Cash settlement of storm damage claim for garage and contents: ceiling damage not assessed, storage costs, contents settlement and delay
Text of the determination
Determination
Case number 927369
Financial firm Insurance Australia Limited
Determination | Case number: 927369 Page 1 of 10
Case number: 927369 29 February 2024
1 Determination overview
1.1 Complaint
The complainant had home building and contents insurance with the financial firm (insurer).
The complainant lodged a claim on 22 October 2021 for damage to his garage and its
contents from a storm. The insurer accepted the claim and cash settled the complainant
$59,500 on 29 December 2022, being a settlement of $60,000 less the $500 excess.
The complainant says the settlement is insufficient and seeks an additional $23,906.15. The
insurer offered to pay the complainant an additional $8,500 to finalise the claim, but this was
not accepted and has been withdrawn.
1.2 Issues and key findings
Has the insurer fairly assessed the building claim?
No. The insurer fairly settled the accepted building repairs, but did not assess all of the
damage identified. The insurer is required to cover the ceiling damage consistent with the
claimed event and the accidental damage cover provided by the policy.
Is the insurer required to pay for contents storage?
Yes. The insurer is required to reimburse the complainant for contents storage costs until
January 2023, being a month after the settlement was paid. This is because the complainant
had not been paid for the repairs, and the ceiling damage was not included in the settlement,
leaving a risk of contamination if the contents were returned before the repairs could be
completed.
Has the insurer fairly settled the contents claim?
No. The insurer has not fairly settled the contents claim. It is required to increase the
settlement as specified below.
Is the complainant entitled to further compensation?
Yes. Additional compensation is warranted as the claim was not well managed by the insurer,
including extensive and avoidable delays and inconvenience.
Why is the outcome fair?
The outcome is fair as the insurer did not efficiently manage the claim or correctly calculate
the settlement owed to the complainant, resulting in extended delays and additional storage
and settlement costs.
1.3 Determination
This determination is substantially in favour of the complainant.
Within a reasonable time of being advised of the complainant’s acceptance of this
determination, the insurer is required to pay the complainant:
Determination | Case number: 927369 Page 2 of 10
the reasonable cost of replacing the garage ceiling in accordance with section 2.1 below
$3,691.45 for contents storage costs, plus interest at the rate determined under section 57
of the Insurance Contracts Act 1984 (Cth) from the date of each storage invoice was paid
until the payment date
an additional $1,331.80 for the sauna and $147.50 for the pool robot
interest on the settlement of $36,702.04 paid for the other contents items at the rate
calculated in accordance with section 57 of the Insurance Contracts Act from 1 September
2022 to 29 December 2022
an additional $781.33 compensation for non-financial loss.
Determination | Case number: 927369 Page 3 of 10
2 Reasons for determination
2.1 Has the insurer fairly assessed the building claim?
No. The insurer fairly settled the accepted building repairs, but did not assess all of the
damage identified. The insurer is required to cover the ceiling damage consistent with the
claimed event and the accidental damage cover provided by the policy.
Insurer required to pay reasonable cost to repair the damaged part of the home
The policy says the insurer will replace, reinstate or repair the damaged part of the home as
far as possible to its original condition, or pay the complainant the reasonable cost of doing
so. The complainant asked to be cash settled for the building repairs, so his builder (CC)
could complete these works. He attended to the building remediation works himself, due to
this not being arranged by the insurer within two months of the claim. Accordingly, he also
requested a cash settlement for these works.
The insurer agreed to cash settle the complainant, however a dispute remains regarding the
reasonable cost of these works, and the scope of the repairs.
Insurer paid the reasonable cost of the accepted building works
The insurer’s restorer (ST) provided an estimate of $5,800.20 on 22 November 2021 for the
structural remediation of the garage. This included disposal of the wall sheets up to 1200mm
and washing and drying the structural frames and interior of the garage.
The insurer and complainant both provided quotes for the building repair works (from JL and
CC respectively) which included items covered in ST’s scope of works (removing the plaster
and sanitising the wall frames/cavities). A comparison between the costs and items quoted by
each trade is set out in section 3.3 of this determination. None of the quotes made allowance
for variations.
The complainant seeks settlement for the building works based on CC ’s quote of $14,261.94
with a 10% uplift and payment of $5,800.20 for the structural remediation.
CC included $1,863.90 in its quote to replace the bottom plates in the wall framing if they
were found to be damaged. This item was speculative and has not been demonstrated to be
required.
