Home / Bendigo and Adelaide Bank / Determination 927414

Determination 927414

Alleged unreasonable delay in completing mortgagee sale of properties and continued charging of interest, fees and costs after taking possession

FirmBendigo and Adelaide Bank
Decided2023-09-18
ProductCredit · Home loan
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant said the bank unreasonably delayed settlement of mortgagee sales of two properties and wrongly kept charging interest, fees and costs. AFCA found in favour of the bank and ordered no compensation.

The delay was caused by matters outside the bank's reasonable control, and the loan terms entitled the bank to keep charging interest, fees and enforcement costs until repaid.

Issues

Subjects and remedies

home or building damagethird party authorityno remedy

Related

All Bendigo and Adelaide Bank determinations · Find similar determinations

Text of the determination

Determination Case number 927414 Financial firm Bendigo and Adelaide Bank Limited Determination | Case number: 927414 Page 1 of 12 Case number: 927414 18 September 2023 1 Determination overview 1.1 Complaint The complainant and her ex-husband obtained a loan from the financial firm (the bank). The loan was secured by a mortgage over a property. In early 2020, the bank took possession of the property as mortgagee. At the time, two houses were constructed on the property but the plan of subdivision had not been approved by the local council or registered at the Land Registry. The bank sold each house with settlement of each sale subject to the approval and registration of the plan of subdivision. The bank had to engage various parties (including the builder) to obtain certain compliance certificates that the local council and titles office required to approve and register the plan of subdivision. Certain works, including stormwater drainage works, also need to be completed. When all the works and compliance certificates were obtained, the plan of subdivision was approved and registered. Settlement of the sale of the two properties (properties) created by the subdivision were then completed. The complainant says the bank:  unreasonably delayed completing the sale of the properties  should refund the additional interest she had to pay on the loan because of the bank‟s delay  continued to charge her interest, fees and costs after taking possession of the properties. 1.2 Issues and key findings Did the bank unreasonably delay completing the sale of the properties? Although it took a substantial amount of time to register the plan of subdivision and complete the sale of the properties, this was not caused by the bank acting unreasonably. Completing the necessary works and registering the plan of subdivision was complex and time consuming. The delays were due to matters outside the bank‟s reasonable control. The bank did not unreasonably delay completing the sale of the properties. Is the bank entitled to charge interest, fees and costs after taking possession of the properties? The bank can charge interest and fees on the loan until the amount it is owed is paid in full. The loan terms also allow the bank to charge or pass-on its enforcement costs. Why is the outcome fair? The outcome is fair because although it took time to complete the sale of the properties, this was caused by matters outside the bank‟s reasonable con trol. The bank is also entitled to continue to charge interest, fees and costs after taking possession of the properties. As the bank has not breached a duty or obligation owed to the complainant and has acted in accordance with the agreed loan terms, it would not be fair to make the bank compensate the complainant. Determination | Case number: 927414 Page 2 of 12 1.3 Determination This determination is favour of the bank. The bank is not required to pay any compensation to the complainant. Determination | Case number: 927414 Page 3 of 12 2 Reasons for determination 2.1 Did the bank unreasonably delayed settlement of the properties? Although it took a substantial amount of time to register the plan of subdivision and complete the sale of the properties, this was not caused by the bank acting unreasonably. Completing the necessary works and registering the plan of subdivision was complex and time consuming. The delays were due to matters outside the bank‟s reasonable control. The bank did not unreasonably delay completing the sale of the properties. The complainant says the bank unreasonably delayed completing the sales The complainant says the bank unreasonably delayed completing the sale of the properties. In support of her position, the complainant points to the fact that the bank sold the properties in August and September 2020 but did not complete the sales until mid-May 2023. Settlement was delayed due to matters outside the bank’s control After considering all the information, I find the bank did not unreasonably delay completing the sale of each property. Instead, I find the delay was caused by several matters outside the bank‟s reasonable