Home / IAG / Determination 923457

Determination 923457

Insurer sought to cap liability at sum insured and offered less than repair quotes after its make-safe and mould remediation failures led to major damage

FirmIAG
Decided2023-12-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$732,000
Non-financial loss$5,400
Amount claimed$731,977
SourceAFCA PDF

Summary

Homeowners' house was badly damaged after storms and the insurer's inadequate make-safe and mould remediation work. AFCA found the insurer could not limit liability to the $400,000 sum insured, ordered a cash settlement based on the complainants' quotes, additional temporary accommodation, interest and $10,800 compensation.

Because the insurer's claim mismanagement was the primary cause of the major damage, it was unfair to rely on the policy sum insured to limit its liability.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 923457 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 923457 Page 1 of 8 Case number: 923457 13 December 2023 1 Determination overview 1.1 Complaint The complainants hold home building and contents insurance with the financial firm (insurer). They lodged a claim for damage to their home following a storm on 2 December 2021. The insurer attended to make safe repairs. The property sustained further, more significant damage during a storm on 7 January 2022, and subsequently became mould affected. The insurer accepts that its make safe repairs and mould remediation were inadequate. It has offered to pay the complainants the $400,000 sum insured plus amounts outside the policy. The complainants say the insurer’s negligent claim handling has resulted in the destruction of their home, such that it is liable for the full cost of repairs. Based on their quotes, which include the cost to replace the home’s slab, they say those costs will exceed $700,000. 1.2 Issues and key findings Is the insurer’s liability limited to the sum insured? No. The amount in dispute is the difference between the insurer’s offer and the repair costs claimed by the complainants. As the insurer’s claim mismanagement is the main cause of the significant damage to the home, it is not entitled to limit its liability based on the policy terms. Is the insurer entitled to undertake further investigations? No. The insurer has had enough time to obtain a geotechnical report regarding the slab. Is the insurer required to pay more than it has offered? Yes. Based on the exchanged information, a cash settlement based on the complainants’ quotes is reasonable. Is compensation payable? Yes. The insurer acknowledges that its poor claim handling has caused the complainants major indirect financial and non-financial loss. It is to pay the maximum $5,400 AFCA may award for each ($10,800 in total), as it previously offered to do. Why is the outcome fair? It would not be fair for the insurer to apply policy terms to limit its liability when the primary cause of damage to the complainant’s home was its claim mismanagement. 1.3 Determination This determination is substantially in favour of the complainants. If the complainants provide written notice they accept this determination (notice) the insurer is required to:  Pay the amounts set out in section 2.3 below, in relation to the building damage claim  within 21 days of receiving the notice, pay $5,400 in indirect financial loss compensation  within 21 days of receiving the notice, pay $5,400 in non-financial loss compensation. Determination | Case number: 923457 Page 2 of 8 2 Reasons for determination This determination solely relates to the complainants ’ complaint concerning the building damage claim. it does not affect the parties’ rights and obligations in relation to the contents damage claim. 2.1 Is the insurer ’s liability limited to the sum insured? No. The amount in dispute is the difference between the insurer’s offer and the repair costs claimed by the complainants. As the insurer’s claim mismanagement is the main cause of the significant damage to the home, it is not entitled to limit its liability based on the policy terms. Complainants’ home was damaged On 2 December 2021, the complainants notified the insurer that during a storm earlier that day water had entered their home through the roof. The following day the insurer advised them that builder UB would be attending the home to undertake make safe repairs, which would include checking the electrical components and placing a tarp over the roof. On 4 December 2021, UB’s subcon tractor (AJ) attended the home to undertake roofing make safe repairs. This comprised of ‘silicone and roofing screws secured to areas of impact’. On 16 December 2021, UB reported that the damage was consistent with having been caused by water pooling on the roof sheeting which was under the minimum required pitch. As a result, water had back flowed through the transition flashing and into the roof cavity. UB’s opinion was based on a roofing report from TB, plumber. TB said the roofing had been installed with a 0.3 degree fall despite 1.0 degree being the minimum requirement. The photo TB took of the alleged non-compliance actually shows a measurement of 1.35 degrees. On 7 January 2022, the home was affected by a much larger volume of water ingress during a second storm. The following day, builder TC attended to undertake make safe repairs. TC said AJ’s silicone work had failed, resulting in stormwater travelling up and under the f lashing. In mid January 2022, the insurer’s trades removed drying equipment from