To address the overlap between ST’s remediation quote and the quote from JL, the insurer
deducted th e amount allowed to sanitise the wall cavities from JL’s quote and added the full
amount of ST’s building remediation estimate. This comes to $14,961.38, which exceeds the
amount quoted by CC. If the same approach was applied to CC’s quote, and the allowan ce
for replacing the wall plates is removed (as it has not been sh own this work is required), CC’s
quote would come to $14,298.24, still below the amount calculated by the insurer.
The complainant seeks an uplift of 10% on the building settlement. I agree it is appropriate in
the circumstances to apply an uplift to allow for price increases between when the costs were
quoted and when settlement was paid, and for any variation to the scope of works (such as
the wall plates). The insurer applied an uplift of 15% ($2,244.21), bringing the total paid for
the building repairs and remediation to $17,205.59. I am satisfied the settlement paid for the
accepted building repairs and remediation works was reasonable.
Determination | Case number: 927369 Page 4 of 10
Insurer did not assess water damage to ceiling
JL mentioned severe water damage to the ceiling in its quote in February 2022. This damage
had also been noted by the complainant in emails to the insurer in November 2021. JL says
this was not quoted due to the loss adjuster’s instructions.
The complainant’s certificate of insurance shows he had classic home cover. The policy says
this covers accidental damage to the building during the period of insurance. Accident is
defined in the policy (as set out in section 3.2 of this determination) to mean a sudden,
unexpected and unintended event.
Given the broad cover provided by the policy and the accepted storm damage to the garage,
it is unclear why the insurer did not assess its liability for the ceiling damage, particularly
given the complainant’s concerns with mould in the garage.
The insurer says this is because CC only quoted for the damage to the walls, and JL was
providing a comparison quote. However, JL included various other items not initially quoted
by CC.
Fair for insurer to cover the garage ceiling damage
I am not satisfied it was reasonable for the insurer to dismiss the identified water damage to
the garage ceiling without assessment. There is no information to show this damage was
intended or expected by the complainant. It is also reasonable to consider this water damage
could have occurred in the same storm event.
The complainant has since arranged for CC to remove the garage ceiling. Given the claim
was lodged in October 2021 I am satisfied the insurer had an adequate opportunity to assess
this damage. As it did not do so, it has not established any basis for declining cover for the
garage ceiling. Accordingly, I consider it is reasonable for the garage ceiling to be accepted
under the claim.
The insurer is required to increase the building settlement paid to the complainant to include
replacement of the garage ceiling, including insulation if confirmed to have been installed in
this area. This additional settlement should be based on a current actionable quote, or the
actual cost of these works to the complainant on provision of a sufficiently itemised invoice
identifying the garage ceiling works.
Damage to other areas not confirmed to relate to this claim
The complainant says damage to the roof tiles from the event was identified by his builder
and roofer during the repairs in 2023. The complainant also recently said damage has
extended into the kitchen and lounge room as a result of this issue not being identified.
When making a claim, the complainant has the onus to show he suffered a loss of a type
covered under the policy. The complainant must show this on the balance of probabilities (i.e.
that it is more likely than not).
The complainant has provided detailed submissions and correspondence concerning the
claim. However, no reports or photos have been provided showing any damage to the roof,
kitchen or living area. If the damage to the kitchen and living area was due to the same event,
I would have expected it to have presented around the same time as the garage damage. In
the absence of any information confirming the nature, extent and cause of the damage to the
roof, kitchen and living area, I am not satisfied the complainant has shown these damages
relate to this claim.
Determination | Case number: 927369 Page 5 of 10
It is open to the complainant to lodge a claim for the roof damage and any resultant damage
to the interior of the house for assessment by the insurer in accordance with the policy terms.
2.2 Is the insurer required to pay for contents storage?
Yes. The insurer is required to reimburse the complainant for contents storage costs until
January 2023, being a month after the settlement was paid. This is because the complainant
had not been paid for the repairs, and the ceiling damage was not included in the settlement,
leaving a risk of contamination if the contents were returned before the repairs could be
completed.
Home is not uninhabitable as a result of the claim
The complainant wants the insurer to pay $8,740 for storage of the remediated contents
items, or to pay for a storage container to be permanently placed at the property.
The insurer declined cover for the storage costs. It says the policy provides cover for up to
$5,000 in storage costs only when the home is uninhabitable. As the claimed damage was
limited to the garage, the insurer says the home was not uninhabitable and this benefit does
not apply.
The complainant says they have not been living in the home since July 2022 due to ongoing
mould issues and indicated this is related to the roof damage recently identified by his builder.
