1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
The complainant’s home was damaged in a storm (event). The insurer accepted liability for
most of the damage. However, it says the complainant is liable for the costs of reinstating the
waterproofing to an external wall as this is a maintenance issue.
The complainant says the insurer’s advice and direction about maintenance resulted in
unnecessary expenses that he is seeking reimbursement for. He is also seeking a greater
amount for the internal damage as well as other indirect costs.
1.2 Issues and key findings
Is the insurer liable for costs associated with waterproofing a wall?
No. The available information does not show the wall was damaged by the storm. Neither
does the information show the complainant incurred unnecessary costs due to the insurer’s
advice or direction.
How should the outstanding repairs be settled?
Given the relationship between the parties, this matter should be cash settled. The
complainant’s quotes are preferred in th is regard. The insurer is to pay the sum set out in
section 2.2.
Should the insurer pay more temporary accommodation?
Yes. The insurer has contributed to the delays. However, so has the complainant given his
claim for the waterproofing costs was not substantiated. Therefore, the insurer should pay
half the temporary accommodation costs the complainant incurs as set out in section 2.3.
Is the insurer liable to pay for indirect and non-financial losses?
The insurer’s customer service has been inadequate. The insurer has acknowledged this and
offered $5,000 in compensation. This is fair.
The complainant is not entitled to other indirect losses sought.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to cash settle the property damages as set out in section 2.2.
The insurer is to pay for temporary accommodation costs as set out in section 2.3.
The insurer should pay $5,000 non-financial loss.
Determination | Case number: 924910 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer liable for costs associated with waterproofing
a wall?
Complainant seeking costs associated with waterproofing a wall
The insurer had denied liability for the waterproofing of a wall. This is because the insurer
says the waterproofing did not fail due to the claim.
The complainant has since waterproofed the wall. However, he says the insurer required him
to do more than was necessary. This is mainly because he says the insurer required him to
replace a non-existent membrane system. Therefore, he incurred significant costs and losses
he would have otherwise avoided.
In support, he provided several emails from engineer MC dated 10 February and 13 July
2023. In these emails, MC referred to the wall having an existing ‘lead flashing system’ that
was classed as ‘business to first class standard’. MC said the wall had no external or internal
bituminous barrier as alleged by the insurer. MC also said the existing waterproofing could
have been repaired for about $3,000.
The insurer has not specifically responded to these points. Instead, the insurer says the wall
was not damaged by the storm and it is not liable for these costs.
Insurer not liable for these costs
Having carefully considered all the exchanged information, the panel notes the following.
The expert information does not show the wall was damaged by the storm. Neither party’s
experts support this. For instance, MS’s email dated 13 July 2023 refers to two visible tree
roots damaging the joint. This would be unrelated to the storm.
Therefore, the panel does not accept the wall, or its waterproofing, was damaged by the
storm.
Regarding the complainant’s arguments the insurer’s advice and direction put him to much
greater expense than necessary, the panel notes the following.
The insurer’s letter dated 20 September 2022 simply requested the comp lainant repair the
waterproofing. There is nothing in the letter that directed the complainant to undertake
specific works for a bituminous barrier. Further, if the complainant could have repaired the
waterproofing for $3,000, as he now submits, it is not clear why he did not do so.
In addition, MS’s opinions do not appear to be based on any physical inspection. For
instance, his email dated 13 July 2023 refers to inspecting various documents, not the site
itself. Therefore, it is not clear how certain he can be of the wall’s pre -existing waterproofing
or the specific costs required to repair this.
The panel also notes it is clear the wall’s waterproofing system had failed. It is not clear if any
expert could have identified the pre-existing waterproofing system without digging and
excavating the site. MS’s diagram with his email dated 13 July 2023 indicated the existing
waterproofing was between the outer and inner brick walls and at the bottom of the wall. Part
of this wall was retaining earth. Therefore, it appears this system would only have been
Determination | Case number: 924910 Page 3 of 8
identified after excavation works were undertaken. Given this, MS’s argument that the
waterproofing system could have only been repaired for $3,000 seems unlikely.
