Dispute over temporary accommodation, upstairs bathroom repair costs and cash settlement amount following storm claim
Text of the determination
Determination
Case number 926198
Financial firm AAI Limited
Determination | Case number: 926198 Page 1 of 12
Case number: 926198 9 October 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim under his home insurance policy with the financial firm
(insurer) for property damage following a storm event in December 2020.
The parties engaged experts in 2021 and from April 2021 the insurer paid the costs of the
complainant‟s temporary accommodation.
The insurer accepted the claim and offered a cash settlement in July 2022.
The insurer also says it has paid to the complainant the maximum allowance for temporary
accommodation under the policy and significant additional ex gratia amounts.
The complainant seeks further amounts for upstairs bathroom replacement and further
amounts for temporary accommodation.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
Yes. The insurer has correctly assessed the claim:
in relation to the claim for temporary accommodation, by making appropriate payments
and additional ex gratia payments in excess of its obligations
in denying the claim in relation to the upstairs bathroom
in the assessment of the cash settlement in July 2022.
Why is the outcome fair?
The outcome is fair based on the information and consistent with the policy terms and the
payments made by the insurer in relation to temporary accommodation exceeded its
obligations.
1.3 Determination
The determination is in favour of the insurer.
The insurer is not required to take any further action.
Determination | Case number: 926198 Page 2 of 12
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
Yes. The insurer has correctly assessed the claim.
Complainant has initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is
more likely than not) that the loss or damage claimed falls within the insuring provision of the
policy. This is known as a „valid‟ (or prima facie ) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish,
on balance, the application of a policy exclusion or that it is otherwise entitled to decline or
limit the claim under the policy.
The policy covers damage by storm subject to conditions and exclusions
The policy is comprised of the Certificate of Insurance (COI) and the Product Disclosure
Statement (PDS) (together the COI and the PDS are referred to as the policy in this
Determination). There is no dispute that the complainant received the policy documentation.
The policy covered loss or damage caused by a storm, subject to certain conditions and
exclusions.
The insurance cover had the following features:
the period of the policy was from 10 September 2020 to 10 September 2021
the property was insured for $657,600 and its contents for $280,100
the Policy was a Classic policy which provided additional features and set specific limits for
any one insured event.
The policy provided (p.22) that the insurer covered “Loss or damage caused by a storm”.
The additional features under the policy included (p.30):
Temporary accommodation would be “up to 10% of home sum insured for up to 12
months”.
> The most the insurer would pay for (p.32) was up to 4 weeks in short term
accommodation agreed to by us (e.g. standard rates for a hotel, motel or serviced
apartment), then if necessary up to another:
– 48 weeks in residential accommodation of a similar standard to your home if you
have Classic cover
> The most the insurer will pay under this feature is 10% of the home sum insured and
the longest period you can claim is 12 months
> The insurer did not cover “if you do not need to pay for temporary accommodation”.
Damage to gardens and plants (p.30 and 40) - Nil
The claim was complex, involved many specialists and extensive engagement
The claim has involved complex circumstances regarding the cause and extent of the
damage and the impact of mould (and its remediation). The claim has required the
engagement and involvement of engineers, builders, restorers, roofers, leak detector
Determination | Case number: 926198 Page 3 of 12
plumbing specialists, cleaning specialists and hygienists and, often, initial, progress and final
assessments, re-attendances and reports.
Each of the numerous documents, submissions and reports provided by the parties has been
reviewed in the preparation of this Determination.
During the course of the claim and according to the claim notes, there were extensive (often
highly charged) interactions between the complainant and the insurer and its representatives.
During those interactions:
on 12 May 2021, when advised by the complainant that he wished to escalate the matter
to AFCA, the insurer appropriately advised the complainant that he had every right to do
so but that the matter needed to go through the insurer‟s complaint process first to enable
it to resolve prior to AFCA doing so
on 2 July 2021, the insurer appropriately declined to pay for the cost of indoor plants but
agreed to pay $1,000 for the complainant‟s claim experience, which the complainant
accepted and which the insurer paid
the insurer adopted a stance to the complainant‟s approach to the claim which was
appropriate:
> of advising the complainant on 22 February 2022 not to put deposits on matters relating
to the claim unless he had received prior agreement from the insurer
> regarding the complainant‟s upset and disappointment with the process, of expressing
that the insurer was understanding, empathetic and apologetic for which the
complainant thanked the insurer representative on 24 June 2022 and shared that the
complainant was also facing additional stress due to the complainant‟s wife‟s serious
health condition
During the course of the claim the insurer on 4 July 2022, paid the complainant $37,548.15
($29,925.07 for repair costs plus 20% contingency amount for $7,623.08) in settlement of the
liability quote for the scope of works for the building repairs. This amount remains in dispute.
