The complainant claimed storm damage to his home after the insurer initially accepted and then reversed its acceptance, denying the claim. AFCA found the insurer entitled to decline as damage was due to wear, deterioration and poor maintenance, and that the insurer's offer of $6,678.31 for make-safe damage was fair.

The complainant must prove a claimable loss caused by an insured event; on balance the proximate cause was wear and tear, deterioration and lack of maintenance, which is excluded.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 924335 Financial firm Youi Pty Ltd Determination | Case number: 924335 Page 1 of 9 Case number: 924335 7 September 2023 1 Determination overview 1.1 Complaint The complaint holds a home insurance policy with the financial firm (insurer). On 3 March 2022, the complainant lodged a claim for damage to his property following a storm event. The insurer accepted the claim. However, upon commencement of repairs, the complainant raised further issues. The insurer then reassessed its liability and denied the claim in its entirety. The insurer says it did so because the proximate cause of damage to the property is excluded under the policy. It says the damage occurred over time and due to improper repairs of a previous event and poor maintenance. The complainant disagrees with the insurer’s decision and seeks that the claim is covered. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. On balance, the damage occurred over time due to wear and tear or deterioration and the property not being maintained in good condition. It has not been caused by a storm event. Therefore, the complainant has not established a claimable loss. Accordingly, the insurer is entitled to decline the claim. Is the complainant entitled to compensation? No. I do not consider the complainant is entitled to further compensation in the circumstances. Why is the outcome fair? On balance, the complainant has not established a claimable loss. In the circumstances, it would not be fair to require the insurer to cover the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to deny the claim. However, if the complainant accepts the determination, within 14 days of being notified of his acceptance, the insurer must pay the complainant $6,678.31 for the make safe repairs. Determination | Case number: 924335 Page 2 of 9 2 Reasons for determination Due to the nature of the complaint we have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. There has been a full exchange of all material information relied on for this determination and each party has had the opportunity to address any issues raised by the other. All material provided by the parties has been reviewed and considered. This determination is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. While the parties have raised numerous issues in their submissions, for the purposes of this determination commentary has been restricted to those issues considered directly relevant to the outcome only. 2.1 Is the insurer entitled to decline the claim? Yes. On balance, the damage occurred over time due to wear and tear or deterioration and the property not being maintained in good condition. It has not been caused by a storm event. Therefore, the complainant has not established a claimable loss. Accordingly, the insurer is entitled to decline the claim. Onus on complainant to establish a claimable loss The complainant is required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainant must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies. Policy covers insured events subject to exclusions The insurer’s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainant. The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by an insured event, and not subject to an exclusion, is covered. The insured events are set out in the PDS and include storm. However, the PDS says that cover for storm does not include rising damp or seepage of water from the ground. The policy also generally excludes loss or damage caused by: 23. …a failure to keep your property in good condition… 35. wear and tear, rust, corrosion, or deterioration; 36. rising damp or seepage of water from the ground; Determination | Case number: 924335 Page 3 of 9 37. mould, rot, damp, or the effects of the climate or weather, unless as a direct result of an incident for which we have accepte d a claim… 40. poor or faulty design specification, materials, planning or workmanship, or by a defect, unless you were not and could not reasonably have been aware of the problem prior to the incident; Insurer accepted the claim but has now reversed its decision Following the lodgement of the claim, the insurer appointed a builder, JL, to assess and report on the damage. JL attended the property on 7 March 2022 and found internal damage to the ceilings and cornices and external damage to the eaves linings throughout the backyard. It says there was a clear mould spot growing and a home patch job that would need to be redone. JL concluded that the damage was consistent with water ingress into the property due to storm. Its report dated 11 March 2022 says ‘ the damage caused to the property was a result of heavy rainfall and strong winds from the recent storm event which had made its way through the ceiling linings to the affected rooms and through to sections of the eaves lining’ . It also states there are no maintenance issues existing or related to the insured event that may have contributed to the damage. On 14 March 2022, the complainant confirmed that he had completed all previous repairs and maintenance associated with the previous claims. On 16 March 2022, JL attended to make safe repairs on the roof of the property. The insurer also appointed a restorer, RS, who carried out mould containment works on 30 March 2022. RS’ report dated 22 Ma rch 2022 states that the damage is consistent with the claimed event. However, on 13 June 2022, the complainant reported the mould had worsened. The insurer accepted the claim and authorised JL to carry out the relevant repairs on 12 July 2022. Further make safe works were also completed on 4 August 2022, including decontamination and removal of one ceiling. On 18 August 2022, RS told the complainant that all ceilings needed to be removed, including areas not included in the initial claim. Due to the unexplained areas of mould growth in unaffected and separate areas of the building that occurred after further containment had been completed, the insurer says it engaged another builder, IN, and a mould specialist, PG, to