Dispute over scope of works and cash settlement amount for storm water damage claim
Text of the determination
Determination
Case number 927442
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 927442 Page 1 of 19
Case number: 927442 15 February 2024
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
He lodged a claim for damage from stormwater.
The insurer has partly accepted liability and offered to cash settle for $18,179.34. They state
that anything beyond that amount was assessed as maintenance issues or upgrades.
The complainant disputes the settlement figure and maintains the scope of works is not
sufficient to complete the repairs to the premises. The complainant seeks a cash settlement
of $110,426.68 inclusive of GST and temporary accommodation from when the repairs begin.
1.2 Issues and key findings
Is the Insurer liable to cover the complainant’s quote ?
Yes. The complainant has provided a detailed quote and comprehensive explanations for the
scope of work and the process involved. The insurer has disagreed with the quote and the
process but has not provided any explanations besides them being „ excessive ‟ .
The quote is so far out of date that the complainant is to arrange for PG to update the quote
of 5 March 2022. The roof is to be excluded from the quote.
The matter should be cash settled and the insurer is to pay an uplift of 10% on the amount to
cover contingencies.
Is there evidence of mould/rotting to the main timber frame?
Yes. The complainant has sufficiently established the presence of mould in and around the
property with the help of supporting expert reports and photos. However, the insurer never
appointed any expert for mould assessment. They have disagreed with the complainant on
the presence of mould or it being due to the single storm event with no supporting expert
report or evidence.
Why is the outcome fair?
It is fair because it is based on the assessment of expert reports and evidence that show the
presence of mould and that the complainant ‟s quote is fair and reasonable, subject to the
provision of a new quote.
1.3 Determination
The Determination is substantially in the favour of the complainant. The insurer is required to
cover the complainant‟s quote for all areas except the roof.
The complainant is to obtain an updated quote from PG and the insurer is to cash settle the
complainant, together with an uplift of 10% on the amount to cover contingencies, upon proof
of completion of roof repairs.
Determination | Case number: 927442 Page 2 of 19
Determination | Case number: 927442 Page 3 of 19
2 Reasons for determination
2.1 Is the insurer liable to cover the complainant’s quote ?
A valid claim has been established as both parties accept the heavy rain damaged the
property.
The issue in dispute is the area that was actually damaged by the storm event and which
party‟s quote is more fair and reasonable .
The complainant‟s builder PG provided a quotation for repairs in March 2022.
Complainant has sufficiently showed presence of mould in timber frames
A major point in contention whether the storm event caused mould growth.
The complainant‟s expert P G builder (PG) has pointed out from the start that the property has
mould presence in multiple areas, on surface and inside (timber frames), around the property.
PG stated the following regarding the areas from where water ingress happened:
“Water entry was from the Front French Doors to the office‟s own courtyard, the
balcony to the upstairs bedroom located immediately above the French doors &
the Bedroom directly above the office”
The complainant stated the following in their responses regarding the points of water ingress :
“I‟d like to clarify that water entered the house from multiple areas, not only the
roof. The roof leaked from a Skylight, and overflowing box gutters. Water also
entered from the Front door to the house, Front Office Doors that face the front of
the house & the French doors to the upstairs bedroom that is situated above the
office .”
From the above statements it is evident that water did not just enter the property from the
various openings but also flowed down through ceiling and walls, creating moisture and
mould marks shown in photos provided by the complainant. Therefore, the gyprock inside the
walls and ceilings was exposed to water from unprecedented rain storm.
However, the insurer‟s expert PB declined the possibility of mould or it being a result of the
storm event by stating the following:
“I notified the insured that timber frame is allowed to get wet as this is the first
thing to be erected when a house is being built. Timber frame are always subject
to rain days and moisture during construction therefore a one off event wetting
timber is not a problem
When a home is built the timber frame is erected with no coverings. Timber frame
is erected for approximately 2 to 3 months before any coverings are installed.
During this 3 Months, the timber frame is exposed to the elements, rain, sun, ice
and does not rot.
Determination | Case number: 927442 Page 4 of 19
If there is wet rot to the timbers this can be attributed to long term exposure to
moisture through maintenance issues identified ”
The complainant‟s property is already fully built, and the timber frames are fully covered with
gyprock that absorbed a lot of water. As the timber frames were fully covered with gyprock,
they did not have enough ventilation to dry out. Therefore, the comparison to a new property
construction and the timber frames being left in open, exposed to various elements, is not
persuasive.
When the insurer was asked why they never appointed hygienist/mould removalist for mould
assessment report, they stated the following:
“ There was no discussion regarding the mould remediation.
The FF has not engaged their own restorers, however, is currently considering the
complainant‟s mould remediation costs”
It should be noted that the complainant requested the insurer for a mould assessment on few
occasions. However, the insurer, to date, has never appointed any mould assessment and
have declined to cover any of it based on their assumptions stated above.