the home. This was done despite the complainants reporting that internal areas remained wet and expert confirmation moisture levels were elevated. The home was then increasingly mould affected. On 20 January 2022, the insurer denied the claim. It did so as UB had reported that the water ingress was due to roofing defects. As the complainants disagreed with the insurer’s claim denial, the insurer arranged for the home to be assessed by builder PB. In its report dated 11 February 2022, PB advised that the resultant damage was storm related. It noted the storm’s severity meant any pre -existing issues with the roof had not contributed. On 18 February 2022, the insurer accepted the claim and the additional damage caused by the second storm. Insurer says policy sum insured applies The insurer acknowledges that:  its assessment that the roof was below the minimum 1.0 pitch was incorrect  AJ’s make safe repairs amounted to ‘faulty workmanship’ Determination | Case number: 923457 Page 3 of 8  AJ’s inadequate make safe repairs materially contributed to the extensive water ingress on 7 January 2022  the premature removal of drying equipment contributed to the spread of mould  its failure to install sump pumps resulted in the home sitting in water, leading to elevated moisture levels, and contributing the spread of mould  it is liable to return the home to its ‘pre event condition’. However, the insurer says its liability for the cost of repairs is capped at the $400,000 building sum insured plus interest, in addition to payments previously made. It says this is because:  it has not been negligent in its claim handling  AJ was not negligent when completing the make safe repairs  ‘if not for the roof not being watertight, water ingress would not have occurred’  the ‘ storm event ’ was the proximate (dominant) cause of loss, not any make safe issues or negligence  complainant LS says her father (JS) made the roof watertight following AJ’s make safe work, so AJ’s work did not cause the subsequent water entry or damage  before the second storm, JS advised LS that AJ’s make safe work was defective and that there would be further water ingress if another extreme storm occurred. He offered to rectify the problem, but LS told him not to do so as the insurance claim was ongoing, and the insurer’s assessor was yet to inspect the property  the complainants therefore failed to comply with their obligation under the product disclosure statement (PDS) to do everything reasonable to prevent further damage. Complainants say insurer is liable for the full cost of repairs The complainants say the insurer is responsible for the full cost of repairs, which exceed the building sum insured, because:  the claim should never have been denied, and the denial resulted in unnecessary delays  the cost to repair the damage caused by the first storm was likely only $5,000, but after the second storm and the insurer’s mismanagement their home has been destroyed  the insurer said the day after the first storm the roof would be tarped, but that did not occur  AJ was not qualified to perform the roofing make safe repairs and did so negligently, resulting in the significant water ingress on 7 January 2022  the premature removal of drying equipment and the failure to install sump pumps resulted in a mould infestation, which the insurer did not address for months  p ursuant to the insurer’s own protocols, sump pumps should have been installed. The insurer’s failure to do so caused the floor to heave, cracking a pipe and resulting in a leak  the insurer ignored the recommendation its building consultant CF made on 19 August 2022 that drying equipment be reinstalled  t he insurer’s negligent conduct has resulted in the home becoming a total loss. Due to the major increases in building costs, the sum insured will not be sufficient to cover rebuilding. Insurer is not entitled to limit its liability to the sum insured The panel is not satisfied that the insurer is entitled to limit its liability for the cost of building repairs to the building sum insured. This is because:  the insurer accepts it is liable to pay the sum insured plus interest, so the amount in dispute between the parties is the difference between that figure (approximately $425,000) and the cost of repairs the complainants say are payable (approximately $731,000)  the damage due to the first storm was very minor, with UB estimating on 16 December 2021 the repair costs at $2,996.50. Immediately following the second storm repair costs Determination | Case number: 923457 Page 4 of 8 had increased but were still relatively contained, with PB estimating $19,189.30 on 11 February 2022. The insurer accepts claim related repair costs now exceed $400,000  the insu rer’s acknowledgements that AJ’s make safe faulty workmanship materially contributed to the water ingress in the second storm, and that it’s mould remediation was inadequate, undermine its submission the ‘storm event’ was the proximate cause of loss  the in surer’s submissions concerning J S (that he attended to make safe repairs before the second storm, and that LS prevented him from doing so) are contradictory  the panel is not satisfied that JS attended to make safe repairs before 7 January 2022 (JS has denied doing so), or that the complainants failed to take reasonable steps to prevent further damage. The basis on which LS told JS not to undertake work was reasonable. The insurer’s claim mismanagement was the primary cause of the major damage to the home and therefore the significantly increased repair costs. The insurer is therefore not entitled to limit its liability by reference to the policy terms. 