While the parties have raised a number of issues in their submissions, this determination is
restricted to the issues that are relevant to the outcome. Whilst the documentation in relation
to the claim was voluminous and the issues highly complex, the issues which remain in
dispute relate only to:
the complainant‟s claim for temporary accommodation
the complainant‟s claim in relation to the upstairs bathroom
the insurer‟s assessment of the cash settlement payment in July 2022
Each of these issues are addressed in more detail below.
The insurer has complied with its obligations for temporary accommodation
The policy provided for a maximum of 52 weeks or 10% of the home sum insured ($65,700)
for temporary accommodation.
The storm occurred in December 2020.
According to the claim notes:
on 15 April 2021 the insurer offered the complainant temporary accommodation, but the
complainant declined the offer and requested to dispose of the damaged contents instead
on 19 April 2021 the insurer approved the complainant‟s request to stay at the neighbour‟s
house for $600 per week
Determination | Case number: 926198 Page 4 of 12
The insurer says that it has paid $41,880.04 in relation to the complainant‟s temporary
accommodation costs. This sum comprised:
$29,280.04 for 48 weeks per the policy limit; and
$12,600.00 for 21 weeks paid on an ex gratia basis.
In total, the insurer has paid the complainant 69 weeks, i.e. 17 ¼ months, for temporary
accommodation (which is well in excess of the 52 week maximum).
In the circumstances and based on the information provided, the insurer has complied with its
obligations under the policy and has appropriately considered, and paid, ex gratia further
amounts than required under the policy.
No valid claim for bathroom repair costs in July 2022
On 1 July 2022 the complainant sought the costs of bathroom repairs relating to mould which
he said arose from the storm event in December 2020. The complainant requested an urgent
response from the insurer on the basis that if the remaining tiles in the bathroom needed to
be removed then a tiler would need to be engaged urgently over the weekend as his plasterer
and builder started on the next Monday and the complainant requested advice regarding at
whose expense it will it be to remove all tiles and plaster from the bathroom walls.
The insurer‟s assessor urgently replied on 1 July 2022 to the complainant and advised that if
there was damage to additional walls in the bathroom that the complainant was requested
please not to proceed and the insurer could come and inspect to confirm if the damage was
to form part of the claim. The assessor made clear the insurer‟s position that:
we haven‟t advised there is no water or mould damage here. What we have said
is this claim is for damage caused by a storm in late 2020 and there is no
evidence to suggest that the actual bathroom was damaged by this event,
therefore not part of this claim.
If this room is concerning you, you are able to lodge a separate claim for „escape
of liquid‟ for consideration, however plumbing tests were also conducted which
ruled out plumbing leaks.
The complainant did not respond further until 1 November 2022 when he sent an email to the
insurer and reported additional mould damage to the upstairs bathroom, which has been
stripped out, and sought the repair costs to reinstate the bathroom.
On 2 November 2022 the insurer wrote to the complainant regarding the issue (and noted
that the complainant had not responded to its email of 1 July 2022):
Please confirm which bathroom walls exactly your [sic, you] are asking us to
inspect and refer to the email below for further information as the assessor listed
all the possibilities and asked you to confirm before we make a decision.
Please provide your respond [sic, response] in writing to avoid any
miscommunication and to be able to refer it to our supervisor.
On 9 December 2022 the insurer submitted (based on an Assessment Report dated 29
November 2022 which included photographs which had been provided by the complainant):
Determination | Case number: 926198 Page 5 of 12
the mould damage to the bottom of the rear shower wall and adjoining bedroom 2 was not
caused by the original claimed storm event and was consistent with damage caused by
liquid leaking from a shower recess from a failed waterproof membrane, which the
[complainant] previously advised occurred approximately 12 years ago
the complainant‟s quotes and invoices for the repair costs to reinstate the bathroom were
excessive and included costs to upgrade the bathroom fittings
the replacement of the tapware, vanity and toilet was not required, and these items could
have been salvaged
the electrical works included upgrades for 12 downlights when previously, the bathroom
only included 2 batten light fittings
the complainant had not provided any new evidence to substantiate any additional damage
to the upstairs bathroom was caused by the original claimed storm event
The complainant did not accommodate the insurer‟s request to review the bathroom in or
about July 2022. The policy provided that to process a claim, the complainant must allow the
insurer to inspect the damage (to the home or contents as the case may be) and allow it to
arrange experts to assess the damage and to quote on repair or replacement (p.81). Further,
the complainant did not provide an expert‟s report in relat ion to the damage to the upstairs
bathroom and the complainant‟s expert‟s report dated 17 March 2021 (see further below) did
not address any issue in relation to damage to the upstairs bathroom. The insurer says in its
Notice of Response dated 24 November 2022 that the complainant “has prejudiced the claim
by stripping out the bathroom prior to allowing the Insurer to assess the damage and to
conclusively determine the cause of damage, and consequently the policy coverage position.”
