Text of the determination
Determination
Case number 930397
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 930397 Page 1 of 6
Case number: 930397 17 November 2023
1 Determination overview
1.1 Complaint
Complainant JB holds home building and contents insurance issued by the financial firm
(insurer), covering the home in which she and complainant AB reside. On 24 March 2022, the
complainant lodged a claim for damage from a storm that occurred on 27 February 2022.
The insurer partially accepted the claim and offered $7,662.51 as a cash settlement.
Recently, it agreed that additional repairs are to be covered, bringing the accepted repair
costs to about $9,500. However, it says most of the damage is from excluded causes
including building defects, wear and tear, and gradual deterioration.
The complainants maintain that the storm damage is more extensive than the insurer has
accepted.
1.2 Issues and key findings
Is the insurer required to pay a higher cash settlement?
Yes. The complainants have established a claimable loss for all damage claimed, except to
the guttering. The insurer has not shown exclusions apply. The insurer is to cash settle the
cost to repair the damage claimed (except the guttering) and pay a 20% contingencies uplift.
Why is the outcome fair?
Other than for the guttering damage, the complainants have established a claimable loss. The
insurer has not shown the rest of the disputed repair items are excluded. It is fair that the
insurer cash settles the claim related repair costs and pays a contingencies uplift.
1.3 Determination
This determination is substantially in favour of the complainants.
If the complainants accept this determination, the following steps are to be taken:
within 21 days of notifying their acceptance, the complainants are to provide the insurer for
a quote for the ‘like for like’ cost of replacement lights and fans
within 14 days of receiving that quote, the insurer is to pay them a cash settlement amount
calculated in accordance with the table set out in section 2.1 below.
Determination | Case number: 930397 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer required to pay a higher cash settlement?
Yes. The complainants have established a claimable loss for all damage claimed, except to
the guttering. The insurer has not shown exclusions apply. The insurer is to cash settle the
cost to repair the damage claimed (except the guttering) and pay a 20% contingencies uplift.
Complainants have shown a claimable loss under the policy
The complainants are required to show on the balance of probabilities (that it is more likely
than not), that they suffered a claimable loss under the policy. This means they must show
the loss was caused by a risk for which JB is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
policy covers damage to the home and contents caused by a listed insured event. The
insured events listed in the PDS include ‘Storms and rainwater’ (‘Storms’).
The complainants lodged the claim on 24 March 2022. They said that heavy rain and hail in
late February 2022 had damaged their patio ’s structural elements (including its roof) and
wiring, and a dividing fence.
The insurer accepts that during the storm event, the roof and fence were damaged. To that
extent, it accepts the complainants have established a claimable loss under the ‘Storms’
insured event. However, the insurer says most of the damage was due to building defects,
wear and tear, and gradual deterioration. Damage from those causes is excluded.
Once the complainants prove the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer says disputed damage is not covered
The insurer says that following claim lodgement, it agreed to the complainants supplying their
own assessment report and quote. Complainant AB prepared the report/quote, which the
insurer was unwilling to accept. It appointed builder LB to undertake an assessment.
LB inspected the home on 16 June 2022. LB reported that the polycarbonate patio roofing
was hail damaged, and the shared fence had slipped due to the storm. LB also said the PVC
guttering had not been connected properly and may damage to the patio in the future. The
deteriorated pointing and cracked tile on the rear lower roof were also maintenance issues.
LB’s comments on the roofing were based on a report from roofer TR. TR also advised that
the patio roof had been underpitched (two degrees instead of the recommended five degrees)
and had no profile seal to prevent backflow).
The insurer obtained a report dated from electrician LE. According to LE, the patio’s electrical
items were functioning and ‘not likely a safety risk ’ . Any damage was age related, such as the
rusted fan. The lighting worked but did not appear to have been professionally installed.
In seeking to address the complainants’ dissatisfaction, the insurer obtained a se cond
building opinion from AR. After inspecting the home on 13 September 2022, AR reported that:
the patio roof damage was consistent with hail, although this may not have occurred in the
claim event, as that storm involved rainfall rather than hail
the structure supporting the patio was not adequately flashed
Determination | Case number: 930397 Page 3 of 6
the gutter was poor quality PVC and set too low from the sheets
the shade cloth under the patio roof was sagging in places, likely due to a failure of the
timber trims holding it up, exacerbated by animals climbing on it (a photo of a cat sitting on
the shade cloth was included with the report).
AR subsequently provided further commentary in which it confirmed its opinion that:
the [patio] roof is in fact underpitched and any issues relating to the condition of
the timber framing is age and deterioration related and not the result of a specific
weather event.
AR referred to a 2005 real estate website photo of the patio. It said the timber trims appeared
to be the same, such that they would have reached the end of their serviceable life before the
storm event. It also provided photos identifying various defects with the patio structure.
The insurer’s home assessor inspected the home on 8 November 2022. He noted the patio
framing appeared to be H3 treated. He said such timber should not have been impacted by
moisture coming through hail created holes in the brief period between the storm and the
complainants patching the roof.
The insurer says the disputed damage is not covered because the PDS contains general
exclusion precluding cover for damage directly or indirectly caused by:
defects, structural or design faults an insured knew or should reasonably have known
about and was maintenance related or not fixed within a reasonable period
wear, tear, or other gradual deterioration.
Insurer has offered a cash settlement
On 19 July 2022, LB provided a scope of works (SOW) for claim related repairs to the patio
roof and shared fence. LB allowed for a complete replacement of the roof (47m 2 ) and battens
(70/m). It quoted $15,222.42.
The insurer asked LB to revise its SOW/quote as it considered full roof and batten
replacement was not required to rectify the storm damage. LB’s revised SOW dated 22 July
2022, allowed for replacement of 20m 2 of the roof. No allowance was made for battens. LB
quoted $7,662.51.
