Insurer denied the claim for structural damage (cracking to dividing wall) after a flood, relying on exclusions for long-term settlement, moisture and wear

FirmSuncorp Group
Decided2024-04-09
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Strata owners claimed for structural damage, including cracking to a dividing wall, after the 2022 northern NSW flood. The insurer paid most of the claim but denied the structural damage. AFCA found the proximate cause was long-term settlement and deterioration, which are excluded, and decided in favour of the insurer.

On the balance of probabilities the proximate cause of the structural damage was gradual deterioration and ground movement, which the policy excludes, so the flood did not cause it.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 930465 Financial firm AAI Limited Determination | Case number: 930465 Page 2 of 12 Case number: 930465 9 April 2024 1 Determination overview 1.1 Complaint The complainants hold a strata insurance policy with the financial firm (insurer). They lodged a claim for damage to their insured property located on the north coast of New South Wales after a storm and flood event occurred in about February 2022. The insurer accepted the claim regarding the majority of damage. However, it denied the part of the claim which relates to structural damage caused by the flood event, including cracking to a dividing wall (the structural damage). The insurer says the structural damage was caused by long-term ongoing natural movement and settlement of the foundation soils, long-term moisture issues and seepage, and inadequate drainage. All these causes are excluded from cover under the terms of the policy. The complainants obtained evidence from several experts who concluded the structural damage to the property was caused by the flood event. They say the insurer should therefore accept the claim for the structural damage. 1.2 Issues and key findings Is the insurer entitled to deny the claim for the structural damage? Yes. The exchanged material shows the flood did not cause the structural damage. The proximate cause of the structural damage is excluded from cover under the terms and conditions of the policy. Why is the outcome fair?  The outcome is fair in all the circumstances because the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim the for the structural damage  Throughout this complaint AFCA’s approach has remained objective, consistent with the facts and based upon the law. 1.3 Determination This determination is in favour of the insurer. The insurer does not need to take any further action in relation to this complaint. Determination | Case number: 930465 Page 3 of 12 2 Reasons for determination 2.1 Is the entitled to deny the claim? Yes. The exchanged material shows the flood did not cause the structural damage. The proximate cause of the structural damage is excluded from cover under the terms and conditions of the policy. Complainants have the onus to establish a valid claim It is established insurance law that the complainants first have the onus to establish the claimed loss is a result of an event covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not. If the complainants are able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely upon an exclusion under the policy or is otherwise entitled to decline the claim. The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant s . It follows the insurer is entitled to rely upon the contents of the documents. Policy covers accidental damage and damage caused by insured events The policy c overs accidental loss or damage and damage or loss caused by various insured events, being the incidents listed in the policy docum en ts , subject to policy exclusions . These incidents include ‘flood’ and ‘storm’. Page 3 of the PDS includes the following: What we cover Accidental loss or damage cover We cover accidental loss or damage to the building and common contents, including for incidents like flood, fire (including bushfire), escape of liquid and impact. Page 108 of the PDS defines accidental loss or damage as: … loss or damage that occurs without intent and includes loss or damage from the incidents shown on pages 39 to 52. Particulars about the cover provided by the policy for loss or damage caused by flood and storms are set out on pages 41 and 42 of the PDS, respectively, together with details about some of the damage that is excluded from cover. For instance, page 41 of the PDS includes: Flood Determination | Case number: 930465 Page 4 of 12 We cover Loss or damage caused by flood. We don’t cover … • loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, flood and not because of erosion, structural fault or design fault… Page 110 of the PDS also defines and ‘incident’ as: … a single event, accident or occurrence wh ich you did not intend or expect to happen that is not excluded by your policy. A series of incidents attributable to one source of originating cause is deemed to be the one incident. Dispute about whether an insured event caused the structural damage In early 2022 a storm caused flooding to parts of the New South Wales north coast. In March 2022, the complainants lodged a claim for damage to the insured property. The complainants reported: House flooded, flood waters came up to my knee and gradually