In the circumstances, the complainant has not established a valid claim in relation to the
repairs to the upstairs bathroom.
The insurer’s assessment of the cash settlement in July 2022 was correct
The storm occurred in December 2020.
As referred to above, both the insurer and the complainant engaged experts at an early stage
of the claim.
In relation to the cause of the damage, both parties engaged engineers who provided reports.
Prior to the engagement of an engineer, the insurer first appointed an assessor, R, who noted
the following on 19 January 2021:
During the inspection we have noted water damage to carpet in down stairs pool room
cracking to render/stucco to brick walls under patio and around openings to downstairs pool
room
Upstairs cracking was evident to ceiling in open plan lounge dining & kitchen and in separat e
entry way
Water damage was evident to light fitting in open plan dining area
R noted additional damages to windows throughout the residence but believe that they are not
related to this event consistent with hail or stones
R also noted water damage to bulkhead to downstairs bedroom ceiling which was located
below the toilet/bathroom RCC believe that this is also a separate claim being an EOL
Client advised that they were away at the time of the recent rain event
Determination | Case number: 926198 Page 6 of 12
Client advised that they have upgraded drainage around the perimeter of the residence after
the residence was built
R recommend an engineer be appointed to attend site and provide causation report and SOW
for repairs and identify any possible maintenance issues that may be required
A consulting engineer, K, prepared a report dated 23 February 2021 on behalf of the insurer
(18 pages including photographs). It was based on a site inspection on 17 February 2021 by
K (which also involved the review of a Leak Detection Report by R dated 10 January 2021 (4
pages including photographs), a Roof Report by R (undated) (6 pages including photographs)
and a Building Assessment Report by R (undated). K‟s opinion was:
i. The absence of any observable settlement related cracking externally to
the eastern and northern (to the east of the stairs) Games 2 walls
suggests that it would be unlikely that the internal cracking to the rendered
brickwork walls in these locations would be related to differential
settlement.
ii. The high moisture meter readings obtained along the northern and eastern
Games 2 room walls internally is consistent with a combination of rising
damp and lateral damp likely due to the absence of:
a. A suitable DPC, as required to prevent rising damp.
b. A waterproof membrane between the retained soil and the external
brickwork walls, as required to prevent lateral damp.
c. A weatherproof finish to the external walls. As per AS 4773.2-2015
Masonry in Small Buildings – Construction a weather-resistant coating
is required for single skin external masonry walls around a habitable
room space.
Noting that high moisture meter readings were obtained over the full height of the
northern and eastern Games 2 room walls it is likely that rising / lateral damp has
been occurring for some time, and is unlikely to be related to a single defined
event.
iii. We observed no obvious storm created openings in the Lower Level
Games 1 and 2 room walls.
iv. The cracking to the render in the Games 1 and 2 areas has typically
occurred in locations which were observed to have very high moisture
meter readings and we observed evidence to suggest that the cracking
had affected the render only and not the underlying brickwork.
v. The roof and downpipe leaks result in external water discharge towards
the northern end of the eastern external wall (eastern side of the Games 2
area). Such leaks would unlikely influence the moisture levels along the
northern Games 2 wall. Noting that the moisture levels were very high
Determination | Case number: 926198 Page 7 of 12
over the full length of the northern Games 2 wall, it is likely that the
external leaks have not been the proximate cause of the elevated moisture
levels in the Games 2 area.
vi. In conclusion, the cracking to the rendered brickwork walls in the Lower
Level Games 1 and 2 areas is considered to be related to the debonding
of the render from the underlying brickwork caused by the high moisture
levels in these walls associated with rising damp / lateral damp (refer to
item 7.ii. above) and is not related to the roof and plumbing leaks identified
in the previous roof and leak detection reports. It is possible that the
historically high level of annual rainfall received over 2020 has contributed
to the elevated moisture level in these walls.