As noted above, I am not satisfied the complainant has shown roof damage from the 2021
storm event. As the demonstrated damage is limited to the garage, I am not satisfied it has
been shown the home was uninhabitable due to the storm event, so the storage benefit has
not been shown to apply under the policy terms.
Omission of ceiling damage left risk of recontamination of contents items
ST recommended the restored items not be returned to the garage until the structural
remediation works were completed, to avoid recontamination. ST noted there would be
ongoing storage costs until that time.
The insurer initially arranged and paid for storage of the remediated contents. The items were
relocated to the complainant’s preferred storage unit on 17 August 2022, as he wanted to be
able to access these items while waiting for the repairs to be completed. I accept this was
reasonable in the circumstances.
As the ceiling damage was not included in the repair scope, and no settlement was paid until
December 2022, I do not consider the complainant could reasonably complete the garage
repairs or return the contents items until after the initial settlement was paid.
While the insurer notes the complainant refused to accept the settlement prior to December
2022, I accept this was because previous settlement offers were inadequate. Accordingly, I
am satisfied the insurer was responsible for the delayed settlement. The insurer also could
have arranged prompt completion of the remediation works, to avoid the need for extended
offsite storage.
Insurer should reimburse storage costs from July 2022 to January 2023
The complainant provided invoices for storage costs from 15 July 2022. The insurer says the
contents items were returned to the complainant on 17 August 2022. The loss adjuster’s
Determination | Case number: 927369 Page 6 of 10
report from 25 July 2022 indicates the storage unit was arranged by the complainant in July
2022 for the insurer to move the contents to.
The insurer says the repairs could have been completed in two weeks, and the complainant
has not provided an alternative time frame. Accordingly, I consider it is fair for the insurer to
cover the storage cost of contents storage from when the complainant arranged alternative
storage in July 2022 until the end of January 2023, when the garage repairs could reasonably
have been completed. After this time, I consider the complainant had been settled sufficiently
to complete the garage repairs and avoid the need for ongoing storage costs.
The insurer is to reimburse the complainant $3,691.45 for the storage costs incurred from
July 2022 to January 2023, plus interest at the rate determined under section 57 of the
Insurance Contracts Act 1984 (Cth) from the date of each storage invoice was paid until the
payment date. This amount does not include reimbursement of late fees charged by the
storage provider, as this expense was wi thin the complainant’s control.
2.3 Has the insurer fairly settled the contents claim?
No. The insurer has not fairly settled the contents claim.
Insurer is to increase the settlement for sauna and pool robot
The complainant seeks an increased settlement for a sauna, pool robot, and other non-
restorable contents items.
Both parties acknowledge an equivalent one-person sauna is not available. The parties
previously agreed on a replacement model costing $2,288, but the insurer did not agree to
pay the delivery costs of $1,484.76. It settled the complainant $2,631.20 for the sauna in
December 2022. The complainant notes she was not able to replace this item without it being
delivered and says the model agreed on is no longer available. She provided a new quote
from 27 October 2023 totalling $3,963 including delivery. The insurer was prepared to accept
this increased cost as part of the additional settlement offered, and has not disputed this was
an appropriate replacement model. Accordingly, I consider the insurer should increase the
settlement for the sauna by $1,331.80 to cover the full replacement cost of the sauna.
The insurer settled the complainant $2,242.50 for the robotic pool cleaner. The insurer agreed
to increase the settlement for this item to $2,390 (being an additional $147.50) based on a
quote from October 2023. The complainant also provided quote for a replacement costing
$2,839.99 in October 2023, although this was for a different model. The model previously
agreed on by the parties remains available online within the increased costing sourced by the
insurer. Accordingly, I accept the insurer’s October 2023 costing is a reasonable basis of
settlement for this item.
Insurer is to pay interest for delayed settlement of other contents items
The complainant provided costings for new for old replacement of the other non-restorable
contents items in May 2022. The loss schedule was updated in August 2022 and totalled
$36,400.04. The complainant seeks an increase of 15% on the total in the loss schedule on
the basis that the replacement costs of these items has likely increased since the items were
costed, or for all items to be re-quoted at current rates.
The complainant says he could not replace the contents as he had nowhere to store the items
as the garage repairs were not complete. However, the initial settlement was paid over a year
ago, allowing him to complete these works from that time.
Determination | Case number: 927369 Page 7 of 10
The insurer paid the complainant $36,702.04 for the other contents items in December 2022,
which exceeds the base amount claimed by the complainant. The insurer notes it is not liable
for any increased cost of the items since the settlement was paid. I accept this, however there
was a delay of around five months between the complainant providing updated costings for
items (other than the sauna and pool robot) and the settlement.