subsided roughly 40CM high, floorboards have buckled and all the timber chipboard has been damaged. The insured property is a single storey residential duplex, incorporating two dwellings. The construction is rendered masonry set on blockwork piers with a sheet metal roof. The complainants purchased the property in about 2019. It is estimated to have been built in or around 1990. A common brick dividing-wall separates the dwellings. The complainants also say the structural damage (including cracking to walls) was caused by ground movement which occurred during the flood. They say such damage should, therefore, also be covered by the insurer. Whilst the insurer accepted the claim for most of the damage, it denied the claim insofar as it relates to the structural damage to the insured property. In particular, the insurer denied the claim for cracking and damage caused by movement of the property. It says the cracking and movement of the property is long-term in nature and has progressively occurred over a period of time. It says the cracking and movement was not caused by an insured event, but is a result of wear, tear, gradual deterioration, seepage and ground movement unrelated to the flood event, which are all causes that are excluded from cover under the terms of the policy. In this regard, the insurer relies upon several policy exclusions, including the following set out on pages 26 to 38 of the PDS: Determination | Case number: 930465 Page 5 of 12 Things we don’t cover Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from: … erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically insured under the following insured incidents: • ‘Flood’… • ‘Storm’… … any part of the building or common contents that has wear, tear, rust, fading, rising damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to:  tiles and their adhesive or grouting breaking down  weathering of roof tiles or roof ridge capping  gradual weathering and breakdown of bricks, mortar or concrete. Insurer relies upon engineer ’s evidence to deny claim for structural damage The insurer appointed JH, engineer, to inspect the insured property on 23 June 2022 and provide a report. JH’s first report is dated 10 August 2022. It is comprehensive and logical and is supported by illustrative photographs, figures and tables. JH ’s report includes the following observations and conclusions:  the cracking through the brickwork on the dividing wall between the two units is due to settlement of the founding soils towards the front end of the wall  given the high sand content within the founding soils, the soil will have subsided rather than heaved in the rear corner  the other factor that influences settlement in sandy soils is general moisture  there is evidence of long-term moisture seepage on the internal face of the subfloor blockwork to indicate moisture is entering the subfloor and likely settling towards the front sections  there are a number of indicators that the damage to the brickwork has not been caused by the recent flood event: > the first is the absence of cracking to the plasterboard immediately around the cracked brickwork wall in the rear bedrooms. Given the plasterboard has been fixed directly to the brickwork, any movement in the brickwork will result in cracks through the plasterboard > immediately above the substantial brickwork cracking, the plasterboard shows no evidence of cracking which indicates that the movement happened a long time ago or at least prior to the installation of new plasterboard. There is evidence of multiple different plaster adhesives on both sides of the cracked partition wall which is further evidence that the damage occurred some time ago and the plasterboard has been replaced > there was no evidence of washout or erosion of the sandy soils within the subfloor to indicate the flood has caused any major scour that would explain the substantial subsidence Determination | Case number: 930465 Page 6 of 12 > there are packers installed under several bearers within the subfloor of one unit however it is unclear whether they have been placed there following the recent event. If not, this would be a further indicator of ongoing movement concerns at the property. The previous patching to similar cracking through the same dividing wall in the garage is clear evidence of ongoing movement issues with the brickwork wall. JH ultimately concluded: The available evidence indicates that the movement and cracking to the dividing/separation wall between the two units is the result of long-term differential settlement of the founding soils. There is evidence of previous patching to cracks through the same wall in the garage as well as remnants of a plasterwork re placement via multiple adhesives in the bedroom dividing wall… The absence of damage to the plasterwork within both units indicates the building movement occurred prior to the flood event. The repair and or replacement of the plasterboard wall linings, as indicated by the varying adhesive daubs, is also indicative of the pre-existing condition to the dwellings. I note that an additional report from JH dated 12 April 2023 does not advance the matter substantially. Complainant appointed experts to investigate the damage The complainants provided a report from EL, architect, dated 25 November 2022. EL stated:  prior