Home / RACQ / Determination 925698

Determination 925698

Partial decline of storm damage claim (pool, upstairs tiling) and disputed settlement amount and delay

FirmRACQ
Decided2023-10-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,870
Non-financial loss$1,250
Amount claimed—
SourceAFCA PDF

Summary

The complainant's storm damage claim was partly accepted by the insurer, which excluded the pool and upstairs tiling. AFCA required a fresh unredacted quote with a 20% uplift, payment of $3,870 invoices, pool report costs, interest and $1,250 non-financial loss, but upheld the exclusions.

The policy excludes pool damage and seepage damage, but the insurer's settlement approach was unfair and its delay caused unusual stress and inconvenience.

Issues

Subjects and remedies

disabilityfinancial hardshiphealth or medicalhome or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossreassess claim

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination Case number 925698 Financial firm RACQ Insurance Limited Determination | Case number: 925698 Page 2 of 8 Case number: 925698 9 October 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). He lodged a claim on 28 February 2022 for storm damage to the home. The insurer accepted the claim. It agreed to cover most of the damage, excluding the pool and the tiling upstairs. The insurer says this damage is excluded under the terms of its policy. The complainant is unhappy with the insurer’s approach, its decision to not cover some damage and the time taken. He seeks further cover and compensation for non-financial loss. 1.2 Issues and key findings Is the insurer’s settlement proposal fair ? No. The insurer is required to re-quote the damage and settle the claim as detailed in section 2.1 of this determination. It must also pay the complainant $3,870 for invoiced downstairs work (which is not required to be re-quoted) and reimburse him for the pool reports, subject to receiving invoices for the amounts charged. The insurer is not required to cover the claimed tiling or pool damage as this is excluded by the policy. Is an award of compensation appropriate? Yes. The insurer unduly delayed settlement of the claim and this caused an unusual degree of stress and inconvenience for the complainant. The insurer must pay additional compensation for non-financial loss of $1,250. Why is the outcome fair? A new quote will better ascertain what the insurer should pay. It must also provide a contingency uplift to ensure the complainant is fairly compensated. The exchanged material shows, on balance, the insurer is not liable for the tiling or pool damage. Given the delays and difficulties involved, it is fair the insurer pays additional compensation for non-financial loss. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is required to resolve the matter as outlined in section 2.1 of this determination. The insurer is also to pay interest on the payment for $3,870 and the pool expert fees, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from the dates of each invoice, until the date of settlement. The insurer is not required to pay interest on any subsequent cash settlement for the outstanding repairs. This amount will be based on an up-to-date quote and subject to a contingency uplift. The insurer is required to pay compensation for non-financial loss of $1,250. Determination | Case number: 925698 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer’s settlement proposal fair ? No. The insurer is required to re-quote the damage and settle the claim as detailed below. It must also pay the complainant $3,870 for invoiced downstairs work (which is not required to be re-quoted) and reimburse him for the pool reports, subject to receiving invoices for the amounts charged. The insurer is not required to cover the claimed tiling or pool damage as this is excluded by the policy. Complainant seeks cover for storm and runoff rainwater damage to home The complainant’s home was significantly inundated with water and damaged during a storm event. He seeks cover for this damage under the terms of the policy. The insurer’s records show the complainant informed it at the time of lodging the claim: Heavy rain caused water entry on the topside of the house, top floor pantry side, downstairs and shed full of tools are flooded. [Mass] amounts of mud left on the floor Extensive damage was caused from water inundation. The insurer covered some, but not all, of this damage. The complainant seeks additional cover in three areas:  downstairs – the costs incurred for damage to the front door, furniture removal and cleaning expenses and the costs to remove a damaged wall and gyprock  upstairs – guttering damage on the roof, replacement of the floor tiles  expert reports – the complainant says he obtained some pool expert reports on the advice of the insurer which were later rendered irrelevant. The complainant also claimed for contents damage and the parties agree this is now resolved. The insurer paid the sum insured under the policy ($50,000). Policy covers rainwater run off damage under ‘flood’ subject to conditions The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. The policy covers damage caused by one or more of the listed events. It does not provide cover for all damage. Amongst these events is cover for loss or damage caused by ‘ flood or water runoff ’ and ‘storm’ . Cover for ‘flood or water runoff’ does not extend to loss or damage caused to:  lawns or grass,  swimming pools and spas, and their covers and liners,  the water in swimming pools and spas,  shade or sail cloth and fabric awnings. Cover for storm does not include loss or damage to:  