Insurer limited liability for storm damage to garage, alleging pre-existing defective construction and excluded causes
Text of the determination
Determination
Case number 924121
Financial firm Insurance Australia Limited
Determination | Case number: 924121 Page 1 of 9
Case number: 924121 23 May 2023
1 Determination overview
1.1 Complaint
The complainant with her husband jointly hold a home building insurance policy (policy) with
the financial firm (insurer). On 8 March 2022, a claim was lodged for damage to the insured
building (garage) and contents stored within from significant storms that affected the area.
The insurer has accepted the claim. However, the parties disagree on the insurer’s
assessment of its liability regarding the repairs to the garage. The insurer has cash settled the
complainant for the contents ’ loss in the amount $46,957.67. It is offering a cash settlement of
$29,337.10 towards repairs to the garage, which the complainant has declined.
The complainant is seeking for the insurer to arrange the necessary repairs and restore the
garage to its pre-loss condition. Alternatively, if cash settled, this is to be based on the scope
of works and quotes provided by the independent consultants and not the insurer’s appointed
consultants.
1.2 Issues and key findings
Is the insurer’s assessment of its liability under the claim fair?
No. The insurer has not shown it is more likely than not that the damage to the garage it
seeks to decline is excluded under the policy. However, it is fair that the insurer be permitted
to decline cover for damage noted between the garage and swimming pool.
Is the complainant entitled to non-financial loss compensation (NFL)?
Yes. Given the complainant’s poor experience under the claim, it is fair that the insurer pays
her $2,000 in NFL.
Why is the outcome fair?
The outcome is fair as the insurer has not been successful in showing it is more likely that the
garage was not constructed in line with the building standards/practices in place at the time of
its construction. It is however fair that the insurer be permitted to decline cover for the cost to
repair damage noted between the garage and swimming pool. Given the complainant’s poor
experience under the claim, it is fair that the insurer pays her $2,000 in NFL.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is to accept liability for the damaged garage and settle the claim as set out in
section 2.1 of this determination. The insurer is not required to cover the cost of repairs to the
area between the swimming pool and garage. The insurer is to pay the complainant $2,000 in
NFL.
Determination | Case number: 924121 Page 2 of 9
2 Reasons for determination
2.1 Is the insurer’s assessment of its liability fair ?
No. The insurer has not shown it is more likely than not that the damage to the garage it
seeks to exclude from cover is due to circumstances excluded under the policy. However, it is
fair that the insurer be permitted to decline cover for the cost to repair the damage in the area
between the swimming pool and garage.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is
entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including Storm. Cover is subject to the conditions, limitations and
exclusions specified in the PDS.
The complainant is first required to show, it is more likely than not, that the loss or damage
claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift
to the insurer to show, on balance, it is entitled to decline cover in line with the policy or
otherwise.
There is no dispute the complainant ’s garage and contents stored within suffered damage
because of significant weather events experienced in the area during March 2022. Loss or
damage caused by storm triggers cover under the policy. Given this, the onus rests with the
insurer to show it is entitled to decline/limit its liability under the claim in line with the policy or
otherwise.
Consultants have provided conflicting information
The insurer appointed building consultant ’s ‘B’ to investigate the cause and extent of the
damage to the insured building. In a report dated 10 May 2022, B confirms damage to the
garage ceiling and concrete slab, however, says the damage was old and pre-existing i.e. not
consistent with storm damage.
B says in its opinion the cause of water ingress into the garage is a combination of back
overflow from gutters due to leaf build-up, cracked pointing to capping, cracked roof tiles and
unseated tiles. B says the damage to the slab and ceiling is due to two separate and
independent events.
