Insurer limited liability for storm damage to garage, alleging pre-existing defective construction and excluded causes

FirmIAG
Decided2023-05-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$110,844
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's garage was damaged in March 2022 storms and the insurer offered a limited cash settlement, saying the damage was due to defective construction. AFCA found the insurer had not shown an exclusion applied for the garage, required it to rebuild or cash settle on AG's quote plus 20%, excluded the area between garage and pool, and awarded $2,000 non-financial loss.

The insurer bore the onus of showing an exclusion applied and council records and the more persuasive expert evidence showed the storm was the dominant cause of the garage damage.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay non financial lossrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 924121 Financial firm Insurance Australia Limited Determination | Case number: 924121 Page 1 of 9 Case number: 924121 23 May 2023 1 Determination overview 1.1 Complaint The complainant with her husband jointly hold a home building insurance policy (policy) with the financial firm (insurer). On 8 March 2022, a claim was lodged for damage to the insured building (garage) and contents stored within from significant storms that affected the area. The insurer has accepted the claim. However, the parties disagree on the insurer’s assessment of its liability regarding the repairs to the garage. The insurer has cash settled the complainant for the contents ’ loss in the amount $46,957.67. It is offering a cash settlement of $29,337.10 towards repairs to the garage, which the complainant has declined. The complainant is seeking for the insurer to arrange the necessary repairs and restore the garage to its pre-loss condition. Alternatively, if cash settled, this is to be based on the scope of works and quotes provided by the independent consultants and not the insurer’s appointed consultants. 1.2 Issues and key findings Is the insurer’s assessment of its liability under the claim fair? No. The insurer has not shown it is more likely than not that the damage to the garage it seeks to decline is excluded under the policy. However, it is fair that the insurer be permitted to decline cover for damage noted between the garage and swimming pool. Is the complainant entitled to non-financial loss compensation (NFL)? Yes. Given the complainant’s poor experience under the claim, it is fair that the insurer pays her $2,000 in NFL. Why is the outcome fair? The outcome is fair as the insurer has not been successful in showing it is more likely that the garage was not constructed in line with the building standards/practices in place at the time of its construction. It is however fair that the insurer be permitted to decline cover for the cost to repair damage noted between the garage and swimming pool. Given the complainant’s poor experience under the claim, it is fair that the insurer pays her $2,000 in NFL. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is to accept liability for the damaged garage and settle the claim as set out in section 2.1 of this determination. The insurer is not required to cover the cost of repairs to the area between the swimming pool and garage. The insurer is to pay the complainant $2,000 in NFL. Determination | Case number: 924121 Page 2 of 9 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability fair ? No. The insurer has not shown it is more likely than not that the damage to the garage it seeks to exclude from cover is due to circumstances excluded under the policy. However, it is fair that the insurer be permitted to decline cover for the cost to repair the damage in the area between the swimming pool and garage. The policy is an insured events contract of insurance The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including Storm. Cover is subject to the conditions, limitations and exclusions specified in the PDS. The complainant is first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy or otherwise. There is no dispute the complainant ’s garage and contents stored within suffered damage because of significant weather events experienced in the area during March 2022. Loss or damage caused by storm triggers cover under the policy. Given this, the onus rests with the insurer to show it is entitled to decline/limit its liability under the claim in line with the policy or otherwise. Consultants have provided conflicting information The insurer appointed building consultant ’s ‘B’ to investigate the cause and extent of the damage to the insured building. In a report dated 10 May 2022, B confirms damage to the garage ceiling and concrete slab, however, says the damage was old and pre-existing i.e. not consistent with storm damage. B says in its opinion the cause of water ingress into the garage is a combination of back overflow from gutters due to leaf build-up, cracked pointing to capping, cracked roof tiles and unseated tiles. B says the damage to the slab and ceiling is due to two separate and independent events. Given delays in the insurer appointing engineering consultants, the complainant arranged for engineering consultant ’s ‘M’ to attend and inspect the garage on 24 May 