to work together to finalise cash settlement for upper level damage The complainant has provided a list of damaged items (contents including flooring/stock/equipment) and their respective values. Including the damaged refrigerated Determination | Case number: 930467 Page 10 of 13 stock considered above, the total amount she is claiming is $777,132.29 which exceeds the policy sum insured of $604,000 for contents and stock. The only other specific reference to and evidence of damaged items (apart from some photographs) is in CH’s report, where they recommend as follows: Remove and dispose of all porous items, textiles, leather lounges, massage type tables etc. Due to not being able to guarantee to remove all mould and all mould spores which may come back. As per the standards IICRC S520 Removal and Disposal of electronic device’s/equipment The electronic devices have visible mould growth on them, because there is visible mould growth on the outside you could assume there would be mould, mould spores on the inside of the device’s that means there is no guarantee of removal, which may become airborne and start propagating once more. With the extremely high humidity (moisture in the air) the electronic device’s electronic’s [sic] could have been damaged due to the moisture which could go faulty anytime (possible corrosion) which could also start an electrical fire. The insurer has not disputed the nature and extent of the damage to the upper level contents/stock/equipment etc, nor the damaged items themselves. It is, however, fair that the complainant provides any further evidence which might reasonably be requested by the insurer to specifically confirm details of the losses and items being claimed and their respective values, so as to allow the insurer to properly assess its liability. In arriving at an assessment of the total value of the loss, the insurer is entitled to apply applicable policy terms and limits. The insurer is then required to cover 30% of the identified loss for those remaining items (not including the refrigerated items considered separately above) which fall within the scope of cover, and subject to any individual policy limits. To be clear, if the total value of the loss for those remaining items is more than the $604,000 sum insured, then the insurer is only liable for 30% of the sum insured amount. However, the insurer is also required to add statutory interest on the total loss amount payable, calculated from the date the claim was declined up to the date of settlement. 2.2 Is insurer liable for complainant’s claim preparation costs? Insurer to pay 30% of the complainant ’s claim preparation costs , plus interest The policy provides cover for up to $25,000 in claim preparation expenses where the insurer has accepted liability. In the current case, since the insurer is liable for 30% of the losses claimed, it is fair and app ropriate that it also pays 30% on the complainant’s claim preparation costs incurred in engaging the services of LMI (up to a maximum of the policy limit). Determination | Case number: 930467 Page 11 of 13 If the complainant has not already done so, she is required to provide the insurer with evidence of the costs incurred. The insurer is also required to pay statutory interest on the amount for which it is liable, calculated from the date the complainant paid up to the date of settlement. 2.3 Why is the outcome fair? The insurer has not established it is entitled to decline the claim in full based on the flood exclusion, and so it is not fair that it avoids all liability. While it is not possible to precisely quantify the extent to which the claimed damage was the result of storm or flood respectively, based on the evidence that is available it is fair that the insurer be liable for 30% of the upper level damage. It is also fair that the insurer be liable for all the stock loss attributable to electricity failure, since that has not been shown to be from an excluded cause. That means it is also fair that the insurer pays 30% of the complainant’s claim preparation costs, which were reasonably incurred and assisted in resolution of the claim and complaint. Determination | Case number: 930467 Page 12 of 13 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: (a) the legal principles (b) applicable industry codes or guidance (c) good industry practice (d) previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: (e) an ombudsman (f) a member with significant experience in consumer and small business advocacy (g) a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: (h) available documents (i) the recollections of the parties (j) all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 930467 Page 13 of 13 3.2 Relevant policy extracts Document Key sections Product Disclosure Statement Contents means all property, belonging to You or for which You are responsible, including: a) unused stationery and printed books; b) where You are a tenant of a leased or rented premises: i. property owner’s plant, fixtures, fittings, window blinds, floor coverings and glass at the Insured Location for which You are legally liable under the terms of a lease or similar agreement; ii. fixtures and fittings, and fixed carpets and floor coverings, installed by You at the Insured Location and for Your use in the Business; and iii. awnings and signs at the Insured Location; … Certificate of Insurance General Property  Unspecified Items (cover is limited to $ 2,500 per Item)  Specified Items Sum Insured Laptop / Apple I Pad AIr $ 500 Laptop / HP Spectra X360 Laptop $ 3,588 Tools of Trade / Eye Protection for Laser/IPL $ 2,000 Total Specified Items $ 6,088

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.