Alleged inappropriate lending in breach of Code of Banking Practice clause 27 and refusal to provide further funding
Text of the determination
Determination
Case number 926453
Financial firm Commonwealth Bank of Australia
Determination | Case number: 926453 Page 2 of 18
Case number: 926453 7 March 2024
1 Determination overview
1.1 Complaint
This complaint relates to the loan facilities held by the complainant, I Company, with the
financial firm (the bank). Mr T represented I Company, as one of its directors. I Company is
the trustee of a family trust.
In section 3.2 below I include a table with a summary of I Company‟s loans that are the
subject of this complaint (the loans). The loans were obtained between 2016 and early 2019
and have now been refinanced from the bank to other institutions.
Mr T says the loans were not provided appropriately and, in addition, that the bank should
subsequently have provided additional funding requested by I Company. Mr T and the
complainant submit that the bank did not comply with its obligations in the then applicable
Code of Banking Practice (Code). That is, it did not exercise the care and skill of a diligent
and prudent banker in selecting and applying its credit assessment methods and in forming
its opinion about the complainant‟s ability to repay the loans. I have extracted the applicable
clause of the Code in section 3.3 below.
Mr T says the failure of the bank to subsequently provide additional funding led I Company to
refinance the loans to other lenders.
The bank does not agree it lent inappropriately, nor that it should have been required to
provide additional funding.
1.2 Issues and key findings
Did the bank appropriately provide facilities to the complainant?
The bank complied with the obligations on it when it approved and provided the loans to the
complainant.
Was the bank required to provide subsequent funding?
The bank was not required to provide the further funding requested by the complainant in
order to complete the property development.
Why is the outcome fair?
When I Company requested the loans from the bank, the bank was under an obligation to
diligently and prudently select and apply its credit assessment methods when forming its
opinion about I Company‟s ability to repay the loans. While the complainant has made
comprehensive and detailed submissions about how the bank should have undertaken more
analysis and work when considering the complainant‟s requests for the loans, I think the bank
did sufficient analysis at the relevant points in time to comply with the obligations on it.
Similarly, the submitted material indicates the bank did not breach any obligation on it when it
required further information from the complainant in order for the bank to assess whether it
should provide additional finance facilities.
Determination | Case number: 926453 Page 3 of 18
Because the bank complied the obligations on it, it would not be fair to require it to
compensate the complainant.
1.3 Determination
This determination is in favour of the bank. The bank does not need to take any action in
response to this complaint.
Determination | Case number: 926453 Page 4 of 18
2 Reasons for determination
2.1 Did the bank appropriately provide the facilities to the
complainant?
The bank complied with the obligations on it when it approved and provided the loans to the
complainant.
The complainant was part of a group
The complainant submitted that it was related to:
M Company, which operated a butchery business in an Australian capital city
C Company, which operated a cold storage and transport business.
Mr T controlled both M Company and C Company, as well as the complainant (being I
Company). I Company is the sole shareholder of C Company and Mr T is the sole
shareholder of M Company. An ASIC search of C Company indicates it has been under
external administration for over a year.
While this complaint relates to the loan facilities the bank provided I Company, it is relevant to
note that each of M Company and C Company, as well as Mr and Mrs T, also held facilities
with the bank. Mr and Mrs T held a home loan, for example, and the other two companies
had equipment finance facilities and overdrafts. M Company and C Company operated other
businesses. The bank assessed requests for new or increased facilities on a consolidated
basis which was reasonable, and each entity provided guarantees and security in support of
the others.
Mr T decided to expand his business operations
In 2016, Mr T decided to expand the overall business, operated via his corporate entities, by
buying a rural property (the property) on which he could raise beef cattle. He used I
Company as the entity to buy the property.
The property was near the capital city in which Mr T operated some of his other businesses
(via the other entities) such as the butchery business (it operated a few retail outlets, for
example, in that city).
The purchase of the property by I Company was part of an overall plan of introducing a
„Paddock to Plate‟ strategy (which Mr T referred to as the PTP plan).
