Text of the determination
Determination
Case number 926530
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 926530 Page 1 of 10
Case number: 926530 4 May 2023
1 Determination overview
1.1 Complaint
The complainants hold a maritime insurance policy with the financial firm (insurer). On 13 July
2022 they lodged a claim for accidental damage to their boat caused by a water leak.
The insurer accepted the claim and authorised repairs of what it says was the damage
caused by the leak.
The complainants dispute the scope of the insurer‟s proposed settlement of the claim. In
particular, the complainants say that a packless sealing system shaft seal („PSS seal‟) that
failed, as well as water-damaged carpets, should be replaced. The complainants also say that
the insurer should be responsible for mechanical and electrical repairs to the vessel.
During the ongoing dispute with the insurer, the complainants withdrew their permission for
the authorised repairs to take place. The insurer therefore elected to offer a cash settlement.
1.2 Issues and key findings
Should the insurer provide coverage for replacement of the PSS seal?
No. The insurer is not obliged to pay for the replacement of the PSS seal.
Should the insurer provide coverage for replacement carpets?
The insurer has shown that the water-damaged carpets can likely be repaired, and that
process should be attempted. If the result is unsatisfactory then the insurer should replace the
carpets.
Should the insurer provide coverage for mechanical and electrical repairs?
No. The mechanical and electrical repairs are maintenance related.
Is the insurer entitled to cash settle?
Yes. The insurer is entitled to cash settle the claim.
Why is the outcome fair?
The events the complainants have described are unfortunate and I understand they have
suffered a financial loss over and above the cash settlement sum offered by the insurer in
circumstances that are out of their control. However, the outcome is fair because:-
The complainants established a valid claim for accidental damage to their boat after
water ingressed the vessel due to a leak
The insurer accepted the claim and authorised repair works according to a scope of
works („SOW‟)
The SOW was comprehensive, fair and reasonable
After adjustment and tightening, the PSS seal did not require replacement
The water-damaged carpets can likely be repaired
Determination | Case number: 926530 Page 2 of 10
The mechanical and electrical repairs are maintenance related
The insurer is entitled to cash settle the balance of the claim
The insurer is entitled to rely upon the terms and conditions of the policy to determine
its obligations to the complainants regarding the claim
Throughout this complaint AFCA‟s approach has remained objective, consistent with
the facts and based on the law.
1.3 Determination
This determination is in favour of the insurer.
Within 14 days of receipt of notice that the complainants accept this determination, the insurer
must pay a cash settlement sum to the complainant in the sum of $4,286.04, less any
outstanding excess. The insurer must also arrange for the carpets to be cleaned and assess
the efficacy of the cleaning process.
Otherwise, the insurer is not required to do anything further regarding the claim.
Determination | Case number: 926530 Page 3 of 10
2 Reasons for determination
2.1 Should the insurer provide coverage for the replacement of
the PSS seal?
Boat took on water in July 2022
The complainants purchased their Markline 1100 in 2019, planning to enjoy the vessel during
their retirement. They say they spent about $50,000 making the vessel seaworthy, including
replacing the port and starboard PSS seals in November 2019.
A PSS seal is a dripless mechanical propeller shaft seal designed to prevent water ingress
into the bilge of a boat. PSS seals are composed of high density carbon and high grade
stainless steel sealing components. They have apparently become the industry standard
propeller shaft seal as they have many advantages over traditional-type packing gland
propeller seals and lip-seals.
I have read the evidence which supports the claimants‟ contention that they arrange d for the
PSS seals to be replaced in timely manner in November 2019 (see the email from AM dated
13 December 2022 and the accompanying invoice from DM dated 2 November 2019 for
“ parts to replace 2 PSS seals ” in the sum of $775.88).
Despite this and other extensive maintenance on the vessel which was carried out in mid-to-
late 2020, the port side PSS seal began leaking and, on about 4 July 2022, the complainants
received a telephone call advising them the vessel was listing on the port side.
After immediately pumping out the vessel, the complainants drove the boat to a marina (MP)
in the City of Lake Macquarie, New South Wales. The vessel was then dry-berthed at MP so
that further water could be drained and the damage could be assessed.
The boat was later inspected by BM on behalf of the insurer. BM provided three reports
pursuant to its inspection and assessment of the vessel, dated 9 October 2022, 12 February
2023 and 14 February 2023. A copy of an informative document entitled “ PSS Shaft Seal
Maintenance & User Guidelines ” was appended to the second BM report.
BM‟s reports are logical, informative and helpful.
I note the complainants have supplied a great deal of evidence about the extensive
maintenance that was performed on the boat prior to the leak of the PSS seal in July 2022.