2022. M has provided a report dated 23 June 2022 which says in part:  the garage is situated on sloping ground terrain, with the high point of the ground terrain at the Eastern (behind the garage) end of the site and low point located at the Western (front of garage) end at the bottom of the driveway. M says it is it is evident that the garage is located along an overland flow path  M noted significant soil erosion along the sloping driveway entry with photos from shortly after the storm event showing substantial soil erosion at the front of the garage  slab cracking within the garage building was observed, which in M’s experience appeared to have developed recently  water ingress and damage were observed to the internal garage walls and ceiling Determination | Case number: 924121 Page 3 of 9  the complainant provided M photos of the garage from before the storm which show there were no signs of cracking to the slab or damage to the ceiling  the rear wall of the garage is retaining soil as the ground level behind the garage is higher  M says the damage to the garage was very likely due to the recent extreme storm events in March 2022, where cracking to the slab and parts of the masonry walls was most likely due to the rainwater induced erosion and possible hydrostatic pressure build-up. The insurer arranged for B to re-attend the insured property after which B has provided a report dated 11 July 2022. In its second report B moves away from its original findings and says the damage to the garage ceiling and walls is consistent with water ingress through the roof from a storm event. Further, that the damage to the slab and surrounding areas is due to stormwater run-off as identified by M, however, given reference to erosion and hydrostatic pressure by M, B says there is no cover for the slab under the policy. B recommends a specialist be appointed to determine the exact cause for the damage to the slab and pool area. An internal assessor for the insurer has provided a report dated 9 August 2022, which says the garage is classed as a ‘Class 10 Building - non- inhabitable building or structure’ in line with the National Construction Code. Given this, the garage is not designed to be watertight. This report:  confirms there are cracks present to the internal concrete slab of the garage but in his opinion, there was no major cracking present or major failure  notes the assess or’s opinion that the cracks appeared to be < 0.3mm and would therefore be considered hairline cracks  says the assessor agrees the garage roof presents as having had roof restoration works undertaken with a full paint finish. However, that the roof tiles are showing wear and tear of the paint. The assessor says the roof pointing appeared to be in good condition. The insurer appointed engineering consultant ’s ‘S’ to investigate the cause and extent of damage. S has provided a report dated 18 August 2022, which says in part:  it observed extensive rising dampness and lateral water seepage damage in the garage. S says this is consistent with defects during the original construction of the garage i.e. inadequate damp proof provisions  the garage roof tiles were in a deteriorated state with fretting of the terracotta occurring. The tiles have an expected lifespan of 30 years to 50 years and in S’s opinion the tiles had come to the end of their expected lifespan  S noted inward rotation of the masonry garage wall consistent with building defect at the time of the garage ’s construction. This being inadequate tensile capacity of the masonry wall and long-term earth pressure contrary to applicable Australian Standards  S observed cracking between the junction of the slab and surrounding rendered wall [in the swimming pool area] and opines this was consistent with general building movement and defective/missing isolated joint between two dissimilar materials (rendered wall, concrete slab and pavement)  in S’s opinion, the garage is unlikely to be a council approved structure. However, in the unlikely event that the garage was a council approved structure, S suggests the insurer refer the matter for recovery. S provided two supplementary reports dated 21 September 2022 and 22 February 2023, which were in response to additional information and/or concerns raised by the complainant. In these reports S says:  the design code applicable at the time of construction of the garage would have been Ordinance 71, which was first published around the 1920s. Based on this design code Determination | Case number: 924121 Page 4 of 9 the construction of the garage is subject to defective design/workmanship due to inadequate damp proof provisions  S reviewed the information from the council noting the garage roof was re-tiled. However, it was unclear if a complete re-roof was performed, or a localised replacement of the roof tiles was performed  S refers to historical imagery (Google street view from 2007) and notes the roof profile and staining is the same as the existing roof tiles  the Australian Standards and Building Code that was applicable at the time of the construction of the garage (1950’s circa) is Commonwealth Experimental Building Station NSB 33: Small Retaining Walls  the design guide suggests a base width equal to 0.5 times the retained height for a gravity