Home / Allianz Australia / Determination 929280
Determination 929280
Extent of storm damage cover for pool paving and non-financial loss for claim delays
Summary
Storm damaged the complainants' property and the insurer cash settled pool paving for $5,940, while the complainants sought $40,920 to replace all paving. AFCA found the settlement adequate but ordered $2,000 for non-financial loss caused by delays.
The complainants did not show the storm was the proximate cause of damage to all the paving, and the quote included an improvement (travertine), but the insurer's delays warranted non-financial loss compensation.
Issues
- Claim amount dispute primary · not upheld
“The complainants have not established that it is necessary to replace all the pool pavers because of the insured event.”
- Delay secondary · upheld
“The insurer's unreasonable delays caused the complainants stress, frustration and inconvenience.”
Subjects and remedies
home or building damagenatural disasterpay non financial loss
Text of the determination
Determination
Case number 929280
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 929280 Page 2 of 7
Case number: 929280 29 February 2024
1 Determination overview
1.1 Complaint
The complainants hold a Home and Contents policy with the financial firm (the insurer). On 28
February 2022 the complainants ’ property was damaged following a severe storm. The
insurer has accepted liability for internal damage, repairs to the electric front gate, pool fence
and pool pump. However, the parties are in dispute in relation to the extent of the insurer’s
liability for pool paving.
The insurer has cash settled the complainants $5,940 for pool paving and says that this
represents the extent of damage caused by the insured event.
The complainants have provided a quote in the amount of $40,920 for the pool paving. They
say that all the pool paving should be replaced because of the insured event. They also seek
compensation for poor claims handling, including delays, stress and inconvenience suffered.
1.2 Issues and key findings
Is th e insurer’s offer for pool paving adequate?
Yes. The complainants have not established that it is necessary to replace all the pool pavers
because of the insured event.
Are the complainants entitled to non-financial loss compensation?
Yes. The insurer’s unreasonable delays caused the complainants delays, stress and
inconvenience. The insurer is required to pay them $2,000 in non-financial loss
compensation.
Why is the outcome fair?
The insurer has correctly assessed and compensated the complainants for damage caused
by the storm. It would not be fair to require the insurer to compensate the complainants for
the entire pool paving when only certain areas require repairs.
1.3 Determination
This determination is in favour of the insurer.
If the complainants accept the determination, within 14 days, the insurer is to pay the
complainants $2,000 in non-financial loss compensation.
Determination | Case number: 929280 Page 3 of 7
2 Reasons for determination
2.1 Is th e insurer’s offer for pool paving adequate?
Yes. The complainants have not established that it is necessary to replace all the pool pavers
because of the insured event.
Onus on complainants to establish a claimable loss
The complainants are required to show, on the balance of probabilities (that it is more likely
than not), that they suffered a claimable loss under the policy. This means they must show
the loss was caused by a risk for which they are insured.
Once the complainants prove the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Subject to the terms and conditions set out in the Product Disclosure Statement (PDS), the
policy covers damage to the complainants’ home caused by a listed insured event. Those
events include ‘Storm, cyclone, rainwater or run - off’.
Complainants say that all pool paving to be replaced
The complainants seek that the insurer pay them $40,920 based on a quote obtained from
SL. The complainants say that the pool paving has experienced soil subsidence due to the
storm event in February 2022 and requires replacement of all the pool paving to restore the
area to the condition that it was in prior to the storm event. It says that the insurer’s offer to
replace paving in four areas would only achieve a band aid effect.
The complainants obtained an engineering report from NS dated 10 October 2023 following a
site inspection. NS observed that there were multiple areas where the ground had sunk.
Cracks were observed in the low retaining wall. Significant damage was found to the
foundation of the poolside pavement. Previous attempts at repairs were also observed.
NS says that in February and March 2022, Sydney received 368.2mm and 473.6mm for the
respective months. These significant rainfalls were notably higher than the typical average
rainfalls of 117.0mm in February and 124.5mm in March. NS says that the intense rainfall
resulted in a build-up of water without sufficient time for drainage. NS says this can
exacerbate land settling, amplifying damage to structures on the property.
NS says that replacement of sunken pavers is only a temporary fix and does not address the
underlying issue of soil movement beneath the surface.
NS recommends replacement of the entire drainage system, including the paver’s sub -base.
NS also recommended the paving is replaced with materials capable of withstanding surface
flooding and a foundational layer beneath the paving to mitigate future subsidence.
NS provided a supplementary report dated 31 October 2023. NS says that they found no
evidence of structural defects or poor workmanship. Further, NS did not observe any signs of
gradual, long term movement and noted that the property appeared to be in a good condition
for its age. NS says that the deterioration appeared recent, as indicated by crack formations.
NS says that the underlying issue stemming from soil movement beneath the surface caused
from the flood event is not addressed by replacement of only certain paved areas. NS says
Determination | Case number: 929280 Page 4 of 7
the soil has been softened, and subsidence will continue to occur if severe flooding happens
again.
Insurer says that it has reasonably settled paving damage
The insurer does not dispute that the storm event caused damage to the pool paving area.
However, it says that it has cash settled the complainants the sum of $5,940 for the damage
from the insured event. This includes a 20% contingency uplift. The insurer says that it has
also increased the offer, accepting the complainants’ quote from their preferred landscaper ,
SL, for the paving costs.
The insurer engaged an engineer, IE who inspected the property on 21 December 2022. The
complainants showed a video to IE of water flowing in an open channel drainage easement
through the site. Water was also observed cascading down the rocks at the rear of the poo l
from the neighbouring property.