The complainant submitted that I Company purchased the property in March 2016, with funds
from Mr T (not the bank). There was no dwelling on the property. Then in June 2016, the
complainant purchased the adjoining property, also with funds from Mr T, and it had a home
on it. Mr T and his wife, Mrs T, lived on that neighbouring parcel. Mr and Mrs T kept their
existing home.
At least two of the loans being considered in this complaint were provided to I Company in
2016 and related to the property. The loan purpose listed in one of the 2016 loan contracts is
“Purchase of land” and the other is “Working capital and improvements to property” .
Determination | Case number: 926453 Page 5 of 18
The PTP plan did not succeed
The complainant submitted that shortly after acquiring the property and the neighbouring
parcel, Mr T suffered a work injury, and because of that, as well as because of drought
conditions, the PTP plan did not succeed.
However, Mr T (and the complainant) then decided, in 2017 and 2018, on a new plan, which
was to develop the property so that it could be subdivided and lots sold.
A series of valuations conducted by a valuation firm of lots 1 to 6 of the property are all dated
in October 2017. So the proposal to subdivide the property must have been under
consideration by Mr T by October 2017. Also, the original submission from the complainant‟s
first representative said that the „…ultimate purpose of buying the land was to subdivide it…”
So it is possible that Mr T used the complainant to buy the property with the intention to raise
beef cattle and also look to sub-divide the property in the future.
In 2018, the bank was approached to provide facility increases to assist the complainant
complete the development and sale of the lots into which the property had been subdivided.
In between the acquisition of the property in 2016 and the approaches to the bank to assist
with further funding to sub-divide the property (into smaller lots), I Company sold the
neighbouring farmhouse property (in May 2018), with some of the proceeds of sale used to
repay some of the loans.
The subdivision and sale required development
Because of the nature of the property and of the proposed subdivision, the complainant was
required to carry out some development of the property. In addition to subdividing it into lots,
a causeway needed to be built, so as to ensure all purchasers could access the lots they
acquired (some lots did not require that causeway, but most of them did). The construction of
this causeway, and various government approvals, are part of the background to this
complaint.
The complainant submitted that the development was to be funded by the sale of existing
cattle and from the sale of lot one from the subdivision of the property.
In addition, the complainant entered into two exchanged contracts of sale, each for lots within
the subdivision. But those contracts were subject to a condition that the causeway had been
built.
Work progressed but the bank did not provide additional finance
During 2018 and 2019 the bank provided some temporary limit increases to assist the
complainant with development costs. However, in 2019 and into 2020 the bank declined
further funding. I deal with this part of the complaint in section 2.2 below.
The complainant submits that in April 2020 it refinanced the bank‟s facilities to other lender s
at higher interest rates and also it has been unable to complete the causeway work on the
property.
Before coming back to the question around the bank not providing further funding, I now look
in more detail at the complaint about the 2016 loans (in relation to the PTP plan) and the
2018 and 2019 loans (in relation to the sub-division of the property).
Determination | Case number: 926453 Page 6 of 18
The bank’s decision to provide facilities in 2016
The complainant‟s submission is that it acquired two properties in 2016 (one being the
property under consideration and the other being its neighbouring homestead property). It
said that both of them were:
…solely funded by [Mr T] in his personal capacity...
That may have been the case, but as mentioned, the May 2016 letter of offer the bank issued
to I Company for a $500,000 term loan, referred to the loan purpose as „Purchase of land‟ .
The purchase price of the two neighbouring parcels mentioned above were each for an
amount greater than the $500,000 limit on the loan. So the contemporaneous documentation
indicates either:
the May 2016 letter of offer was to provide finance to I Company to acquire the property
(e.g. in March 2016 it signed a contract of sale, with settlement occurring in May 2016 or
later) or
the May 2016 letter of offer was to provide finance to I Company to acquire the
neighbouring parcel with the homestead in June 2016 or
if Mr T lent the money to I Company to enable I Company to acquire the property in March
2016, the bank‟s May 2016 facility was to assist I Company repay Mr T‟s shareholder loan.