swimming pools and spa covers and liners that are more than 5 years old, Whilst the complainant initially sought to claim for the damage caused to his swimming pool, he now accepts this is not covered. He does, however, seek cover for the costs incurred to Determination | Case number: 925698 Page 4 of 8 obtain reports about the condition of his pool. He says this was only done as the insurer told him had to obtain evidence of the damage. Under the ‘Advanced cover’ section of the policy, the complainant is covered for ‘accidental damage’ in certain situations. This includes when damage is caused to a ‘ to a fully enclosed and lockable part of your home ’. It also extends to c ontents in certain situations. ‘Accidental damage’ is defined in the PDS as ‘damage caused by an accident’. An ‘accident’ is defined as ‘an event or incident which you did not intend or expect’. This cover does not extend to swimming pools or their covers or liners. Insurer to reimburse complainant for invoiced amounts for downstairs work Much of the downstairs damage at the complainant’s home has been repaired by contractors he retained. The insurer has since reimbursed the value of most of these invoices. The complainant seeks cover for the costs incurred to address the front door, wall and gyprock damage and to remove furniture and clean up after the damage. These costs are detailed in the invoices from SB (invoice 226 for $2,385) and PE (invoice 288 for $1,485). Both invoices are dated 6 February 2023. The SB invoice covers the front door, wall and gyprock damage. The complainant says the removal of furniture and clean-up costs are part of the PE invoice. The insurer agreed to cover these losses. It says these amounts are catered for in the scope of works (SOW) from builder AB. This SOW has no amounts quoted in it, so it is not clear what the insurer agreed to pay for repairs. Given both the amounts sought by the complainant are invoices (and therefore for services rendered), I am satisfied the insurer should settle based on the invoiced amounts. The insurer must reimburse the complainant for the respective invoices from SB and PE for $3,870 in total. To the extent these repairs were included in the AB SOW, the insurer may deduct the value of this work from any further settlement. Insurer agrees to cover upstairs guttering, but tile damage is excluded Builder AB inspected the guttering for the insurer and agreed the joint had split and ‘this could have ha ppened due to large volumes of rain’. It agreed this damage should be covered. The insurer says the damage to the guttering is included in the AB SOW. Whilst the complainant estimates the value of the guttering damage is $8,800, it is not clear what he bases this on. The insurer has also not provided costing for these repairs, which I will address later. There were some concerns expressed by the insurer’ s assessor about a quote from builder UB for $48,741. This quote is to address the 82sqm of upstairs tiling, which the complainant says must be replaced. It also includes amounts for damaged plaster walls, waterproofing the brick extensions, damage to cabinets and skirting. The insurer says the damage in this area is limited to one drummy tile. It further says the tile was damaged due to water seepage through the external wall. It maintains a properly secured home should not have permitted water to enter through the brickwork. AB wrote about this damage: Determination | Case number: 925698 Page 5 of 8 the Veranda has been enclosed with a brick veneer type construction, the two left- hand side and right hand side walls respectively have been bricked in line with the building, the Veranda slab protrudes outside the building line and was not cut off during the renovation. This has created a small open void which hasn’t filled up with stormwater and allowed seepage to occur into the enclosed Veranda area causing water damage to the paintwork on the skirting and plasterboard. as the stormwater entry has been caused by defective workmanship Water entry from the veranda area flooded the tiled floor in the kitchen. The insurer says this damage is excluded as the policy does not cover: Loss or damage caused by seepage, pollution or contamination by any substance no matter how it is caused. The complainant provided no expert opinion to challenge the view water entered this area by seeping through the walls. Therefore, I accept the cause of this aspect of the loss is excluded by the policy. Insurer is to re-quote the damage and settle the complainant The insurer says it is prepared to settle the complainant for the balance of the claimed damage, as follows: Original Scope = $3,853.00 (AB SOW) Kitchen + Gables = $7,576.97 Painting Timber Beam = $290.40 Total = $11,720.37 For reasons which are not clear, and despite the complainant saying he was in financial difficulty, the insurer chose not to pay the above amount on at least an interim basis. It seems the insu rer wanted the complainant’s acknowledgement that receipt of this payment would be full and final settlement of the claim. He did not agree with the settlement offer. I am not satisfied the above amount, or the insurer’s approach to settlement, was fair. The AB SOW was based on quoted items the insurer redacted. This meant the complainant was unable to verify the fairness of the quote. It is also not clear if it was actionable. I acknowledge the AB SOW will now need to be amended to account for the removal of the invoiced items for $3,870 I agree the insurer is required to pay. To resolve the matter, I consider the insurer must now:  arrange an up to date quote to cover the repair of the remaining items it is liable