Insurer declined a third round of repairs to internal water damage from repeated rainwater ingress, relying on exclusions for wear and tear, lack of maintenance and inherent defects
Text of the determination
Determination
Case number 926277
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 926277 Page 1 of 6
Case number: 926277 16 May 2023
1 Determination overview
1.1 Complaint
The complainants hold a home building and insurance policy (policy) with the financial firm
(insurer) arranged in April 2020. On 14 October 2020, a claim was lodged for stormwater
ingress damage to the insured building.
The insurer, subject to the complainants completing recommended maintenance works,
accepted to cover the internal water damage. Repairs were authorised on two occasions,
however, on the damage re-appearing a third time the insurer declined to repair the damage.
The insurer says the complainants have not completed all the recommended maintenance
works, which is the reason for the damage, and is excluded under the policy.
The complainants say the insurer failed to identify the cause for the water ingress, despite
appointing several consultants, and therefore it should be required to cover the damage.
1.2 Issues and key findings
Is it fair for the insurer to decline cover for the existing internal damage?
Yes. The initial onus rests with the complainants to show it is more likely than not that the
damage is due to circumstances covered by the policy. The complainants have not
established the repeated water ingress damage is due to circumstances covered under the
policy, rather the policy excludes from cover:
loss or damage caused by rainwater that enters the insured building through an opening
not created by a storm or cyclone
loss or damage as result of, caused by or arising from:
- wear and tear including gradual deterioration and lack of maintenance
- inherent defects including faulty design, structural defects or poor workmanship
Why is the outcome fair?
The outcome is fair given the insurer initially accepted to cover the resultant water ingress
damage, subject to the complainants arranging recommended maintenance works. Although
the complainants arranged for some minor maintenance works, these did not meet the
requirements set out by the consultants’ recommendations. There is no information to show
the rainwater ingress is due to a storm created opening, rather, it more likely due to
circumstances excluded from cover. Therefore, it would not be fair to require the insurer to
authorise repairs to the internal water damage for a third time in these circumstances.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to authorise a third round of internal repairs or take any further
action under the claim.
Determination | Case number: 926277 Page 2 of 6
2 Reasons for determination
2.1 Is it fair for the insurer to decline cover for the existing
internal damage?
Yes. The initial onus rests with the complainants to show it is more likely than not that the
damage is due to circumstances covered by the policy. The complainants have not
established the repeated water ingress damage is due to circumstances covered under the
policy, rather, it more likely the damage is due to circumstances excluded under the policy.
The policy is an insured events contract of insurance
The insurer provided the complainants with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). Therefore, I accept the
insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more listed
insured events, including ‘ Storm, Cyclone, Rainwater or Run- off’ . Cover under these benefits
is subject to the conditions, limitations and exclusions specified in the PDS.
The complainants need to show the damage triggers cover under the policy
The complainants are first required to show, it is more likely than not, that the loss or damage
claimed triggers cover under the policy. Only if the complainants can do this, will the duty shift
to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording
or otherwise.
Given this, although I acknowledge the complainants feel it is the insurer who has failed to
determine the exact cause of rainwater ingress into their home, it is the complainants ’
responsibility to do so.
There is no dispute the insurer has in good faith accepted and authorised repairs to the
insured building after the complainants advised they had arranged for the maintenance works
recommended by the insurer. The insurer has now declined to authorise a third round of
repairs on the basis the complainants have not completed all the recommended maintenance
works.
Information from the consultants appointed by the parties
The insurer appointed building consultants ‘D’ to investigate the cause and extent of damage
to the insured building. D has provided a report dated 23 October 2020 confirming rainwater
ingress damage to the building. D noted the following:
it appeared water ingress was occurring through cracks in the external wall
the poorly sealed metal drainage channel between the box gutter and rain head near the
affected loungeroom window was allowing water entry into the wall cavity
rainwater was migrating between the metal channel and masonry opening and moving
down the line of the crack in the masonry exiting affecting the internal plaster
water ingress had increased due to ongoing differential movement in the external walls
and likely increase in the severity of the cracking/damage to external masonry walls
the external walls will need to be rectified before internal repairs are completed, otherwise,
the damage will be ongoing.
The complainants accepted to arrange maintenance works and rejected a cash settlement
offer from the insurer for the internal repairs, advising their preference was for D to complete
Determination | Case number: 926277 Page 3 of 6
the repairs. Several months later, in March 2021 the complainants contacted the insurer to
advise the maintenance works had been completed. D was authorised to complete the
internal repairs, which were completed on or about 22 March 2021. On 24 March 2021, the
complainants contacted the insurer to advise rainwater ingress damage re-appeared in the
same location.