Given delays in the insurer appointing engineering consultants, the complainant arranged for
engineering consultant ’s ‘M’ to attend and inspect the garage on 24 May 2022. M has
provided a report dated 23 June 2022 which says in part:
the garage is situated on sloping ground terrain, with the high point of the ground terrain at
the Eastern (behind the garage) end of the site and low point located at the Western (front
of garage) end at the bottom of the driveway. M says it is it is evident that the garage is
located along an overland flow path
M noted significant soil erosion along the sloping driveway entry with photos from shortly
after the storm event showing substantial soil erosion at the front of the garage
slab cracking within the garage building was observed, which in M’s experience appeared
to have developed recently
water ingress and damage were observed to the internal garage walls and ceiling
Determination | Case number: 924121 Page 3 of 9
the complainant provided M photos of the garage from before the storm which show there
were no signs of cracking to the slab or damage to the ceiling
the rear wall of the garage is retaining soil as the ground level behind the garage is higher
M says the damage to the garage was very likely due to the recent extreme storm events
in March 2022, where cracking to the slab and parts of the masonry walls was most likely
due to the rainwater induced erosion and possible hydrostatic pressure build-up.
The insurer arranged for B to re-attend the insured property after which B has provided a
report dated 11 July 2022. In its second report B moves away from its original findings and
says the damage to the garage ceiling and walls is consistent with water ingress through the
roof from a storm event.
Further, that the damage to the slab and surrounding areas is due to stormwater run-off as
identified by M, however, given reference to erosion and hydrostatic pressure by M, B says
there is no cover for the slab under the policy. B recommends a specialist be appointed to
determine the exact cause for the damage to the slab and pool area.
An internal assessor for the insurer has provided a report dated 9 August 2022, which says
the garage is classed as a ‘Class 10 Building - non- inhabitable building or structure’ in line
with the National Construction Code. Given this, the garage is not designed to be watertight.
This report:
confirms there are cracks present to the internal concrete slab of the garage but in his
opinion, there was no major cracking present or major failure
notes the assess or’s opinion that the cracks appeared to be < 0.3mm and would therefore
be considered hairline cracks
says the assessor agrees the garage roof presents as having had roof restoration works
undertaken with a full paint finish. However, that the roof tiles are showing wear and tear of
the paint. The assessor says the roof pointing appeared to be in good condition.
The insurer appointed engineering consultant ’s ‘S’ to investigate the cause and extent of
damage. S has provided a report dated 18 August 2022, which says in part:
it observed extensive rising dampness and lateral water seepage damage in the garage. S
says this is consistent with defects during the original construction of the garage i.e.
inadequate damp proof provisions
the garage roof tiles were in a deteriorated state with fretting of the terracotta occurring.
The tiles have an expected lifespan of 30 years to 50 years and in S’s opinion the tiles had
come to the end of their expected lifespan
S noted inward rotation of the masonry garage wall consistent with building defect at the
time of the garage ’s construction. This being inadequate tensile capacity of the masonry
wall and long-term earth pressure contrary to applicable Australian Standards
S observed cracking between the junction of the slab and surrounding rendered wall [in the
swimming pool area] and opines this was consistent with general building movement and
defective/missing isolated joint between two dissimilar materials (rendered wall, concrete
slab and pavement)
in S’s opinion, the garage is unlikely to be a council approved structure. However, in the
unlikely event that the garage was a council approved structure, S suggests the insurer
refer the matter for recovery.
S provided two supplementary reports dated 21 September 2022 and 22 February 2023,
which were in response to additional information and/or concerns raised by the complainant.
In these reports S says:
the design code applicable at the time of construction of the garage would have been
Ordinance 71, which was first published around the 1920s. Based on this design code
Determination | Case number: 924121 Page 4 of 9
the construction of the garage is subject to defective design/workmanship due to
inadequate damp proof provisions
S reviewed the information from the council noting the garage roof was re-tiled. However, it
was unclear if a complete re-roof was performed, or a localised replacement of the roof
tiles was performed
S refers to historical imagery (Google street view from 2007) and notes the roof profile and
staining is the same as the existing roof tiles
the Australian Standards and Building Code that was applicable at the time of the
construction of the garage (1950’s circa) is Commonwealth Experimental Building Station
NSB 33: Small Retaining Walls
the design guide suggests a base width equal to 0.5 times the retained height for a gravity
retaining wall system. A retained height of approximately 1200 mm would require a
minimum base width of 27 inches (approximately 700 mm) . However, S’s site
measurements show that the existing wall was noted to be approximately 200 mm thick,
and does not comply with the standards or design applicable at time of construction
based on a satellite image review, S says the swimming pool pavers/pavement renovation
work was performed in circa 2019 with the relevant Australian Standards, AS 3727-1993
stating:
the gap between the pool pavement and the garage is consistent with concrete shrinkage
and no isolation joint between the pavement and the garage
photos from the complainant alleged to show the presence of a waterproofing membrane
in the garage wall is in fact a flashing sheet or damp-proof material
in the instance the waterproofing to the rear of the wall was adequate, S would expect no
lateral water seepage and rising dampness related damage be present, which is not the
case here
concludes the lateral water seepage and rising dampness related damage is consistent
with original defective design/workmanship at time of construction.
