The complainant's storm damage claim was partly accepted by the insurer with a $18,179.34 cash settlement offer. AFCA found substantially in the complainant's favour, requiring the insurer to cash settle an updated version of the complainant's builder's quote, excluding the roof, plus a 10% uplift.

The complainant's expert evidence on storm-caused mould and scope of works was detailed and unrebutted by the insurer, so the complainant's quote was fair and reasonable apart from the roof, which had maintenance issues.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 927442 Financial firm Auto & General Services Pty Ltd Determination | Case number: 927442 Page 1 of 19 Case number: 927442 15 February 2024 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). He lodged a claim for damage from stormwater. The insurer has partly accepted liability and offered to cash settle for $18,179.34. They state that anything beyond that amount was assessed as maintenance issues or upgrades. The complainant disputes the settlement figure and maintains the scope of works is not sufficient to complete the repairs to the premises. The complainant seeks a cash settlement of $110,426.68 inclusive of GST and temporary accommodation from when the repairs begin. 1.2 Issues and key findings Is the Insurer liable to cover the complainant’s quote ? Yes. The complainant has provided a detailed quote and comprehensive explanations for the scope of work and the process involved. The insurer has disagreed with the quote and the process but has not provided any explanations besides them being „ excessive ‟ . The quote is so far out of date that the complainant is to arrange for PG to update the quote of 5 March 2022. The roof is to be excluded from the quote. The matter should be cash settled and the insurer is to pay an uplift of 10% on the amount to cover contingencies. Is there evidence of mould/rotting to the main timber frame? Yes. The complainant has sufficiently established the presence of mould in and around the property with the help of supporting expert reports and photos. However, the insurer never appointed any expert for mould assessment. They have disagreed with the complainant on the presence of mould or it being due to the single storm event with no supporting expert report or evidence. Why is the outcome fair? It is fair because it is based on the assessment of expert reports and evidence that show the presence of mould and that the complainant ‟s quote is fair and reasonable, subject to the provision of a new quote. 1.3 Determination The Determination is substantially in the favour of the complainant. The insurer is required to cover the complainant‟s quote for all areas except the roof. The complainant is to obtain an updated quote from PG and the insurer is to cash settle the complainant, together with an uplift of 10% on the amount to cover contingencies, upon proof of completion of roof repairs. Determination | Case number: 927442 Page 2 of 19 Determination | Case number: 927442 Page 3 of 19 2 Reasons for determination 2.1 Is the insurer liable to cover the complainant’s quote ? A valid claim has been established as both parties accept the heavy rain damaged the property. The issue in dispute is the area that was actually damaged by the storm event and which party‟s quote is more fair and reasonable . The complainant‟s builder PG provided a quotation for repairs in March 2022. Complainant has sufficiently showed presence of mould in timber frames A major point in contention whether the storm event caused mould growth. The complainant‟s expert P G builder (PG) has pointed out from the start that the property has mould presence in multiple areas, on surface and inside (timber frames), around the property. PG stated the following regarding the areas from where water ingress happened: “Water entry was from the Front French Doors to the office‟s own courtyard, the balcony to the upstairs bedroom located immediately above the French doors & the Bedroom directly above the office” The complainant stated the following in their responses regarding the points of water ingress : “I‟d like to clarify that water entered the house from multiple areas, not only the roof. The roof leaked from a Skylight, and overflowing box gutters. Water also entered from the Front door to the house, Front Office Doors that face the front of the house & the French doors to the upstairs bedroom that is situated above the office .” From the above statements it is evident that water did not just enter the property from the various openings but also flowed down through ceiling and walls, creating moisture and mould marks shown in photos provided by the complainant. Therefore, the gyprock inside the walls and ceilings was exposed to water from unprecedented rain storm. However, the insurer‟s expert PB declined the possibility of mould or it being a result of the storm event by stating the following: “I notified the insured that timber frame is allowed to get wet as this is the first thing to be erected when a house is being built. Timber frame are always subject to rain days and moisture during construction therefore a one off event wetting timber is not a problem When a home is built the timber frame is erected with no coverings. Timber frame is erected for approximately 2 to 3 months before any coverings are installed. During this 3 Months, the timber frame is exposed to the elements, rain, sun, ice and does not rot. Determination | Case number: 927442 Page 4 of 19 If there is wet rot to the timbers this can be attributed to long term exposure to moisture through maintenance issues identified ” The complainant‟s property is already fully built, and the timber frames are fully covered with gyprock that absorbed a lot of water. As the timber frames were fully covered with gyprock, they did not have