2.2 Is the insurer entitled to undertake further investigations? No. The insurer has had enough time to obtain a geotechnical report regarding the slab. Extensive causation investigations have been undertaken At the insurer’s request, CF inspected the home on 8 April 2022. It reported high moisture levels and mould growth. CF considered that damage to the flooring throughout the home was storm related. On 31 May 2022, engineer PM issued a report to the insurer in relation to the sunroom. PM concluded that: the movement of the sunroom is primarily caused by the non-compliant (defective) construction of the sunroom – principally the lack of a sufficiently stiff structural slab to this area. However, the pre - existing damage has been substantively increased by t he storm event. On 14 June 2022, plumber EC provided a report after investigating a possible leak from the main bathroom’s shower. EC said the strip drain had moved and the silicone and grouting around it was defective. EC noted this could have been due to foundation movement. The insurer’s second engineer, IL, provided a report dated 6 July 2022. IL said:  t here was no evidence of structural damage or foundation movement around the home’s perimeter that would indicate the water inundation had resulted in structural issues  the lack of distress to the brickwork and exposed concrete slab indicated that the 50mm vertical variation in bedroom two was not due to recent foundation movement due to saturation of founding soils  publicly available real estate images from 2013 and 2021 showed pre-existing internal brickwork efflorescence staining and ceiling trim distress  the issues with the main bathroom’s shower were localised and unlikely to be related to the claim event, although further investigations were needed to confirm this. In its re-attendance report dated 19 August 2022, CF said:  the movement damage and cracking affecting internal walls and ceilings had progressed and was claim related  there were still elevated moisture levels within the home Determination | Case number: 923457 Page 5 of 8  the eastern side floor level exceeded the maximum deviation tolerance of 20mm. As there had been no storm damage or observable movement or cracking on that side of the home, CF assumed the original slab levels were outside tolerances at the time of construction  the floor level deviation above 20mm on the western side can be accounted for by water ingress into the slab from external ground elevations and the storm  the floor levels should start to equalise once wall and floor coverings have been removed and recommended dehumidification commenced  if the moisture levels remained high after the strip out and dehumidification, the concrete surface should be sanded, and liquid waterproof membrane applied to it  leak detection testing should also be undertaken. On 18 October 2022, plumber FL undertook leak detection testing. FL reported that the main bathroom’s shower drain and its connection pipe within the slab had dislodged. FL suggested this was due to movement in the slab. This was causing water damage to the internal wall frame and wall behind the shower. Further, the rear bathroom wall had shifted. On 28 October 2022, foundation specialist AC reported to the complainants that their home had subsided considerably. AC said ‘excessive water damage has contributed to the movement in the slab and walls’. At the request of the complainants, PM reinspected the home on 7 June 2023. PM advised:  following the two storms, there was water around the home for over six weeks  that water had caused the soil foundation and slab to heave  the existing slab had undergone significant differential movement from the events and the foundation moisture levels and footing movement has not reached an equilibrium state where the ground moisture has stabilised  ‘ Given the extent of differential footing movement observed, it is not recommended to reusing the existing concrete slab as it has deformed significantly and is yet to stabilise and depending on the permeability of the foundation, may take several years to reach a new equilibrium ’ . Insurer is not entitled to undertake further investigations Until PM issued its second report, the insurer maintained that it was not liable for any issues with the slab, which in any event was reusable. It also said it was able to attend to repairs. Following receipt of PM’s second report, the insurer advised that it was no longer able to attend to repairs and offered to cash settle based on the full sum insured. In July 2023, the insurer advised that it also wished to appoint a geotechnical engineer to prepare a report on the slab. The panel is not satisfied that it would be reasonable to permit the insurer to undertake further investigations concerning the slab. This is because:  it has already had the opportunity to extensively investigate causation issues in relation to the slab, and has received multiple expert reports in that regard  PM, the engineer it first engaged, has unequivocally expressed the view that the slab has heaved due to the water inundation events and is not reusable  the relationship between the parties has significantly deteriorated to the point where it is in both their interests that the claim is finalised as soon as possible and without the need for prolonged interactions between them. Determination | Case number: 