The complainant has provided several documents from the relevant council regarding the
construction and location of the garage. I note the council was initially ‘K’ and then was
changed to ‘G’. In the interest of brevity, reference to the council includes both K and its
subsequent name G, for the remainder of this determination. The documentation sourced
from the council includes:
a Certificate of Compliance dated 22 January 1987
a Development Application from 2005
a Site inspection and Assessment report from 2005
a Structural Engineer’s Certificate dated 13 June 2006
an Engineering plan assessment report dated 22 May 2006
a Notice of determination of a Development Application dated 3 May 2005
a Construction Certificate dated 3 May 2006
a Council Memo dated 3 August 2009.
The complainant has provided three repair quotes from ‘ RB ’ $62,183.00 dated 28 October
2022, ‘AG’ $91,675.00 dated 22 February 2023 and ‘SB’ $95,700.00 dated 24 February 2023.
The insurer has not shown an entitlement to limit cover for the garage damage
The insurer is seeking to limit is liability for the damage to the garage and area between the
garage and swimming pool (pool). The insurer says the garage presented with pre-existing
defects in construction with no damp-proof provisions, the terracotta roof tiles fretting, inward
rotation of the garage wall and a defective or missing isolation joint between the rendered wall
and the concrete slab next to it.
Determination | Case number: 924121 Page 5 of 9
Further, that S has identified the garage is located over a council storm drain that runs
downhill and that it is unlikely the council would permit reconstruction of a building on the
location. The insurer says, regardless of whether the council will allow the garage to be
demolished and rebuilt, the PDS excludes costs to rebuild to current regulations, if the
property was not built to the existing regulations at the time it was built or modified.
I have considered all the information from the parties including the communications between
the parties, the consultants’ reports, photos and other rel ated information provided to AFCA. I
am not satisfied the insurer has shown, on balance, it is entitled to limit its liability under the
claim for the damage to the garage and driveway area.
The insurer has for the most part relied on the opinions and information from S to limit its
liability for the damaged garage. I acknowledge the information from B, however, I do not find
it persuasive. B has provided conflicting positions in the two reports and in my opinion the
subsequent assessments by M, S and the insurer’s internal assessor were more detailed and
undertaken by more qualified consultants.
The insurer has accepted the damage to the concrete slab. Therefore, I will limit my
consideration to the areas/damage that remains in dispute between the parties.
Roof tiles
I note the insurer’s internal assessor in his report dated 9 August identifies the garage as a
Class 10 Building - non-inhabitable building or structure and given this it is not designed to be
watertight. Further, that in his opinion restoration works to the garage roof had been
undertaken including a full repaint with some tiles showing wear and tear of the applied finish.
Having reviewed all the photos from the various consultants, I am not of the opinion they
support S’s position regardin g the tiles. I accept there is wear and tear, however, it is more
consistent with the internal assessor’s view of peeling paintwork as opposed to fretting
terracotta. Further, the information from the council in its memo of 3 August 2009, confirms
the garage had been renovated including have been re-tiled. Given this, S reference to the
tiles being 30yrs to 50yrs old is not compelling.
The historical pictures provided are of poor quality and do not assist S’s position. For these
reasons, I am not satisfied the insurer’s position regarding he condition of the tiles is
compelling.