control. From the information available to AFCA, a timeline of events can be created. The timeline is set out in section 3.2. The timeline contains what I find took place regarding the registration of the plan of subdivision and completion/settlement of the property sales. Below is an overview of that timeline. It is the combination of the circumstances described below and in the timeline that caused the delay. The delay was not caused by the bank acting unreasonably. An overview of what took place When the bank sold the properties as mortgagee in possession, the plan of subdivision had not been approved by the local council or registered at the Land Registry. To register the plan of subdivision, significant works needed to be completed, those works inspected (and in some cases rectified), and then certified as complete. This was necessary so that certain compliance certificates could be issued. The works included works to stormwater drainage and plumbing. An occupancy permit was also required. Despite the bank and its agent‟s reasonable attempts, those engaged to carry out and inspect the required works sometimes delayed, were hard to contact or did not respond. To keep things moving forward the bank had to appoint new parties to step in and carry out some of the work or the required inspection which added time. The builder who constructed the homes on the properties was also unhappy about not being paid the final instalment under the building contract and was in dispute with the complainant and her ex-partner. The dispute was not finalised until September 2021. A copy of the orders made by the tribunal that heard the dispute were not provided to the bank until February 2022, and the orders did not a ssist dealing with the builder‟s claim that it was owed a final instalment of $184,000. The bank then negotiated directly with the builder for a reduced amount of $150,140.67 but doing so took time. A deed documenting the terms of agreement also needed to be prepared Determination | Case number: 927414 Page 4 of 12 and negotiated with builder‟s solicitor. The deed between the builder and bank was finalised in July 2022. The bank then paid the builder the agreed amount, and the builder released certain compliance certificates that were necessary to obtain an occupancy permit. The occupancy permit was necessary to register the plan of subdivision, but it was not issued until 22 August 2022. Registering the plan of subdivision was then further delayed because the Land Registry required the bank and the registered proprietors to sign a document – a section 88B instrument. However, when the bank contacted the complainant and asked her to sign the document as one of the registered proprietors, the complainant refused. This meant the bank had to investigate alternatives on how the document could be signed on behalf of the registered proprietors which caused further delays. After consulting its solicitor and Land Registry, Land Registry accepted the document could be signed using powers provided to the bank under its mortgage. A caveat was also lodged on the property by the complainant‟s solicitor for unpaid legal fees which the bank had to deal with. The bank had to obtain a letter of consent to the subdivision from the caveator before the plan of subdivision could be registered. The plan of subdivision was finally registered by Land Registry on or around 19 April 2023 with settlement of the sales completed by 16 May 2023. Although the time to register the plan of subdivision and complete the sales was longer than what the parties may have initially expected, I find the delay was due to matters outside the bank‟s reasonable control, not by the bank acting unreasonably. A determination has already been made on when the bank decided to sell the properties The complainant says the bank should have negotiated with the builder before selling the properties because it sold the properties before the plan of subdivision was registered. However, there has already been a determination issued by AFCA in case 759584 that found the bank was not required to wait or rectify defects before exercising its rights as mortgagee. That is, deciding to sell the properties before the plan of subdivision was approved and registered. The information does not show the bank failed t o respond to the complainant’s solicitor The complainant says her solicitor would often contact the bank‟s solicitor and be ignored, which increased her own legal costs. However, this is not support by the information the parties have provided. If the complainant has an issue about the legal costs her solicitor has charged her, the complainant can raise this directly with her solicitor, and if not satisfied with the response, with the Office of the NSW Legal Services Commissioner. The bank’s estimates to payout the loan that were not misleading The complainant says the bank provided incorrect and misleading information when it provided payout estimates for the loans. The complainant says the bank represented the estimates would not