to the purchase in 2019, I inspected the property to advise on the building condition. I assessed the property to be in good condition  there were no visible cracks in the party wall on any occasion prior to the flood  the last time I visited the property prior to the February 2022 flood was in December 2021  I attended the property shortly after the flooding and observed damage to the property  I observed cracking on both sides of the party wall, minor cracks forming along the cornices and edges of the ceiling and exterior cracking between the bricks and sliding door frames  it was apparent that movement had occurred in the wall, causing the cracking  I believe this was the result of movement of the building footings caused by subsidence in the ground. The complainants also arranged for several experts to inspect the damage. TD, engineer, inspected the insured property on 3 May 2022 and provided a report dated 13 May 2022. The report includes the following observations:  diagonal crack in the masonry wall (common wall) of dwelling 1 shows the footings beneath this wall have settled with a variable cracking between 10 – 20 mm  subfloor area in dwelling 1 & dwelling 2 demonstrates variable movement of the bearers supporting the subfloor areas. TD concluded:  after inspection and due consideration, it is believed the effects of the recent storm events where flood waters inundated both dwellings to approximately 400 mm above the timber floor have caused significant structural damage to both the dwellings  the section of the cracked common wall also means the associated footings need to be underpinned. Determination | Case number: 930465 Page 7 of 12 TD reiterated its findings and conclusions and expanded upon them in a supplementary report dated 21 January 2023. LU, engineer, then inspected the insured property on 31 August 2022 and again on 30 September 2022. LU’s report, dated 30 September 2022 includes the following conclusions:  the cracking to the rear of the party wall … shows the horizontal displacement in an area where a power socket was previously installed… It is infeasible that this amount of movement would not have been noticed prior to the flood event.  in our opinion, we believe there are indications that contradict the conclusion in the (JH) report that all of the damage associated with footing movement was pre-existing  whilst we agree with the assessment in the ( JH’s ) report that washout and scour are unlikely to be a factor, soft sandy soils subject to a high degree of water inundation appear to undergo settlement associated with the ‘drawdown’ of the flood waters, which we would argue has happened in this instance  in our opinion, this building has undergone a degree of rapid settlement associated with the flood, additional to any long-term footing movement  damage to the floors and masonry wall from this short-term movement has rendered the two units unserviceable, and will need to be rectified prior to any internal repair works commencing. LU also commented about evidence provided by the complainants about the condition of the insured property prior to the flood event. LU stated: We also believe that in these cases, owners’ testimony about pre -existing conditions must be taken into consideration. AS, engineering geologist, also inspected the property and provided a Geotechnical Site Investigation report dated 29 November 2022. The report includes the following observations and conclusions:  the sub-surface profile consists of (fill) Silty Sand, Clayey Sand and Silty Clay underlain by (natural) Clayey Sand, Sand and Silty Sand through to the target investigation depth  underlaying clay fill materials (0.2 to 0.7m depth) were observed at the southern side of the building where subsidence/differential settlement has occurred  it is our opinion that during the March 2022 flood, following complete and prolonged saturation, clay fill materials are likely to have softened and weakened resulting in the footing subsidence observed. Additional hydrostatic flood loads would have also contributed to this movement  minimal scouring/washout to piers was observed within the 200mm sandy surface layer  typically, movement to footings following flood events in sandy soils is the result of scouring/washout. However, due to this settlement being associated with sub-surface clay fill, surface movement is likely to have occurred without any visible surface signs of washout and scouring  the lack of scouring/washout should not be used as a conclusion that the March 2022 flood event did not cause induced settlement  it is our opinion that the damages/movement that has occurred is the direct result of the March 2022 flood. A supplementary report by AS dated 27 March 2023 does not advance the matter in any significant way. DS (engineer) provided two reports, the first dated 7 December 2022. DS noted: Determination | Case number: 930465 Page 8 of 12  I attended the property on multiple occasions before, during and after the unprecedented flooding event that took place over multiple days between 28 February 2022 and 3 March 2022.  