provide a further assessment. Based on IN and PG ’s reports, the insurer reversed the acceptance of the claim. Insurer ’ s experts conclude damage due to factors other than storm The insurer relies on the reports from IN and PG dated September 2022. During its inspection, IN noted various damage to the property and found:  no evidence of a storm created opening from within the roof void;  no elevated humidity with no visible water damage and no elevated moisture content, which indicates there was no water penetration issues in most areas with mould; and  there have been previous repairs/damage that are not related to the claimed event. Further, IN says:  the laundry and adjacent water closet is located under rooms above. They have no roof area above it. The first floor ensuite was recently renovated;  stains that appear to be mould were observed on the ceiling and walls. The common doorframe and associated architraves between the two areas are also swollen at the base; Determination | Case number: 924335 Page 4 of 9  there is a clothes dryer in the laundry and the laundry area has no natural ventilation. Ventilation is provided only by the window within the adjacent WC through a common doorway which requires the door and window to be open;  the water damage and staining in the laundry area is attributable to multiple factors, being the onset of a compromised waterproofing system to the first-floor bathroom, routine mopping where water contacts the bottom of the door frame and condensation caused by the clothes dryer;  the mould requires proper treatment to prevent its spread. The water stains to the ceilings in the laundry, rumpus, and bedroom 1 relate to historic issues and require the correct painting system so that the stains do not bleed through and present themselves; and  a water stain on a ceiling usually presents itself as a ring which is light brown in colour. The stains observed were spotted and dark brown/black and sporadic. This mould is visible in all rooms inspected. Therefore, it is caused by environmental issues which are unrelated to the storm event of 1 March 2022 and is a maintenance related issue. In its report, PG says historically, various instances of water ingress have occurred at the property. This includes water staining to the bedroom ceiling, water leaking through the kitchen lights and through the vent in the master bedroom ensuite and water damage to the entryway ceiling. On inspection, PG found that there had been repairs to the original roofing and rerouting of the guttering in an attempt to mitigate water overflow and ingress into the property. In addressing causation, PG says there are two potential sources of water availability at the property that is creating conditions suitable for mould proliferation, being:  historic fault to the roofing structure, which allows water ingress to the roof cavities and impacts the ceilings. PG says this is evident from previous repairs; and  elevated humidity experienced within the property as a result of both occupancy and environmental humidity. PG concludes:  mould growth localised to the northeast cornice of the rumpus room is linked to a historic roofing leak;  mould is noted to be of a widespread spotting growth habit due to favourable environmental conditions rather than a single source of water ingress;  there is no evidence of a specific water ingress; and  there is no evidence to support that mould growth at the property is related to an external water ingress event. Complainant says damage caused by storm The complainant says he has regularly maintained the property and that it is in good condition. In support of his position, he has provided invoices for historic repairs and maintenance. I note that:  roof repairs were completed in August 2014, January 2017, November 2019, November 2020 and February 2022 by a roofer, RR;  the 2014 repairs included rebedding and repointing on the garage roof, and fixing the cracked flashing (along the back of the premises) and tiles on the main roof;  the 2017 repairs involved replacing roof tiles, repointing, replacing sarking and repairs to the gable edge on the second storey;  the 2019 invoice states roof repairs were completed but does not provide any details;  the 2020 repairs involved reinstating a blown-up kitchen flue flashing and replacing a broken roof tile which had allowed water penetration; Determination | Case number: 924335 Page 5 of 9  the 2022 repairs included replacing 12 roof tiles and cleaning out down pipes. It also covers fixing fast flashing to the bottom of the front valleys to eliminate potential leaks and rebedding front hip tiles;  additional works were also completed: > in January 2017 to ‘r emove and replace water damaged areas Inside the house, prepare and paint the entire [sic] ’; > in March 2017, to ‘r emove and replace water damaged areas kitchen, bedrooms and apply paint ’; > in May 2020, to ‘replace Gyprock plasterboard ceiling [and apply] mold [sic] resistant paint. Fixing Ceiling outside patio area [and applying] mold [sic] resistant paint’. The complainant has also provided a building and pest inspection report dated 9 November 2022 from HI. It says, amongst other things, that:  damp soil in the subfloor is likely due to rainfall and inadequate drainage and ventilation;  there are gaps noted to the external façade and windows which need to be sealed off to prevent water intrusion. There are also cracked tiles and deterioration externally; and  internally, there is minor settlement and join cracks. Further, a plumbing report from SP dated 23 June 2022 confirms that water pressure testing for appliances has been carried out and no leaks in the hot or cold water pipes have been detected. It has also provided invoices for works carried out after the storm event including invoices for:  the replacement of an air conditioning filter dated 30 March 2022;  stormwater and connection of downpipes to the absorption trench and new drainage pit and replaced the down pipe on the roof from metal to PVC dated 23 June 2022. A stormwater drainage compliance certificate was also obtained the same day;  the installation of gutters, downpipes, drainage and spreaders dated 17 July 2022; and  subsequent works carried out in November 2022. Proximate cause of the damage must be established The complainant needs to show the proximate cause of the damage being claimed was, on balance, the storm event which is not otherwise excluded. