Denial of storm/rainwater runoff claim for scouring damage to footings
Summary
The insured claimed for storm and runoff scouring damage to the home's footings and surrounds, and the insurer denied the claim. AFCA found the three most affected footings were covered and ordered the insurer to obtain a scope of works and repair or cash settle, but upheld the decline for other damage.
The three footings were damaged by storm runoff within the policy's erosion cover, but soil is not insured property and wear and tear and poor construction exclusions applied to the rest.
Issues
- Claim denial primary · upheld
“I am satisfied the three most affected concrete footings have suffered damage as a result of the storm; insurer otherwise entitled to refuse the remaining damage.”
- Inadequate claim investigation secondary · not upheld
“I do not accept the insurer's argument that the drainage was inadequate.”
- Product terms interpretation secondary · upheld
“Cover for soil movement including erosion caused by rainwater runoff within 72 hours; soil not insured property; wear and tear excluded.”
Subjects and remedies
home or building damagenatural disasterreassess claimrepair or rectify
Text of the determination
Determination
Case number 926766
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 926766 Page 2 of 7
Case number: 926766 7 June 2023
1 Determination overview
1.1 Complaint
The complainant held a Home and Contents Insurance policy with the financial firm and
lodged a claim on 2 March 2022 after severe storms in February 2022.
The complainant says heavy rain caused soil to wash away from the footings of the building
with resultant damage.
The insurer relies upon the terms of the policy to deny liability for the claim and says there is
no damage to the subfloor area. While the severity of the storm contributed to the scouring,
this would not have occurred but for the inadequate drainage of the property.
1.2 Issues and key findings
Has the complainant established a valid claim within the terms of the policy?
Yes, I am satisfied the three most affected concrete footings have suffered damage as a
result of the storm. The insurer is to complete the repairs as set out in section 2.1 of this
determination.
Is the insurer entitled to limit its liability?
Yes. The insurer is entitled to limit its liability in accordance with the terms of the policy as set
out under section 2.2 of this determination.
Why is the outcome fair?
The outcome is fair as the available information confirms likely impact damage to the stability
of the three most affected concrete piers and that suitable repairs should be completed in a
prompt manner. The policy otherwise excludes liability for the damage sustained.
1.3 Determination
This determination is partially in favour of the complainant. Within 14 days of the
complainant’s acceptance of this determination the insurer is to:
appoint an engineer to prepare a scope of works (SOW) and obtain a quote to complete
the repairs to the three most affected concrete footings.
on receipt of the SOW and quote the insurer is to determine whether to complete the
repairs or cash settle the claim as set out under section 2.1 of this determination.
The insurer is otherwise entitled to refuse payment of the claim in accordance with the terms
and conditions of the policy.
Determination | Case number: 926766 Page 3 of 7
2 Reasons for determination
2.1 Has the complainant established a valid claim within the
terms of the policy?
Yes, I am satisfied the three most affected concrete footings have suffered damage as a
result of the storm.
The complainant has initial onus to prove claim falls within the terms of the
policy.
It is accepted insurance law that an insured person has the initial onus to show, on the
balance of probabilities (that is, more likely than not) that the loss or damage claim falls within
the cover provided under the terms of the policy. Only once this is established does the onus
shift to the insurer to prove the application of any condition or exclusion if it seeks to reduce
its liability under the policy.
The complainant’s policy provides cover for a series of listed events including storm and
rainwater runoff. The complainant had also included the optional cover for flood.
Circumstances of claim
The complainant lives in Queensland. In late February 2022 over 600 ml of rain fell which
resulted in water flowing through the property.
The property slopes from the back yard to the front yard. During the storm, water flowed
under the home resulting in the loss of soil from under the house and scouring around the
footings.
There is no dispute that there was heavy rain during the period or that water flowed through
the property resulting in the scouring of materials around the supporting stumps and earth
embankment.
The complainant says the damage to the property was caused by storm, rainwater or runoff
and believes it should be covered under the terms of the policy. The insurer says that whilst
there was scouring, there was no actual damage to the complainant ’ s home or movement of
the bearers.
The insurer says the claim is not a result of an insured event. To the extent that there is
scouring of the soil, soil is not included in the definition of building within the terms of the
policy. Alternatively, the damage has been caused by wear, tear and gradual deterioration
and/or faulty design, structural defects and poor workmanship.
The insurer says while the concrete footings in the subfloor area displayed some scouring,
the scouring was due to inadequate drainage which did not prevent surface water from
reaching the rear of the house and entering the subfloor area.
Engineering report identifies damage to three concrete post footings
The insurer engaged the services of an engineer, (SBC) to inspect the property and assess
any damage to the building footings and/or to the complainant’s driveway. SBC concluded as
follows:
the scouring to the subfloor has occurred as a result of lack of adequate surface water
drainage provisions throughout the rear of the site.
Determination | Case number: 926766 Page 4 of 7
in every storm event there is potential for surface water runoff to the subfloor area of the
house to occur. If adequate drainage had been provided the surface water runoff into the
subfloor space would have been significantly less and scouring would have been
considerably reduced.
the scouring to the subfloor following the February 2022 event was more severe than
would otherwise have occurred during previous rainstorm events.
it is good building practice to have either a flatter gradient or alternatively for the floor
space to be constructed with a formal retaining wall to support the presently unsupported
soil.
although three concrete post footings have been severely eroded the floor of the house
shows no signs of being adversely affected.
the scouring of the three most affected concrete footings has possibly impacted the lateral
stability of the piers and therefore suitable repairs should be undertaken promptly.