Waterproofing/Damp-proof provisions
I note S’s reference to defective design/workmanship in terms of the garage’s original
construction. S says there is an absence of waterproofing/damp proof provisions. Further,
that the relevant design code at the time of construction was Ordinance 71, first published in
the 1920’s. The complainant has provided photos showing the presence of
waterproofing/damp proof provisions, contrary to S’s ini tial findings. S says the photos are not
of waterproofing but rather it is flashing sheet or damp-proof material.
I have reviewed the information from Ordinance 71 referred to by S. It says every person
constructing a building wholly or partly of masonry or of timber frame construction shall
provide and insert damp proof courses of material approved by the Department of Local
Government as complying with the appropriate standard approved by such department.
Further, that the council may permit the omission of damp proof courses form sheds,
outbuildings or the like.
Determination | Case number: 924121 Page 6 of 9
Neither S or the insurer has provided any information distinguishing a flashing sheet from a
waterproof membrane or its function. I accept the photo in question shows a material inserted
into the garage wall. S originally advised there is an absence of waterproofing or damp-proof
provisions, however, on reviewing the photos S says the material is possibly damp-proof
material. Regarding Ordinance 71, I am satisfied it suggests approval of the damp-proof
course material rests with the Department of Local Government or the council, even to such
extent that the council may permit omission of such requirements.
The complainant has provided information from the council in the form of site inspections,
assessments, construction certificates and a certificate of compliance. I am satisfied this
information/records from the council show the garage has been inspected, assessed and
approved by the council. There is no evidence of the council noting any issues of compliance
or otherwise.
Rather, in the certificate of compliance dated 22 January 1987, the council confirms that all
aspects of the building comply with the Local Government Act of 1919. The information also
shows the council had no concerns about the location of the garage, with it having approved
a development application allowing alterations and additions to the garage in 2006.
I find the information from the complainant to be more persuasive and accept this shows, on
balance, the garage was constructed to and complied with the requirements in place at the
time of its construction. Given the above, I am not satisfied the insurer has shown an
entitlement to limit its liability under the claim for the damage to the garage based on:
the structure presented with pre-existing defects in construction or that it is unlikely the
council would permit reconstruction of the structure in location
the PDS excludes costs to rebuild to current regulations, if the property was not built to the
existing requirements at time it was built, which has not been shown to be the case here.
Garage walls
I note S’s reference to inward rotation of the masonry garage wall and/or the construction of
the walls in general. S says the design and construction of the walls do not meet the
requirements set out in the Australian Standards and Building Code applicable at the time of
construction, this being the Commonwealth Experimental Building Station NSB 33: Small
Retaining Walls.
However, consistent with matters considered above, I find the information sourced from the
council to be more relevant and persuasive. I accept the council has confirmed that all
aspects of the structure comply with the Local Government Act of 1919. Further, I find the
information from M in terms of the how the significant storm event will have caused the
damage to the garage (including slab and walls) compelling and consistent with the photos of
the area immediately after the event.
I note the garage has remained in position for approximately 70 years, which does not
support an assertion of defective construction or workmanship. Also, the information from the
complainant, who purchased the property in March 2021, shows there was no damage to the
slab, walls or ceiling in the garage at the time of purchase. This shows it more likely the
damage is recent and due to the significant storm(s) in question.
In the absence of compelling information to the contrary, I am satisfied the available
information shows the dominant and therefore proximate cause for the damage to the garage
is the significant storm(s) in March 2022, which is covered under the policy.
Determination | Case number: 924121 Page 7 of 9
It is fair the insurer decline cover for the area between the garage and pool
S says, based on a satellite image review, the pool pavers/pavement renovation work was
performed in circa 2019 with the relevant Australian Standards, AS 3727-1993 stating:
Guide to residential pavements, say “an isolation joint should be provided where a
pavement adjoins a building or other rigid structure such as a drainage pit.
Isolation joints should allow freedom of movement between the slab and the
structure and resist the entrance of foreign matter.”
S says its inspection found the gap between the pool pavement and the garage is consistent
with concrete shrinkage and there was no isolation joint between the pavement and the
garage as required by the relevant standards. Further, that the damage in this area is due to
general building movement and the missing isolation joint between dissimilar materials
(rendered wall, concrete slab and pavement).