A structural engineer, M, prepared a report dated 17 March 2021 on behalf of the
complainant. M‟s report was based on a site inspection on 9 March 2021 and his opinion was:
that the water entering the games room during the storm was the result of
windblown rain entering the wall cavity via a gap between the brickwork and the
left-hand sliding door fame (sic, frame) at the front of the house. Rain water may
have entered the wall cavity on previous occasions but never entered the
downstairs games room. The conditions of the storm in December 2020 which
resulted in intense rain blown horizontally against the glass door allowed a large
amount of water to flow down the cavity and into the games room. The carpet and
some furniture were damaged by the water. A simple test using a garden hose
spraying against the glass door demonstrated the same flow of water into the
games room.
This, in my opinion, is a valid insurance claim.
An engineering report by [K], on behalf of the insurance company, focussed on
issues other than the source of water entering the games room. While these
issues raised are important for a building condition report, they are not part of the
insurance claim. The author of the report missed the source of the water entering
the games room through the front glass door.
If storms such as that experienced in December 2020 were to occur again, and to
avoid a repeat of the water damage, it is strongly suggested that a storm mould (a
simple aluminium angle) be installed between the brickwork and the left-hand
door frame.
The insurer‟s assessor prepared a Report dated 14 April 2021. It recorded that the assessor
and the complainant had discussed the claim history at length. It also recorded:
Mould is evident throughout the downstairs and upstairs and this has affected
ceilings, carpet and contents. A distinct musty smell is evident downstairs and in
some rooms upstairs.
Determination | Case number: 926198 Page 8 of 12
This needs to be treated immediately and containment set up between upstairs
and downstairs to stop the spread of air borne mould.
Assessor has requested CM engage a restorer immediately to commence
remediation works.
It is likely that the rising damp issues in subfloor area will inhibit repair, and
building damage will be addressed by way of cash settlement to the downstairs
area. There is a design/ construction fault causing the water ingress that will need
to be addressed.
The roof flashing will need to be addressed also if the upstairs ceilings are to
recover.
Assessor will concentrate on mould issues initially and then engage with engineer
to identify resultant damage to building and what maintenance will be required by
the owner to rectify the damp and or water entry issues.
A dual assessment is required with restorer to discuss initial mould treatments.
Customer happy with outcome and may need to be accommodated until mould
levels can be reduced to downstairs only.
The assessment report recorded that the following issues were identified in April 2021 and
discussed:
the suitability of a cash settlement
a dual assessment was required with the restorer to discuss mould treatments
whilst the claim was not resolved, the complainant was happy with the outcome
the complainant may need to be accommodated until mould levels can be reduced to the
downstairs area.
In the circumstances, a cash settlement was appropriate for varying reasons including
cracking of ceiling and gable issues (Assessment Report dated 5 March 2021) and
maintenance/ pre-existing damage concerns and inability to warrant works (Assessment
Report dated 25 March 2021). The complainant has also sought a cash settlement of the
claim.
In the period between April 2021 and June 2022 numerous steps were taken by the insurer
and its representatives in relation to the claim and its progress which are recorded in reports
on an almost monthly basis, including:
An Assessment Report dated 11 May 2021 (8 pages including photographs)
A Cleaning and Restoration Report dated 30 June 2021 regarding mould levels (5 pages)
An Assessment Report dated 28 July 2021 (26 pages including photographs)
Building Assessment Report dated 5 August 2021 (82 pages including photographs)
An Assessment Report dated 31 August 2021 (6 pages including photographs)
An Assessment Report dated 29 September 2021 (17 pages including photographs);
An Assessment Report dated 31 October 2021 (29 pages including photographs)
An Assessment Report dated 29 November 2021 (8 pages including photographs)
A Mould Remediation Report undated (2022) (43 pages including photographs)
Determination | Case number: 926198 Page 9 of 12
An Assessment Report dated 9 March 2022 (7 pages including photographs)
Builder Assessment Report dated 27 April 2022 (2 pages)
An Assessment Report dated 28 April 2022 (12 pages including photographs) which noted
that it “was carried out to provide a final SOW for cash settlement to the [complainant].
In the Assessment Report dated 26 May 2022 (11 pages including photographs) it is
recorded:
Assessor has conducted a desktop review on the liability quote (LQ) supplied by
KBA building totalling $29,418.04.
The LQ has been provided by KBA following the last inspection as a final SOW for
cash settlement.
Assessor has called the [complainant] to discuss and the [complainant] has
advised that they do not agree with all comments.
The [complainant] believes the existing mould in bedroom 1 behind the wardrobe
to be associated with this current event and is adamant that they want a new
bathroom.