But either way, the combined value of both the property and the neighbouring parcel was
$1,805,000 (the complainant submitted the property was purchased for $930,000 and the
neighbouring homestead parcel for $875,000) whereas the bank financing was for $500,000.
The bank also then provided to the complainant:
a $400,000 term loan in December 2016, with the loan purpose in the relevant letter of
offer being „working capital and improvements to property‟
an overdraft for working capital in January 2018
a $300,000 term loan in January 2018, with the loan purpose in the relevant letter of offer
being „ improvements on existing property ‟ .
To the extent the bank provided finance in 2016 (including the January 2018 facilities), the
complainant‟s submission is that the bank did so without diligently and prudently assessing
the relevant applications. The complainant submitted, for example, that:
Mr T had no experience with rural properties and did not obtain advice about how to
operate them
The bank did not properly asse ss Mr T‟s lack of experience before it provided the 2016
loans
The bank should have sought input about the complainant‟s 2016 funding requests from its
specialist agricultural lending team.
The complainant submitted that:
…as a result of the [bank‟s] breac hes of the Code and abhorrent funding of the
parties, they are in a perilous financial situation which continues to escalate
exponentially and beyond all control;
Before considering this in detail, I first provide more detail about the 2018/2019 credit
facilities.
Determination | Case number: 926453 Page 7 of 18
The bank’s decision to provide facilities in 2018 and 2019
During 2018, the complainant sold the homestead and paid down some of its debt to the
bank, but it also requested further facilities in order to assist with the works on the property.
Those works were needed in order to complete the development of it.
The complainant submitted that during 2018 it had sold lot one in the development, with the
proceeds being used to assist the further subdivision, and had also agreed to sell two of the
other lots. However, the sale agreement for those two other lots was conditional upon the
construction of capital works (such as a causeway) to ensure those two lots were accessible.
The bank‟s internal credit memorandum from August 2018, from when the com plainant was
seeking a $500,000 increase, explained the situation this way:
At this point the client holds two exchanged contracts for the value of $750K each
and upon completion of works being the construction of a bridge this allows the
balance of the land to be unlocked and the sales can proceed. Customer has also
advised that a further 3 sales are currently being negotiated but purchasers are
waiting on finalisation of the sub-division before committing. Completion will result
in full clearance of commercial debt.
The need for funding continued into 2019 and 2020, which leads to the next part of the
complaint, which I consider in section 2.2 below.
The complainant submitted expert reports about the bank’s assessment
The complainant submitted reports from two experts to support its submissions that both the
2016 lending assessments and the 2018 lending assessments were not undertaken in a
diligent and prudent manner. The expert reports deal with whether the bank‟s ass essment of
finance relating to the PTP proposal and its assessment of finance relating to the subdivision
and development of the property, were diligent and prudent.
Both of the experts were former employees of the bank, with one of them even being the
relationship manager for the complainant for a short period of time under consideration in this
complaint.
The first of those reports, from Mr R, is an opinion in relation to only the development and
sub-division of the property, and so relates to only the 2018 credit facilities. The other report,
from Mr M, deals with both the 2016 facilities in relation to the PTP period, as well as the
2018 facilities in relation to the development and sub-division.
The expert report from Mr R
In Mr R‟s report, he says:
During one of my postings at the bank…I was responsible for the management of
[I Company‟s] file.
Presumably Mr R remained in contact with Mr T, because he says at the start of his report
that:
Determination | Case number: 926453 Page 8 of 18
To assist [Mr T] with this complaint [against the bank‟ he ha s asked me to provide
an overview of how the bank handled his file, most notably in relation to the
…subdivision.
Mr R‟s report does not provide an overall opinion that the bank did not exercise t he care and
skill of a diligent and prudent banker in selecting and applying its credit assessment methods
when forming its opinion about the complainant‟s ability to repay the 2018 loans. That is the
ultimate issue here.