retaining wall system. A retained height of approximately 1200 mm would require a minimum base width of 27 inches (approximately 700 mm) . However, S’s site measurements show that the existing wall was noted to be approximately 200 mm thick, and does not comply with the standards or design applicable at time of construction  based on a satellite image review, S says the swimming pool pavers/pavement renovation work was performed in circa 2019 with the relevant Australian Standards, AS 3727-1993 stating:  the gap between the pool pavement and the garage is consistent with concrete shrinkage and no isolation joint between the pavement and the garage  photos from the complainant alleged to show the presence of a waterproofing membrane in the garage wall is in fact a flashing sheet or damp-proof material  in the instance the waterproofing to the rear of the wall was adequate, S would expect no lateral water seepage and rising dampness related damage be present, which is not the case here  concludes the lateral water seepage and rising dampness related damage is consistent with original defective design/workmanship at time of construction. The complainant has provided several documents from the relevant council regarding the construction and location of the garage. I note the council was initially ‘K’ and then was changed to ‘G’. In the interest of brevity, reference to the council includes both K and its subsequent name G, for the remainder of this determination. The documentation sourced from the council includes:  a Certificate of Compliance dated 22 January 1987  a Development Application from 2005  a Site inspection and Assessment report from 2005  a Structural Engineer’s Certificate dated 13 June 2006  an Engineering plan assessment report dated 22 May 2006  a Notice of determination of a Development Application dated 3 May 2005  a Construction Certificate dated 3 May 2006  a Council Memo dated 3 August 2009. The complainant has provided three repair quotes from ‘ RB ’ $62,183.00 dated 28 October 2022, ‘AG’ $91,675.00 dated 22 February 2023 and ‘SB’ $95,700.00 dated 24 February 2023. The insurer has not shown an entitlement to limit cover for the garage damage The insurer is seeking to limit is liability for the damage to the garage and area between the garage and swimming pool (pool). The insurer says the garage presented with pre-existing defects in construction with no damp-proof provisions, the terracotta roof tiles fretting, inward rotation of the garage wall and a defective or missing isolation joint between the rendered wall and the concrete slab next to it. Determination | Case number: 924121 Page 5 of 9 Further, that S has identified the garage is located over a council storm drain that runs downhill and that it is unlikely the council would permit reconstruction of a building on the location. The insurer says, regardless of whether the council will allow the garage to be demolished and rebuilt, the PDS excludes costs to rebuild to current regulations, if the property was not built to the existing regulations at the time it was built or modified. I have considered all the information from the parties including the communications between the parties, the consultants’ reports, photos and other rel ated information provided to AFCA. I am not satisfied the insurer has shown, on balance, it is entitled to limit its liability under the claim for the damage to the garage and driveway area. The insurer has for the most part relied on the opinions and information from S to limit its liability for the damaged garage. I acknowledge the information from B, however, I do not find it persuasive. B has provided conflicting positions in the two reports and in my opinion the subsequent assessments by M, S and the insurer’s internal assessor were more detailed and undertaken by more qualified consultants. The insurer has accepted the damage to the concrete slab. Therefore, I will limit my consideration to the areas/damage that remains in dispute between the parties. Roof tiles I note the insurer’s internal assessor in his report dated 9 August identifies the garage as a Class 10 Building - non-inhabitable building or structure and given this it is not designed to be watertight. Further, that in his opinion restoration works to the garage roof had been undertaken including a full repaint with some tiles showing wear and tear of the applied finish. Having reviewed all the photos from the various consultants, I am not of the opinion they support S’s position regardin g the tiles. I accept there is wear and tear, however, it is more consistent with the internal assessor’s view of peeling paintwork as opposed to fretting terracotta. Further, the information from the council in its memo of 3 August 2009, confirms the garage had been renovated including have been re-tiled. Given this, S reference to the tiles being 30yrs to 50yrs old is not compelling. The historical pictures provided are of poor quality and do not assist S’s position. For these reasons, I am not satisfied the insurer’s position regarding he condition of the tiles is compelling. Waterproofing/Damp-proof provisions I note S’s reference to defective design/workmanship in terms of the garage’s original construction. S says there is an absence of waterproofing/damp proof