change by thousands of dollars, but this is what occurred. I have been provided with copies of the emails between the parties regarding the payout estimates. It is clear from these that the bank said the estimates provided as at 28 October 2022: Determination | Case number: 927414 Page 5 of 12  excluded interest to settlement  that there would be settlement adjustments to take into account. The complainant‟s solicitor then asked the bank to clarify the estimated figures as they “…do not potentially include hundreds of thousands of dollars worth of builders’ fees and council costs. Please confirm this is or is not the case as the information provided thus far has been most vague. ” The bank‟s solicitor responded saying: I am further instructed the figures provided on 31 October 2022, albeit an estimate, include all major costs and a „small‟ buffer for unexpected costs. The figures do not include settlement adjustments and interest from 28 October 2022 to settlement date. My client does not expect figures will change by hundreds of thousands. The bank‟s estimates and the final pa yout amounts did not vary by hundreds of thousands. Having considered all the information, I find the bank did not mislead or provided incorrect information to the complainant or her solicitor. 2.2 Is the bank entitled to charge interest, fees and costs after taking possession of the properties? The bank can charge interest and fees on the loan until the amount it is owed is paid in full. The loan terms also allow the bank to charge or pass-on its enforcement costs. The bank can charge interest, fees and costs after taking possession of the properties The complainant says the bank should not charge interest, fees and costs after it took possession of the properties. However, the bank‟s entitlement to do so is set in the terms and conditions of the loan which the complainant agreed to when she signed the loan contract. Relevantly, those terms provide the bank is entitled to:  charge interest and fees until the amount owing is paid (see clause 5 and 7)  recover the costs it incurs in enforcing and selling its security (see clause 21). 2.3 Why is the outcome fair? The outcome is fair in all the circumstances The outcome is fair because although it took time to complete the sale of the properties, this was caused by matters outside the bank‟s reasonable control. The bank is also entitled to continue to charge interest, fees and costs after taking possession of the properties. As the bank has not breached a duty or obligation owed to the complainant and has acted in accordance with the agreed loan terms, it would not be fair to make the bank compensate the complainant. Determination | Case number: 927414 Page 6 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Timeline of events Date & Record Description 5 Aug 2020  Cont ract of sale for property one is signed. Settlement is subject to registration of the plan of subdivision. 24 Sep 2020  Cont ract of sale for property two is signed. Settlement is subject to registration of the plan of subdivision. 21 Oct 2020  The bank‟s solicitor advises they have experienced delays with the surveyor 25 Nov 2020  The bank‟s solicitors advises all documents to support subdivision has been Determination | Case number: 927414 Page 7 of 12 provided to the Council 4 Dec 2020  Council inform the bank of additional requirements to obtain subdivision approval. 21 Dec 2020  The bank‟s solicitor advises the property presenter the bank requires a Final Identification Survey f rom the surveyor to finalise the subdivision 15 Jan 2021  Identification Survey inspection is booked for this date 27 Jan 2021  Identification Survey inspection takes place 29 Jan 2021  Identification Survey received from the surveyor. Additional documents from the surveyor are needed Feb 2021  The Property presenter makes multiple attempts are made to reach the surveyor throughout early to mid - February 2021 to gain an update on documents for subdivision 19 Feb 2021  The Property presenter cont acts the surveyor again requesting further documents required for subdivision as a matter of urgency  The Bank‟s solicitors advised they are liaising with the Council regarding stormwat er plans required for subdivision 22 Feb 2021  The Property presenter advises the Bank‟s solicitor the surveyor has responded to the many requests for additional documents with “Everything other than the storm water plan you already have”. Mar 2021  The Bank‟s solicitor engaged the servic es of an engineering consu ltant to provide a Hydraulic/Stormwater Engineer Certificate for the stormwater drainage 8 Apr 2021  The Bank is made aware of inc omplet e drainage works, which need to be finalised before the Engineer can provide a Hydraulic Engineers Certificate 28 Apr 2021  The current surveyor is viewed as unresponsive. Bank‟s solicitor contacts a new surveyor for assistance in obtaining the Occupancy Certificat e needed for the subdivision 7 May 2021  A plumber and engineer attend the property to finalise the Hydraulic/Stormwater Engineer Certificate. However, the certific ate was not approved on this day and it eventuates that further visits are necessary 12 May 2021  The new survey or responds to the Bank‟s solicitors to advise of costs prior to their inspect ion 23 Jun 2021  The Bank‟s solicitor advises the final inspection was satisfactory and all that remains now is for the pool fencing to be reins pected. 