Rather, Mr R expresses his opinion that the bank:
Should have assessed the 2018 loans, in relation to the subdivision, against its own
property development credit underwriting standards, rather than just as secured business
credit, and if it had done it would have obtained building plans, costs, formal building
contracts and the loans would not have been provided
Did not take into account Mr T‟s lack of development experience
Provided the loans without imposing appropriate checks and balances in how the loans
were advanced
The temporary overdraft limits were made so as to avoid more senior officers in the bank
fully assessing the credit position of the complainant, and these temporary overdrafts
made a bad situation even worse for the complainant
Did not adequately calculate the investment risk associated with the 2018 facilities.
It is clear Mr R considers the bank did not comply with the diligent and prudent lending
obligations on it when it assessed and approved the 2018 and 2019 loans.
Mr R does not comment on the full context
Mr R does not comment on how the complainant had commenced the sub-division of the
property prior to the bank considering the relevant credit facilities. The submitted material
indicates that Mr T purchased the property in 2016 and:
did so with the intention of sub-dividing it, whether as a secondary intention should his
cattle raising business not succeed; or
sometime during 2017 he decided to sub-divide it.
The sub-division was under way before the bank was asked about the 2018 and 2019
facilities.
Nor does Mr R comment on how the complainant did engage supporting experts, such as a
consulting surveyor firm. This is something the bank noted in response to the complainant‟s
submissions.
In this complaint, there is no suggestion that Mr T went to the bank first because he was
considering sub-dividing the property and he first wanted to discuss that possibility with the
bank, and the bank encouraged him to pursue such a plan. Rather, the complainant and Mr
T decided on the sub-division, commenced the relevant development and then sought
assistance from the bank.
Further, Mr R does not comment on how the complainant was part of a broader group. The
submitted material indicated that the complainant was one of a number of companies
operated by Mr T. The property was initially acquired, for example, to assist the complainant
supply beef to another company operated by Mr T and which company operated retail
butcher shops (hence, the paddock to the plate reference). With cross-guarantees and
associated security, the bank‟s credit assessment was made on a consolidated b asis.
Further, in the months prior to August 2018, when the first temporary excess was approved to
Determination | Case number: 926453 Page 9 of 18
the complainant, some of the other entities operated by Mr T obtained equipment finance
facilities. The group was relatively active in its operations.
While Mr R comments on the temporary nature of the 2018 and 2019 facilities, he said he
thought the bank agreed to only temporary facilities so that they could “fly under the radar”
and that this occurred “…subsequent to my involve ment with [the] file…” . That is, if longer-
term facilities were approved instead of temporary overdrafts, then more internal assessment
and reporting would have been needed. To some extent, this is not his opinion about the
diligence of what the bank did, but rather his opinion about the motivation of bank officers
who took over from him. Mr R has not provided any information in support of this assertion.
Referral to expert teams or applying criteria is dependent on parameters
Because of the diverse nature of the consolidated group, and also because Mr T and the
complainant had commenced the sub-division before the relevant bank facilities were
discussed, I do not agree that a diligent and prudent banker would have referred the credit
requests to a specialist property development team or applied specific property development
credit underwriting standards.
Referral of a credit application to a specialist, or the use of more targeted credit standards, is
dependent upon more various parameters, and is not dependent solely on what industry a
borrower is participating in. The loan amount, other industries within the customer group and
other factors will contribute to the requirements of the referral.
Part of the bank‟s response to this question included:
The applications from 2016 to 2019 were assessed as Diversified Credit
applications, being nonspecialised lending and not subject to an Industry Credit
Standard. In 2016 and 2017, the bank was able to satisfy the Servicing Test and
was able to extend credit under a term debt arrangement. By 2018 the client
could not satisfy the Servicing Test for the requested increase, so the bank
considered the request on a temporary excess arrangement with the executed
contracts of sale as the defined clearance source.
The bank‟s credit memorandum from August 2018 includes the following comment:
The core business of the client is wholesale/retail meat and cold storage and
transport.