provisions. Further, that the relevant design code at the time of construction was Ordinance 71, first published in the 1920’s. The complainant has provided photos showing the presence of waterproofing/damp proof provisions, contrary to S’s ini tial findings. S says the photos are not of waterproofing but rather it is flashing sheet or damp-proof material. I have reviewed the information from Ordinance 71 referred to by S. It says every person constructing a building wholly or partly of masonry or of timber frame construction shall provide and insert damp proof courses of material approved by the Department of Local Government as complying with the appropriate standard approved by such department. Further, that the council may permit the omission of damp proof courses form sheds, outbuildings or the like. Determination | Case number: 924121 Page 6 of 9 Neither S or the insurer has provided any information distinguishing a flashing sheet from a waterproof membrane or its function. I accept the photo in question shows a material inserted into the garage wall. S originally advised there is an absence of waterproofing or damp-proof provisions, however, on reviewing the photos S says the material is possibly damp-proof material. Regarding Ordinance 71, I am satisfied it suggests approval of the damp-proof course material rests with the Department of Local Government or the council, even to such extent that the council may permit omission of such requirements. The complainant has provided information from the council in the form of site inspections, assessments, construction certificates and a certificate of compliance. I am satisfied this information/records from the council show the garage has been inspected, assessed and approved by the council. There is no evidence of the council noting any issues of compliance or otherwise. Rather, in the certificate of compliance dated 22 January 1987, the council confirms that all aspects of the building comply with the Local Government Act of 1919. The information also shows the council had no concerns about the location of the garage, with it having approved a development application allowing alterations and additions to the garage in 2006. I find the information from the complainant to be more persuasive and accept this shows, on balance, the garage was constructed to and complied with the requirements in place at the time of its construction. Given the above, I am not satisfied the insurer has shown an entitlement to limit its liability under the claim for the damage to the garage based on:  the structure presented with pre-existing defects in construction or that it is unlikely the council would permit reconstruction of the structure in location  the PDS excludes costs to rebuild to current regulations, if the property was not built to the existing requirements at time it was built, which has not been shown to be the case here. Garage walls I note S’s reference to inward rotation of the masonry garage wall and/or the construction of the walls in general. S says the design and construction of the walls do not meet the requirements set out in the Australian Standards and Building Code applicable at the time of construction, this being the Commonwealth Experimental Building Station NSB 33: Small Retaining Walls. However, consistent with matters considered above, I find the information sourced from the council to be more relevant and persuasive. I accept the council has confirmed that all aspects of the structure comply with the Local Government Act of 1919. Further, I find the information from M in terms of the how the significant storm event will have caused the damage to the garage (including slab and walls) compelling and consistent with the photos of the area immediately after the event. I note the garage has remained in position for approximately 70 years, which does not support an assertion of defective construction or workmanship. Also, the information from the complainant, who purchased the property in March 2021, shows there was no damage to the slab, walls or ceiling in the garage at the time of purchase. This shows it more likely the damage is recent and due to the significant storm(s) in question. In the absence of compelling information to the contrary, I am satisfied the available information shows the dominant and therefore proximate cause for the damage to the garage is the significant storm(s) in March 2022, which is covered under the policy. Determination | Case number: 924121 Page 7 of 9 It is fair the insurer decline cover for the area between the garage and pool S says, based on a satellite image review, the pool pavers/pavement renovation work was performed in circa 2019 with the relevant Australian Standards, AS 3727-1993 stating: Guide to residential pavements, say “an isolation joint should be provided where a pavement adjoins a building or other rigid structure such as a drainage pit. Isolation joints should allow freedom of movement between the slab and the structure and resist the entrance of foreign matter.” S says its inspection found the gap between the pool pavement and the garage is consistent with concrete shrinkage and there was no isolation joint between the pavement and the garage as required by the relevant standards. Further, that the damage in this