enough ventilation to dry out. Therefore, the comparison to a new property construction and the timber frames being left in open, exposed to various elements, is not persuasive. When the insurer was asked why they never appointed hygienist/mould removalist for mould assessment report, they stated the following: “ There was no discussion regarding the mould remediation. The FF has not engaged their own restorers, however, is currently considering the complainant‟s mould remediation costs” It should be noted that the complainant requested the insurer for a mould assessment on few occasions. However, the insurer, to date, has never appointed any mould assessment and have declined to cover any of it based on their assumptions stated above. The complainant submitted expert report and supporting photos. The photos clearly show presence of black mould on timber frames, visible through the opening in the garage where a part of the ceiling has fallen. Further, the expert report from PG states the following: “The mould present in all timber framing was a direct result from both direct water entry from overflowing guttering & ingress of water from flooding due to the volume of water that was being deluged. The insulation batts that are in the ceilings and walls all soaked up the water. They act like sponges. The excessive moisture retained in the framing caused the excessive humidity in the air & the lack of ventilation was why the mould grew in the first place inside the wall & ceiling cavities.” From the above, I am satisfied the timber frames and certain exterior surfaces (like the ceiling in the garage and near the skylight) have clear signs of mould damage and that it was caused by the single storm event that triggered this claim. Areas in dispute for cover There are number of areas in dispute. In the following pages, I will review each parties‟ position and provide my reason and decision for each area. A summary of each parties‟ scope of work (SOW) and their reasons for the respective SOW is contained in Section 3 of this Determination. Determination | Case number: 927442 Page 5 of 19 Roof tiles The insurer appointed PD builder (PD) who assessed property damage on 6 April 2022 . They concluded the following – “ Minor water damages were sighed to the plaster ceiling linings in Front Porch, Entryway/Landing, Lounge Room and Garage … Inspection of the Bedroom on the second story of home appear water entry had resulted from the large quantities of water flooding the balcony and subsequently overflowing through the door sill and damaging the carpeted floor coverings … Minor cupping was sighted to the hardwood flooring in the downstairs entryway/stairwell area following the water entry. The hardwood flooring was continuous throughout the downstairs area however the damages did not continue into the open plan Kitchen/Living Area. … Some water damages were also sighted to the wall linings in main entryway/foyer … Minor mould growth was sighted suggesting water entry has occurred around the skylight flashings.” PD further appointed CN Roofer (CNR) for a roof assessment. They assessed multiple maintenance issues – “Front entry - deteriorated ridge cap mortar over this area. One tile water channel has been blocked by silicone and the cover tiles over the skylight soaker trays have insufficient coverage. Garage / Porch - deteriorated ridge cap mortar over this area, deteriorated seals in the box gutter. Box gutters on either side of both areas do not discharge via a sump or rain head and there are no overflow prov isions installed.” CNR further recommended that maintenance repair work to the roof was required before any internal repair begins. The roof should not be covered as it has not been damaged by the storm event and has multiple maintenance issues, as pointed out earlier by the insurer‟s expert CNR. The complainant‟s builder PG confirmed to remove the roof from SOW by stating the following – Determination | Case number: 927442 Page 6 of 19 “The scope and amount relating to this can be removed due to it being a maintenance item rather than a storm resultant item. The client can pay for these works separately.” Therefore, it is mutually agreed that the roof will be excluded from the insurer‟s cover and it is the complainant‟s responsibility to fix the roof before the insurer compensates the complainant for the remaining quote. External ceiling area in front of the front door The insurer states that the complainant is seeking to cover a greater area than necessary to repair the property. The complainant‟s expert PG has provided ample reasons (through th eir explanations in multiple reports submitted) for the area to be covered, whereas the insurer‟s expert has not provided reasons on why a smaller area should be covered. The removal and replacement of timber framing needs to be covered because of the reasons stated previously. In response to PD‟s criticism of the removal and replacement of the lights being excessive, PG has accordingly removed it. Therefore, I am satisfied this area shou ld be covered as per PG‟s quote, with the removal of the lights. Garage Ceiling PG has explained the extent of damage in the garage through their expert reports and the complainant‟s photos. Therefore, the extent of damage to the whole garage is clear, with other contents in/around it were damaged and are part of this complaint (discussed in a later section). PG has explained sufficiently how their process for repair and cleaning benefits the complainant physically. The process, according to PG, is cheaper as well which is financially beneficial for the insurer. PD has not provided much details on their process, but instead just criticized the process of PG. There is no clarity if PD will isolate the rest of the furniture and belongings in the property from dust and debris or take