Determination 929357
Complainants sought the cost of external rectification works allegedly based on incorrect advice from the insurer's builder, plus compensation for claim handling
Summary
Homeowners claimed the cost of external rectification works they said were based on incorrect advice from the insurer's builder after repeated water ingress. AFCA found in favour of the insurer, finding no loss from reliance on incorrect advice and that the insurer's $1,000 offer was reasonable.
The complainants did not show detrimental reliance on incorrect advice, defect rectification is excluded from cover, and the insurer's $1,000 offer for a slight delay was fair.
Issues
- Misleading conduct primary · not upheld
“not satisfied the complainants have established they have relied on any incorrect advice to their detriment”
- Poor claim handling secondary · not upheld
“I am not satisfied the insurer has erred in its assessment or handling of the claim.”
- Delay secondary · upheld
“insurer's acknowledgement there was a slight delay in organising a second assessment. The insurer offered $1,000 compensation”
- Product terms interpretation secondary · not upheld
“The policy does not provide loss of rent given the risk has been identified as owners occupied”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case number 929357
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 929357 Page 2 of 7
Case number: 929357 26 May 2023
1 Determination overview
1.1 Complaint
The complainants lodged a claim with the financial firm under their home and contents
insurance policy. This is for the water damage sustained to their property following water
inundation during a storm.
The insurer says water has entered the property through the lower parts of some walls due to
the outside ground level being higher than the inside floor. The insurer agreed to cover the
resultant water damage subject to the complainants undertaking the required maintenance
work to mitigate any water ingress issues.
The complainants say they completed the external maintenance-related repairs however
water ingress has occurred again. The complainants are seeking the cost incurred in
undertaking these works on the basis the insurer’s builder has given them incorrect advice
regarding the extent of the work required.
1.2 Issues and key findings
Did the complainants suffer a loss due to incorrect advice?
No. The complainants have not established a loss as a result of any incorrect advice from the
insurer’s builde r.
Is the insurer liable for any compensation?
The insurer handled the claim reasonably overall. However, the insurer’s offer is reasonable
in the circumstances.
1.3 Determination
This determination is in favour of the insurer.
Within 14 days of receiving notice the complainants accept this determination, the insurer is
required to pay the complainants $1,000 in compensation.
Determination | Case number: 929357 Page 3 of 7
2 Reasons for determination
2.1 Did the complainants suffer a loss due to incorrect advice?
There is no dispute the defects caused the water ingress
These relevant facts are not in dispute:
the property sustained water ingress issues on numerous occasions due to a building
defect
the insurer accepted the claims for the resultant damage including the contents
the insurer engaged a builder (MC) who would be able to undertake the maintenance
issues (subject to a successful homeowner’s warranty insurance claim).
The insurer says MC would be able to warrant the internal water damage-related repairs if the
maintenance repairs are carried out successfully. The exchanged information shows the
complainants are pursuing a homeowner’s w arranty claim to rectify the external maintenance-
related repairs.
The exchanged information shows that following the initial water inundation, the insurer
engaged a builder (SH) to assess the cause and extent of the damage. In his report, SH says
the external ground levels outside bedroom 4 (point of water ingress) have been constructed
above the internal floor slab level, the weep holes and the damp course level. Further, there
is insufficient draining to cope with the heavy rainfall.
In his report, SH noted the external ground level is higher than the internal ground level by
60mm. Importantly, SH referred to the Australian building code AS3660 where the minimum
slab edge exposure to the perimeter is 75mm. The insurer says the policy does not provide
cover for the rectification of the identified defects.
The complainants do not dispute that the policy does not provide cover for any maintenance-
related works. Amongst other things, the complainants say:
they have relied on the SH ’s advice and undertook insufficient maintenance works
SH advised that the land around the property needs to be dropped by 200 to 300mm
the insurer’s building consultant (IN) attended the proper ty 6 months later and provided
detailed and accurate recommendations after vaguely rectifying the land following SH’s
assessment
they have incurred unnecessary costs.
The exchanged information shows the rectifications the complainants carried out to the
external defects were inadequate and further work is required.
The insurer is not liable for the maintenance work
To establish a claim for misrepresentation or misleading advice the complainants need to
establish they were given incorrect information, that they reasonably relied upon it, and have
suffered a loss arising from reliance on that incorrect information.
I have carefully reviewed the exchanged evidence, I am not satisfied the complainants have
established they have relied on any incorrect advice to their detriment.
Firstly, I do not accept it is the insurer’s liability to establish the extent of the rectification
required for defective construction of a property. This falls outside the policy’s scope of cover.
The insurer engaged (IN) following the second inundation where 6 months had lapsed. I
accept 6 months was sufficient time for the complainants to engage the correct expertise to
Determination | Case number: 929357 Page 4 of 7
assess the extent of rectification required to mitigate water ingress to the property and make it
compliant with the relevant building code.