Under the insured event for storm, rainwater and runoff there is cover for loss or damage
caused by or arising from soil movement, including erosion if it is caused directly by and
within 72 hours of a storm. I accept based on the report from SBC that there was loss or
damage caused by soil movement including erosion that was caused directly by rainwater
runoff within 72 hours of the storm.
Damage to concrete piers covered under Building cover
Under the building cover, the policy provides cover for various physical structures and
fixtures, such as the house, garage, fences and paved driveways. Precise terms of the policy
are set out in section 3.2. I accept that the concrete footings are physical structures that make
up the home buildings. This does not appear to have been disputed by either party.
The complainant has established a valid claim for damage to the three most
affected concrete footings
Whilst the insurer has claimed that there is no evidence of damage sustained to the property,
I disagree.
The report from SBC indicates that there was possible lateral movement to the three most
affected concrete footings caused by the scouring and this possibly impacted on the lateral
stability of those piers.
I do not accept the insurer’s argument that the drainage was inadequate. SBC has referred to
the Building Code of Australia (BCA) relevant at the time of the household instruction. In
dealing with surface water the BCA provides:
(a) Surface water, resulting from storm having an average recurrence interval of 20 years
and which is collected or concentrated by a building or site work, must be disposed of in
a way that avoids the likelihood of damage or nuisance to any other property.
(b) Surface water, resulting from a storm having an average interval of 100 years must not
enter the building.
Reports have confirmed that no storm water entered the complainant ’ s building, the storm
water caused the scouring of the soil. The report confirms the event was a one in 100-year
recurrence interval event, it was not a usual or normal storm event or an event having an
average recurrence interval of 20 years.
There is no evidence that the drainage was not adequate to cope with storm water resulting
from a storm having an average recurrence interval of 20 years.
Determination | Case number: 926766 Page 5 of 7
While I accept the drainage proved inadequate to cope with the event I do not accept that the
information provided is sufficient to establish the irrigation and drainage system did not meet
the relevant building code or relevant BCA.
Based on the available information, I am satisfied that there is loss or damage to the building
due to the runoff from the storm. I am satisfied the storm has impacted the three most
affected concrete piers identified by SBC. SBC indicates possible lateral stability of the piers
has been impacted and that suitable repairs should be carried out promptly.
The insurer should appoint an engineer to prepare a scope of works to complete the repairs
to the three most affected concrete footings. Upon receipt of the scope of works, the insurer
should obtain an actionable quote and determine whether to either complete the repairs or
otherwise cash settle the complainant for the cost of the repairs.
Should the insurer determine to cash settle the complainant for the cost of the repairs then
the insurer must pay the complainant the amount quoted plus a 20 per cent uplift to cover
possible contingencies.
2.2 Is the insurer entitled to limit its liability?
Yes. The insurer is entitled to limit its liability in accordance with the terms of the policy
No evidence that concrete driveway or patio slabs damaged in the storm event
The policy excludes damage caused by wear and tear, gradual deterioration and
depreciation.
SBC obtained a Google street image of the complainant’s driveway from January 2014 . That
showed differential vertical movement between the panel slabs. While it is possible that the
damage may have been exacerbated, SBC concluded that the damage was due to long-term
differential foundation movements. SBC also identified minor cracking damage in the
driveway. I accept was most likely caused by a combination of plastic shrinkage cracks and
long-term drying shrinkage of the concrete.
Insofar as there was damage to the front concrete driveway and patio slabs, SBC confirmed
approximate cause of the damage was most likely long-term differential foundation movement
and lack of positive connection between the slab panels.
SBC considered this to be long-term differential foundation movement, possibly exacerbated
by surface water running from the back yard. Again, the evidence suggests that the damage
has not been caused or contributed by the event during late February 2022 but most likely
long-term differential foundation movement and lack of a relevant isolation joint.
There is no information to dispute these findings and I accept it as reasonable in these
circumstances to exclude cover under the terms of the policy. The insurer is entitled to rely
upon the terms and conditions of the policy that exclude cover for wear and tear, gradual
deterioration and depreciation.
Insurer not liable for loose soil under the house
While I accept the insurer has liability for the damage to the most affected concrete footings, I
accept that the insurer is entitled to refuse liability for the scouring and washout of the
subfloor materials and repairs to the steeply exposed earth embankment under the house.
Determination | Case number: 926766 Page 6 of 7
I accept the damage is damage to the soil rather than damage caused by the soil. Soil is not
insured property under the definition of building or the terms of the policy.
I also accept SBC’s findings that the steeply exposed earth embankment indicated poor
construction practices and as such the insurer is entitled to rely upon the terms of the policy
to refuse liability for that damage.
2.3 Why is the outcome fair?
The outcome is fair as the available information confirms likely impact damage to the stability
of the three most affected concrete piers and that suitable repairs should be completed in a
prompt manner. The policy otherwise excludes for the damage sustained.
Determination | Case number: 926766 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.