The insurer appointed engineering consultants ‘PS’ to attend the insured property to further
investigate the cause for the rainwater ingress and associate internal damage. PS attended
the property and has provided a report dated 15 April 2021, which provides:
the level of the overflow in the rain head is above the invert level of the box gutter and
drainage channel. If the downpipe becomes blocked, or the inflow into the rain head is too
great, the overflow is designed to discharge the water, preventing it from backing up and
entering the roof or wall space
in this case, when the overflow starts to discharge, the water level has already backed up
to approximately halfway up the drainage channel. Water would then be free to penetrate
through the unsealed (or improperly sealed) interface between the rain head and the
drainage channel and into the wall cavity
the most likely cause for the internal damage is the poor construction of the rain head
given the overflow weir position does not meet the requirements of AS3500.3. Due to the
incorrect location of the overflow, water has most likely backed up and entered the cavity
through the interface of the rain head and drainage channel
to reduce the likelihood of future damage, PS recommended the below maintenance
works:
- seal the small hole in the capping
- replace the drainage channel with a closed tube and seal appropriately
- properly seal the interface of the drainage channel and the rain head, preventing
backed up water from penetrating into the cavity
- replace or modify the rain head to ensure the position of the overflow weir is below
the bottom of the drainage channel
The complainants arranged for plumbing consultants ‘OP’ to attend to the recommended
maintenance works. OP has provided a tax invoice dated 5 November 2021 in the amount of
$340.45. The document provides the following information from OP:
Have done what was asked by the insurance company but believe it will still leak
as there is an issue with the render see photos. The leak only happens in
northern rain and the cracks are on norther side right in area of concern.
Recommend to get ready to repair with new membrane. (sic)
The insurer arranged for building consultants ‘PW’ to attend the insured property after which a
report dated 5 February 2022 was provided to the insurer. PW reported:
that an outlet from the gutter penetrating the external wall to the rain head outside is
directly above the location of the water damage inside. This penetration has been
sealed with silicon several times and is undoubtedly leaking again and as such is the
cause of the ingress. Simply adding more silicon to a problem rarely fixes it as silicon
does not seal to existing silicon very well
all the old silicon needs to be removed, the rivets drilled out and the metal surfaces
cleaned so a good silicon seal can be achieved
the gutters on the home have a full height front face which is sealed by a capping
flashing, but the back of the gutter is much lower and does not reach up and onto the
Determination | Case number: 926277 Page 4 of 6
bottom purlin. There is a gap of about 10mm at the back of the gutter and if the gutter
were to overflow, water would leak into all the rooms on this side of the house.
Information from the consultants does not support the complainants’ position
Having considered the available information, I am not satisfied it is has been shown that the
rainwater ingress is the result of an opening created by the storm. Rather, on balance, there
is a consistency in the concerns from the several consultants regarding maintenance issues
as well as the design and installation of the stormwater guttering/drainage system.
I acknowledge the complainants arranged maintenance works and their opinion that OP
completed the works required by the insurer. However, on considering OP’s information, I
note:
there is an absence of any information to identify/itemise what works were actually
completed and given the invoice amount of $340.45, it is unlikely all the recommended
maintenance works noted in the reports from D and PS were completed
also, OP clearly says in his opinion rainwater will continue to leak into the home given the
cracks in the external render
there is no information that the complainants arranged for this maintenance issue to be
addressed. I note this was also identified by D as a maintenance requirement in the first
assessment of the insured building.
I note the complainants’ opinion that the insurer has failed to identify the cause for the
rainwater ingress and associate damage. However, as discussed above, the responsibility to
show the damage is due to circumstances covered under the policy rests with the
complainants, and not the insurer. Further, I am satisfied the investigations by the various
consultants are consistent in reporting concerns with and recommending maintenance works
relating to:
cracks in the external wall rendering
the poorly sealed metal drainage channel of the box gutter and the rain head
the poorly positioned overflow weir within the drainage channel; and
maintenance works by OP (simply re-applying more silicone) in the attempt to seal the
metal drainage channel of the box gutter and rain head, were inadequate.
The insurer is not required to cover the existing water ingress damage
I am not satisfied the complainants have shown, on balance, that they did arrange for all the
recommended maintenance works to be completed or that the works were completed to an
adequate standard to prevent future rainwater ingress into their home.
Given the above, I am of the opinion, it would be unfair to require the insurer to repeatedly
authorise repairs for the same internal damage.
2.2 Why is the outcome fair?
The outcome is fair given the insurer initially accepted to cover the resultant water ingress
damage, subject to the complainants arranging recommended maintenance works. Although
the complainants arranged for some minor maintenance works, these did not meet the
requirements set out by the consultants’ r ecommendations. There is no information to show
the rainwater ingress is due to a storm created opening, rather, it more likely due to
circumstances excluded from cover. Therefore, it would not be fair to require the insurer to
authorise repairs to the internal water damage for a third time in these circumstances.
Determination | Case number: 926277 Page 5 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy provisions
What’s not covered?
X Loss or damage caused by:
…
rainwater, run-off, hail, wind or water that enters your buildings through an
open
door, window or other opening (excludes openings made by the storm or
cyclone).
Determination | Case number: 926277 Page 6 of 6
...
Things we won’t cover
We want to be clear about what you’re covered and not covered for. In addition to
any other exclusions listed for an event or cover section – here’s a list of things
we won’t cover under any section of the policy. ...
Always excluded
Loss, damage, injury or legal liability as a result of, caused by or arising from: ...
Wear and tear
Including depreciation, gradual deterioration, wear and tear or lack of
maintenance.
Inherent defects
Including faulty design, structural defects or poor workmanship.
.