923457 Page 6 of 8 2.3 Is the insurer required to pay more than it has offered? Yes. Ba sed on the exchanged information, a cash settlement based on the complainants’ quotes is reasonable. Complainant has provided quotes The complainant has provided the following quotes to reinstate their home:  quote dated 18 July 2023 from builder DC for building works - $688,994.90  quote dated 3 August 2023 from demolisher BD - $14,685.00  quote dated 8 August 2023 from septic tank supplier GS - $28,297.19. The combined total of these quotes is $731,977.09. Insurer has made a cash settlement offer On 12 September 2023, the insurer offered to cash settle for $474,032.93, comprised of:  building sum insured - $400,000.00  interest - $22,339.73  excess refund - $500.00  temporary accommodation (TA) to 5 January 2024 - $35,843.20  report fees - $4,550.00  compensation - $10,800.00. The insurer noted its offer was in addition to previous payments made to and for the complainants. Since making its cash settlement offer, the insurer has paid the report fee component. The compensation aspect is discussed in section 2.4 of this determination. Insurer is required to pay more than it has offered After deducting the report fee and compensation components, the difference between the insurer’s offer and the total of the complainants’ quotes is $273,294.16. That figure represents the quantum in dispute between the parties. The panel notes that the insurer has not disputed that the cost of repairs will exceed the sum insured. Nor has it provided quotes in response to those the complainants submitted in July and August 2023. The complainants’ quotes are recent and have been provided by trades prepared to undertake the work. The panel is satisfied they are actionable. In the circumstances and given the finding the insurer’s claim mismanagement was the primary cause of the major damage to the home and therefore the significantly increased repair costs, the panel is satisfied that it is reasonable that the insurer pays a cash settlement based on the complainants’ quotes. This means it is to pay the disputed amount in addition to its previous offer (less the report fee and compensation components). The insurer is to update to the date payment is made its interest calculation on the sum insured component. The updated interest payment is payable instead of the contingencies uplift that may be applied to a cash settlement payment. The insurer’s previous offer included an allowance for TA until 5 January 2024. It is inevitable that TA will be required beyond then. Therefore, the complainants are to confirm with BD when it will be able to demolish the home. DC is then to be asked by them to provide a written Determination | Case number: 923457 Page 7 of 8 estimate of when the home will be ready to be lived in, given the works outlined in its quote dated 18 July 2023. The insurer is to pay, as a cash settlement, the additional TA required beyond 5 January 2024 (based on the current TA arrangements). So, if the complainants accept this determination, the insurer is required to pay the following:  within 21 days, $458,682.93 (offer less the report fee and compensation components)  within 21 days, $273,294.16 (disputed amount)  within 21 days, interest on $400,000 pursuant to section 57 of the Insurance Contracts Act, 1984 (Cth) , from 13 September 2023 to the date payment is made  within 21 days of receiving from the complainants DC’s estimate o n how long the home will be unliveable during its repairs, the additional TA costs required beyond 5 January 2024. 2.4 Is compensation payable? Yes. The insurer acknowledges that its poor claim handling has caused the complainants major indirect financial and non-financial loss. It is to pay the maximum $5,400 AFCA may award for each ($10,800 in total), as it previously offered to do. AFCA can award indirect financial loss compensation Under paragraph D.3.2 of the AFCA Rules, we may require an insurer to compensate a complaint for indirect financial loss (also known as consequential loss). The maximum amount we may award is capped at $5,400. However, we may not award of indirect financial loss if the complaint arises as a result of a claim on a general insurance policy that expressly excludes such liability. AFCA can award compensation for poor claim handling Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Insurer is to pay compensation to the complainants The complainants say that the insurer’s poor claim handling has caused them to sustain significant loss of income and to incur major travel expenses. They also say the insurer’s poor conduct has compromised their physical and mental health. The insurer acknowledges that its poor claim handling has caused major indirect financial and non-financial loss. It has apologised to the complainants and has offered to pay them a total of $10,800 in compensation. While the panel notes the complainants’ position that the insurer’s offer does not represent adequate compensation for their experience, the offer represents the combined total of the maximum amounts AFCA may award for indirect financial and non-financial loss. Accordingly, the insurer is to pay the complainants a total of $10,800 in compensation. 2.5 Why is the outcome fair? It would not be fair for the insurer to apply policy terms to limit its liability, when the primary cause of damage to the complainant’s h ome was its claim mismanagement Determination | Case number: 923457 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.