Determination 925624
Insurer declined storm claim for roof replacement and internal damage, offering only partial cash settlement for the second bedroom
Summary
A landlord's storm claim for roof replacement was declined, with the insurer offering a cash settlement for only the second bedroom. AFCA found the insurer liable only for the second bedroom and mould remediation, and awarded $700 for non-financial loss.
The roof was aged and poorly maintained so storm damage to it was not established, but wind-driven rain caused the second bedroom water damage, which is covered, and claim delays warranted compensation.
Issues
- Claim denial primary · not upheld
“There is no persuasive evidence to show the storm damaged the roof; balance of claimed damage not related to the storm and not covered.”
- Claim amount dispute secondary · upheld
“Insurer must also arrange mould remediation quote and cash settle it with a 25% contingency uplift.”
- Delay secondary · upheld
“The insurer should have responded more quickly to resolve the matter, causing unusual delay and inconvenience.”
- Poor communication secondary · upheld
“frustrated with the delays in resolving the matter and the infrequent communication from the insurer.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case number 925624
Financial firm Insurance Australia Limited
Determination | Case number: 925624 Page 1 of 6
Case number: 925624 20 September 2023
1 Determination overview
1.1 Complaint
The complainant holds a landlord insurance policy for his tenanted investment home. The
policy is underwritten by the financial firm (insurer). On or about 28 February 2022, the tenant
reported storm damage to the home and the complainant lodged a claim.
The insurer reviewed the damage and denied the claim. It acknowledges water got into the
property, however it says there was no damage to the roof caused by the storm. The insurer
says the damage is not covered by the policy. Notwithstanding this, the insurer offered a cash
settlement to cover the damage to the second bedroom, which sustained water ingress.
The complainant disagrees with the insurer. He seeks cover to repair or the replace the roof.
He also seeks compensation for non-financial loss.
1.2 Issues and key findings
Is the loss covered by the policy?
The insurer is required to cover the damage to the second bedroom only. This includes the
cost to attend to mould remediation. This damage was caused by water entry from the storm.
The balance of the claimed damage is not related to the storm and not covered by the policy.
Is an award of compensation appropriate?
Yes. The insurer should have responded more quickly to resolve the matter. This caused the
complainant an unusual degree of delay and inconvenience. The insurer is required to pay
compensation of $700 for non-financial loss.
Why is the outcome fair?
The roof was in poor condition. Wind driven rain from the heavy storm got in under the tiles
and it is fair the insurer covers the water ingress damage to the second bedroom. Given the
delays and its effect on the complainant, it is also fair the insurer pays compensation.
1.3 Determination
This determination is mostly in favour of the insurer.
Subject to the complainant accepting this determination, the insurer must:
pay the complainant $2,744.82 for the repairs to the second bedroom, plus a contingency
uplift of 25%, meaning an overall settlement of $3,431.03 (less the policy excess)
arrange an actionable quote for mould remediation to the home and allow a 25%
contingency uplift for this amount, and
pay $700 compensation for non-financial loss.
As the settlement must be based on actionable quotes and includes a contingency uplift for
each, there is no need to award interest.
Determination | Case number: 925624 Page 2 of 6
2 Reasons for determination
2.1 Is the loss covered by the policy?
The insurer is required to cover the damage to the second bedroom only. This includes the
cost to attend to mould remediation. This damage was caused by water entry from the storm.
The balance of the claimed damage is not related to the storm and not covered by the policy.
Complainant says his landlord property was damaged by a storm
The complainant says his property was managed by a real estate agent and regularly
inspected. He says it sustained storm damage and believes the insurer should repair it.
He obtained a quote from roofer AM for $24,909.17 to replace the roof but did not provide
quotes to address the internal damage.
Onus on complainant to establish claimable loss
The complainant has the onus of establishing he suffered a loss from an event covered by the
policy. If a claimable loss is established, the insurer then has the onus of establishing the
application of any exclusion or condition it relies on to deny or reduce its liability.
For both the complainant and the insurer, the onus of proof is the balance of probabilities
(that is, it is more likely than not).