them out and keep them in a separate secured area or clean later, or leave it as is with dust and debris. The removal and replacement of timber framing needs to be covered because of the reasons stated previously. Therefore, I am satisfied this area should be covered as per PG‟s quote. Front office flooring and ceiling PG has provided a thorough and detailed explanation for the process of repair for this area, the level of finishing involved in the flooring and has clearly shown that PD‟s quote for standard sanding and coating is insufficient and does not take into consideration the type of material and the process required to reach the pre-damage condition. Even though this area is directly under the balcony that was flooded, PD has completely ignored it in their SOW and not provided any reasons for doing so. Determination | Case number: 927442 Page 7 of 19 PD just disagrees with PG on the knowledge of the right kind of floor material but does not provide any reasoning for their disagreement. By stating that there is no swelling or cupping and there is no water damage to the flooring, PD further contradicts their own previous expert report (previously mentioned) which stated that they witnessed minor cupping to the hardwood flooring. The removal and replacement of timber framing needs to be covered because of the reasons stated previously. Therefore, this area should be covered as per PG‟s quote. Entry foyer timber flooring For this area PD does not provide reasons why they have not included the skirting boards and the architraves. Even in their quote they have not explained why they believe painting the skirting boards is sufficient as opposed to replacing them as they would be rotted due to mould. The removal and replacement of timber framing needs to be covered because of the reasons stated previously. Therefore, this area should be co vered as per PG‟s quote. Front foyer ceiling and walls PD does not provide reasons as to why they believe that certain or most items in PG‟s quotes for this area are upgrades. The insulation was water damaged from the storm (as previously pointed out by PG in their report) and retained water which caused further water ingress to gyprock and timber frame. The removal and replacement of timber framing needs to be covered because of the reasons stated previously. Therefore, this area should be covered as per PG‟s quote. Carpet As PD has clearly stated that they accept to cover the carpets and have not provided reasons on why they reject PG‟s quote for the carpets, this area should be covered as per PG‟s quote. Miscellaneous The insurer has not provided any reasons for not including the modular shelving, the lawn mower or any other content items. The certificate of insurance clearly states that it covers the complainant for contents as well. Due to lack of any contradicting assessment report or evidence from the insurer regarding the contents , it fair and reasonable that this should be covered as per PG‟s quote . Settlement of claim This determination is substantially in favour of the complainant. PG provided a quotation for repairs on 5 March 2022. This quotation is well out of date. Upon acceptance of this determination the complainant is to obtain an up to date, actionable quotation, based upon the March 2022 document but excluding the roof. Determination | Case number: 927442 Page 8 of 19 The failure to repair the roof would put the repairs at risk of damage for further water ingress. In the circumstances it is fair that the complainant provides proof of completion of the roof repairs prior to the insurer cash settling this claim. It is appropriate that this matter be cash settled and within 14 days of receiving the updated document together with confirmation the roof has been repaired. The insurer is to pay that sum, together with an uplift of 10% to cover contingencies. 2.2 Why is the outcome fair? The outcome is in favour of the complainant. The insurer is responsible to cover the quote provided by the complainant except for the roof. The roof has multiple maintenance issues and should be rectified as a pre-requisite for cash settlement. This outcome is fair because it is based on the assessment of expert reports and evidence that show the presence of mould and that the complainant‟s quote is fair and reasonable. Determination | Case number: 927442 Page 9 of 19 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 927442 Page 10 of 19 External ceiling area in front of the front door Party Scope of Works Complainant Builder  Insurer Builder  Party Summary of position Complainant  “Removal and replacement of wet rot timbers due to mould.  No removal of ceilings was undertaken at the make safe, so mould has definitely formed there and is present in the timber trimming.  We can agree to remove Line 9 on Quote – Electrical of $250” Insurer  “The Complainant‟s quote allowed for greater area to be repaired than necessary to repair the property. Therefore, there are additional works were included as electrician‟s fees to remove and reinstall downlights. Determination | Case number: 927442 Page 11 of 19  If there is wet rot to the timbers this can be attributed to long term exposure to moisture throug h maintenance issues identified. When a home is built the timber frame is erected with no coverings . Timber frame is erected for approximately 2 to 3 months before any coverings are installed. During this 3 Months, the timber frame is exposed to the elemen ts, rain, sun, ice and does not rot.” Garage Ceiling Party Scope of Works Complainant Builder  Insurer Builder  Determination | Case number: 927442 Page 12 of 19 Party Summary of position Complainant  “ The garage was heavily flooded with water entry from storm event.  Removal and replacement of wet rot timbers due to mould .  