With that context in mind, and for the following reasons, I think it fair in all the circumstances
to conclude that the bank approved and provided the 2018 and 2019 facilities in compliance
with the obligations on it, despite Mr R‟s opinion to the contrary:
the prime industry undertaken by Mr T and the consolidated group as a whole was not
property development but were other cash generating businesses
the customer group had alternative income streams
the credit facilities were short term
when approving them, the bank identified proposed clearance sources for them (e.g. the
sale of the lots via two already agreed contracts of sale)
investment risk rests with Mr T and the complainant, not with the bank.
Determination | Case number: 926453 Page 10 of 18
The expert report from Mr M
The complainant submitted two reports from Mr M. The first was in response to a detailed
letter of instruction fr om the complainant‟s solicitor and t he second was a shorter letter from
Mr M responding to the last submission from the bank.
In his first (and main) report, Mr M opined on the things he would have requested from the
complainant, and that he would have considered, if he was considering advancing the funds
to the complainant, both in 2016 and January 2018 in relation to the PTP proposal and then
also in 2018 and 2019 in relation to the sub-division of the property.
Mr M opened his first (and main) report by commenting that he would rely on the five
characteristics of a lending proposal:
character
cause
capacity
collateral
capital
These are sometimes called the “5Cs” of credit, and they are also sometimes included within
the “7Cs” of credit. If seven characteristics are used, they add things like:
Commitment: How committed is the borrower to the success of the business/proposal?
Conditions: What is the growth outlook for the borrower‟s industry?
In summary, Mr M‟s first report is that on both occasions the bank should have requested
more information, and considered a broader range of factors, than it did.
In relation to the PTP facilities, those extra things include (this is not an exhaustive list from
his report) information about:
Mr T‟s experience with rural enterprises and how he proposed to obtain experience and
guidance
how the PTP proposal may affect existing (related) business
what legal and accounting advice did the complainant obtain
was there a business plan and what were any underlying assumptions.
In relation to the sub-division proposal, those things include (again, this is not an exhaustive
list):
how the complainant would obtain, and retain, expert assistance
details about project development costs
internal discussion with one of the bank‟s property development specialists.
Mr M is of the view that the relevant relationship managers at the bank should have involved
the bank‟s specialist units, or at least referred to their expertise in some way.
Mr M comments on the earlier report from Mr R, and opines:
In a “nutshell” the lett er [from Mr R] concludes that the form of funding
provided…was inappropriate to a property development debt finance proposal. I
hold a similar view.
Determination | Case number: 926453 Page 11 of 18
The bank did not agree it approved the facilities inappropriately
In relation to the PTP facilities in 2016, the bank did not agree that they were provided
inappropriately. Rather, it submitted they were appropriately approved based on criteria
which:
…includes loan type (in this case, a property purchase), serviceability, no
unsecured components, credit checks (VEDA) and loan size
The bank submitted a copy of its internal credit assessment memorandum from August 2018,
and submitted that the loans that related to the sub-division were also appropriately provided.
The bank also submitted that it had internal guides and criteria which customers are to meet
before they are referred to specialist groups (such as a specialist property team or specialist
agricultural team). The bank noted that the criteria (such as loan size) were not met in this
instance.
In response, Mr M noted that the criteria provide a discretion, given to the relationship
manager, allowing the referral of a client into such groups. Mr M opined that he understands
the earlier expert report from Mr R as including the opinion that the relationship manager
should have request support from the bank‟s property specialist team.
Mr M ’s opinion deals with part of the full context
Mr M‟s opinion is that many further enquiries should have been made, as well as the resulting
material then being co nsidered, as part of the bank‟s assessment of both the PTP as well as
the sub-division loans.