However, they have elected not to have the vessel formally assessed by a licenced
shipwright, boat-builder or marine mechanic (or other suitably qualified expert) for the
purposes of this complaint.
BM concluded that, despite the maintenance which had previously been carried out on the
vessel, the port side PSS began leaking in July 2022, probably because one or more set
screws were missing from the collar/rotor of the seal. This likely caused the locking collar of
the seal to loosen.
BM further noted that, after this problem had been remedied and the PSS seal had been
tightened and adjusted, the leak ceased and the PSS seal began to operate effectively and
efficiently again. In other words, the problem which caused the leak in July 2022 had been
fixed.
Determination | Case number: 926530 Page 4 of 10
Unfortunately, however, there was other damage to the vessel which had been caused by the
leak and the ingress of water.
Policy provides coverage for accidental damage
T he policy provides coverage for a variety of events, including „accidental damage‟.
Page 23 of the PDS includes:-
We will cover you for:
accidental damage-
if your boat is damaged accidentally
if your boat sinks accidentally, provided it was in seaworthy condition
at the time of sinking.
Page 16 of the PDS includes a definition of „accident‟: -
An incident that is unforeseen and unintended and that causes loss of damage. This
includes a series of accidents arising out of the one event.
Insurer accepted claim and authorised repairs works
Based upon the evidence of BM, and consistent with its obligations pursuant to the policy, the
insurer accepted the claim and authorised repairs. The repair works included, as mentioned,
adjustment and tightening of the offending PSS seal.
Other repairs included in the SOW are set out in three quotations provided by MP dated 14
July 2022, 14 September 2022 and 26 September 2022. Notably, these include, amongst
other things:
mechanical repairs such as the removal, flushing and replacement of engine, gearbox,
and transmission fluids
the supply and fitting of a new N200 battery
cleaning of water internal marks on floors and bulkheads
repairs to a bilge pump
supply and fitting of a replacement float switch.
I note the costs associated with the repairs and berth fees set out in the first and third MP
quotations have been met by the insurer. However, the costs associated with the works set
out in the second MP quote dated 14 September 2022 remain at issue. These costs total
$3,571.70.
In sum, a dispute remains about the adequacy of the SOW and the extent and costs of the
repairs the insurer is prepared to cover.
No need to replace PSS seals
The complainants say that the costs associated with replacement of the PSS seals should be
borne by the insurer. However, I disagree.
Determination | Case number: 926530 Page 5 of 10
The failure of the locking collar of the port-side PSS seal was clearly identified, and I have no
reason to doubt the conclusion of BM that, after tightening and adjustment, the seal operated
effectively and the water ingress was stopped.
Thus, the PSS seal was not damaged by the insured event (that is, the leak and water
ingress that occurred in early July 2022). In fact, the evidence shows the port side PSS seal
was the cause of the claim, and not a result of the claim event.
Indeed, the insurer notes the port side PSS seal had a history of leaking, and points to an
invoice for repairs from the complainants‟ preferred repairer, EM, dated 24 July 2020. The
in voice includes a reference to, “ Test gears – found port PSS seal leaking” and “ adjust PSS”
to stop the leak.
The evidence shows that PSS seals require regular inspection and maintenance. The PSS
Shaft Seal Maintenance & User Guidelines that was appended to the second BM report
states that the seals should be inspected twice annually and replaced every six years,
regardless of condition.
Whilst the insurer has paid for the adjustment and tightening of the port side seal on this
occasion (see the third MP quote dated 26 September 2022), regular inspection and
maintenance of the seals in the future should be performed by the complainants.
BM notes the estimated cost of a standard maintenance kit required for PSS seals is $374.50,
plus GST. The cost of these kits, which will be required from time to time, should be borne by
the complainants as they will form an integral part of the ongoing, long-term maintenance of
the vessel.
In sum, after the leak which began in July 2022, the port side PSS seal was
adjusted/tightened. This remedied any defect and the seal began to function effectively again.
Consequently, the insurer is not required to replace the PSS seals as part of this claim.
Determination | Case number: 926530 Page 6 of 10
2.2 Should the insurer provide coverage for replacement
carpets?
Water-damaged carpet can likely be repaired
I have seen the photographs which depict the water damaged carpets and I am aware the
complainants say the carpets should be replaced. However, the insurer says the carpets can
be cleaned.
The insurer‟s letter dated 25 November 2022 includes the following: -
The carpets were quoted as being able to be cleaned within the repair costs, in line with
…. (MP‟s) expertise on these matters.
Nevertheless, the next sentence of that letter states:-
Should it transpire that cleaning of the carpets does not reinstate them to their pre-event
condition, replacement considering new for old contribution would be reviewed at that
time as required.