The complainant submitted expert report and supporting photos. The photos clearly show
presence of black mould on timber frames, visible through the opening in the garage where a
part of the ceiling has fallen.
Further, the expert report from PG states the following:
“The mould present in all timber framing was a direct result from both direct water
entry from overflowing guttering & ingress of water from flooding due to the
volume of water that was being deluged.
The insulation batts that are in the ceilings and walls all soaked up the water.
They act like sponges.
The excessive moisture retained in the framing caused the excessive humidity in
the air & the lack of ventilation was why the mould grew in the first place inside
the wall & ceiling cavities.”
From the above, I am satisfied the timber frames and certain exterior surfaces (like the ceiling
in the garage and near the skylight) have clear signs of mould damage and that it was caused
by the single storm event that triggered this claim.
Areas in dispute for cover
There are number of areas in dispute. In the following pages, I will review each parties‟
position and provide my reason and decision for each area.
A summary of each parties‟ scope of work (SOW) and their reasons for the respective SOW
is contained in Section 3 of this Determination.
Determination | Case number: 927442 Page 5 of 19
Roof tiles
The insurer appointed PD builder (PD) who assessed property damage on 6 April 2022 . They
concluded the following –
“ Minor water damages were sighed to the plaster ceiling linings in Front Porch,
Entryway/Landing, Lounge Room and Garage
…
Inspection of the Bedroom on the second story of home appear water entry had
resulted from the large quantities of water flooding the balcony and subsequently
overflowing through the door sill and damaging the carpeted floor coverings
…
Minor cupping was sighted to the hardwood flooring in the downstairs
entryway/stairwell area following the water entry. The hardwood flooring was
continuous throughout the downstairs area however the damages did not
continue into the open plan Kitchen/Living Area.
…
Some water damages were also sighted to the wall linings in main entryway/foyer
…
Minor mould growth was sighted suggesting water entry has occurred around the
skylight flashings.”
PD further appointed CN Roofer (CNR) for a roof assessment. They assessed multiple
maintenance issues –
“Front entry - deteriorated ridge cap mortar over this area. One tile water channel
has been blocked by silicone and the cover tiles over the skylight soaker trays
have insufficient coverage.
Garage / Porch - deteriorated ridge cap mortar over this area, deteriorated seals
in the box gutter. Box gutters on either side of both areas do not discharge via a
sump or rain head and there are no overflow prov isions installed.”
CNR further recommended that maintenance repair work to the roof was required before any
internal repair begins.
The roof should not be covered as it has not been damaged by the storm event and has
multiple maintenance issues, as pointed out earlier by the insurer‟s expert CNR. The
complainant‟s builder PG confirmed to remove the roof from SOW by stating the following –
Determination | Case number: 927442 Page 6 of 19
“The scope and amount relating to this can be removed due to it being a
maintenance item rather than a storm resultant item. The client can pay for these
works separately.”
Therefore, it is mutually agreed that the roof will be excluded from the insurer‟s cover and it is
the complainant‟s responsibility to fix the roof before the insurer compensates the
complainant for the remaining quote.
External ceiling area in front of the front door
The insurer states that the complainant is seeking to cover a greater area than necessary to
repair the property. The complainant‟s expert PG has provided ample reasons (through th eir
explanations in multiple reports submitted) for the area to be covered, whereas the insurer‟s
expert has not provided reasons on why a smaller area should be covered.
The removal and replacement of timber framing needs to be covered because of the reasons
stated previously.
In response to PD‟s criticism of the removal and replacement of the lights being excessive,
PG has accordingly removed it.
Therefore, I am satisfied this area shou ld be covered as per PG‟s quote, with the removal of
the lights.
Garage Ceiling
PG has explained the extent of damage in the garage through their expert reports and the
complainant‟s photos. Therefore, the extent of damage to the whole garage is clear, with
other contents in/around it were damaged and are part of this complaint (discussed in a later
section).
PG has explained sufficiently how their process for repair and cleaning benefits the
complainant physically. The process, according to PG, is cheaper as well which is financially
beneficial for the insurer.
PD has not provided much details on their process, but instead just criticized the process of
PG. There is no clarity if PD will isolate the rest of the furniture and belongings in the property
from dust and debris or take them out and keep them in a separate secured area or clean
later, or leave it as is with dust and debris.
The removal and replacement of timber framing needs to be covered because of the reasons
stated previously.
Therefore, I am satisfied this area should be covered as per PG‟s quote.
Front office flooring and ceiling
PG has provided a thorough and detailed explanation for the process of repair for this area,
the level of finishing involved in the flooring and has clearly shown that PD‟s quote for
standard sanding and coating is insufficient and does not take into consideration the type of
material and the process required to reach the pre-damage condition.