If the complainant can establish he suffered a claimable loss, the onus shifts to the insurer to
show, on balance:
it is entitled to rely on an exclusion under the policy, or
it is otherwise entitled to decline the claim.
The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure
Statement (PDS). There is no dispute the insurer sent these documents to the complainant.
The policy covers damage caused by one or more of the listed events. It does not provide
cover for all damage. Amongst these events is cover for ‘storm’. The PDS says this includes
loss or damage caused by:
> violent wind or thunderstorm (including a tornado or cyclone),
> heavy rain, hail or snow.
For storm claims, the insurer says it will not cover loss or damage caused by:
water entering through an opening resulting from poor maintenance or defective
workmanship, construction or design
The insurer also does not cover loss or damage arising directly, or indirectly from, or
connected with:
Poor maintenance or inadequate maintenance or failure to keep your rental
property in good repair.
...
Determination | Case number: 925624 Page 3 of 6
Water damage including:
> water seeping through or into walls, roofs or floors,
...
Wear and tear including gradual deterioration, rust, corrosion, fading or
deterioration from exposure to light.
Insurer’s experts say there was no storm damage to the roof
After the report of the loss, the insurer arranged for several experts to inspect the damage.
Builder UB attended the property on 17 March 2022. It found there was a ‘large water stain to
the second bedroom’. UB inspected the roof and says:
The cause of the damage was severe foot traffic which has caused dents and
created gaps to the aluminium roof tiles, and wind driven rain which has allowed
rainwater to enter the roof cavity. There was no storm damage present to the roof.
Internal damage to the second bedroom was due to water ingress through the roof. However,
UB says the damage was due to the ‘deterioration of the aluminium roof tiles’ caused by foot
traffic, general wear and tear and the lack of appropriate maintenance.
Roofer UR also inspected the property. UR concluded the damage was due to:
severe foot traffic which has caused dents and created gaps and wind driven rain
has entered the ceiling cavity.
UR also noted there was ‘extensive debris’ in the gutters, rotting of the timber fascia and
extensive foot traffic damage to the decramastic roof tiles. It says the roof cannot be repaired.
Bu ilder PG was the third expert to inspect the damage. PG described the home’s condition as
‘Fair to poor’. It noted the home required ‘a significant amount of maintenance’ to return it to
an acceptable standard. There was significant mould growth on the ceiling of the second
bedroom and ‘numerous heavily foot dented tiles’ on the roof. PG says this:
would cause water to pond on the surface and greatly increase the chances of
wind driven rainwater entering the roof space.
PG found no evidence of storm damage to the roof but noted decramastic roof tiles ‘have a
reputation of being susceptible to water ingress’. It accepted recent storm activity was the
reason for this. PG suggested the extreme nature of the storm event likely caused ‘wind
driven rainwater’ into the ceiling space. Whilst PG noted the ceiling was sagging in the master
bedroom, it says there was no storm damage in this room.
PG said the ceiling areas in the home were separating from the roof trusses. It says this is
because the adhesive was spaced too far apart. PG considers the issues in the master
bedroom are due to adhesive failure.
The complainant has recently reported similar issues with the ceiling in the lounge. This was
not inspected by the insurer as it occurred well after its decision was made.
Determination | Case number: 925624 Page 4 of 6
Photos from the three experts show severe water and mould damage to the ceiling in the
second bedroom. There is severe denting and warping of some of the roof tiles, which is
consistent with foot traffic. The tiles appear aged and in poor condition. Photos inside the
ceiling space also show where parts of the ceiling are separating from the roof trusses.
Insurer offered the complainant a partial settlement for the loss
The complainant says the roof tiles were damaged by the emergency service workers, which
conducted make safe repairs by placing tarpaulins over the roof after the event. These
workers were contracted by the complainant, not the insurer.
The insurer acknowledges foot traffic from the workers may have caused some damage to
the tiles. However, it says this does not explain the water ingress into the roof space (which
occurred before) and is not the reason the roof requires replacement. I agree with this. Whilst
some damage might have been caused through the make safe work, the roof was aged and
likely at the end of its serviceable life.