This was discussed on site with IA F and the [complainant] was advised that this
was not to be part of the SOW. At the time of my last inspection the small area
was sealed so not to spread anywhere else and the customer took the cover off.
The [complainant] has been adamant on the past few assessments that want the
bathroom fully stripped and replaced. I am in agreeance that this mould is from a
a water leak in the roof which the [complainant] had repaired and the mould had
formed within the wall cavity and not spread any further.
The [complainant] then advised that they had been in the roof cavity and had
found mould on some insulation batts above the bathroom. I advised them that
these were on the SOW to be replaced by the [complainant‟s] trades.
the [complainant‟s] trade is going to inspect the roof tomorrow and also inspect
the insulation
The assessor has approved the liability quote for $29,418.04 and this may need
to be revised following further inspection.
MAINTENANCE:
The following items were identified as maintenance, wear and tear and will need
to be rectified by the customer as the policy does not cover these items;
Pre-existing mould to bedroom/ bathroom wall
Determination | Case number: 926198 Page 10 of 12
In the Assessment Report dated 13 June 2022 (26 pages including photographs) it is
recorded that “Building reinstatement to be recommended as cash settled as customer
preference” (page 3) and:
previous assessor has then approved the $29,418.04 LQ which includes this WC
wall and remove/reinstate toilet
spoke to previous assessor and confirmed would be unable to maintain decline of
wc wall as there are conflicting reports, it is consistent with water entry through
roof, would not be possible to confirm how old the mould is and is also consistent
with the recorded eol claim
Assessor COMMENTS
- [complainant] agrees with sow in general.
-29418.04 LQ includes items overlapping with payments already issued and minor
adjustment required to
1. Increase quantity of loungeroom ceiling lining to 10.2 - typo under estimated.
2. Remove allowance to paint loungeroom ceiling - already settled
3. Remove allowance to paint bedroom 4 wall - already settled
4. Add supply and install outdoor 1x double sensor light
-Two building items outstanding
1. Unknown trade/restorer damage to front light - KBA to submit variation.
2. Crack in shower screen [complainant] claims caused by stripout crew or
restorers. Advised We will need to look into this as will be potential recovery
against KBA or restorer.
This has already been allowed for in the previously approved LQ and there is a
mention In previous assessor‟s report about referring to recoveries but there are
no notes in either report about this. There are however notes that [complainant]
has been in the roof cavity and found mould on insulation. [Complainant] also
advised onsite his builder has been in the roof cavity. I have reviewed all photos
and only located 1x blurry photo which isn‟t clear enough to see if the crack
existed previously. As this is the final outstanding item in contention and
[complainant] is living in a caravan with wife with cancer for over 12 months and
seeking ex-gratia accomodation/ storage, benefit of the doubt can be given.
However there would be no recovery opportunity
Determination | Case number: 926198 Page 11 of 12
-confirmed 20% contingency will be added to total building including the 8190.38
already paid – [complainant] requested final total. Advised [complainant] we will
need to go away and confirm once revised quote is in however as an indication
$35-36k total including contingency, shower screen and light
- [Complainant] queried tv in storage as believes they haven‟t been electrical
tested properly. Advised can be electrical tested but as they are currently in
storage Advised will have CM follow up and action as required (may need to
request this once items returned and unpacked)
- [Complainant] asked if assessor is right person to talk to as they are seeking
an additional 4 months accomodation and storage from todays date and
backdated til last payment. As this is gratia advised this is out of scope for
assessing and CM will follow up. Assessor can advise this timeframe is f&r
On 4 July 2022, the Insured paid to the Customer $37,548.15 ($29,925.07 for repair costs
plus 20% contingency amount for $7,623.08) in settlement of the liability quote for the scope
of works for the building repairs.
The figure of $37,548.15 (inclusive of the 20% contingency) was approximately $1,750
greater than the indicative $35,000-$36,000 as recorded in the Assessment Report dated 13
June 2022. The complainant has not provided any expert evidence which provides a basis
upon which it could be said that the insurer‟s assessment was unfair or unreasonable. In the
circumstances, and in the absence of persuasive evidence to the contrary from the
complainant, the insurer‟s assessment was fair and approp riate. The sum has been paid by
the insurer to the complainant and it includes an allowance for the contingencies associated
with the transfer of risk to the complainant and in full satisfaction of the claim.
2.2 Why is the outcome fair?
The outcome is fair
The outcome is fair based on the information and consistent with the policy terms and the
payments made by the insurer in relation to temporary accommodation exceeded its
obligations.
Determination | Case number: 926198 Page 12 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.