Claim declined for broken conduit beneath driveway; insurer said damage not sudden and exclusions applied
Text of the determination
Determination
Case number 929431
Financial firm Strata Community Insurance Agencies Pty Ltd
Determination | Case number: 929431 Page 1 of 7
Case number: 929431 29 June 2023
1 Determination overview
1.1 Complaint
The complainants are the owners of one of four townhouses that share some common
property. The common property is owned by an owners’ corporation formed amongst the
owners of the four townhouses (the OC). The OC holds an insurance policy with the financial
firm (the insurer) to cover loss or damage to the common property (the OC policy).
On 28 October 2022 there were heavy rains and flooding in the area and the complainants
experienced the sudden loss of electricity to their townhouse. The loss of electricity was later
found to result from a broken conduit housing cabling that was beneath the OC’s driveway.
The complainants have made a claim under the OC policy to have the broken conduit and
resultant damage repaired.
The insurer has declined the complainants claim under the OC policy saying:
the broken conduit could not have occurred suddenly and as such is not covered
even if it were covered, a number of exclusions apply including in relation to electrical fault,
ground movement, faulty workmanship, an inherent vice or latent defect, gradual
deterioration, wear and tear or developing flaws.
This complaint is about whether the insurer is entitled to decline the complainants ’ claim.
1.2 Issues and key findings
Is the insurer entitled to decline the complainant s’ claim ?
No. The complainants have shown the damaged conduit occurred suddenly, causing
resultant damage to cabling. The insurer has not shown a policy exclusion applies.
Why is the outcome fair?
The OC policy provides cover for sudden and accidental damage to common property and for
resultant costs, including temporary accommodation of lot owners. The complainants as part
of the OC pay insurance premiums, specifically to have access to this cover. It is fair that the
insurer covers them for the claimed loss and damage that arises under the OC policy.
1.3 Determination
This determination is in favour of the complainants. The insurer must accept the
complainants’ claim for damage to the broken conduit and rethreading of the damaged
cabling, reimbursement for the costs of contractors and temporary accommodation up to the
relevant OC policy limits and less any applicable deductions.
Determination | Case number: 929431 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer entitled to decline the complainants’ claim ?
No. The complainants have shown the damaged conduit occurred suddenly, causing
resultant damage to cabling. The insurer has not shown a policy exclusion applies.
The OC policy covers sudden and accidental damage to property
The complainants claim the conduit housing cabling running beneath a driveway on common
property broke. This in turn caused a dead short, resulting in the loss of electricity supply to
their townhouse. They claim:
the cost of repairing the broken conduit and rethreading of cabling, which may or may not
include removal and replacement of the driveway
the cost of temporary accommodation until repairs are completed
reimbursement for the cost of any contractors who have attended to investigate or assess
the claimed damage.
The initial onus is with the complainants to establish on the balance of probabilities (that is, it
is more likely than not) that the loss or damage claimed falls within the terms of the OC’s
policy. This is known as a valid (or prima facie ) claim.
Once the complainants have established a valid claim, the onus shifts to the insurer to
establish, on balance, the application of a policy exclusion or that it is otherwise entitled to
decline the claim under the OC policy. The OC policy covers damage from any sudden and
accidental cause. This is detailed on page 22 of the Product Disclosure Statement (PDS)
which says:
We will pay up to the Sum Insured shown on the Schedule for Section 1,
against Loss or Damage to Your Insured Property
Loss or Damage is defined on page 19 of the PDS as:
direct physical loss of, destruction of, or damage to property from any
sudden and accidental cause not otherwise excluded by this Policy.
On this basis, I am satisfied the OC policy covers damage to the broken conduit if the cause
was sudden and accidental.
The complainants have shown the cause of damage was sudden and accidental
The parties do not dispute there was no known issue with the conduit prior to the
complainants’ sudden loss of power on 28 October 2022. Initial investigations found the
broken conduit and consequent damage to cabling was the cause of the loss of power. The
complainants say a particularly heavy storm likely caused the conduit to break, or
alternatively that it was caused by ground movement.
The insurer appointed Company H to attend and provide a report. It says it is unlikely the
cause was heavy rain and the damage was more likely caused by faulty workmanship or
ground movement. I do not accept Company H’s report. This is because it has provided no
reasons for the conclusion it has drawn and provided no supporting evidence. I accept this is
Company H’s opinion, but in the absence of reasons and supporting evidence I am unable to
assess the persuasiveness of this opinion.
The insurer also appointed Company F to attend and provided a report. Company F found:
Determination | Case number: 929431 Page 3 of 7
Conduit found to be snapped, exposing cables and eventually causing fault.
There is no dispute between the parties that the damage to the conduit was accidental, and
the consequent damage to cabling likewise. The insurer says the damage to the conduit
could not have occurred suddenly given its location beneath a concrete driveway. The
insurer’s view is inconsistent with Company F’s finding that the conduit had “snapped”
suggesting it occurred in a single moment, not gradually over time.
Based on this, and the absence of any information indicating an earlier issue with the conduit,
I am satisfied the complainants have shown it is more likely than not the damage to the
conduit occurred suddenly and accidentally. The cause of the resultant damage to the cabling
was therefore a sudden and accidental event. Whether or not the damage was caused by the
storm is immaterial, as the complainants need only establish the cause of the damage, being
the snapped conduit, was sudden and accidental to establish a valid claim.
The insurer has not shown an exclusion applies
As outlined above, the insurer says that even if the complainants can establish a valid claim,
a number of policy exclusions apply that entitle the insurer to decline their claim. Once the
complainants have established a valid claim, the onus shifts to the insurer to show it is more
likely than not a policy exclusion applies. The insurer relies on exclusions in relation to:
electrical fault (the electrical fault exclusion)
ground movement (the ground movement exclusion)
faulty workmanship (the faulty workmanship exclusion)
an inherent vice or latent defect (the inherent vice or latent fault exclusion)
gradual deterioration (the gradual deterioration exclusion)
wear and tear or developing flaws (the wear and tear and developing flaws exclusion).