Given all this, the panel is not persuaded there is sufficient basis to conclude the complainant
incurred more expenses than necessary because of the insurer’s advice or direction.
Therefore, his claim for the cost of doing these works, and other incidentals that resulted from
this (e.g. the direct and indirect costs sought under AFCA1 in his submissions) are not
substantiated. The insurer is not liable for these costs.
2.2 How should the outstanding repairs be settled?
This complaint should be cash settled
The complainant wants the insurer to do the repairs. However, during the claim and
complaint, the complainant made several serious allegations about the insurer. This included
acting in bad faith, misleading both him and AFCA, and trying to use unethical tactics for
financial gain, among others. This has resulted in numerous and lengthy correspondence.
Given this background, the panel considers it unlikely the parties can effectively and
efficiently work together to complete the repairs. The history to date indicates otherwise.
Instead, it is likely that if the parties were to work together, further disputes and complaints
will arise.
Further, the complainant is not vulnerable. He has shown himself capable of engaging
experts, reviewing plans, advocating strongly for his position and organising substantial
renovations to his property prior to this event.
Therefore, the panel considers the most effective and efficient way of resolving this complaint
would be by way of cash settlement.
The complainant’s quotes are preferred
There is no dispute the insu rer is liable for the internal damage. However, the parties do not
agree on the final quantum.
The insurer’s current offer to resolve this dispute is based on the scope of works and quote
prepared by MP dated 17 October 2022. MP quotes the required repairs at $104,128.75. The
insurer says in recognition of the transfer of risk to the complainant and allowing for
contingencies, it is appropriate to add an uplift of 20%.
The insurer put forward an offer for the internal repair costs of $124,954.50 on 23 June 2023.
This has not been accepted by the complainant.
The complainant submitted a quote for the internal works prepared by his preferred builder (TJB).
This totalled $159,417.03. The complainant is also seeking $28,930 for ‘Internal Building Re -
Certificatio n as necessary’. In support of this second aspect, he provided a quote and email from
MP. MP said this re - certification was likely necessary as internal framing has been removed.
The exchanged information does show some internal wall framing was removed. T his indicates
such re - certification is likely necessary.
In considering the respective quotes, the panel prefers the complainant’s costs given the
following:
MP’s quote is about a year old
there is no information to show the scope of works set out in TJB’ s and MP’s documents is not
Determination | Case number: 924910 Page 4 of 8
fair or claim related
TJB’s quote is based off a more recent inspection and has a viable timeframe for the repairs to
commence
the complainant’s quotes are actionable and current
The panel also considers a 10% contingency shoul d be added. This should account for any
unforeseen variations, the transfer of risk and the loss of the insurer’s lifetime guarantee. Whilst
the complainant has sought to 20%, the panel does not consider such a large percentage is fair
given the amount pai d is based on current and actionable amounts.
This means the insurer’s total liability for the building repairs is:
$207,181.73, minus
Any payments the insurer has already contributed that covers the works set out in TJB’s and
MP’s quotes, minus
Any outst anding policy deductions (e.g. excess).
No interest is payable given the amount payable is based on current rates.
2.3 Should the insurer pay more temporary accommodation?
Insurer should only contribute 50% for additional costs
There is no dispute the policy provides a temporary accommodation benefit to the
complainant. Neither is there any dispute the ground floor of the property is uninhabitable.
Currently the complainant is in temporary accommodation and the insurer has provided this
until 31 October 2023. The insurer is not prepared to pay for more.
The complainant says the cash settlement offered by the insurer is inadequate. Further, he
and his family have been forced to continue living in temporary accommodation until this
matter is resolved and they can repair their property.
The panel acknowledges the policy has a limit. However, this does not apply in circumstances
when these costs have been incurred due to the insurer’s conduct rather than the claim.
It is clear the resolution of the claim has been delayed. This has been partly due to the fact
the insurer’s proposed cash settlement was not shown to be fair and its overall claims
handling. However, the delay has also been caused by the complainant. The complainant has
sought substantive costs associated with the waterproofing of the wall. He has also made
substantive submissions and allegations about this. They have not been proven, and have
substantively contributed to the delay as well.