On 25 July 2022, the insurer offered the complainants $7,662.51 as a cash settlement.
The insurer also obtained SOWs from AR dated 14 September 2022 for the roof and fence
repairs. The quoted prices totalled $12,636.36. However, the insurer did not increase its offer.
On 29 June 2023, the insurer accepted it was liable for the following, based on the
complainants’ pricing:
$5,775 - removal and replacement of 55m 2 polycarbonate roofing
$474 – building materials and supplies
$TBA – levy insurance and fees
$2,813 – share of fencing replacement.
These amounts total $9,062 plus levy and insurance fees (GST to be added).
The repair items the complainants have priced which the insurer continues to say are
excluded are:
$7,495 - removal and replacement of timber rafters, battens and trim
$1,350 – guttering removal and replacement
Determination | Case number: 930397 Page 4 of 6
$926 – removal and replacement of shade cloth
$4,708 – electrical work (supported by quote dated 30 May 2023 from electrician JP. The
amount does not include the cost of lights and fans).
These amounts total $14,479 (GST to be added).
Complainants say cash settlement offer is insufficient
Complainant AB is a licensed builder and carpenter. He submits from his background and
experience that the insur er’s expert trades have made numerous errors in their assessme nts.
The complainants say that immediately before the storm event, the patio was in ‘better than
good condition’. However, it was unable to withstand one of the worst recorded weather
events in the region, with 265mm of rain and hail falling in one evening.
AB says:
he has calculated the roof pitch at 5.08 degrees, meaning it is compliant
the extreme weather exposed the timber frame to much more than the ‘moderate wetting’
the manufacturer said it was designed to resist
the water ingress during and following the storm had caused the patio structure to swell,
bow and warp. It is no longer safe
the shade cloth had been tightly installed before the storm. The water ingress in the storm
has caused the staples affixing the cloth to the rafters to rust, and the trim to buckle, bow,
and fall apart
the cat could gain access to the shade cloth solely due to the storm related damage
the ferocity of the storm had broken the guttering away from the roof, and he had
subsequently installed temporary guttering
LE’s suggestion the electrical items were ‘not likely a safety risk’ was not an adequate
justification for the insurer not to attend to electrical repairs
the deteriorated state of the electrical items was due to continuing water ingress in the five
months between the storm and LE inspecting the home.
The complainants have provided several images and a video in support of their position.
These include ‘before and after’ photos of the shade cloth, trim and fan.
Insurer is required to pay a higher cash settlement
A cash settlement must be based on a reasonable quote for claim related repairs. An uplift is
then typically applied to the quoted amount to allow for contingencies and the loss of the
lifetime guarantee that applies to insurer approved repairs.
I am satisfied that LB’s quote dated 22 July 2022, on which the insurer based its cash
settlement offer, does not reasonably account for claim related repairs. It is the lowest quote
submitted. It is also for an amount less than the insurer agreed on 29 June 2023 is payable.
I am, on balance, satisfied the insurer is entitled to deny liability for the guttering. I
acknowledge that the guttering the insurer’s experts have commented on is the temporary
replacement AB installed in May 2022, rather than the guttering in place when the storm
occurred. However, there is no persuasive information the storm damaged the original
guttering to the point where it required replacement.
I am not satisfied that the insurer has established on the balance of probabilities that it is
entitled to exclude cover for the other disputed items. This is because:
Determination | Case number: 930397 Page 5 of 6
the ‘before’ photo provided by the complainant shows the shade cloth, trim and fan were in
good condition only a month before the storm. If under-pitching had been causing water to
pool on the roof leading to gradual deterioration, I anticipate that would have been visible
the ‘after’ photos the complainant has provided as well as those included in the insurer’s
expert reports show the shade cloth, trim and fan in poor condition after the storm. The
complainant has also provided a video of water pouring into the patio during a later storm. I
accept the deterioration in the shade cloth etc was due to continuing water ingress due to
the initial storm damage
the roof patching AB attended to in May 2022 was temporary in nature and I am not
satisfied it guaranteed the roof would be watertight
as it does not appear the insurer offered make safe repairs, I am not satisfied the insurer
could argue the complainants were responsible after May 2022 for ongoing water ingress
the insurer’s experts did not inspect the home until four or more months aft er the storm, by
the time the patio damage had been worsened by the continuing water ingress
while the insurer suggests that the complainants contributed to the delay because they
wanted to get an assessment report and quote, the insurer did not have to agree to their
request
I agree with the complainants that LE’s suggestion the electrical items were ‘not likely a
safety risk’ was not an adequate justification for the insurer not to attend to electrical
repairs.
I am also satisfied that it is reasonable that the insurer pays a 20% uplift for contingencies.
The complainants are to provide the insurer with quotes for the lights and fans to be replaced.
As these will be current quotes, there is no need for the uplift to apply to them.
This means the insurer is required to pay as a cash settlement:
Amount previously accepted $9,062
Disputed items, less guttering $13,129
Subtotal $22,191
GST $2,219.10
Subtotal $24,410.10
20% uplift $4,882.02
Subtotal $29,292.12
Levy and insurance fees on $24,410.10, incl GST, plus 20% $TBA
Cost of lights and fans, incl GST $TBA
Total $29,292.12 plus TBAs
The insurer is to calculate the levy and insurance fees. It is entitled to deduct the $3,000
policy excess from the total amount payable.
2.2 Why is the outcome fair?
Other than for the guttering damage, the complainants have established a claimable loss. The
insurer has not shown the rest of the disputed repair items are excluded. It is fair that the
insurer cash settles the claim related repair costs and pays a contingencies uplift.
Determination | Case number: 930397 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.