area is due to general building movement and the missing isolation joint between dissimilar materials (rendered wall, concrete slab and pavement). The complainant disputes this and has provided a photo which she says shows the presence of an isolation joint, only that it has been painted over. I have carefully considered this photo, however, I am not persuaded this establishes an isolation joint was in place in line with the relevant standards in place at the time construction. Further, the complainant has not provided any other information from M or any of the other consultants in response to S’s findings in this regard. Without persuasive information to the contrary, I accept S is suitably qualified to provide its opinion on the cause for the damage noted in the area between the garage and pool. There is no information showing the council had inspected or visited the property at the time of or after the works in 2019. I am not satisfied the complainant has shown this damage is due to the storm or any other listed insured event. Rather, on balance, the damage is due to the absence of the required isolation joint, concrete shrinkage and general earth movement, which is not covered under the policy. The insurer is to increase the level of cover offered under the claim In line with the matters discussed above, I am not satisfied the insurer’s assessment of its liability is fair or consistent with its obligations under the policy. I am satisfied the insurer is to increase the level of cover it has accepted under the claim to include all the damage to the garage and front driveway. However, the insurer can decline cover for the damage noted in the area between the garage and pool. I acknowledge the complainant’s experience under the claim has been stressful and as vulnerable customers (given the complainant’s husbands health), their wish is for this matter to be brought to conclusion. I accept the complainants are not seeking a cash settlement and would prefer for the insurer to authorise and arrange the repairs. However, I also accept the decision as to how a claim is settled rests with the insurer in line with the policy. Accordingly, at the discretion of the insurer, it is to settle the claim in one of two ways specified below:  the insurer authorises and manages the demolition and reconstruction of the garage. In the instance, this requires additional works to ensure it meets the current standards, codes and building requirements, this is to be covered in line with the policy  alternatively, in the instance the insurer chooses to cash settle the claim, the cash settlement is to be based on the more competitive and complete of the two most recent quotes before me, this being AG ’s quote dated 22 February 2023 ($91,675.00 plus GST) Determination | Case number: 924121 Page 8 of 9  if the claim is cash settled the insurer is to increase the settlement by a further 20% ($20,168.50) to allow for contingencies, the transfer of risk of arranging the repairs and loss of the lifetime repair guarantee  the insurer is to inform the complainant of its preferred settlement option within 14 days of rece iving notice of the complainant’s acceptance of this determination. 2.2 Is the complainant entitled to NFL? Yes. Given the complainant’s poor experience under the claim, it is fair that the insurer pay s her $2,000 in NFL. AFCA Rules allow for an award of NFL in certain circumstances The AFCA Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. Complainant experienced undue levels of stress, inconvenience and delays I acknowledge the complainant raises various concerns relating to the insurer ’s management of the claim, the consultants appointed to the claim, the insurer’s processes and the time it has taken to bring this matter to conclusion. I accept the evidence shows there did occur failures in the insurer’s management of the claim, in particular within the claim ’ s area as well as the assessment process. This has caused the complainant an unusual extent or degree of stress, anxiety, inconvenience as well as contributed to delays experienced in finalising the claim. The poor level of service includes instances of failures in the claim departments ’ processes and unreasonable decisions made by the insurer’s representatives over the life of the claim. The insurer was aware of the vulnerable condition of the complainant’s husband and the impact its claim handling was having on the family. Having considered the available information, and in line with AFCA approach to awarding NFL, I am satisfied it is fair that the insurer pays the complainant $2,000 in NFL. This is to be paid within 14 days of receiving notice of the complainant’s acceptance of this determination. 2.3 Why is the outcome fair? The outcome is fair as the insurer has not been successful in showing it is more likely that the garage was not constructed in line with the building standards/practices in place at the time of its construction. It is however fair that the insurer be permitted to decline cover for the cost to repair damage noted in area between the garage and pool. Given the complainant’s poor experience under the claim, it is fair that the insurer pays her $2,000 in NFL. Determination | Case number: 924121 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.