Insurer partially denied a water damage claim relying on wear and tear and inherent defect exclusions; AFCA found the denial unjustified

FirmAllianz Australia
Decided2023-06-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted only part of a home water damage claim, attributing the rest to roof deterioration and poor maintenance. AFCA found for the complainant and required the insurer to cover internal and external damage including mould remediation, by repair or cash settlement with a 20% uplift, plus the engineer's invoice.

The insurer bore the onus of establishing the wear and tear and inherent defect exclusions and, on the exchanged evidence, did not show the roof's condition contributed to the damage.

Issues

Subjects and remedies

home or building damagethird party authoritypay claimpay compensationrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 929571 Financial firm Allianz Australia Insurance Limited Determination | Case number: 929571 Page 1 of 11 Case number: 929571 27 June 2023 1 Determination overview 1.1 Complaint This complaint relates to a claim by the complainant under her home insurance policy held with the financial firm (insurer), for damage to the insured property. The insurer partially accepted the claim but denied the balance saying that the cause of the remaining damage is excluded from coverage under the policy. 1.2 Issues and key findings Is the insurer entitled to deny the balance of the complainant’s claim? No. Given the exchanged material the insurer is not entitled to deny the balance of the complainant’s claim. Why is the outcome fair? The outcome is fair as based upon the exchanged material the complainant has established a valid claim and the insurer has not established the basis on which it is entitled to deny the balance of the claim, or to limit its liability to the complainant. 1.3 Determination This determination is in favour of the complainant. The insurer is required to pay the claim in accordance with the provisions of this determination and under the terms and conditions of the policy. Determination | Case number: 929571 Page 2 of 11 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address all issues. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions where applicable. While the parties have raised numerous issues in their submissions, for the purposes of this determination commentary has been restricted to those issues considered directly relevant to the outcome only. 2.1 Is the insurer entitled to deny the balance of the complainant’s claim? Coverage of the policy The complainant’s home insurance policy covers loss or damage to the complainant’s buildings and/or contents caused by one or more of the policy insured events that take place during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant. The policy insured events include “Storm, storm surge, cyclone, rainwater or run - off”. The PDS, at page 17, details; Storm, storm surge, cyclone, rainwater or run-off What’s covered? Buildings and/or contents ✔ Loss or damage caused by: • storm, • storm surge*, • cyclone*, • rainwater, • run -off (provided run-off is not combined with flood waters). The policy insured events also include “ Water or other liquid damage ”. The PDS, at page 18, details: Determination | Case number: 929571 Page 3 of 11 Water or other liquid damage What’s covered? What’s covered? What’s not covered? Buildings and/or contents ✔ Loss or damage resulting directly from bursting, leaking, discharging or overflowing of any: • domestic home appliances – for example a dishwasher or washing machine, • fixed rainwater or hot water tanks, It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. The insurer has accepted that some damage has been caused by the leaking pipe from the hot water service and I am therefore satisfied that the complainant has met her onus to establish a valid claim. The onus now transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim. The insurer seeks to rely upon the general policy exclusions at pages 60 – 63 of the PDS: Wear and Tear Including depreciation, gradual deterioration, wear and tear or lack of maintenance. Inherent defects Including faulty design or materials, structural defects or poor workmanship. Circumstances of the loss and claim The complainant lodged her claim for water damage at the insured property, with the insurer, on 18 May 2022. At lodgement of the claim, the insurer recorded: (Complainant) reported water damage on her ceiling and wall caused by recent rains. (Complainant) doesn’t know if there is something else damage as she doesn’t get into the room, bedroom. The complainant maintains that when she lodged the claim, she advised the insurer that she was not sure what the cause of the damage was. The complainant requested from the insurer a copy of the call recording, but AFCA has not been provided with a copy, which would be part of the normal exchange process. On instructions from the insurer, chartered loss adjusters (AS), attended on site on 5 July 2022, and provided a report dated 8 July 2022. AS says that the complainant’s father (MG) who was at the onsite inspection, “… also attempted to assert that damage to the study, main bedroom and ensuite has occurred as a result of a burst hot water system …” Determination | Case number: 929571 Page 4 of 11 The insurer partially accepted the claim and advised:  It accepted the water damage to the hallway is consistent with a leaking pipe from a hot water system,  It offered a 20% contribution for damage to the study and ensuite due to the failed hot water system,  The remaining internal and external damage is caused by gradual deterioration of the roof, poor workmanship and lack of maintenance and therefore this portion of the claim is denied. I find it concerning that despite the complainant requesting an explanation as to why a 20% contribution, no explanation has been forthcoming. The complainant maintains that the roof is in reasonable condition and has been appropriately designed, assessed and checked to comply with all necessary requirements and standards. The documentation for the property having been reviewed, approved and signed off by the appropriate government authorities. The complainant says that there have not been issues with the