In these circumstances, the panel considers it is fair that for any temporary accommodation
costs incurred above the policy limit and beyond what the insurer has agreed to pay should
be shared equally between the parties. This is in recognition that both parties have
contributed to the delay.
The complainant’s contracto r says the works should be completed on or about 1 April 2024.
There is no information to suggest this estimated timeframe is unreasonable.
Given this, the panel considers it fair in all the circumstances the insurer is liable to contribute
to 50% of the temporary accommodation costs incurred by the complainant from 1 November
2023 until 1 April 2024.
Determination | Case number: 924910 Page 5 of 8
2.4 Is the insurer liable to pay for indirect and other losses?
Non-financial loss
Under the AFCA Rules, we can award compensation for non-financial loss. We will only
award this type of compensation if a complainant suffers an unusual degree of stress,
inconvenience, or delay because the insurer mishandled a claim.
AFCA will also consider if any inconvenience was caused by the complainant’s actions, or by
factor s outside the insurer’s control.
The panel has previously noted that both parties have contributed to the delays.
The insurer agrees it is liable for compensation for non-financial loss. It has offered to pay the
complainant $5,000. The panel agrees this is fair in all the circumstances.
Complainant’s other claims for indirect loss is not substantiated
In his submission dated 4 September 2023, the complainant sought to claim for $262,870
plus GST as indirect losses associated with this insurance claim and the subsequent
complaint with AFCA.
He has broken this down into two tables: AFCA1 and AFCA2. The AFCA1 table appears to
be associated with the waterproofing of the wall. As his complaint was not substantiated on
that point, the panel does not consider there is any basis to consider those losses.
For the AFCA2 indirect losses, these have been broken down as follows:
additional management required by him – 10 days at $300 per day
family disruption, stress and anxiety - $15,000
lifetime insurance premium – 20% contingency
temporary accommodation provision if supplied by the complainant - $88,900
professional services claim from RP and MD - $5,600 plus GST and $8,850
insurer’s offer to pay for damages - $7,000
The third and fourth categories have already been dealt with. The disruption and stress has
been dealt with under the award for non- financial loss. The insurer’s offer to pay for damages
was not $7,000. It initially offered $2,000 and then increased it to $5,000. It did not agree to
pay $7,000 in total. Further, this was considered and applied in the award for non-financial
loss.
The additional management cost sought is not a financial loss. This is based on the time the
complainant spent and he has valued this at his hourly rate. No evidence has been provided
to show he incurred a financial loss. This time lost has been considered and factored in the
award for non-financial loss.
This leaves the professional services costs. One is to do with consultancy and project
management. There is no information to show this is necessary. This is not payable. The
other is to do with QBCC and misconduct. There is nothing to show the insurer has engaged
in misconduct.
Therefore, the panel does not consider the insurer is liable for the indirect losses sought
beyond the non-financial loss awarded.
Determination | Case number: 924910 Page 6 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
3.2 Relevant documents
Expert reports exchanged bet ween the parties
Certificate of insurance and PDS
Submissions and other material provided by the parties
Correspondence bet ween the parties
Record Key points
PDS pg. 13 Your responsibilities
— take steps to prevent theft, loss, damage or legal liability (e.g. ensuring there are
working smoke detectors in the home or unit);
— maintain door locks and window locks in good working condition and keep alarms
working and connected;
— follow all the terms and responsibilities set out in your policy;
— keep the home structurally sound, watertight, secure and well maintained (e.g. remove
mould, fix any holes in floors, walls and ceilings, fix loose, missing or rusted steps,
gutters, floo ring);
— fix any inherent defect, faulty design, structural defect, structural fault and/or faulty/
poor workmanship at the home as soon as possible after you identify it or are told about it
PDS pg. 32 Seepage of water
water seeping or running:
— through the earth (hydrostatic water seepage);
— down the sides of earth or earth fill that is up against the home;
— down the sides, against the sides or underneath sw imming pools, spas
Determination | Case number: 924910 Page 7 of 8
Record Key points
or tanks;
— against or through retaining walls;
— from agricultural pipes or overflow pipes.