the house and substructure has existed in a safe and serviceable condition since its construction in approximately 1990. Evidence of this exists in multiple occupation certificates and DAs, as well as multiple photographs of the property without damage prior to the recent events  being a Civil Engineer myself, I inspected the property on behalf of the (complainants) for such issues in 2021 and can categorically state that there was no cracking evident in the masonry beneath the house or in any of the walls observable from beneath and outside the structure  the wall linings in this case are sheets that are weakly glued to masonry and joined structurally in the corner by tape, plaster and often a backing angle  it's clear from the photos that the adhesives no longer adhere to the masonry due to submersion or deterioration, so it is unreasonable to assume that cracking in the masonry would result in cracking of the wall lining  I can attest to the fact that the wall and power socket were correctly installed and operational prior to the March 2022 event and that this socket is clearly not serviceable following the event. In his second report dated 17 September 2023, DS states:  the report prepa red by the insurer’s expert (JH ) is used to suggest that there was pre- existing damage to a masonry wall  the report infers that different adhesives were used around the crack in the masonry wall, which JH suggests is evidence of previous attempts to repair pre-existing damage, and therefore evidence of pre-existing damage  it is assumed that JH is referring to the patches of white adhesive and what appears to be patches of yellow adhesive  on further investigation of the wall and the adhesive patches, it is obvious that JH has made a fundamental mistake in assuming that the yellow patches are a secondary adhesive  the yellow patches are not a secondary adhesive but actually areas where the primary white adhesive has detached from the wall along with a layer of paint, exposing a yellow undercoat  these yellow patches and white adhesive spots are consistent throughout the house where it was once painted yellow. JH failed to observe or mention this in their report. This lack of detail, expertise, or understanding reflects un-sound, untrustworthy or biased engineering advice  to support the facts above, please find attached further photos and a video demonstrating that the yellow undercoat of paint is easily exposed when the pink or white paint on the wall is sanded back  it is evident that the bond between the yellow paint and the overlying paint was weaker than the bond between the adhesive and the overlying paint in these yellow areas, meaning that any movement of the adhesive or gyprock relative to the wall would have resulted in separation of the paint layers to expose the yellow paint below  during the flood event, it is likely the inundated section of masonry wall cracked as the lower portion subsided. The gyprock wall sheet may not have been affected by this crack formation since it was the paint that failed in these areas and not the adhesive  evidence that the wall failed during the event is obvious when the power outlet mounting screw holes are observed to not line up where once they did as per my previous letter. Determination | Case number: 930465 Page 9 of 12 Complainants say damage to wall caused by flood event In summary, the complainants provided the following submissions:  TD’s inspection on 3 May 2022, and its subsequent report concludes the building has incurred structural damage as a result of the flood  LC’s opinion , based on two separate inspections of the property on 31 August and 30 September 2022, adds supplementary evidence  AS ’s site inspection includes bore hole soil sampling and testing. This proves that the conclusions made in JH’s report are based on incorrect geotechnical assumptions  an extensive statement from DS reviews claims made in the JH report and offers a thorough and comprehensive statement. This reinforces that the flooding event in question caused considerable structural damage to the building. This statement highlights multiple incorrect assumptions and baseless claims in JH ’s report reliant on evidence obtained months after the event  DS’ s statement highlights that JH had limited experience in flood damage assessment. This Engineer graduated in 2019. It is fair to assume a lack of significant field experience in assessing flood-affected homes. This further supports our dispute that the insu rer’s position to rely solely on the JH claim is unreasonable  an addendum from TD concludes and reinforces our dispute and further highlights that the insurer’s position on this matter is unreasonable  rainfall data from the Bureau of Meteorology shows the magnitude of the insured event. This quantifies unprecedented amounts of rainfall throughout this period. JH’s report makes assumptions that previous weather events may have caused the damage and draws a comparison to other flood events. Floodwater has never entered our property. JH unfairly dismisses all provided evidence and records that illustrate the unprecedented catastrophic scale of the 2022 flooding event of the Northern Rivers  EL assessed the building before and after the flood event. This supports the claim that the structural damage to the building was caused by the insured event  further photographic evidence of one of the major cracks in the photos before and after the flooding event shows a wall with no damage and further evidence of the cracks that have developed since the event. Proximate