Complete extracts of each claimed exclusion are set out in section 3.2 of the determination.
The parties have engaged a number of contractors to attend and assess the damage. The
complainants initially engaged Company S, who could not identify the cause of the broken
conduit. The complainants also engaged Company FE who verbally advised the cause of the
loss of power supply was a dead short. However, Company FE expressed no view as to the
cause of the claimed damage, being the broken conduit.
In relying on the exclusion relating to an electrical fault the insurer says:
All attending contractors involved in this matter confirmed that there was a dead
short across the consumer main cables.
I accept the contractors have consensus on this point. However, the claimed damage is not
damage resulting from a dead short. The claimed damage is the broken conduit, which in turn
caused the dead short. There is no information to support the broken conduit was caused by
an electrical fault. For this reason, I am not satisfied the insurer has shown the electrical fault
exclusion applies.
Alternatively, the insurer relies on Company H’s report which concludes the broken conduit
was most likely caused by either gradual deterioration or faulty workmanship. For the reasons
outlined above however, I do not find Company H’s report persuasive. Gradual deterioration
and faulty workmanship are distinctly separate and different causes. To conclude the claimed
damage was caused by one or the other without explanation, reasons or supporting evidence
is not persuasive.
Determination | Case number: 929431 Page 4 of 7
I acknowledge the complainants’ submission that ground movement may be a cause, but I
find this speculative and insufficient to satisfy the insurer’s obligatio n to show this was the
likely cause. For this reason, I am not satisfied the insurer has shown the exclusions relating
to either ground movement or faulty workmanship applies.
While the insurer alternatively claims that exclusions relating to inherent vice or latent defect,
gradual deterioration or wear and tear apply, it has provided no information to support this
other than to say it is a matter of logic given the location of the conduit beneath the driveway.
I am unwilling to rely on this in the absence of expert opinion confirming the absence of other
logical or possible causes.
For these reasons, I am not satisfied the insurer has shown an exclusion applies.
The OC policy covers the complainants’ claim for temporary accommodation
The complainants also claim temporary accommodation under the OC policy which provides:
When a Lot Owner occupies their Lot We will pay the reasonable cost of
Temporary Accommodation they necessarily incur if their Lot is made unfit to be
occupied for its intended purpose by:
(i) Loss or Damage that is admitted as a claim under Section 1 ;…
The insurer says the complainants claim for temporary accommodation is due to the dead
short which is most likely caused by ground movement or faulty workmanship.
For the reasons outlined above, I am not satisfied the insurer has shown either the ground
movement or faulty workmanship exclusions apply. I have considered whether the electrical
fault exclusion applies to the claim for temporary accommodation given the dead short has
resulted in them being unable to occupy their property.
I am satisfied the insurer is not entitled to decline the complainants’ claim for the reasonable
costs of temporary accommodation. This is because the complainants have incurred these
costs as a result of being unable to occupy their property for its intended purpose due to the
claimed damage to the conduit. The damage to the conduit is claimed under Section 1 of the
OC policy. Given the insurer is not entitled to decline this claim it follows it is not entitled to
decline the claim for temporary accommodation.
The insurer is not entitled to decline the complainants’ claim
I am satisfied the insure is not entitled to decline the complainants’ claim because
the complainants have established a valid claim under the OC policy, namely that damage
to the conduit occurred suddenly and unexpectantly
the insurer has not shown an exclusion applies to the claimed damage
the complainants are entitled to temporary accommodation costs given the claim cannot
be declined under section 1 of the OC policy.
The insurer must accept the complainants’ claim for damage to the broken conduit and
rethreading of the damaged cabling, reimbursement for the costs of contractors and
temporary accommodation up to the relevant OC policy limits and less an applicable
deductions.
Determination | Case number: 929431 Page 5 of 7
2.2 Why is the outcome fair?
The outcome is fair
The OC policy provides cover for sudden and accidental damage to common property and for
resultant costs including temporary accommodation of lot owners. The complainants as part
of the OC pay insurance premiums, specifically to have access to this cover. It is fair that the
insurer covers them for the claimed loss and damage that arises under the OC policy.
Determination | Case number: 929431 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant extracts from the OC policy
The PDS says on page 28:
We will not pay for Loss or Damage:
[…]
(c) (i) caused by moths, termites or other insects, vermin, mice, rats, rust or
oxidisation, mildew, mould, contamination or pollution, wet or dry rot, corrosion,
gradual corrosion or deterioration, change in colour, dampness of atmosphere or
other variations in temperature, evaporation, disease, inherent vice or latent
defect, loss of weight, change in texture or finish or pecking, biting, chewing or
scratching by birds or animals;
(ii) caused by Wear, Tear, fading, concrete or brick cancer, gradual deterioration
or developing flaws;
(iii) caused by lack of maintenance or failure to maintain Your Insured Property in
a reasonably good state of repair.
[…]
(e) caused by overwinding, mechanical breakdown or derangement, electrical
breakdown or derangement, or failure caused by electric current.
[…]
Determination | Case number: 929431 Page 7 of 7
(g) caused by vibration or from the removal or weakening of or interference with
the support of land or buildings or any other property, Erosion or Earth Movement.
The PDS says on page 29:
We will not pay for:
[…]
(b) the cost of rectifying faulty or defective materials or faulty or defective
workmanship.
Earth movement is defined within the PDS as follows:
Earth Movement
means heavage, landslide, land-slippage, mudslide, settling, shrinkage, subsidence or
collapse.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.