Secondly, I consider it reasonable the complainants should have engaged their builder or
engineer to assist them in identifying the extent of the defect rectification needed prior to
commencing the work. This is because the nature and extent of repairs required to the
external of the property are extensive. Amongst other things, it includes drainage works,
waterproofing and excavations. I accept these are major rectification works requiring an
expert’s input.
I note MC is currently assisting the complainants in doing so.
Thirdly, I note the insurer has provided the complainants with a copy of SH’s report and his
findings on 6 April 2022. I note this is approximately 6 days post inspection and prior to the
complainants commencing any rectification works to the external of the property. I accept
SH’s report was a reasonable starting point for the complainants ’ investigation. SH in his
report outlined relevant building codes and the exact height difference between the external
grounds and internal slapping. I note SH’s findings are consistent with IN’s.
Fourthly, the exchanged evidence shows the complainants were struggling with the
maintenance repairs due to the cost exceeding $20,000. This is evident in the telephone
conversation with the insurer on 18 May 2022. Importantly, the complainants say SH
confirmed it is unable to advise the level of the required maintenance works.
Lastly, the complainants say they were verbally advised to lower the ground by 200 to
300mm. This exceeds the noted level in SH’s report. When IN attended, the noted works the
complainants undertook were not to the 75mm level. Further, IN noted some drainage pipes
remained disconnected during his assessment.
Even if I were to accept the complainants were told verbally that they needed to excavate
between 200 – 300 mm in depth, I am not satisfied that this solely establishes a detriment.
This is because the complainants received a copy of SH’s report where the information noted
is different from the verbal advice (if any). I accept the complainants were required to
undertake their due diligence checks prior to commencing the works.
I am not satisfied that the complainants have shown they have relied on SH’s assessment or
discussion (if any) to their detriment. The insurer is not liable for any cost incurred by the
complainants in rectifying the construction defects identified by either SH or IN.
2.2 Is the insurer liable for compensation?
AFCA can award compensation for non-financial loss
AFCA will award compensation for non-financial loss (capped at $5,400) if there has been an
unusual degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainants ’ expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainants have suffered some inconvenience and delays.
AFCA expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
The complainants are dissatisfied with the insurer’s handling of the claim. Amongst other
things, the complainants say:
Determination | Case number: 929357 Page 5 of 7
they suffered loss of rent given their intention to rent the available bedrooms in the
property
they are unable to commence the internal repairs.
The insurer’s offer is fair and reasonable in the circumstances
I note, the insurer:
engaged several builders and consultants to assist the complainants in establishing the
extent of the loss
agreed to undertake the repairs to the resultant water ingress damage in the event the
defects are rectified
provided alternative accommodation where necessary
took all reasonable steps to mitigate further damage to the property by engaging a
restorer.
I note the policy gives the insurer the discretion to either undertake the repairs or cash settle
its liability. The insurer says due to the ongoing water ingress issue, it is unable to warrant the
repairs.
In its submissions to the Authority, the insurer says it agreed to the complainants ’ request not
to cash settle the claim, however the insurer’s builder is unable to warrant repairs.
Whilst the method of the claim’s settlement is not in dispute, I note the insurer’s position is
reasonable. I accept the insurer went beyond the policy’s scope of cover to assist the
complainants with their homeowner’s warranty claim.
I accept there were delays, however this is mainly due to the issues surrounding the identified
maintenance and defects. The exchanged evidence shows the insurer has assessed the
extent of the insurable loss promptly. However, repairs did not commence due to the ongoing
water ingress issue which the complainants are liable for.
I acknowledge the difficult circumstances the complainants faced following the identification of
the defective construction. However, I am not satisfied the insurer has erred in its assessment
or handling of the claim.
I note the complainants’ arguments regarding the loss of rent. I do not accept th is is a loss the
insurer is liable for. The complainants’ intentions to rent the empty rooms to individuals would
have altered the risk details from an underwriter ’s perspective. The policy does not provide
loss or rent given the risk has been identified as owners occupied rather than tenant
occupied. Further, the complainant has not provided any persuasive evidence of any losses
in that regard.
I note the insurer ’s acknowledgement there was a slight delay in organising a second
assessment. The insurer offered $1,000 compensation. I accept this is reasonable in the
circumstances.
2.3 Why is the outcome fair?
There is no evidence to establish the complainants have suffered any loss as a result of any
inaccurate or inappropriate recommendation from SH. The insurer provided all the information
available prior to the complainants’ commencement of the defect repairs. The insurer is not
required to establish the extent of repairs to a defect that is not in dispute and that it is
excluded under the policy.
Determination | Case number: 929357 Page 6 of 7
The complainants are required to take any reasonable steps to establish the extent of the
rectification required to make their property compliant with the relevant building code.
Determination | Case number: 929357 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.