property, prior to the leaking hot water service. Further, the construction company (PC) confirms that they attended at regular intervals and conducted any required maintenance (see report below). The complainant says that there is no evidence of the roof leaking. Reports All material lodged by the parties has been exchanged. The following is a summary rather than a full description of all material. The parties have had the opportunity to provide submissions on all the exchanged material. The exchanged material includes a tax invoice from plumber (AP), dated 17 May 2022. The tax invoice confirms that AP attended the property on 17 May 2022, to investigate a leak from the hot water service. AP found the service to be beyond repair and he removed and replaced the service to comply with Australian Standards. At the complainant’s request, AP provided a report that includes several photographs. The report from AP details: In May 2022 the hot water tank and drip tray at the property leaked and water flooded onto the ceiling in the hallway, bedroom, ensuite and study (The old hot water system discharge pipe was running over the study area and a large amount of water was leaking from it on the sloped ceiling in the study and in the inside of the external study wall ) . Since the hot water system and drip tray has been replaced, no more leaks have occurred in the area since the replacement of the unit. …. Date of inspection: 20 / 04 / 2023 …. Determination | Case number: 929571 Page 5 of 11 The findings in this report are based on a visual inspection at the time of the above date. The report is prepared for the client at her request. …. The exchanged material includes a tax invoice from PC, dated 12 May 2022. The tax invoice details:  Replace one Custom Orb roof sheet  Replace several rusted screws with nails  Clean all gutters  Check and tighten all loose screws  Replace one section of the front soffits. The complainant says that all this work was carried out to the front part of the roof which is completely separate from the location in question. The complainant also says that PC made this clear to AS, but AS failed to include or mention this in his report. The complainant says that the work completed by PC was just part of the regular maintenance she carried out at the home. The exchanged material includes an inspection report from PC, prepared 24 April 2023. The report includes several photographs. Within the report PC says:  I have attended your property in regular intervals over the last few years. I check and attend to any required maintenance work to the roof.  On the 12/5/22, I attended your property and completed some regular maintenance work to the front part of the roof.  Sometime around July 2022, I received a call from someone who identified himself as an assessor for the insurance company. During that call I made it clear to him that during that visit, all the work I completed was to the front part of your roof since the rear part of the roof did not require any work at the time. To confirm, no work was done to your roof over or near the area where the ensuite and study is located.  At your request, I attended the property today, 24/4/23 and removed the screws from part of two sheets from the area above the ensuite and the study, and found as per the standard requirement, the Silsolation (sarking) is there under the sheets and preforming satisfactorily (PC refers to a specific photograph where he can be seen to be lifting the roof sheeting above the ensuite and study, and showing the sarking present and intact underneath).  The roof as is and in general is preforming similar to most of the roofs of the same age and does not require any major work with general maintenance happening from time to time.  I have not witnessed leaks from the roof to the inside of the house since maintaining your property and we confirm the roof is still in reasonable condition. The insurer engaged a specialist roofer (AR), who attended onsite on 17 June 2022, and provided a report and a scope of works. The report includes several photographs. AR advised: Determination | Case number: 929571 Page 6 of 11  the mould at the property and the faulty hot water service were two separate events  the mould build-up and subsequent damage was caused by long term water ingress via the roof to the rear of the property, as opposed to the faulty hot water service  the damage within the hallway was caused by the faulty hot water service, with the rest a result of long term water ingress because of the dilapidation within the roof and lack of maintenance  the roof was past its useful life, with minimal maintenance completed on the gutter, large dilapidation in roof sheets and incorrect workmanship in the application of half- length roof sheets, large amounts of rust on sheets and screws, a reroof is required  the box guttering is inadequate and full of debris  rusted screws have dilapidated and detached from trusses  ridge seal not completed correctly on ridge cap with gaps showing  pre-existing long-term repairs to roof sheeting (opposite of roof to the damage)  ridge fla shing isn’t “Scribed” to the roof sheet profile allowing wind driven rain to ingress the ceiling cavity  roofing screws are lifting and depress under foot above the study where the most significant ingress is observed  the existing sarking within the ceiling cavity is torn and deteriorated, requires replacement and any water ingress via the roof will not exit via the eaves but fall straight onto the ceiling lining  mould within the study room appears to be from an extended period and not from a one-off event. The exchanged material includes a report from (MG) Consulting Engineers, dated 4 August 2022. The report confirms that MG attended the property on several occasions for inspection, in June, July and August of 2022. MG has provided a detailed version of events that he says occurred during the three inspections. It is common knowledge that MG is the complainant’s father. While MG is not strictly independent, given his qualifications as a structural engineer, length of experience (over 30 years) and personal knowledge of the home, I am satisfied that his views should not be ignored, but rather reviewed considering all the exchanged material. Within