Even though this area is directly under the balcony that was flooded, PD has completely
ignored it in their SOW and not provided any reasons for doing so.
Determination | Case number: 927442 Page 7 of 19
PD just disagrees with PG on the knowledge of the right kind of floor material but does not
provide any reasoning for their disagreement.
By stating that there is no swelling or cupping and there is no water damage to the flooring,
PD further contradicts their own previous expert report (previously mentioned) which stated
that they witnessed minor cupping to the hardwood flooring.
The removal and replacement of timber framing needs to be covered because of the reasons
stated previously.
Therefore, this area should be covered as per PG‟s quote.
Entry foyer timber flooring
For this area PD does not provide reasons why they have not included the skirting boards
and the architraves. Even in their quote they have not explained why they believe painting the
skirting boards is sufficient as opposed to replacing them as they would be rotted due to
mould.
The removal and replacement of timber framing needs to be covered because of the reasons
stated previously.
Therefore, this area should be co vered as per PG‟s quote.
Front foyer ceiling and walls
PD does not provide reasons as to why they believe that certain or most items in PG‟s quotes
for this area are upgrades. The insulation was water damaged from the storm (as previously
pointed out by PG in their report) and retained water which caused further water ingress to
gyprock and timber frame.
The removal and replacement of timber framing needs to be covered because of the reasons
stated previously.
Therefore, this area should be covered as per PG‟s quote.
Carpet
As PD has clearly stated that they accept to cover the carpets and have not provided reasons
on why they reject PG‟s quote for the carpets, this area should be covered as per PG‟s quote.
Miscellaneous
The insurer has not provided any reasons for not including the modular shelving, the lawn
mower or any other content items. The certificate of insurance clearly states that it covers the
complainant for contents as well.
Due to lack of any contradicting assessment report or evidence from the insurer regarding the
contents , it fair and reasonable that this should be covered as per PG‟s quote .
Settlement of claim
This determination is substantially in favour of the complainant. PG provided a quotation for
repairs on 5 March 2022. This quotation is well out of date. Upon acceptance of this
determination the complainant is to obtain an up to date, actionable quotation, based upon
the March 2022 document but excluding the roof.
Determination | Case number: 927442 Page 8 of 19
The failure to repair the roof would put the repairs at risk of damage for further water ingress.
In the circumstances it is fair that the complainant provides proof of completion of the roof
repairs prior to the insurer cash settling this claim.
It is appropriate that this matter be cash settled and within 14 days of receiving the updated
document together with confirmation the roof has been repaired. The insurer is to pay that
sum, together with an uplift of 10% to cover contingencies.
2.2 Why is the outcome fair?
The outcome is in favour of the complainant. The insurer is responsible to cover the quote
provided by the complainant except for the roof. The roof has multiple maintenance issues
and should be rectified as a pre-requisite for cash settlement. This outcome is fair because it
is based on the assessment of expert reports and evidence that show the presence of mould
and that the complainant‟s quote is fair and reasonable.
Determination | Case number: 927442 Page 9 of 19
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 927442 Page 10 of 19
External ceiling area in front of the front door
Party Scope of Works
Complainant Builder
Insurer Builder
Party Summary of position
Complainant “Removal and replacement of wet rot timbers due to mould.
No removal of ceilings was undertaken at the make safe, so mould has
definitely formed there and is present in the timber trimming.
We can agree to remove Line 9 on Quote – Electrical of $250”
Insurer “The Complainant‟s quote allowed for greater area to be repaired than
necessary to repair the property. Therefore, there are additional works
were included as electrician‟s fees to remove and reinstall downlights.
Determination | Case number: 927442 Page 11 of 19
If there is wet rot to the timbers this can be attributed to long term
exposure to moisture throug h maintenance issues identified. When a
home is built the timber frame is erected with no coverings . Timber frame
is erected for approximately 2 to 3 months before any coverings are
installed. During this 3 Months, the timber frame is exposed to the
elemen ts, rain, sun, ice and does not rot.”
Garage Ceiling
Party Scope of Works
Complainant Builder
Insurer Builder
Determination | Case number: 927442 Page 12 of 19
Party Summary of position
Complainant “ The garage was heavily flooded with water entry from storm event.
Removal and replacement of wet rot timbers due to mould .
No removal of ceilings was undertaken at the make safe, so mould has
definitely fo rmed there and is present in the timber trimming.
We don‟t want dust or debris to travel through the house, so we allow to
isola te dust a nd debris within the controlled work area. I‟m not sure after
reviewing insurers builder ha s allowed for in any particular sections of the
house.