The complainant disputes this and has provided a photo which she says shows the presence
of an isolation joint, only that it has been painted over. I have carefully considered this photo,
however, I am not persuaded this establishes an isolation joint was in place in line with the
relevant standards in place at the time construction.
Further, the complainant has not provided any other information from M or any of the other
consultants in response to S’s findings in this regard. Without persuasive information to the
contrary, I accept S is suitably qualified to provide its opinion on the cause for the damage
noted in the area between the garage and pool. There is no information showing the council
had inspected or visited the property at the time of or after the works in 2019.
I am not satisfied the complainant has shown this damage is due to the storm or any other
listed insured event. Rather, on balance, the damage is due to the absence of the required
isolation joint, concrete shrinkage and general earth movement, which is not covered under
the policy.
The insurer is to increase the level of cover offered under the claim
In line with the matters discussed above, I am not satisfied the insurer’s assessment of its
liability is fair or consistent with its obligations under the policy. I am satisfied the insurer is to
increase the level of cover it has accepted under the claim to include all the damage to the
garage and front driveway. However, the insurer can decline cover for the damage noted in
the area between the garage and pool.
I acknowledge the complainant’s experience under the claim has been stressful and as
vulnerable customers (given the complainant’s husbands health), their wish is for this matter
to be brought to conclusion. I accept the complainants are not seeking a cash settlement and
would prefer for the insurer to authorise and arrange the repairs. However, I also accept the
decision as to how a claim is settled rests with the insurer in line with the policy. Accordingly,
at the discretion of the insurer, it is to settle the claim in one of two ways specified below:
the insurer authorises and manages the demolition and reconstruction of the garage. In the
instance, this requires additional works to ensure it meets the current standards, codes
and building requirements, this is to be covered in line with the policy
alternatively, in the instance the insurer chooses to cash settle the claim, the cash
settlement is to be based on the more competitive and complete of the two most recent
quotes before me, this being AG ’s quote dated 22 February 2023 ($91,675.00 plus GST)
Determination | Case number: 924121 Page 8 of 9
if the claim is cash settled the insurer is to increase the settlement by a further 20%
($20,168.50) to allow for contingencies, the transfer of risk of arranging the repairs and
loss of the lifetime repair guarantee
the insurer is to inform the complainant of its preferred settlement option within 14 days of
rece iving notice of the complainant’s acceptance of this determination.
2.2 Is the complainant entitled to NFL?
Yes. Given the complainant’s poor experience under the claim, it is fair that the insurer pay s
her $2,000 in NFL.
AFCA Rules allow for an award of NFL in certain circumstances
The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
Complainant experienced undue levels of stress, inconvenience and delays
I acknowledge the complainant raises various concerns relating to the insurer ’s management
of the claim, the consultants appointed to the claim, the insurer’s processes and the time it
has taken to bring this matter to conclusion.
I accept the evidence shows there did occur failures in the insurer’s management of the
claim, in particular within the claim ’ s area as well as the assessment process. This has
caused the complainant an unusual extent or degree of stress, anxiety, inconvenience as well
as contributed to delays experienced in finalising the claim.
The poor level of service includes instances of failures in the claim departments ’ processes
and unreasonable decisions made by the insurer’s representatives over the life of the claim.
The insurer was aware of the vulnerable condition of the complainant’s husband and the
impact its claim handling was having on the family.
Having considered the available information, and in line with AFCA approach to awarding
NFL, I am satisfied it is fair that the insurer pays the complainant $2,000 in NFL. This is to be
paid within 14 days of receiving notice of the complainant’s acceptance of this determination.
2.3 Why is the outcome fair?
The outcome is fair as the insurer has not been successful in showing it is more likely that the
garage was not constructed in line with the building standards/practices in place at the time of
its construction. It is however fair that the insurer be permitted to decline cover for the cost to
repair damage noted in area between the garage and pool. Given the complainant’s poor
experience under the claim, it is fair that the insurer pays her $2,000 in NFL.
Determination | Case number: 924121 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to
the Complainant’s feelings or humiliation has been suffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant’s
expectation of enjoyment or peace of mind has occurred.