for in a single repair quote for the outstanding damage  this quote must be prepared by a repairer prepared to undertake the work for the quoted price (that is, it must be an actionable quote)  the quote cannot be redacted, therefore ensuring the complainant is privy to the amounts quoted for each part of the repair  if the insurer elects not to attend to the repairs, the insurer is required to pay a cash settlement to the complainant for the full amount of this quote Determination | Case number: 925698 Page 6 of 8  the cash settlement (if paid) must also include a contingency uplift of 20% to compensate the complainant for the loss of the lifetime guarantee, the transfer of risk and any minor, incidental work that might not have been catered for. The insurer is not required to include the tile damage in this quote for the reasons previously stated. Swimming pool not covered but insurer will cover cost to obtain reports The complainant seeks reimbursement for the expert fees he incurred to account for the pool damage. The parties agree the pool itself is not covered as it is excluded under the terms of the policy. However, the complainant says the insurer told him it had the ‘pool under review’ and this led him to obtain reports about the cause of damage. The insurer says it is willing to cover costs incurred to obtain these reports. These costs are not detailed in the exchanged information. To the extent the respective experts charged the complainant for the reports, I accept he may seek reimbursement from the insurer. I am satisfied the insurer is not liable for any costs detailed to implement repair options in these reports, noting the pool damage is excluded. No cover for additional claimed expenses The complainant says the insurer’s poor handling of the matter forced him to seek medical attention. He wants the insurer to cover these expenses. I am not satisfied the insurer is required to do this. The policy does not cover medical expenses. To the extent the complainant believes the insurer’s conduct was poor, this is a compensation issue. I will address this separately. The complainant also says he had to apply for the early release of superannuation payments to fund many of the invoices he covered for damage at the home. He provided no evidence in support of this. The insurer has since refunded most of these payments as part of its settlement. I am not satisfied the insurer has any further obligation to the complainant. The complainant’s home was advertised for sale at the time of the loss. He says he incurred a loss as he was unable to sell it. There is no persuasive evidence the value of the home diminished due to any action (or inaction) of the insurer. 2.2 Is an award of compensation appropriate? Yes. The insurer unduly delayed settlement of the claim and this caused an unusual degree of stress and inconvenience for the complainant. The insurer must pay additional compensation for non-financial loss of $1,250. Complainant unhappy with the insurer’s handling of the complaint The complainant suffers from autoimmune disease and is permanently disabled. I accept he is vulnerable and this requires that the insurer ensures it takes reasonable steps to attend to his needs. He says the insurer’s handling of his claim and this complaint has been poor. He seeks compensation for non-financial loss as part of his settlement. Determination | Case number: 925698 Page 7 of 8 AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer is required to pay extra non-financial loss compensation of $1,250 The complainant made it clear to the insurer from the outset of his disability. He was vulnerable and in need of special assistance. I acknowledge the time taken to consider, process and handle the claim has upset the complainant and inconvenienced him. I also acknowledge his home was damaged in a significant major event, which affected many people and stretched the resources of insurers. The insurer notes the complainant has not been cooperative with some of its contractors and says he has been abusive and difficult. I acknowledge some of the correspondence from the complainant includes inappropriate language. The complainant says he was frustrated by the insurer ’s handling of the matter. In consideration of his circumstances, the insurer notes:  this loss was part of a significant event which impacted its ability to respond  despite this, it prioritised the complainant’s claim in acknowledgement of his personal circumstances, and  it agreed to waive the policy excess ($750) in recognition of his concerns. I acknowledge this. However, I also consider the insurer has not handled the matter in a timely fashion. The insurer has not adequately explained why there are still outstanding payments relating to the matter, noting the loss occurred in early 2022. Given this, I accept the insurer’s handling of the matter delayed the claim and caused an unusual degree of stress and inconvenience for the complainant. I accept an award of compensation for non-financial loss is appropriate. Acknowledging the waiving of the policy excess, I am satisfied the insurer should pay additional compensation to the complainant of $1,250. Why is the outcome fair? A new quote will better ascertain what the insurer should pay. It must also provide a contingency uplift to ensure the complainant is fairly compensated. The exchanged material shows, on balance, the insurer is not liable for the tiling or pool damage. Given the delays and difficulties involved, it is fair the insurer pays additional compensation for non-financial loss. Determination | Case number: 925698 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.