IE identified four areas of sunken pavers.
Location 1 is a function of overflowing water, washing away the sand substrate.
Location 2 is primarily a function of the paving edging being poorly supported allowing
gradual erosion of the poorly compacted substrate and eventual subsidence, likely
worsened by rainfall inundation.
Location 3 was step pavers that were no longer bedded. IE was unable to confirm whether
this was solely because of inundation.
Location 4 was said to be from erosion of the subgrade due to poor drainage.
IE provided a supplementary report dated 20 November 2023. IE noted that the easement
capacity of the stormwater drain was reduced by the two bridges spanning the formed drain.
These bridges provide access to the pool.
IE does not believe that reactive foundation soils have settled because of inundation, nor
softened as found by NS. IE says that where pavers have settled adjacent to the pool shell,
ongoing erosion of the backfill material has occurred. IE found that it is likely that the storm
event significantly contributed to this resultant paving displacement, although it has likely
been occurring gradually.
IE says that the entire pavement area has not been compromised, beyond normal expected
behaviour of the pools surrounds. Cement stabilised and compacted backfill for reinstatement
of affected pavement areas would generally be as appropriate for the level of damage
present. IE says that an estimate of these costs would be approximately $4,000.
Insurer has met its obligations under the policy terms
Page 17 of the PDS provides that there is cover for loss or damage caused by a storm,
rainwater or run-off. The policy also provides cover for loss or damage caused by or arising
from soil movement, including erosion or subsidence if it is caused directly by and occurs
within 72 hours of a storm.
NS says that the insured event compromised the integrity of the surrounding pavement.
However, the presence of previous repairs is consistent with IE’s findings of gradual erosion
in the area. NS acknowledged that there were existing settlement issues although says that
the flooding exacerbated existing settlement issues associated with a reactive clay soil.
Given that there was already erosion present, I am not satisfied that the insured event was
the proximate cause of damage to the surrounding pavement area. Further, while NS says
that it is necessary to replace all pavers as the soil has softened, there is no evidence in
Determination | Case number: 929280 Page 5 of 7
support of this. Based on the photographs provided, I accept that the pavers have only been
affected in the locations described by IE.
NS also says that subsidence will continue if all the pavers are not replaced. However, the
policy also provides cover for subsidence which occurs within 72 hours of the insured event.
NS has not established that the replacement of the pavers is required because of the insured
event. Rather, NS suggests the pavers should be replaced to facilitate drainage
improvements and prevent future subsidence.
While both IE and NS agree that the significant rainfall likely contributed to the sunken
pavers, IE did not believe that it was necessary to replace the entire paving.
The complainants have provided a quote for the replacement of the paving from NL for a total
amount of $40,290. While the complainants say that they are not seeking the costs to rebuild
the retaining wall, or install the drainage as suggested by NS, they see the costs of the paving
to restore the area to its pre-damaged condition. However, the quote provides for the pavers
to be travertine which is a natural stone.
The existing pavers are clay brick. While NS has recommended the use of a material capable
of withstanding surface flooding, I am satisfied that the use of travertine represents an
improvement and not consistent with the policy terms. Page 61 of the PDS provides for the
use of the nearest equivalent of building materials if they are unable to use the original.
I am satisfied that the insurer has met its obligations under the policy terms in settling the
complainants for the damaged areas of paving only. IE has confirmed in its report dated 20
November 2023, that such an area of damage would cost no more than $4,000 to rectify. This
includes the cement stabilised and compacted backfill for reinstatement.
The insurer had previously obtained a quote from PB for repairs to the damaged areas in the
amount of $1,727.88. The insurer increased their offer based on the complainant’s quote from
SL. The insurer has paid the complainants $5,940 which has included a 20% contingency
uplift based on the quote from SL. This uplift is applied to the quoted amount to allow for
contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs.
I am satisfied that the insurer has met its obligations in cash settling the complainants for the
damaged portions only and they are not obliged to pay for the entire pool paving to be
replaced.
2.2 Are the complainants entitled to non-financial loss
compensation?
Yes. The insurer’s unreasonable delays caused the complainants stress, frustration and
inconvenience. The insurer is required to pay them $2,000 in non-financial loss
compensation.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which causes:
an unusual degree of stress, delay, or inconvenience, and/or
interference with a person’s expectation of enjoyment and/or peace of mind.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Determination | Case number: 929280 Page 6 of 7
Insurer has caused stress and inconvenience
The complainants lodged the claim with the insurer on 28 February 2022. The complainants
say that the insurer delayed its assessment of their claim which caused them stress and
inconvenience.
The insurer’s claims notes confirm that while an assessor was appointed and assesse d the
claim in late March 2022. However, in August 2022 the complainants were reporting delays
with the assessor conducting an assessment and approving repairs. The insurer was also
delayed in providing claims decisions.
The insurer did not arrange for an engineer to inspect the property until November 2022,
some nine months after the insured event.
Further, the insurer did not cash settle the complainants until 23 October 2023. Many of the
items were not in dispute. The insurer could have done more to resolve many aspects of the
claim earlier. I am satisfied that this interfered with the complainants’ expectation of
enjoyment and peach of mind.
Given the circumstances, I am satisfied that it is appropriate that the insurer is required to
compensate the complainants $2,000 in non-financial loss compensation.
2.3 Why is the outcome fair?
The insurer has correctly assessed and compensated the complainants for damage caused
by the storm. It would not be fair to require the insurer to compensate the complainants for
the entire pool paving when only certain areas require repairs.
Determination | Case number: 929280 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.