I also note the second MP quotation dated 14 September 2022 includes the following:-
Labour general hand, remove, clean, shampoo and replace all floor carpet, clean water
marks off floor and bulk heads…. $727,27 (emphasis added).
It therefore appears that, if cleaning of the carpets does not produce a satisfactory result, the
insurer is prepared to replace the carpets. This is a fair and reasonable approach and should
avoid any further dispute regarding this particular issue.
Determination | Case number: 926530 Page 7 of 10
2.3 Should the insurer provide coverage for mechanical and
electrical repairs?
Complainants say water ingress caused mechanical and electrical damage over
and above the SOW
After BM‟s initial inspection of the vessel, quotations for various mechanical and electrical
repairs were obtained. Some of these repairs were denied by the insurer for the following
reasons:-
There was no evidence that suggested repairs to the drive shaft were required
because of water immersion brought about by the leak of July 2022
The gearbox did not require an overhaul because, upon inspection, there was no
evidence of water in the gearbox oil
The starter motors did not require replacement as both engines started at inspection
Various suggested electrical repairs were not required because of water damage, but
rather to bring the vessel up to current regulatory condition.
I note that the policy does not require the insurer to meet the cost of repairs or works aimed
solely at bringing the vessel up to current regulatory condition.
Finally, the insurer denied various suggested repairs because they either related to
maintenance issues or were brought about by the processes associated with wear and tear.
Damage caused by „wear and tear‟ and a „lack of maintenance‟ are expressly excluded from
coverage under the terms and conditions of the policy.
Page 16 of the PDS includes a definition of „damage‟: -
Any form of physical harm to the boat but does not include wear and tear or anything
that was present before this policy came into force (emphasis added).
Moreover, page 26 of the PDS lists circumstances in which coverage will not be provided
under the terms and conditions of the policy. These are called policy exclusions. They include
the following:-
We will not cover you for:
loss or damage caused by normal wear and tear
loss or damage caused by lack of maintenance.
According, I agree with the insure r‟s decision to deny coverage for the costs of the following
suggested works:-
repairs to the drive shaft
overhauling of the gearbox
replacement of oils and filters over and above those already replaced as per the three
MP quotations
replacement of the starter motors
any electrical works aimed solely at bringing the vessel up to current regulatory
condition
any electrical works over and above those already set out in the three MP quotations.
Determination | Case number: 926530 Page 8 of 10
2.4 Is the insurer entitled to cash settle the claim?
Complainants cancelled scheduled repairs
The PDS includes the following on page 26:-
We will, at our option,
repair or replace the item involved to as near as possible to the condition,
standard and specification it was before the loss, or
pay you the reasonable cost of repairing, reinstating, or replacing the item
involved to as near as possible condition, standard and specification it was
before the loss.
In other words, the policy allows the insurer to choose how to settle the claim, including by
way of a cash settlement. The insurer‟s choice mu st be fair and must be based upon
reasonable considerations.
In this matter, the complainants cancelled the scheduled repairs that had been authorised by
the insurer. The complainants say they were not comfortable proceeding with the repairs
while they were still in dispute with the insurer.
I cannot criticise the complainants for their decision to cancel the scheduled repairs in such
circumstances. However, given the history associated with this complaint, and the friction
which obviously exists between the parties, I am of the opinion that, in all the circumstances,
the insurer‟s decision to cash settle the remainder of this claim is fair and reasonable.
I therefore determine that, within 14 days of receipt of notice that the complainants accept this
determination, the insurer must:-
pay to the complainants the sum of $3,571.70 as per the second MP quotation
dated 14 September 2022, PLUS a 20% contingency on top of this to factor in
the risk of the works passing to the complainants (that is, a total of $4,286.04),
LESS any policy excess which remains outstanding.
2.5 Why is the outcome fair?
The outcome is fair in all the circumstances because of the following considerations:-
The complainants established a valid claim for accidental damage to their boat after
water ingressed the vessel due to a leak
The insurer accepted the claim and authorised repair works according to a SOW
The SOW was comprehensive, fair and reasonable
After adjustment, the PPS seals did not require replacement
The water-damaged carpets can likely be repaired
The mechanical and electrical repairs are maintenance related
The insurer is entitled to cash settle the balance of the claim
The insurer is entitled to rely upon the terms and conditions of the policy to determine
its obligations to the complainants regarding the claim
Throughout this complaint AFCA‟s approach has remained objective, consistent with
the facts and based on the law.
Determination | Case number: 926530 Page 9 of 10
Determination | Case number: 926530 Page 10 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.