Home / Hollard / Determination 924108

Determination 924108

Denial of earthquake damage claim on basis damage was pre-existing foundation movement

FirmHollard
Decided2023-12-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Complainants claimed for earthquake damage to their home; the insurer denied the claim as pre-existing foundation movement damage. AFCA found the insurer entitled to deny the claim and ordered nothing.

The earthquake was not the proximate cause of the damage, which was mainly pre-existing foundation movement, and the accidental damage cover did not apply.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 924108 Financial firm Hollard Insurance Partners Limited Determination | Case number: 924108 Page 1 of 5 Case number: 924108 14 December 2023 1 Determination overview 1.1 Complaint The complainants lodged a claim with the financial firm (insurer) under their home insurance policy. This is for the damage sustained to their property following an earthquake on 22 September 2021. The insurer denied the claim on the basis the damage is pre-existing, and that the earthquake did not cause any damage. The complainants disagree and seek indemnity under the policy. Further, the complainants are dissatisfied with the way the insurer handled their claim. 1.2 Issues and key findings Is the insurer entitled to deny the claim? Yes. The insurer is entitled to deny the claim. Why is the outcome fair? The exchanged evidence does not establish the damage has either occurred by an insured event or an accident. The insurer is entitled to rely on the policy’s t erms and conditions in assessing its liability. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to deny the claim and is not required to take any further action. Determination | Case number: 924108 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Yes. The insurer is entitled to deny the claim. The complainants have established a claimable loss When making a claim, an insured party has the onus of establishing they suffered a loss for which their insurance policy provides cover. The insured party must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability. The complainants’ policy covers the building for loss or damage caused by one of several insured events including earthquake. The Certificate of Insurance (COI) shows the complainants hold the optional cover ‘accidental dama ge’. The accidental damage optional cover extends to cover loss or damage to the building caused by an accident. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event or an accident, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). It is not disputed that the PDS and COI have been provided to the complainants. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainants. I accept the insurer’s liability depends on the proximate cause of the damage. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. If there are several causes operating at the same time, AFCA will consider each one to determine which cause set the train of events in motion. On balance, the earthquake is not the proximate cause of the damage I have carefully reviewed the parties’ arguments and the exchanged evidence. O n balance, I accept the earthquake is not the proximate cause of the damage. Firstly, I accept the floor level survey is consistent with long term foundation movement. The insurer’s engineer (B D) notes the floor variance from the cinema room to the entry is 56mm being nearly triple the allowable variance across the entire slab footprint. The surpass of the variance in the floor levels is also noted in the kitchen and dining. BD says the general patterns of the slab falling towards the front elevation slab edge. Secondly, on balance, the majority of the damage is pre-existing. I note BD says: Determination | Case number: 924108 Page 3 of 5  the damage is pre-existing and not related to the earthquake. This is evident in the cornice, wall and floor tile damage where the cracking has accumulated debris  there is pre-existing foundation movement damage evident in the detached cornice to the entry, hallway floor tile cracking and the ensuite shower wall damage  if the differential movement in the slab is due to the earthquake, occurring instantaneously, the extent of the building damage would be substantial, and the damage would have spread to the entire house. Neither the complainants nor their engineer (JW) refute the pre-existing movement damage. JW says there are new cracks in the plasterboard walls, the external brickwork and the floor tiling. JW argues the property was strained to 80% and the additional 20% of the earthquake induced strains resulted in new cracks. Even if I were to accept that the earthquake has exacerbated the damage, I am not satisfied it is the dominant cause of the damage. Further, I accept that in the absence of the earthquake, the property requires substantial rectification work. Arguably, the property would have continued to move and worsen over time even in the absence of the earthquake. I accept this is consistent with JW s’ comments. JW says the additional 20% strain is insufficient to cause cracking in an unstressed structure. However, the property has residual strains and stresses in the walls and slabs caused by foundation movement which is evident in the cracking. Based on JWs ’ comments, I consider the operating cause of the damage to be the pre-existing foundation movement. Thirdly, BD notes large trees located within the influence zone of the footing system. Further, BD notes the vegetation has increased between 2010 and 2020 where the mature trees have a significant influence on the soil moisture content, contributing to the differential foundation movement. Finally, I find BD logical, persuasive and conclusive. This is because:  the photographs provided are consistent with his findings  BD explained the influencing factors resulting in the differential movement noted  w hile JW disagreed with some of BD’s comments, he did not provide any persuasive evidence to refute BD’ s findings. The insurer is entitled to deny the claim Amongst other things, the complainants say:  the cornice damage occurred during the 2011 earthquake  the historic cracks referenced in DB’s report were due to the routine cleaning process following the earthquake  the pre-existing damage was minimal  BD did not thoroughly inspect the damage, including the external damage to the brick walls. There is no dispute that an earthquake has occurred. Further, the complainants provided several photographs showing external cracking damage to the brick walls of the property. I am not satisfied these photographs assist the complainants in establishing a causal link between the cracking and the earthquake. I do not accept that the pre-existing damage is minimal in nature. This is not consistent with JW’s findings where he estimates the residual stresses to be significant. I note the complainants have provided their analysis regarding different areas of damage. However, I am not satisfied that their analysis is consistent with e ither BD’s or JW’s findings. Determination | Case number: 924108 Page 4 of 5 There is no dispute the policy covers loss or damage caused by an earthquake. However, I am not satisfied the complainants have established a claimable loss. Further, I do not accept the ‘accidental damage’ cover assists the complainants’ position. This is because the available evidence does not show the damage was caused by a single accident as required by the policy. I am satisfied the insurer is entitled to deny the claim. The insurer handled the claim reasonably overall The complainants are dissatisfied with the insurer’s handling of the claim. The complainants say the insurer has miscommunicated the claim’s denial incorrectly to them. The claims notes show the complainants continued to complain to the insurer and dispute the claim outcome. I have carefully reviewed the exchanged evidence and I accept the insurer handled the claim reasonably overall. The insurer says there were delays, however this was due to the recent weather events and assessment took longer than expected. The exchanged evidence shows the insurer has engaged the correct experts to assess the cause of the damage. While there might have been some confusion regarding the denial, I consider this is an isolated incident and does not warrant compensation. 2.2 Why is the outcome fair? The exchanged evidence does not establish the damage has either occurred by an insured event or an accident. The insurer is entitled to rely on the policy’s terms and conditions in assessing its liability. Determination | Case number: 924108 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.