Home / QBE / Determination 925075
Determination 925075
Denial of earthquake damage claim for cracking and movement; insurer relied on exclusions for long-term ground movement, wear and tear
Summary
The complainant claimed for cracking and movement damage to her home, attributing it to the September 2021 Victorian earthquake. AFCA found the damage was more likely from excluded long-term causes and decided in favour of the insurer.
The complainant did not prove the earthquake was the proximate cause of the damage, and the insurer's engineers' evidence showed excluded causes were more likely.
Issues
- Claim denial primary · not upheld“Insurer is entitled to deny the claim; damage more likely from excluded long-term ground movement, wear and tear and repair issues.”
- Poor claim handling secondary · not upheld“Complainant argued IDR comments meant insurer accepted the claim; AFCA found the comments did not indicate acceptance.”
- Inadequate claim investigation secondary · not upheld“Complainant said insurer's engineering reports were inadequate; AFCA found them more persuasive than AD's reports and did not accept they lacked integrity.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
Text of the determination
Determination
Case number 925075
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 925075 Page 1 of 7
Case number: 925075 18 July 2023
1 Determination overview
1.1 Complaint
The complainant held home building and contents insurance with the financial firm (insurer).
On 16 November 2022, she lodged a claim for cracking and movement damage to her home.
She said the Victorian earthquake on 21 September 2021 caused the damage.
The insurer has denied the claim. It says the proximate (or operative) cause of damage was
not the earthquake. Rather, the damage is due to unrelated long-term ground movement,
wear and tear and maintenance issues. The policy excludes damage from those causes .
The complainant maintains that the earthquake caused significant damage to her home. She
wants the insurer to pay her $260,000 for the loss of property value, plus temporary
accommodation costs from June 2022 at $2,400/month, and $2,500 in professional costs.
The complainant is represented by lawyer RH. In this determination, the complainant and RH
are ref erred to as „the complainant‟ .
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. On balance, the complainant has not established a claimable loss under the policy. It is
more likely than not the damage claimed is not due to the earthquake but is from excluded
causes. The insurer is entitled to deny liability for the damage and the temporary
accommodation (TA) costs sought.
Is the insurer required to reimburse professional costs?
No. The expert reports the complainant has provided have not assisted her in establishing an
entitlement to cover for the claim.
Why is the outcome fair?
The complainant has not established that the proximate cause of the damage was the
earthquake. Rather, the damage was the result of excluded factors. It would not be fair to
require the insurer to cover the claim when the policy does not respond. It would also be
unfair for the insurer to have to reimburse professional costs when the complainant‟s expert
reports did not assist her in establishing that the claim is covered.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the claim. it is not required to take any further action.
Determination | Case number: 925075 Page 2 of 7
2 Reasons for determination
The parties provided numerous submissions to AFCA. While this determination does not refer
to them all, I have taken each submission into account in reaching my decision.
2.1 Is the insurer entitled to deny the claim?
Yes. On balance, the complainant has not established a claimable loss under the policy. It is
more likely than not the damage claimed is not due to the earthquake but is from excluded
causes. The insurer is entitled to deny liability for the damage and the TA costs sought.
Complainant must show a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that she suffered a claimable loss under the policy. This means she must show the loss
was caused by a risk for which she is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
complainant‟s policy covers damage to the insured property caused by a listed insured event.
Those events include „Earthquake‟.
On 22 September 2021, a 5.9 magnitude earthquake occurred north of Rawson, Victoria. The
epicentre of the earthquake was approximately 126km from the complainant ‟s home . The
complainant says that after the earthquake, she noticed cracking and movement damage to
the extent her home could no longer be lived in.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer says the damage is due to excluded causes
The insurer appointed engineer MC to provide an expert opinion on causation. MC inspected
the property on 1 December 2021, and reported that:
there is a difference between earthquake damage and earthquake induced damage. The
latter can occur when the earthquake magnitude of earthquake at a property is inherently
insufficient to cause building damage, but sufficient to expose pre-existing weaknesses.
the shaking experienced at the property during the earthquake would have been MMI III
(weak) to MMI IV (light) on the Modified Mercalli Intensity (MMI) scale. Shaking at that
level would be insufficient to cause the observed damage
the building movement and damage was consistent with long-term pre-existing
settlement/subsidence, exacerbated by inappropriate repairs and upgrades
„The settlemen t issues are most likely related to variations in soil moisture content of the
soil that support the foundations ‟
the proximate cause of damage was long term and pre-existing movement, not
earthquake.
Damage can have more than one cause. The proximate cause is the dominant, efficient or
operative cause of the loss. It is not required to be last in time or the sole cause.
