Determination 926766

Denial of storm/rainwater runoff claim for scouring damage to footings

FirmAllianz Australia
Decided2023-06-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured claimed for storm and runoff scouring damage to the home's footings and surrounds, and the insurer denied the claim. AFCA found the three most affected footings were covered and ordered the insurer to obtain a scope of works and repair or cash settle, but upheld the decline for other damage.

The three footings were damaged by storm runoff within the policy's erosion cover, but soil is not insured property and wear and tear and poor construction exclusions applied to the rest.

Issues

Subjects and remedies

home or building damagenatural disasterreassess claimrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 926766 Financial firm Allianz Australia Insurance Limited Determination | Case number: 926766 Page 2 of 7 Case number: 926766 7 June 2023 1 Determination overview 1.1 Complaint The complainant held a Home and Contents Insurance policy with the financial firm and lodged a claim on 2 March 2022 after severe storms in February 2022. The complainant says heavy rain caused soil to wash away from the footings of the building with resultant damage. The insurer relies upon the terms of the policy to deny liability for the claim and says there is no damage to the subfloor area. While the severity of the storm contributed to the scouring, this would not have occurred but for the inadequate drainage of the property. 1.2 Issues and key findings Has the complainant established a valid claim within the terms of the policy? Yes, I am satisfied the three most affected concrete footings have suffered damage as a result of the storm. The insurer is to complete the repairs as set out in section 2.1 of this determination. Is the insurer entitled to limit its liability? Yes. The insurer is entitled to limit its liability in accordance with the terms of the policy as set out under section 2.2 of this determination. Why is the outcome fair? The outcome is fair as the available information confirms likely impact damage to the stability of the three most affected concrete piers and that suitable repairs should be completed in a prompt manner. The policy otherwise excludes liability for the damage sustained. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of the complainant’s acceptance of this determination the insurer is to:  appoint an engineer to prepare a scope of works (SOW) and obtain a quote to complete the repairs to the three most affected concrete footings.  on receipt of the SOW and quote the insurer is to determine whether to complete the repairs or cash settle the claim as set out under section 2.1 of this determination. The insurer is otherwise entitled to refuse payment of the claim in accordance with the terms and conditions of the policy. Determination | Case number: 926766 Page 3 of 7 2 Reasons for determination 2.1 Has the complainant established a valid claim within the terms of the policy? Yes, I am satisfied the three most affected concrete footings have suffered damage as a result of the storm. The complainant has initial onus to prove claim falls within the terms of the policy. It is accepted insurance law that an insured person has the initial onus to show, on the balance of probabilities (that is, more likely than not) that the loss or damage claim falls within the cover provided under the terms of the policy. Only once this is established does the onus shift to the insurer to prove the application of any condition or exclusion if it seeks to reduce its liability under the policy. The complainant’s policy provides cover for a series of listed events including storm and rainwater runoff. The complainant had also included the optional cover for flood. Circumstances of claim The complainant lives in Queensland. In late February 2022 over 600 ml of rain fell which resulted in water flowing through the property. The property slopes from the back yard to the front yard. During the storm, water flowed under the home resulting in the loss of soil from under the house and scouring around the footings. There is no dispute that there was heavy rain during the period or that water flowed through the property resulting in the scouring of materials around the supporting stumps and earth embankment. The complainant says the damage to the property was caused by storm, rainwater or runoff and believes it should be covered under the terms of the policy. The insurer says that whilst there was scouring, there was no actual damage to the complainant ’ s home or movement of the bearers. The insurer says the claim is not a result of an insured event. To the extent that there is scouring of the soil, soil is not included in the definition of building within the terms of the policy. Alternatively, the damage has been caused by wear, tear and gradual deterioration and/or faulty design, structural defects and poor workmanship. The insurer says while the concrete footings in the subfloor area displayed some scouring, the scouring was due to inadequate drainage which did not prevent surface water from reaching the rear of the house and entering the subfloor area. Engineering report identifies damage to three concrete post footings The insurer engaged the services of an engineer, (SBC) to inspect the property and assess any damage to the building footings and/or to the complainant’s driveway. SBC concluded as follows:  the scouring to the subfloor has occurred as a result of lack of adequate surface water drainage provisions throughout the rear of the site. Determination | Case number: 926766 Page 4 of 7  in every storm event there is potential for surface water runoff to the subfloor area of the house to occur. If adequate drainage had been provided the surface water runoff into the subfloor space would have been significantly less and scouring would have been considerably reduced.  the scouring to the subfloor following the February 2022 event was more severe than would otherwise have occurred during previous rainstorm events.  it is good building practice to have either a flatter gradient or alternatively for the floor space to be constructed with a formal retaining wall to support the presently unsupported soil.  although three concrete post footings have been severely eroded the floor of the house shows no signs of being adversely affected.  