cause of damage needs to be assessed Damage can have more than one cause. For instance, in this matter the complainants say the damage was caused by the flood event. In contrast, the insurer says the damage was caused by a combination of factors, such as wear, tear, gradual deterioration, and ground movement over time, all of which are excluded under the terms and conditions of the policy. In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause. Insurer has correctly denied the claim for the structural damage I have considered all evidence provided by both parties. Determination | Case number: 930465 Page 10 of 12 On balance, I am satisfied the proximate cause of the structural damage was gradual deterioration and ground movement over time, unrelated to the insured event. This is because of the following factors. First, I accept the evidence of JH in regard to the cracking of the common wall. If the flood had caused cracking to the common wall, one would also expect there to be damage caused to the plaster board attached to that wall. The plaster was attached directly to the wall with adhesive. I acknowledge this has been challenged by the complainants. For instance, DS wrote: The wall linings in this case are sheets that are weakly glued to masonry and joined structurally in the corner by tape, plaster and often a backing angle. It's clear from the photos that the adhesives no longer adhere to the masonry due to submersion or deterioration, so it is unreasonable to assume that cracking in the masonry would result in cracking of the wall lining (emphasis added). DS also provided a further theory regarding why the plaster board did not contain any cracking following the insured event. DS stated: During the flood event, it is likely the inundated section of masonry wall cracked as the lower portion subsided. The gyprock wall sheet may not have been affected by this crack formation since it was the paint that failed in these areas and not the adhesive. Evidence that the wall failed during the event is obvious when the power outlet mounting screw holes are observed to not line up where once they did as per my previous letter. I also noted with interest the video evidence provided by the complainants. However, the evidence overall does not support the explanation that the “adhesives no longer adhere to the masonry” . Indeed, the photographic evidence generally appears to show that, subsequent to the insured event, the plaster above the damaged areas is firmly affixed, with no signs of buckling, bending or displacement. Second, a number of the expert reports provided by the complainants suggest there were no issues with the wall prior to the flood. To determine whether any issues existed prior to the insured event, one would need to have removed at least a portion of plaster board from the common wall in order to properly inspect the wall. There is no indication that this ever occurred. Moreover, I note there is, generally, a paucity of photographic evidence related to the inspections undertaken by EL and DS prior to the insured event. In addition, neither EL or DS adequately describes the techniques and strategies they employed during these inspections prior to the insured event. Three, the complainants do not address the following ‘site problem’ set out in the first AS Report: Site Problems AS 2870 contains a list of potential problems that exclude a site from being classified under one of the ‘Normal’ classifications. Such sites are classified as Determination | Case number: 930465 Page 11 of 12 Class P, so that the issues can be addressed using a tailored solution, by a professional Engine er… • Unfortunately, one or more of these potential problems were encountered at your site resulting in a classification of ‘Class P’. While the problems may have been discussed in other sections of this report, they are listed here in the interests of clarity - • Poor Bearing Capacity: the allowable bearing capacity was determined to be less than 100kPa at depths 0.7m to 1.3m across the site (see section 3.4). This is poor and likely to inadequate for the support of a normal footings system within this zone. Four, the complainants do not address, at least in any persuasive way, the clear photographic evidence of patching and repairs of structural damage that existed (presumably) prior to their purchase of the insured property. Moreover, they do not address the issues raised by JH about the sub-floor packers JH observed, as mentioned in its first report. In all the circumstances, I am satisfied the movement and cracking to the insured property is not related to the claimed event. The most likely proximate causes of the identified structural damage are long term in nature and have progressively occurred over a period of time. These include long-term ongoing natural movement/settlement of the foundations soils, general-long term moisture issues and seepage, and general pre-existing ongoing movement issues (as evidenced by previous repairs) which are all causes that fall outside of (or are excluded from) the scope of cover provided by the policy. It follows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim insofar as it relates to the structural damage described herein. Determination | Case number: 930465 Page 12 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.