On 4 January 2022, the insurer denied the claim. The complainant disagreed with the
insurer‟s claim decision. The insurer agreed to obtain a report from another engineer.
Determination | Case number: 925075 Page 3 of 7
On 7 April 2022, engineer SE inspected the property. In its report dated 16 June 2022, SE
supported MC‟s opinion on the application of the MMI scale to the shaking at the property. SE
outlined the results of investigations undertaken by SW, geotechnical engineers. It also noted
evidence of pre-existing damage and repairs, including on historical images. SE concluded:
The damage to the dwelling has been caused by a combination of factors
including undersized concrete footings supporting the clay masonry units, higher
than normal soil moisture content at depth, incorrect installation of the brick ties at
the time of the dwellings construction which have not been connected or fixed to
the stud wall framing and, long term differential foundation and footing movement
over the life of the building.
After the complainant lodged her complaint with AFCA, the insurer obtained a desktop report
dated 27 January 2023 from engineer RB. Following review of documents including the
reports of MC, SE and the complainant‟s expert engineer (AD), RB said:
the property has substantial damage to internal linings and external brickwork. The basic
cause of damage is related to the instability of the moisture content of the subfloor earth
this instability has been complicated by stump alterations, which has contributed to bearer
and flooring undulations. It may also be influenced by a possible (unconfirmed) façade
change from weatherboard to brick veneer and the associated footings
the earthquake on 21 September 2021 did not have the power to cause damage to the
external brickwork or the subfloor structure. Moreover, the pattern and location of damage
is not consistent with that normally imposed by earthquake events
„t he damage to this house is consistent with infiltration of water to the subfloor over a long
period, probably extending for years. Until this infiltration is found and stopped, allowing
stability to return to the subfloor earth, this damage will continue ‟ .
RB has provided supplementary reports dated 28 February 2023 and 11 May 2023. After
reviewing additional reports by AD and the complainant‟s further submissions, RB has
maintained the views set out in its first report.
The insurer says the complainant has not shown a claimable loss under the policy. It says the
proximate cause of the damage claimed was not the earthquake. Rather, the damage is due
to long-term ground movement, wear and tear and maintenance issues. As set out on page
61 of the PDS the policy does not cover incidents arising from or connected with:
wear, tear, depreciation or deterioration
damage caused by atmospheric conditions or inherent defect
previous damage that has not been repaired.
Complainant says the claim should be covered
The complainant relies on three reports by engineer AD. In its first report dated 10 March
2022, AD concluded that:
the extensive external and internal damage appeared to have been caused by excessive
frame movement
the frame movement was likely the result of significant external forces acting on the roof
structure and walls, and was consistent with horizontal seismic acceleration induced forces
the extent of internal wall bracing was unclear, but possible compromised vertical wall
bracing could have contributed to the frame movement and resultant damage
the external and internal damage may have been caused/made worse by the earthquake
cracks in the front and rear concrete slabs also pointed to earth shift/movement possibly
caused by the earthquake.
Determination | Case number: 925075 Page 4 of 7
AD re-inspected the property on 21 January 2023. In its resulting report, AD set out various
calculations and computer-generated modelling and concluded that the property damage was
primarily caused by the earthquake. AD also said that the issues SE had identified were not
causative but explained why the pr operty „was more vulnerable to even [a] mild earthquake‟.
In addition, AD has provided a report dated 26 March 2023 responding to criticisms RB had
made of its second report. AD maintained its view that the earthquake likely caused the
damage claimed.
The complainant also relies on the following comment by CR builder in its repair quote dated
16 March 2022. CR said „ the level of damage which has been caused by extreme vibration or
ground movement are quite significant. It is our professional view that the resent [sic]
earthquake could likely be the leading cause ‟ .
On 29 January 2023, CR reported that after reinspecting the property it was confident that the
earthquake caused the damage. It said the external brick walls had disconnected from the
timber frame. CR said this can only occur by lateral disruption, such as by an earthquake. CR
also said that as the property had been left unrepaired for so long, it was no longer repairable.
In addition, the complainant has provided statutory declarations from her adult daughter, her
neighbour and herself. The statutory declarations concern the experience of the earthquake,
the lack of observable damage before the earthquake, the observable damage after the
earthquake, and a verbal comment by the insurer‟s builder on c ausation.
The complainant refers to an email dated 17 February 2022 from the insurer‟s dispute
resolution officer, which said „ based on my current review I am convinced the earthquake
event has exacerbated the existing cracking/damage to the property ‟ . The complainant also
refers to an IDR outcome letter dated 25 February 2022, in which the officer said:
My final IDR decision is to appoint an alternative engineer to determine the
primary and effective cause of damage to your property. Further, to apportion the
damage in accordance with what was caused by the earthquake and what
damage was pre-existing. Upon receipt of this report the Claims Area is to review
the indemnity of your policy.