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause. Available information does not show damage due to storm Having reviewed all the available information, I am not satisfied that the complainant has established a claimable loss. The complainant has relied on, amongst other things, reports from HI and SP. However, HI’s report does not comment on the cause of the damage. Further, SP carried out a water pressure test but did not carry out any other leak detection tests or comment on the extent of waterproofing at the property. The invoices provided by the complainant also show that Determination | Case number: 924335 Page 6 of 9 various works have been carried out on the property since 2014. The works relate to the repair of the roof as well as internal damage due to previous water ingress. I accept that there is damage to certain areas of the property and that the complainant says this is due to storm. However, there is no evidence of a storm created opening. I note in this regard that most of the damage claimed as a result of the storm event is on the ground floor and not underneath the roof area. The ground and first floors are also separated by an undamaged subfloor. Further, I accept the evidence of IN and PG that there is evidence of mould growth in areas of the property not related to the claimed storm event. This is c onsistent with the complainant’s own statements that there was no evidence of water penetration in these areas. It is also not clear whether the previous repairs to the property (including the roof, internally and the mould damage) were properly completed. I am persuaded by the evidence of IN and PG that the mould has been caused by environmental and occupancy factors, not a storm. Mould requires proper treatment. Without certification that all pre-existing mould has been removed, I cannot be satisfied that any prior remediation works were effective and that the mould has not spread. The policy states that ‘When you claim, it can only relate to one incident and you cannot include multiple incidents in o ne claim’ . Based on the available information, I am not satisfied that the damage claimed relates to one incident. I consider the property has been subject to deterioration and wear and tear . This is confirmed by the complainant’s invoices for the ongoing roof repairs since 2014 and additional internal repairs to the property. Therefore, on balance, the proximate cause of the claimed damage is wear and tear or deterioration and the property not being maintained in good condition. As the policy excludes cover for damage caused by such factors, the insurer is entitled to decline the claim. Therefore, on balance, I am not satisfied that the complainant has established a claimable loss. Accordingly, the insurer is entitled to decline cover for the claim. No evidence incorrect acceptance caused further loss The complainant says when he lodged the claim the insurer advised him to not carry out any repairs until it has finalised its assessment of the damage. The complainant says the insurer took so long to assess the damage that further damage was incurred. Having reviewed the available information, I accept the insurer took too long to finalise its assessment of the damage. However, in my view, considering the circumstance of the claim and the nature of the damage, further assessment was warranted. Further, the complainant has not provided any details and evidence of the further damage the insurer’s delay caused to the property. He also has not provided any information to demonstrate how the insurer’s claim a dvice or incorrect acceptance of the claim contributed to further damage to the property. In any event, the property was subject to previous water ingress and damage. The complainant has the onus to establish a claimable loss. In the absence of evidence to support his claim, the insurer is not liable for any loss arising from the delay. Insurer has caused damage during make safe During the claims process , the insurer’s builder attended the property to carry out make safe repairs. At this time, JL caused further damage to the property for which the insurer has accepted liability. Determination | Case number: 924335 Page 7 of 9 In recognition of the insurer ’s damage, it has offered the complainant cash settlement of $6,678.31 representing a repair cost of $5,807.23 plus a 15% allowance for contingencies. I note the complainant rejected the insurer’s offer and said the amount it has offered is not sufficient to attend to the repairs it caused. However, the complainant has not provided any quote to support his position. In the absence of any informa tion to the contrary, I accept the insurer’s offer is fair and reasonable. Therefore, the insurer is not required to take any further action in relation to the make safe repairs. 2.2 Is the complainant entitled to compensation? No. I do not consider the complainant is entitled to further compensation in the circumstances. AFCA can award compensation for poor claim handling Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes:  an unusual degree of stress, delay, or inconvenience, and/or  interference with a person’s expectation of enjoyment and/or peace of mind. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Compensation is not warranted in the circumstances The complainant lodged a prior complaint with AFCA regarding the delay in the insurer’s handling of the claim. AFCA considered the claim and awarded the complainant $1,500 in compensation. The complainant accepted AFCA’s preliminary assessment in October 2022. Therefore, in this determination, I have only considered what occurred since that time. In this regard, I accept the insurer withdrew its previous acceptance of the claim. I note, however, that this was due to the further damage the complainant reported after the initial mould remediation works and the need to obtain further reports to establish the precise cause of the damage. It is not unreasonable for the insurer to change its position in relation to a claim if it becomes aware of new information. Further, the insurer acknowledged the property was uninhabitable and paid $54,326.86 in temporary accommodation while it was assessing the claim. In the circumstances, I do not consider the insurer is required to pay further compensation to the complainant. 2.3 Why is the outcome fair? On balance, the complainant has not established a claimable loss. In the circumstances, it would not be fair to require the insurer to cover the claim. Determination | Case number: 924335 Page 8 of 9 Determination | Case number: 924335 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.