21 Jul 2021  Bank‟s solicitor provides updat e to the Bank that two certificates are actually still required by Council to progress with subdivision – the Certificate of Occupancy Determination | Case number: 927414 Page 8 of 12 and Hydraulic/Stormwater Engineer Certificate.  Bank is advised of issues with pool complia nce and that there are various stormwat er rectification works to be completed, which the engineer and plumber are to work on 5 Aug 2021  Plumber is yet to finish the stormwater rectification works. Bank‟s solicitor notes the property is in the local government area affected by the COVID - 19 lockdowns 20 Aug 2021  Bank‟s solicitor advises that due to lack of res ponse from the plumber, they had reached out to another plumber and received a quote of $15,279 to complete the stormwat er rectification works. The Bank‟s requests a second quote 23 Aug 2021  The Bank‟s solicitor advises that the new plumber had spoken to the Council as it had come to light that the stormwater rectification work would be more complicated than originally thought, hence the large quotation. The Bank‟s solicitor arranges a second quot e. 3 Sep 2021  A second quote of $13,500. 00 for stormwat er rectification works is received and approved by the Bank 13 Sep 2021  The Property presenter advises the stormwater rectification works should be completed in two weeks. 29 Sep 2021  The Property presenter advises the new plumber has informed them the works would now be completed mid next week due to a slight hold up in receiving materials. 20 Oct 2021  After the Bank requested an updat e on stormwater rectific ation work, the Property presenter advises the plumber has confirmed the works will be completed by the “end of this week or latest Monday next week.” 22 Oct 2021  The plumber advises rectification work has been completed 26 Oct 2021  The Property presenter advises they are trying to arrange the engineer to inspect the completed stormwater rectification work 2 Nov 2021  The Property presenter advises they were having trouble cont racting the engineer to book an inspection of the stormwater rectification work. However, inspection now booked for 4 November 2021 9 Nov 2021  Engineer‟s onsite inspection identified furt her r ectification works are required. Quote from plumber is $32,050. Property pres enter asks the engineer to review the quote and confirm the scope of work is in fact required for compliance certificate to be issued. 11 Nov 2021  Engineer confirms if the scope of works are carried out, a complianc e certificate can be issued for the stormwater works.  Plumber indicates he would be able to push to have work completed before Christmas 17 Dec 2021  The Property Presenter advises that further rectification work has been Determination | Case number: 927414 Page 9 of 12 completed.  The Bank‟s solicitor advises they would contact the engineer and surveyor to obtain relevant certificates. 12 Jan 2022  The Bank follow up as no updates received from engineer or surveyor 21 Jan 2022  The Bank further follow up as no updat es from engineer or surveyor. 31 Jan 2022  Bank solicitor advises they have not been able to reach the surveyor but engineer has just advised they had just returned to work after Chr istmas/New Year holidays 2 Feb 2022  Bank receives engineer‟s compliance certificate. Bank still trying to contact surveyor 7 Feb 2022  Surveyor advises the Bank‟s solicitor that there were a number of items the original builder has not yet provided, which he will need prior to issuing an occupancy certificat e 9 Feb 2022  Bank instructs its solicitor to contact the builder and request a copy of the compliance certificates required to obtain the occupancy certificate. 15 Feb 2022  Email response from the builder stating he held all the required certificat es but will not release them unless he is paid $184,000 for previous completed work.  The Bank‟s solicitor responds to the builder requesting a breakdown of fees claimed. 18 Feb 20 22 Cont act notes  The builder provided a breakdown of costs 23 Feb 2022  The Bank receives a copy of the NCAT orders dated 14 September 2021 in the dispute between the builder and complainant. The bank requests their solicitor review the orders and provide guidance on whether the builder is owed money 25 Feb 2022  The Bank provides a copy of the NCAT orders to its property agent (PS) and advis es their solicitor in reviewing, but asks PS to reach out to the builder for a meeting 2 Mar 2022  Bank‟s p roperty agent schedules meeting with the builder for 17 March 2022. 