No removal of ceilings was undertaken at the make safe, so mould has definitely fo rmed there and is present in the timber trimming.  We don‟t want dust or debris to travel through the house, so we allow to isola te dust a nd debris within the controlled work area. I‟m not sure after reviewing insurers builder ha s allowed for in any particular sections of the house.  From experience, isolating each work area is cheaper than detailing cleaning furniture, crockery, car pets etc at the end if we don‟t do this at the beginning” Insurer  “The Complainant‟s quote does not specify the area that was quoted for replacement .  The timber could get wet for a short period of time .  Trades are to clean after themselves after each day. This is included within the agreed rates given by the insurer. Allowing cleaning for every room is an over stretch.” Front office flooring and ceiling Party Scope of Works Complainant Builder  Determination | Case number: 927442 Page 13 of 19 Party Scope of Works Insurer Builder  Party Summary of position Complainant  “ The office was heavily flooded with water entry from storm event. Water entry was from the Front. French Doors to the office‟s own courtyard, the balcony to the u pstairs bedroom located immediately above the French doors & the Bedroom directly above the office. This caused damage to the ceilings & ceiling framing & the timber flooring to the office .  We confirm that the floorboards were water damaged at the time of the event as we attended to the make safe at the time of damage .  R emoval and repl aceme nt of wet rotted timbers in the ceiling‟s bulkhead framing due to mould and possibly rot being present due to the water sitting in the ceiling creating the mould. Determination | Case number: 927442 Page 14 of 19  New Skirting boards have been also allowed for as they require removal for the correct r epairs & Oiling & waxing of the timber flooring . I t is cheaper for replacement than to pay to remove, de - nail, sand, reinstall and to repaint new again.  They seem to have presumed the flooring is finished with a polyurethane coating. If this was the case, the sanding and recoating is quite a simple process . However, this is not case as this house‟s timber flooring has an Oil & W ax system applied to the timber flooring .  This comprises of 3 coats of Tung oil after the timber floorin g is sanded, each coat at l east 1 day in - between. It is then followed by 2 of coats of Wax that is applied after the Tung Oil has been left to dry for at least a week prior to applying the wax.  So, when repairs will be undertaken, there will be NO WALK ZONE upon the flooring for at least 2 weeks from the start of repairs to the timber flooring . F umes, smells and releasing of odours will occur in the 1st 2 weeks, so its best that no on occupies the house during this initial period .”  From experience, isolating each work area is cheaper than detailing cleaning furniture, crockery, carpets etc at the end if we don‟t do this at the beginning” Insurer  “In regards to the wet rot, again this is not related to a one off event. Mold can be cleaned and sanitized as per insurance policy procedure.  In regards to the damage to the timber flooring in the office, We have concluded that this is sun damage and not water damaged.  There is no swelling or cupping of the floorboards to suggest the whole office was flooded or affected by water.  We d isagree that PD do not know what type of flooring this is.” Entry foyer timber flooring Party Scope of Works Complainant Builder  Determination | Case number: 927442 Page 15 of 19 Party Scope of Works Insurer Builder  Party Summary of position Complainant  Same reasons as Front Office given above. Insurer  “Skirting boards and architraves have not been included.” Determination | Case number: 927442 Page 16 of 19 Front foyer ceiling and walls Party Scope of Works Complainant Builder  Insurer Builder  Determination | Case number: 927442 Page 17 of 19 Party Scope of Works  Party Summary of position Complainant  “A rea requires scaffolding .  Removal and replacement of wet rot timbers due to the water around the skylight ceiling creating the mould .  No removal of gyprock ceilings was undertaken at the make safe.  We don‟t want dust or debris to travel through the house, especially this arear is a 2 - storey void that ope ns to the ground & 1st floors, so we allow to isolate dust and debris within the controlled work area.  I‟m not sure after reviewing insurers builder has allowed for in any particular sections of the house. From experience, isolating each work area is cheap er than detailing cleaning furniture, crockery, carpets etc at the end if we don‟t do this at the beginning.” Insurer  “The quote includes items that are upgrades to the property and not just repairs such as installation of new insulation.  T imber could ge t wet for a short period of time .  PD have allowed for scaffolding .  Again the replacement of timber is not necessary.” Carpet Party Scope of Works Complainant Builder  Determination | Case number: 927442 Page 18 of 19 Party Scope of Works Insurer Builder   Party Summary of position Complainant  “The carpets & underlay to the bedroom were water damaged from storm water entering the house from multiple areas.” Insurer  “ PD has allowed for the carpet.” Miscellaneous Party Scope of Works Complainant Builder  Determination | Case number: 927442 Page 19 of 19 Party Scope of Works Insurer Builder  Party Summary of position Complainant  “The items listed under this section were all in relation to water entry to the house damaging the items noted in quote. These would be for insurer to cover under contents if contents cover is available.” Insurer  “ Modular shelving replacement has not been included in the appro ved scope of works nor the lawn mower. These are contents items. ”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.