the report, MG asserted that AS and AR lacked the qualifications to make the statements they have made and some of the statements made are false and/or incorrect. MG says that their reports should be withdrawn. I do not agree. All exchanged material needs to be reviewed, considering all other material, including the qualifications of the party that provides the report and the recollections of those who were in attendance. As with most of the other reports exchanged, the report from MG includes several photographs. Within the report, MG made the following findings:  The roof sheeting complied with standards at the time of installation, and is in fair to reasonable condition, with minor surface rust on some screws and is in similar condition to houses of the same age, Determination | Case number: 929571 Page 7 of 11  The box gutter was designed and constructed to permit and is sufficient for the discharge of the rainwater for the two areas,  There is no evidence of the roof leaking to the areas maintained above,  The hot water service was located about 5300mm away from the centre of the office external wall and 2000mm approximately out from the line of the side office wall, approximately to the right side of the louvre window of the office,  When the tank started to fail and give away water, the water ran towards the office/ensuite area and since the ceiling is directly fixed to the roof elements, the sloped ceiling allowed water to run to the external wall and collect in the area of the ceiling close to the wall. During this, the leaked water from the tank spread to other areas nearby. MG says this was also confirmed by the plumber who completed the work for the replacement hot water system,  The amount of water was great enough to saturate the ceiling lining and part of the wall, with some also being trapped at the bottom of the wall, and  The saturated ceiling and wall lining attracted mould and kept growing. At the request of AS, builders (MJ) attended on site and provided a Photo Schedule dated 1 September 2022. The Photo Schedule includes numerous photographs and some commentary.  The main roof appears to be in original condition, overall there are signs of general wear and tear due to the age of the property.  There appears to be three separate areas of the property; main original roof, rear patio extension and carport extension.  The main area of the inspection was undertaken over the rear left corner of the property over the affected bedrooms and damaged hot water service.  The inside of the ceiling cavity was inspected, minimal staining and damages around the old hot water service, all damage is localised around the two affected rooms.  It is possible the water ran back along the outlet towards the two damaged rooms.  Barge flashings; Possible ingress, the barge along the elevation adjacent to the master bedroom, appears to run out of square, following the water test, minor staining was evident to the external wall indicating possible ingress.  Ridge capping; Possible ingress, under the ridge and running internally along the sarking installed with the ceiling cavity. Where visible the roof sheets are intermittently weathered, under test condition minor ingress occurred at the area approx. 1.5m in from the rear left external wall.  Roof screws; Possible ingress. Some roof fixings were observed as being loose at the time of inspection, nil ingress under test conditions. Previous sealant applied.  Rood sheets; Possible ingress, where the sheets are slipped under the main roof, where visible did not fail under test conditions.  Contents of gutter; Clear and free of debris…Holding water at the time of inspection, 1 x outlet at the area of inspection, no outlet at opposing end.  Maintenance issues; At the time of inspection, it was discussed with the owner the need for maintenance to the ridge capping. Additionally, upon review of the images, previous sealant has been applied to surrounding fixings. MJ conducted a water test and advised: After the water test, a small pooling of water was observed at the base of the external cladded wall, appears to have come down along the sarking and escaped at the eave lining to the external cladded wall. Determination | Case number: 929571 Page 8 of 11 At the request of AS, consulting engineer (WS) also attended at the property on 1 September 2022, with the complainant, MG and two representatives from MJ and provided a report dated 13 September 2022. WS was provided with various documents which are listed with the report from WS. The report also includes several photographs. Based upon the provided material and his discussions on the day with MG, WS advised that it appeared that the complainant is claiming all water damage internally and externally related to the failed hot water service. WS advised:  He suspected water entry would occur under the ridge flashing due to misaligned scribing of the flashing into the sheeting ribs.  MJ reported water entry under the ridge.  Partial degradation and collapse of the sarking in the roof space, with sufficient sarking in place to direct water down the roof slope to the point where the sarking terminates which is the start of the ensuite/study.  Some water ingress was reported to the end wall where the roof sheets and gable flashings are not in alignment with the external block wall.  