PDS pg. 33 Wear, tear and gradual deterioration
any part of the home, unit or contents that has wear, tear, rust, fading, rising damp,
corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration
such as, but not limited to:
— tiles and their adhesive or grouting breaking down;
— weathering of roof tiles or roof ridge capping;
— gradual weathering and breakdown of bricks, mortar or concrete;
— wear and tear of carpets, furniture and furnishings;
— fading of curtains and drapes;
— gradual weathering of pot plants.
PDS pg. 42 We cover
Loss or damage caused by a storm.
We don’t cover
— loss or damage caused by flood;
— loss or damage caused by actions or movements of the sea or storm surge;
— loss or damage caused by erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement, but we will cover
loss or damage caused by a landslide or subsidence proved to have occurred
within 72 hours of, and directly because of, a storm and not because of erosion,
structural fault or design fault;
— loss or damage to retaining walls, sea walls, revetments, garden borders and
free - standing outdoor walls;
— resultant cracking to sealed paths, sealed roads and sealed driveways, b ut we w ill
cover them if they are washed away by the storm;
— loss or damage to a sporting surface or court including a tennis court, squash
court or multi - court surface;
— loss or damage to boat jetties, pontoons, mooring poles and their attachments
and a ccessories, including if they are washed away by the storm;
— damage to external paintwork of the home, if that is the only home damage
caused by the storm;
— loss or damage to gates, fences or wall fences that would be considered by
a reasonable person to be in an obvious state of disrepair before the loss or
damage occurred
— the cost of cleaning your undamaged contents.
PDS pg. 55 - 56 Temporary accommodation when you have home cover
We cover
When we cover loss or damage to the home and the insured incident damages
the home to the extent that it cannot be lived in, we will pay for your reasonable
and necessary temporary accommodation costs for the time it w ill take to repair
or rebuild the home so that it can be lived in again. We w ill also pay for t emporary
accommodation for your domestic pets in a commercial boarding establishment for
the same period that we pay for your temporary accommodation.
The most w e will pay is the reasonable and necessary costs for:
— short term accommodation agreed to by us (e.g. standard rates for a hotel, motel
or serviced apartment) (up to 4 weeks only);
— residential accommodation of a similar standard to the home (e.g. if the insured
home is a 3 bedroom home w e w ill aim to put you in a 3 bedroom home).
…
Lim it
Classi c
The most w e will pay for
any one incident under this
cover is 10% of the home
sum insured.
PDS pg. 77 Accidental dam age at home
When you have home cover, we cover the home for accidental loss and accidental
Determination | Case number: 924910 Page 8 of 8
Record Key points
damage (e.g. breaking or damaging something) at the insured address during the period of insurance.
…
We don’t cover
loss or damage that is covered under an insured eve nt listed on pages 41 to 48, as you can make a claim
for loss or damage und er the applicable insured event.
PDS pg. 90 - 91 How we settle home claims
We w ill aim to use a member of our builder supplier n etwork to repair or rebuild the damage to the home.
Sometimes this is not always possibl e e.g. if there is pre - existing damage. This w ill determine how the home
claim w ill be settled.
…
When a member from our supplier network can complete the repair or rebuild
When your claim for loss or damage to the home is covered , we will engage a builder from our supplier
network to prepare a scope of works and provide a quote on the co st to repai r or rebuild the home on a ‘new
for old’ basis.
Once the scope of works and quote is provided to us, we will arrange for it to be assessed. This will involve
reviewing the quote to make sure th at the quote is appropriate and reasonable for the scope of wor ks. This
includes a consider ation of the appropriateness of mater ials, repair method, labour and material costs and
overall cost.
Once the scope of works and quote is provided to us, we will arrange for it to be assessed. This will involve
reviewing the q uote to determine it is app ropriate and reasonable for the scope of works. This includes a
consideration of the appropriateness of materials, repair method, labour and ma terial costs and overall cost
eff ectiveness.
If the quote is appropriate and reasonable for the scope of works, we w ill then pay you the
assessed amount. If it is not, the quote may be adjusted. This may include adjusting the
scope of works or the quote. We will then pay you the adjusted amount of the quote.
If w e pay you for the repair or rebuild, the Lifetime guar antee for home repairs does not apply .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.