The complainant says in light of the comments by its insurer‟s dispute resolution officer, the
insurer therefore accepted the claim and should not be permitted to change its decision.
The complainant submits that the insurer‟s expert enginee ring reports are inadequate and
rely on generalisations. She says they fail to properly address the nature of earthquake
damage (lateral seismic movement) as evidenced at the property. In contrast, AD „ properly
considers the nature of the damage in arriving at its conclusion that: the damage is
“consistent with horizontal seismic acceleration induced forces”‟ .
Insurer is entitled to deny the claim
Based on the provided information, I am not satisfied, on balance, that the complainant has
established a loss claimable under the „Earthquake‟ insured event. Rather, it is more likely
than not the damage is the result of excluded causes. This is because:
MC, SE and RB each unequivocally stated the damage is not earthquake related. Rather,
it is due to long-term moisture issues affecting the subfloor, exacerbated by poor
construction/repairs
Determination | Case number: 925075 Page 5 of 7
they also each provided detailed reasoning in support of their conclusions, including
photos of prior cracking and repairs, and each specifically addressed the MMI scale
an earthquake‟s intensity decreases with increasing distance from the epicentre. The MMI
scale is commonly used to describe the damage and felt effects of an earthquake at a
given location . As the complainant‟s property was 126km from the epicentre, the shaking
on the MMI scale would have been MMI III (weak) to MMI IV (light)
AD has not addressed the MMI scale. Nor has it adequately explained how an earthquake
could reasonably have caused the inconsistent pattern of damage at the property
I am not satisfied that AD‟s calculations and computer -generated modelling provide a
sufficient basis to ignore the MMI scale and the pattern of damage
I do not accept the complainant‟s submission that any of MC, SE or RB lack integrity or
that their reports are inherently unreliable
while I accept that CR is a very experienced builder and do not disregard the statutory
declarations the complainant has provided, I consider that engineers are better qualified to
comment on causation in this matter
even if the damage was not observable before the earthquake, that is not enough of itself
to prove the earthquake was the proximate cause. As MC, SE and RB indicate, it may
have exacerbated pre-existing issues, but it was not the primary cause of damage
I do not consider the comment reported to have been made by the insurer‟s builder as
persuasive evidence of a concluded view, or that it is binding on the insurer
I am not satisfied the comment the insurer‟s dispute resolution officer made in his email
dated 17 February 2022 indicated the insurer accepted the claim. Rather, it is consistent
with him holding the view the earthquake was not the proximate cause of damage
I do not agree that the IDR outcome letter dated 25 February 2022 indicated by referring to
possible apportionment, the claim was accepted. The letter said upon receipt of the
alternative engineering report, the indemnity position would be reviewed.
Therefore, based on the information provided, I am not satisfied that t he complainant has
established a claimable loss under the policy. On balance, it has not been shown that the
damage was caused by the earthquake. Rather, it is more likely than not that the damage
was due to excluded long term ground movement, wear and tear and repair issues.
The insurer previously paid $14,742 towards the complainant‟s costs in living in an aged care
institution. It says it did so in error and that, regardless, the costs should not be regarded as
having been paid towards TA. The complainant disagrees and seeks further TA.
As TA is only payable under the policy following damage covered by the policy, I am satisfied
further TA costs are not required to be paid by the insurer.
2.2 Is the insurer required to reimburse professional costs?
No. The expert reports the complainant has provided have not assisted her in establishing an
entitlement to cover for the claim.
AFCA may require ins urer to contribute to a complainant’s professional costs
The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs
incurred by the complainant. These costs are, however, usually capped at a total of $5,000,
unless special circumstances apply.
When considering whether to require an insurer to make a costs contribution, AFCA takes
into account the complexity of the complaint and whether the particular complainant needed
to incur costs to understand or establish their claim.
Determination | Case number: 925075 Page 6 of 7
Complainant is not entitled to professional costs reimbursement
The complainant wants the insurer to reimburse the $2,482.10 she paid AD for its reports.
However, as outlined above, I find the insurer‟s expert reports more persuasive than those of
AD. As AD ‟s reports have not assisted her in establishing her claim, the insurer is not
required to reimburse the complainant the costs she paid to AD.
2.3 Why is the outcome fair?
The complainant has not established that the proximate cause of the damage was the
earthquake. Rather, the damage was the result of excluded factors. It would not be fair to
require the insurer to cover the claim when the policy does not respond. It would also be
unfair for the insurer to have to reimburse professional costs when the complain ant‟s expert
reports did not assist her in establishing that the claim is covered.
Determination | Case number: 925075 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.