When I considered Mr M ‟s opinion, I also considered that :
Both ventures (both the PTP and the sub-division of the property) were underway prior to
requests to the bank for funding. The kinds of questions Mr M refers to, while clearly
helpful in providing detail, would be much more relevant if the bank was being asked to
fund the initial establishment of those ventures, as opposed to assisting in their
continuation, or even their completion. For example, one of the things Mr M says he would
have considered about the sub- division facilities is: “why develop the property and not just
sell “as is””. However, the 2018 and 2019 facilities were sought by the complainant after it
had already started the development which was clearly Mr T‟s intention and it sought funds
to assist it complete the development.
The size of the facilities were not large. I appreciate that loan facility size is relative, in the
sense that a $500,000 facility may be overwhelming for some small businesses, but yet be
relatively standard and comfortable for others. But in the context of Mr T and the
complainant, and the size of the facilities requested, I do not think it compelling that all of
the material listed by Mr M should have been requested by a diligent and prudent banker.
Also, it is clear that Mr M is aware that Mr T purchased the property in 2016 without the
need for finance (as the complainant submits), because he includes that comment in his
second letter.
The facilities in relation to the sub-division were provided after Mr T and the complainant
had received $800,000 from the sale of a property (in May 2018), with the sub-division well
underway. The material indicates those funds were likely used to progress the
development.
While Mr M was asked by the complainant‟s solicitor to assume that Mr T and the
complainant had no experience with rural properties or sub-divisions, the material indicates
Determination | Case number: 926453 Page 12 of 18
that Mr T had significant business experience. He may not have managed a rural
property, nor subdivided for sale a large rural parcel of land, but he was nevertheless
experienced with running businesses, understanding risks and opportunities and dealing
with finances.
Some of the items I mentioned above, when commenting on Mr R‟s expert report, such as
how Mr T did retain a surveyor in relation to the sub-development, meant that the
complainant did obtain expert assistance, at least to some extent.
The full limit of the temporary excesses was not paid in a one-off lump sum to the
complainant, but rather the complainant sent invoices to the bank, where the invoices
related to services provided to further the sub-division and the development of the
property, and the bank arranged for their payment as part of a drawdown on the overdraft.
Source of repayment was identified but not assured
The 2018 and 2019 facilities were short-term increases to overdrafts, provided because there
was a plan that the increase in funds would enable completion of the development and the
sale of two lots would settle. Those two lots were under contract, even if the contracts were
conditional.
Mr M correctly points out in his main report that such pre-sale contracts carry some risk. He
says that they are “meaningless documents”, because they are usually subject to the
condition that the development completes and titles are raised (i.e. the sub-division is
completed). I do not think they are meaningless documents, because they show there is
some interest from prospective buyers, as well as an indication of possible market prices.
But it is true that pre-sale contracts often remain subject to serious conditions, which usually
mean they are not assured. There may be, for example, unforeseen circumstances which
cause cost overruns. In such cases, a lender often considers what alternative income
streams and reserve assets the borrower might hold to fund any cost overruns.
The bank submitted a copy of its credit assessment memorandum from August 2018. The
following comment appears in it:
The Borrower will pay all cost overruns from the Borrower‟s own funds, unless the
Bank approves funds for this purpose, such approval to be given in the Bank‟s
absolute discretion.
This condition is repeated in the bank‟s letter of offer dated 30 August 2018 .
It is not clear what level of discussion occurred about how the complainant would m eet the
cost overruns. But yet it is apparent this was considered by the bank at the relevant time.
Internal referrals to experts may have been helpful but was not a requirement
As mentioned above, the complainant was part of a broader group. That group sought to
engage in the PTP plan to support other businesses within the group. It also operated cold
storage services.
The material does not indicate that the agricultural operations of the customer group were
sufficiently complex to warrant up tiering to a specialist agriculture team.
Determination | Case number: 926453 Page 13 of 18
The overall perspective is important to the assessment
The expert reports from Mr R and Mr M were valuable and I appreciate the perspective they
provided. However, after considering them, as well as reviewing all of the material submitted
by the both the bank and the complainant, I do not agree that the loans were provided in a
manner where the bank failed to comply with the diligent and prudent banker obligation which
it agreed to in the Code.