the scouring of the three most affected concrete footings has possibly impacted the lateral stability of the piers and therefore suitable repairs should be undertaken promptly. Under the insured event for storm, rainwater and runoff there is cover for loss or damage caused by or arising from soil movement, including erosion if it is caused directly by and within 72 hours of a storm. I accept based on the report from SBC that there was loss or damage caused by soil movement including erosion that was caused directly by rainwater runoff within 72 hours of the storm. Damage to concrete piers covered under Building cover Under the building cover, the policy provides cover for various physical structures and fixtures, such as the house, garage, fences and paved driveways. Precise terms of the policy are set out in section 3.2. I accept that the concrete footings are physical structures that make up the home buildings. This does not appear to have been disputed by either party. The complainant has established a valid claim for damage to the three most affected concrete footings Whilst the insurer has claimed that there is no evidence of damage sustained to the property, I disagree. The report from SBC indicates that there was possible lateral movement to the three most affected concrete footings caused by the scouring and this possibly impacted on the lateral stability of those piers. I do not accept the insurer’s argument that the drainage was inadequate. SBC has referred to the Building Code of Australia (BCA) relevant at the time of the household instruction. In dealing with surface water the BCA provides: (a) Surface water, resulting from storm having an average recurrence interval of 20 years and which is collected or concentrated by a building or site work, must be disposed of in a way that avoids the likelihood of damage or nuisance to any other property. (b) Surface water, resulting from a storm having an average interval of 100 years must not enter the building. Reports have confirmed that no storm water entered the complainant ’ s building, the storm water caused the scouring of the soil. The report confirms the event was a one in 100-year recurrence interval event, it was not a usual or normal storm event or an event having an average recurrence interval of 20 years. There is no evidence that the drainage was not adequate to cope with storm water resulting from a storm having an average recurrence interval of 20 years. Determination | Case number: 926766 Page 5 of 7 While I accept the drainage proved inadequate to cope with the event I do not accept that the information provided is sufficient to establish the irrigation and drainage system did not meet the relevant building code or relevant BCA. Based on the available information, I am satisfied that there is loss or damage to the building due to the runoff from the storm. I am satisfied the storm has impacted the three most affected concrete piers identified by SBC. SBC indicates possible lateral stability of the piers has been impacted and that suitable repairs should be carried out promptly. The insurer should appoint an engineer to prepare a scope of works to complete the repairs to the three most affected concrete footings. Upon receipt of the scope of works, the insurer should obtain an actionable quote and determine whether to either complete the repairs or otherwise cash settle the complainant for the cost of the repairs. Should the insurer determine to cash settle the complainant for the cost of the repairs then the insurer must pay the complainant the amount quoted plus a 20 per cent uplift to cover possible contingencies. 2.2 Is the insurer entitled to limit its liability? Yes. The insurer is entitled to limit its liability in accordance with the terms of the policy No evidence that concrete driveway or patio slabs damaged in the storm event The policy excludes damage caused by wear and tear, gradual deterioration and depreciation. SBC obtained a Google street image of the complainant’s driveway from January 2014 . That showed differential vertical movement between the panel slabs. While it is possible that the damage may have been exacerbated, SBC concluded that the damage was due to long-term differential foundation movements. SBC also identified minor cracking damage in the driveway. I accept was most likely caused by a combination of plastic shrinkage cracks and long-term drying shrinkage of the concrete. Insofar as there was damage to the front concrete driveway and patio slabs, SBC confirmed approximate cause of the damage was most likely long-term differential foundation movement and lack of positive connection between the slab panels. SBC considered this to be long-term differential foundation movement, possibly exacerbated by surface water running from the back yard. Again, the evidence suggests that the damage has not been caused or contributed by the event during late February 2022 but most likely long-term differential foundation movement and lack of a relevant isolation joint. There is no information to dispute these findings and I accept it as reasonable in these circumstances to exclude cover under the terms of the policy. The insurer is entitled to rely upon the terms and conditions of the policy that exclude cover for wear and tear, gradual deterioration and depreciation. Insurer not liable for loose soil under the house While I accept the insurer has liability for the damage to the most affected concrete footings, I accept that the insurer is entitled to refuse liability for the scouring and washout of the subfloor materials and repairs to the steeply exposed earth embankment under the house. Determination | Case number: 926766 Page 6 of 7 I accept the damage is damage to the soil rather than damage caused by the soil. Soil is not insured property under the definition of building or the terms of the policy. I also accept SBC’s findings that the steeply exposed earth embankment indicated poor construction practices and as such the insurer is entitled to rely upon the terms of the policy to refuse liability for that damage. 2.3 Why is the outcome fair? The outcome is fair as the available information confirms likely impact damage to the stability of the three most affected concrete piers and that suitable repairs should be completed in a prompt manner. The policy otherwise excludes for the damage sustained. Determination | Case number: 926766 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.