4 - 8 Mar 2022  Bank receives advice from its solicitor on the NCAT orders whic h includes advice that the orders do not say the builder is not entitled to be paid for works performed 16 Mar 2022  After considering solicitors advice, the bank opts to negotiate with the builder to obtain the compliance certificat es required for the plan of subdivision 17 Mar 2022  Bank‟s agent met with the builder and advised that the builder is not willing t o negotiate the final progress payment amount. Determination | Case number: 927414 Page 10 of 12 22 Mar 2022  The advice received form the Bank‟s solicitor is that the builder should be paid the final progress payment less the cost of any rectification works. 29 Mar 2022  Bank offers to pay builder $125,715.00 in return for compliance certificates 30 Mar 2022  The builder requests further information on rectification work 8 Apr 2022  Requested information/documents provided to the builder. 18 Apr 2022  The builder agrees to deduct a total of $24,859.33 from the final progress payment amount for the rectification works, leaving a final payment of $159,140.67. 20 Apr 2022  Bank offers to pay builder $150,140.67 21 Apr 2022  The builder accepts the Bank‟s offer.  The Bank instructs its solicitor to prepare a Deed of Agreement so that payment could be made to the builder in return for the compliance certificates. 23 May 2022  Deed of Agreement sent to the builder to be signed. 27 May 2022  The builder advises he has referred the Deed of Agreement to his solicitor for review prior to signing. 7 Jun 2022  Bank‟s agent requests updat e from builder about signing the Deed of Agreement 8 Jun 2022  Builder advises his solicitor will request some amendments to the Deed of Agreement 15 Jun to 15 Jul 2022  Bank negotiates amendments to terms of Deed of Agreement 18 Jul 2022  Bank receives the signed Deed of Agreement 20 Jul 2022  Builder advises all the required certificates have been lodged via the NSW Planning Port al to the nominated survey or in order to obtain final occupancy certificate.  Bank‟s agent informs the bank that the surveyor will need to inspect the properties as three months has elapsed since the previous inspection 22 Jul 2022  The surveyor re - inspects the properties and finds the rainwater tank is non - compliant as it is too close to the pool fence.  Bank finds solution is to install non - climbable screening Determination | Case number: 927414 Page 11 of 12 22 Jul to 22 Aug 2022  A contractor is engaged to quote and carry out w orks to make rainwater tank and pool compliant. Contractor and surveyor speak about the work that is required. Bank approves quote and works are performed and inspected. 24 Aug 2022  Bank receives the Certificate of Occupancy for lodgement with the Plan of Subdivision 29 Aug 2022  Bank receives advice from the local council listing additional 13 requirements before the Plan of Subdivision can be approved. Requirements include an administration sheet, section 88B instrument, updated survey/linen pla n, updated services letter, new Plan of Subdivision certificate of currency Sep and Oct 2022  Bank attends to satisfying additional council requirements for approval of the Plan of Subdivision with assistance from the builder. There is a delay because a new Certificate of Currency for the Plan of Subdivision is required from the surveyor and the surveyor proves diffic ult to contact/reach Early Nov 2022  Surveyor responds. Inspects site and issues new certific ate of currency for Plan of Subdivision 21 Nov 2022  Plan of Subdivision approved by council 22 Nov 2022  Bank instructs surveyor to lodge Plan of Subdivision with Land Registry 12 Dec 2022  Surveyor advises Bank that the borrowers and the Bank will need to sign a notice referred to the section 88B instrument to register the plan of subdivision with Land Registry. 20 Dec 2022  Complainant declines to sign the s88B instrument to register the plan of subdivision 20 Dec to 2022 10 Jan 2023  Bank investigate how to progress Plan of Subdivision if complainant does not sign s88B instrument which include inquiries with Land Registry 10 Jan 2023  Land Registry inform the Bank it will accept the s88B instrument being signed by the Bank under powers given to the Bank under its mortgage 20 Jan 2023  Pl an of Subdivision lodged with Land Registry 8 Feb 2023 Bank‟s Letter  Bank notified by Land Registry that it requires written consent to the Plan of Subd i vision from the complainant‟s solicitor who has lodged a caveat on the property for unpaid legal fees 9 Feb to 11 April 2023  Bank contacts caveator to obtain caveator‟s consent t o the Plan of Subdivision including follow - ups on the caveator 12 Apr 2023  Bank receives caveator‟s written cons ent to the registration of the Plan of Determination | Case number: 927414 Page 12 of 12 Bank‟s Letter Subdivision which the Bank‟s solicitors provide to the Surveyor so that it can be provided to Land Registry 19 Apr 2023  Plan of Subdivision registered 12 May 2023  Settlement of the first property is c ompleted. 15 May 2023  Settlement of the second property is completed.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.