The obligation on the bank was to exercise due care and skill in assessing the overall loan
proposals to ensure it was satisfied the loans could be repaid in due course from resources
available to the complainant. For such proposals, a bank will generally take into account a
range of factors and make that assessment. Those factors include the kinds of things Mr M
referred to (the „5Cs‟ of credit, or even the „7Cs‟ of credit). The assessment is a matter of
commercial judgment for the lender to be satisfied the debt can be repaid in due course.
The full context in which the complainant sought assistance from the bank, part-way through
the complainant‟s ventures, and the size and nature of the bank‟s facilities, as well as the
assessment undertaken by it, indicate the bank complied with its obligations under the Code.
I appreciate this will disappoint the complainant, and that it and Mr T are in difficult
circumstances, with debt to other lenders. However, the problems the complainant
encountered first with drought (for the PTP) and then with the approvals and sub-division
needs of the local council, were the causes of those concerns, rather than the bank‟s
provisions of the loans.
In addition, I note that the bank submitted, for example, that when in 2019 and 2020 it sought
more information from the complainant before it would consider any further funding, there had
been no defaults under the loans.
2.2 Should the bank have provided additional finance?
The bank was not required to provide the further funding requested by the complainant in
order to complete the property development.
The parties discussed further finance in 2019
The complainant submits that:
a further lot was sold on 25 July 2019 for $955,000, with the bank consenting to the sale
and receiving $775,001.63 as repayment of some of the outstanding facilities.
after that sale, the complainant sought additional finance from the bank, which it declined,
and so in April 2020 the complainant changed banks, refinancing the bank‟s facilities
across to new lenders.
The bank‟s refusal to provide further finance meant the complainant could not complete
the capital works on the property, and so complete the sales, and also led it to refinance to
alternate lenders:
…at significantly higher interest lending rates and remains in a position such that
he i s unable to complete the works…
The complainant also submitted that sometime during 2019 the management of his
relationship with the bank was transferred into the bank‟s credit management, or „bad bank‟
division, even if he maintained contact with a relationship manager.
Determination | Case number: 926453 Page 14 of 18
The bank‟s submission was that during 2019 it‟s risk grading for the customer was such that
the bank held concerns for the underlying businesses and so the management of the
customer group was internally transferred to a credit management area. The bank submitted
that the credit management area was better able to assist commercial customers in financial
difficulty.
In addition, the bank‟s submissions were that it did not formally decline to provide further
funding, but rather when it held discussions with the complainant and a representative, during
2019 and 2020, the bank indicated that for it to consider any further facilities, it would need to
be provided with updated information about the sub-division. As the requested information
was not provided, the bank said it could not fully consider and so provide any further facilities.
The complainant’s claims appear to be incongruous
The first part of the complainant‟s submission is that the bank should have done more due
diligence on the loans it provided. For example, the complainant submitted:
There was little, if not no, due diligence done by [the bank] before advancing the
funds in terms of security to repay the funds and in the meeting of repayments
In contrast, this part of the complaint is that the bank was unreasonable in refusing to provide
further finance because it wanted to undertake more due diligence.
The two parts of the complainant‟s submissions do not sit well together . Perhaps the
complainant is in essence saying either, or both:
the complaint in section 2.1 above is not that the loans should not have been provided, but
that they should have been provided only after more due diligence, whereas this part of the
complaint is that more due diligence was not needed to provide the further finance
once the loans were provided, and the complainant fully committed to the sub-division of
the property, then a diligent and prudent bank would have recognized the need for
additional finance to ensure the development completed.
The required information was not provided to the bank
The parties submitted email correspondence between them, from 2019 and 2020, and that
correspondence indicates that the bank was concerned at the risk level within the
complainant. That is why the August 2018 and February 2019 facilities are only short term
(or temporary) increases.