From experience, isolating each work area is cheaper than detailing
cleaning furniture, crockery, car pets etc at the end if we don‟t do this at
the beginning”
Insurer “The Complainant‟s quote does not specify the area that was quoted for
replacement .
The timber could get wet for a short period of time .
Trades are to clean after themselves after each day. This is included
within the agreed rates given by the insurer. Allowing cleaning for every
room is an over stretch.”
Front office flooring and ceiling
Party Scope of Works
Complainant Builder
Determination | Case number: 927442 Page 13 of 19
Party Scope of Works
Insurer Builder
Party Summary of position
Complainant “ The office was heavily flooded with water entry from storm event. Water
entry was from the Front. French Doors to the office‟s own courtyard, the
balcony to the u pstairs bedroom located immediately above the French
doors & the Bedroom directly above the office. This caused damage to
the ceilings & ceiling framing & the timber flooring to the office .
We confirm that the floorboards were water damaged at the time of the
event as we attended to the make safe at the time of damage .
R emoval and repl aceme nt of wet rotted timbers in the ceiling‟s bulkhead
framing due to mould and possibly rot being present due to the water
sitting in the ceiling creating the mould.
Determination | Case number: 927442 Page 14 of 19
New Skirting boards have been also allowed for as they require removal
for the correct r epairs & Oiling & waxing of the timber flooring . I t is
cheaper for replacement than to pay to remove, de - nail, sand, reinstall
and to repaint new again.
They seem to have presumed the flooring is finished with a polyurethane
coating. If this was the case, the sanding and recoating is quite a simple
process . However, this is not case as this house‟s timber flooring has an
Oil & W ax system applied to the timber flooring .
This comprises of 3 coats of Tung oil after the timber floorin g is sanded,
each coat at l east 1 day in - between. It is then followed by 2 of coats of
Wax that is applied after the Tung Oil has been left to dry for at least a
week prior to applying the wax.
So, when repairs will be undertaken, there will be NO WALK ZONE upon
the flooring for at least 2 weeks from the start of repairs to the timber
flooring . F umes, smells and releasing of odours will occur in the 1st 2
weeks, so its best that no on occupies the house during this initial period .”
From experience, isolating each work area is cheaper than detailing
cleaning furniture, crockery, carpets etc at the end if we don‟t do this at
the beginning”
Insurer “In regards to the wet rot, again this is not related to a one off event. Mold
can be cleaned and sanitized as per insurance policy procedure.
In regards to the damage to the timber flooring in the office, We have
concluded that this is sun damage and not water damaged.
There is no swelling or cupping of the floorboards to suggest the whole
office was flooded or affected by water.
We d isagree that PD do not know what type of flooring this is.”
Entry foyer timber flooring
Party Scope of Works
Complainant Builder
Determination | Case number: 927442 Page 15 of 19
Party Scope of Works
Insurer Builder
Party Summary of position
Complainant Same reasons as Front Office given above.
Insurer “Skirting boards and architraves have not been included.”
Determination | Case number: 927442 Page 16 of 19
Front foyer ceiling and walls
Party Scope of Works
Complainant Builder
Insurer Builder
Determination | Case number: 927442 Page 17 of 19
Party Scope of Works
Party Summary of position
Complainant “A rea requires scaffolding .
Removal and replacement of wet rot timbers due to the water around the
skylight ceiling creating the mould .
No removal of gyprock ceilings was undertaken at the make safe.
We don‟t want dust or debris to travel through the house, especially this
arear is a 2 - storey void that ope ns to the ground & 1st floors, so we allow
to isolate dust and debris within the controlled work area.
I‟m not sure after reviewing insurers builder has allowed for in any
particular sections of the house. From experience, isolating each work
area is cheap er than detailing cleaning furniture, crockery, carpets etc at
the end if we don‟t do this at the beginning.”
Insurer “The quote includes items that are upgrades to the property and not just
repairs such as installation of new insulation.
T imber could ge t wet for a short period of time .
PD have allowed for scaffolding .
Again the replacement of timber is not necessary.”
Carpet
Party Scope of Works
Complainant Builder
Determination | Case number: 927442 Page 18 of 19
Party Scope of Works
Insurer Builder
Party Summary of position
Complainant “The carpets & underlay to the bedroom were water damaged from storm
water entering the house from multiple areas.”
Insurer “ PD has allowed for the carpet.”
Miscellaneous
Party Scope of Works
Complainant Builder
Determination | Case number: 927442 Page 19 of 19
Party Scope of Works
Insurer Builder
Party Summary of position
Complainant “The items listed under this section were all in relation to water entry to
the house damaging the items noted in quote. These would be for insurer
to cover under contents if contents cover is available.”
Insurer “ Modular shelving replacement has not been included in the appro ved
scope of works nor the lawn mower. These are contents items. ”