I acknowledge the complainant refused settlement until all items were agreed, however the
insurer has not provided a reasonable explanation for not agreeing to settle based on the
costings provided by the complainant in August 2022, and has not provided any alternative
costings for these items. I consider this delay is most appropriately compensated by the
payment of interest on the contents settlement amount, from 1 September 2022 (being a
reasonable time for payment after the updated costings were provided) until the settlement
was paid on 29 December 2022.
2.4 Is the complainant entitled to further compensation?
Yes. Additional compensation is warranted as the claim was not well managed by the insurer,
including extensive and avoidable delays and inconvenience.
AFCA may award compensation in certain circumstances
AFCA can award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference with the
complainant’s expectation of enjoyment or peace of mind due to the insurer’s conduct.
The complainant seeks $5,400 in compensation for non-financial loss, being the maximum
AFCA can award.
Complainant seeks compensation for poor claim management and delay
The complainant says they have lived in a separate cabin on the property since July 2022 to
avoid mould related health issues. No information has been provided to confirm any mould
issues to the house itself, so I am not satisfied this has been shown to be required.
However, I accept there was an unusual delay by the insurer in attending to the building
remediation, and in settling the claim. I consider many of the issues with this claim could have
been avoided if the insurer promptly attended to the building remediation and assessed
whether the ceiling damage was covered under the claim.
The complainant attended to the building remediation works himself due to this not being
promptly arranged by the insurer. I accept this caused the complainant unusual physical
inconvenience and interfered with his reasonable expectation of enjoyment and peace of
mind.
Insurer contributed to extended delays
The first payment to the complainant was made over a year after the claim was lodged, in
relation to what should have been a relatively straightforward claim.
The insurer says the settlement was delayed by the complainant refusing settlement until the
amounts in dispute were agreed. While the complainant had not agreed to accept settlement,
earlier offers made by the insurer for the contents items were also inadequate. The
complainant repeatedly made requests for a prompt settlement, and even offered to discount
Determination | Case number: 927369 Page 8 of 10
the contents claim to encourage prompt payment by the insurer. The insurer has not
explained why the contents claim was not efficiently assessed by its loss adjuster.
Insurer should provide additional compensation
The insurer included $1,218.67 for non-financial loss in the settlement paid to the complainant
in recognition of the claim delays.
I am sati sfied the insurer’s failure to proactively manage the claim and promptly make a
reasonable offer for the contents settlement caused unnecessary delay and interfered with
the complainant’s peace of mind over an extended period.
Considering the extensive delays and the insurer’s claim management, I consider the
compensation should be increased to $2,000, being an additional $781.33.
2.5 Why is the outcome fair?
The outcome is fair as the insurer did not efficiently manage the claim or correctly calculate
the settlement owed to the complainant, resulting in extended delays and additional storage
and settlement costs.
Determination | Case number: 927369 Page 9 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy terms
What You are insured against
This policy insures You against Accidental damage, burglary and theft occurring
during the Period of Insurance .
Accident means a sudden, unexpected and unintended event which:
• You did not intend or expect; and
• a reasonable person in Your position and with Your kno wledge and experience
would not have expected.
‘ Accidental ’ and ‘ Accidentally ’ have corresponding meanings.
What We do if Your Home is Accidentally damaged
Determination | Case number: 927369 Page 10 of 10
If ‘ Building ’ and ‘ Replacement ’ are shown on the Certificate of Insurance,
We replace, reinstate or repair the part of Your Home that is Accidentally
damaged as far as possible to its original condition, using materials that are
readily available in Australia. Or, at Our option, We pay You the reason able cost
to do so.
…
You are only insured for the reinstatement, replacement or repair of a wall, ceiling
or fixed floor covering which is damaged in the room where the damage occurred.
3.3 Building remediation and repair quote comparison
ST JL CC
Date 22 November 2021 1 February 2022 5 May 2022
R emove, replace, and paint skirting,
mouldings, and plaster to 1200mm
(strip out of plaster
included)
$3,462.90 $4,596.50
R eplace the bottom plates in the wall
framing if they are found to be damaged
- - $1,863.90
R emove and reinstate furniture /contents (contents removed) $1,500 $880
R emove, prepare, and paint the sliding
door jambs
- $916.30 $1,165
R emove and reinstate the roller doors to
facilitate the repairs
- $952 $660
S anitise the wall frames onc e the wall
cavities are open
(sanitize whole
garage)
$1,190 $3,800
I nsuranc e, cleaning, and rubbish removal - $1,103.96 -
Total $5,800.20 $10,351.18 $14,261.94
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.