The submitted information shows the complainant:
sought the assistance from an adviser about how to obtain further finance from the bank
along with that adviser, the complainant was considering re-financing its facilities from the
bank to other lenders
at one point changed its mind about wanting to refinance, and instead asked the bank to
consider a new loan which consolidated all of the existing facilities
met regularly with the bank, or emailed a bank officer, and the bank asked for updated
information, but that the updated information was not provided.
The complainant‟s adviser did provide the bank with some updated financial information, but
in late 2019 the bank replied and included the following in an email:
To consider further finance we would require a timeline, budget and details of any
potential sales.
Determination | Case number: 926453 Page 15 of 18
AFCA‟s Rules do not allow it to consider a complaint about a financial firm‟s assessment of
the credit risk posed by a borrower or the security to be required for a loan unless the
complaint is about „maladministration in lending‟ (See Rule C.1.3a)). So to the extent this part
of the complaint is challenging the bank‟s credit risk assessment in declining finance, then
AFCA could not consider it unless the submission is that the bank engaged in
„maladministration‟, which means it failed to meet a legal duty or obligation.
However, the submitted material does not establish that the bank failed to meet a legal duty
or obligation when it sought more information. There is nothing to indicate the bank made a
representation that it would provide further finance. Rather, there was nothing unreasonable
about the bank seeking more information in order to assess whether to extend facilities to the
complainant.
2.3 Why is the outcome fair?
When I Company requested the loans from the bank, the bank was under an obligation to
diligently and prudently select and apply its credit assessment methods when forming its
opinion about I Company‟s ability to repay the loans. While the complainant has made
comprehensive and detailed submissions about how the bank should have undertaken more
analysis and work when considering the complainant‟s requests for the loans, I think the bank
did sufficient analysis at the relevant points in time to comply with the obligations on it.
Similarly, the submitted material indicates the bank did not breach an obligation on it when it
required further information from the complainant in order for the bank to provide additional
finance facilities.
Because the bank complied the obligations on it, it would not be fair to require it to
compensate the complainant.
Determination | Case number: 926453 Page 16 of 18
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 926453 Page 17 of 18
3.2 Summary of the loan facilities
The relevant loan facilities the subject of this complaint are listed in this table:
Borrower Date of Loan
Agreement
Details of Loan
I Company 4 May 2016 Term loan with limit of $500,000.
Purpose of loan is listed as “Purchase of land”
I Company 7 December 2016 Term loan with limit of $400,000
Purpose of loan is listed as “Working capital and
improvements to property”
I Company 2 January 2018 A revolving overdraft of $100,000
Purpose of loan is listed as “Working capital”
I Company 2 January 2018 Term loan with limit of $300,000
Purpose of loan is listed as “Fund for improvements on
existing property”
I Company 30 August 2018 Increase of $500, 000 to the above overdraft, so it has
a new limit of $600,000
Purpose of loan is listed as “Working capital to assist
complete subdivision of property at….”
A condition requires the limit to return to $100,000 by
21 December 2018
I Company 13 February 2019 $ 350 , 000 temporary limit increase for two months, with
the limit reducing to $100,000 on 14 April 2019.
3.3 Clause 27 of the Code of Banking Practice
In 2016 and 2018 the bank was an ongoing signatory to the Code. At the time, clause 27 of the
Code was:
27. Provision of credit
Before we offer, give you or increase an existing, credit facility, we will exercise
the care and skill of a diligent and prudent banker in selecting and applying our
credit assessment methods and in forming our opinion about your ability to repay
the credit facility.
3.4 The complainant is I Company
Some of the original submissions by a representative of the complainant referred to each of I
Company, M Company and C Company as complainants. However, during the course of the
complaint and especially when the complainant submitted expert reports, it became apparent
that the main issue was with respect to facilities provided to I Company.
Determination | Case number: 926453 Page 18 of 18
In addition, C Company is under external administration, and its controller has not consented
to it bringing this complaint.
I wrote to the complainant‟s new representative, seeking to confirm if they now understood
that the main issues related to I Company‟s facilities, and it was the only complainant, and
they agreed with that approach.