Based on the PG report, the insurer offered to cover the damage to the second bedroom,
without accepting liability. It refused to cover the damage to the master bedroom (it did not
incur water damage) or the roof (which was not damaged by the storm).
The insurer obtained a quote from UB for $2,744.82 to repair the damage to the second
bedroom’s ceiling. The insurer offered to pay a 25% contingency uplift on this payment. This
is to compensate the complainant for the transfer of risk and the loss of a lifetime repair
guarantee. It increased the offer to $3,431.03. Less the $3,000 policy excess, the insurer’s
settlement offer was $431.03. The complainant did not accept the offer.
Insurer is required to cover the damage to the second bedroom only
There is no persuasive evidence to show the storm damaged the roof. I am also satisfied the
ceiling issue with the master bedroom (and later reported in the lounge) is unrelated to the
storm. Based on PG’s report, I accep t the ceiling damage is consistent with it detaching from
the trusses. Photos clearly show this was an issue at the home. There is no persuasive
evidence to show this is related to the storm events.
All three experts agreed there were maintenance-related issues with the home. I am satisfied
the ceiling issue is one of these issues. I am not satisfied it was caused by the storm, or any
other listed event. The second bedroom is the only room which had evidence of water
ingress. I accept the insurer should repair this damage as I accept wind-driven rain forced its
way under the tiles.
I am satisfied the insurer’s offer for the damage to the second bedroom was fair, on the basis
UB is prepared to undertake the work for the quoted price. I acknowledge this cannot be done
unless the complainant first repairs the roof damage. Given this, I accept the insurer is
entitled to cash settle the complainant for the damage to the second bedroom.
However, noting the extensive mould damage reported and visible in the photos, I consider
the insurer must also arrange for mould remediation to the home. The insurer does not
dispute the mould is present or that it developed due to the water ingress to the ceiling from
the storm event.
I am satisfied the insurer must indemnify the complainant to remediate this damage. I accept
the insurer cannot presently conduct the work as the home remains susceptible to water
ingress whilst the roof remains unrepaired.
Determination | Case number: 925624 Page 5 of 6
The insurer must therefore arrange an actionable quote to remediate the mould in the home.
It must then cash settle the complainant for this quote, with a 25% contingency uplift.
The complainant belatedly raised other issues, including missing smoke alarms and the
tenant reporting the absence of insulation making the home cold. These are issues related to
the tenancy, not the claim. The insurer has no responsibility for agreement between the
tenant and the complainant. If there is a suspicion that the smoke alarms (or other items)
have been stolen, the complainant can lodge a claim for this with the insurer.
2.2 Is an award of compensation appropriate?
Yes. The insurer should have responded more quickly to resolve the matter. This caused the
complainant an unusual degree of delay and inconvenience. The insurer is required to pay
compensation of $700 for non-financial loss.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Insurer to pay compensation for non-financial loss of $700
Whilst the complainant raised concerns about the cost for his time in handling this matter
(including the real estate agent and the tenant), AFCA does not offer compensation for this.
We can only look at the failures of the insurer’s conduct a nd the extent to which this caused
an unusual extent or degree of inconvenience for the complainant.
After the storm and the report of the damage, the insurer did not engage a make safe
repairer. I acknowledge the insurer later reimbursed the costs the complainant incurred to
arrange his own make safe repairs. However, noting the complainant’s concerns over the roof
damage, this situation might have been avoided had the insurer acted when asked.
T he insurer’s delay does not make it liable for any damage caused. I simply acknowledge it
was a complication which might have been avoided.
The complainant has further been frustrated with the delays in resolving the matter and the
infrequent communication from the insurer. I accept the claim should have been handled
better. I also accept this was difficult for the complainant and the delays and the approach
upset him.
Given this, I accept it is appropriate that the insurer pays compensation for non-financial loss.
I am satisfied the insurer should pay $700 compensation.
2.3 Why is the outcome fair?
The roof was in poor condition. Wind driven rain from the heavy storm got in under the tiles
and it is fair the insurer covers the water ingress damage to the second bedroom. Given the
delays and its effect on the complainant, it is also fair the insurer pays compensation.
Determination | Case number: 925624 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.