MJ’s water test highlighted water ingress is highly likely and can be expected through the ridge flashing and the end wall where the gable flashing is misaligned. Based on his findings WS confirmed his view that the mould and stains in the ensuite and study are not entirely the result of the hot water service failure. Further, the location of the hot water service unit adjacent to the sloping ceiling of the ensuite/study would allow a path for escaping water to the outside timber clad wall and there is a part contribution to the damage to these rooms. However, WS says the majority of the damage can be explained by the poor ridge and gable flashings allowing stormwater over a longer period as seen by the timber plank deterioration. Finally, WS advised that the failed hot water service contributed to the damage in the two rooms, but it was not the sole cause, the damage being consistent with long term and not short-term leaks. WS allocated up to 20% of the staining internally to the failed hot water service. The complainant says that WS did not enter the roof space despite his report referring to a roof space inspection. The complainant says that WS declined to accept her photographs, which had been taken over the previous 12 months and a photograph of the complainant in the relevant area. Further, the complainant says that WS provided misinformation. Finally, the complainant says that WS has not explained how the contribution to the damage from the leaking hot water service, amounts to 20%. The insurer has not responded to any of these statements. The complainant provided an email dated 17 September 2022, and an additional report from MG. Within the email, MG raises concern that a photograph made available to, and copied by WS, on 1 September 2022, was not included within or referenced by WS within his report. Determination | Case number: 929571 Page 9 of 11 MG, says the photograph, taken on 21 December 2021, is of the complainant in the rear verandah, ensuite and office extension area, and shows the walls and ceiling in an intact condition and in great condition. I have seen the photograph and if taken in the area described by MG, and I have no reason to believe it was not, it does appear to show the walls and ceiling in an intact condition. MG confirmed:  No evidence of leaks during the heaviest rains in the wet season,  Despite water testing showing no evidence of water leaks to the area inside the roof over the claimed area, WS still says the water test highlights water entry through the roof. The additional report from MG, included within the complainant’s submissions of 4 May 2023, again challenges the reliability and persuasiveness of the material from the insurer. The complainant obtained a report from building certifiers (DB), who carried out a visual site inspection on 16 February 2023. This report includes several photographs. DB advised:  The ceiling and wall damage (in the bedroom, passageway, ensuite and office area) may be attributable to the failure of the existing hot water system  The existing roof cladding appears to be in reasonable condition given the age of the installation  The existing guttering appears to be in reasonable condition given the age of the installation. In my view, these conclusions support the views expressed by PC (see above). Conclusion It is accepted that the failed hot water service has caused damage at the property. The issue is as to the extent of the damage caused. The complainant says that the material she has exchanged confirms that the roof has been maintained and is in reasonable condition. On the other hand, the material exchanged by the insurer raises numerous issues with the condition of the roof. Having reviewed all exchanged material, I prefer the evidence presented by the complainant. PC has attended at regular intervals and my view is in the best position to express an accurate opinion regarding the condition of the roof. Further, PC’s opinion is supported by DB, MG and the material exchanged regarding the construction of the home. Based upon the exchanged material, I am not satisfied that the insurer has established that the roof was in poor condition or has contributed to the loss and damage at the property. Further, WS confirms it is feasible, given the location of the hot water service is adjacent to the sloping ceilings of the ensuite and study, that a path would allow water to escape to the outside timber clad wall. Given the exchanged material I am satisfied that the complainant has established a valid claim for both internal and external damage and that the insurer has not established the basis on which it is entitled to deny the claim or to limit its liability to the complainant. Determination | Case number: 929571 Page 10 of 11 The insurer is required to meet the claim for both the internal and external damage, including mould remediation under the terms of the policy. Within 30 days of acceptance of this determination by the complainant, the insurer is to arrange for a scope of works to be prepared to cover the internal and external repairs, including mould remediation. The insurer is then to obtain an actionable quotation based upon the scope of works. The insurer is then to either, at its discretion, complete repairs or cash settle the complainant based upon the actionable quotation. If the insurer elects to cash settle the complainant, it is to add an additional 20% uplift to allow for contingencies. If the insurer paid the amount of its settlement offer, it is entitled to deduct that amount from the settlement sum. The parties are to work together to finalise this matter, but if they are unable to reach agreement regarding the scope of works or quotation, they may return to AFCA for assistance. The exchanged material includes a tax invoice dated 4 August 2022, from MG. I am satisfied that information provided by MG contributed to my understanding and resolution of this matter. In accordance with AFCA Rules, I am satisfied it is fair that the insurer pays this invoice. Additional matter I am troubled by parts of the report from AS who says that neither he, nor others, including WS and MJ, were afforded the opportunity to meet with the complainant. AS says that because it was not able to discuss the matter with the complainant directly onsite it has been severally prejudiced in its ability to investigate the claim. However, the report from WS clearly states that at its onsite inspection on 1 September 2022, along with MG and two representatives from MJ, the complainant was in attendance. I am satisfied that both WS and MJ were engaged by AS on behalf of the insurer. Clearly, the insurer and its representatives have had access to the complainant and the fact that she has been unavailable on one or more occasions is in my view of no consequence to the outcome of this complaint. 2.2 Why is the outcome fair? The outcome is fair as based upon the exchanged material the complainant has established a valid claim and the insurer has not established the basis on which it is entitled to deny the claim, or to limit its liability to the complainant. Determination | Case number: 929571 Page 11 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.