Insurer limited an earthquake damage claim for floor tiles to 20% of repair costs, relying on faulty workmanship and wear and tear exclusions
Summary
The complainant claimed for floor tiles damaged by an earthquake; the insurer offered only 20% of repair costs, citing faulty workmanship and wear and tear. AFCA found in favour of the complainant, requiring the insurer to accept the claim and advise how it will settle it.
The insurer did not establish on the balance of probabilities that the tiling was faulty or that wear and tear contributed, so the exclusions did not apply to an accidental damage claim.
Issues
- Claim denial primary · upheld
“The insurer has not established the application of any relevant policy exclusion; it is not entitled to limit its liability to 20% of the cost of repairs.”
- Claim amount dispute secondary · upheld
“Settlement must cover replacement of the entire tiled floor and the cost of movement joints up to $25,000.”
- Product terms interpretation secondary · upheld
“Fault or defect undefined, given plain meaning; tiling did not breach regulations when installed so was not faulty or defective.”
Subjects and remedies
home or building damagenatural disasterpay claimrepair or rectify
Text of the determination
Determination
Case number 923191
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 923191 Page 2 of 7
Case number: 923191 21 June 2023
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (the insurer). She
lodged a claim saying her floor tiles had been damaged by an earthquake.
The insurer’s engineer said the earthquake may have damaged the tiles, but this would not
have happened if the tiles were installed correctly. The insurer’s engineer estimated the
earthquake’s contribution to the damage was up to 20%. The insurer offered to settle the
claim by paying 20% of the cost of repairs (less excess).
The complainant rejected the insurer’s offer. The c omplainant wants the insurer to repair the
damage.
1.2 Issues and key findings
Was the damage caused by an earthquake?
Yes. The expert reports obtained by both parties clearly show the damage was caused by an
earthquake.
Is the insurer entitled to deny the claim?
No. The policy excludes cover for damage caused by faulty and defective workmanship.
However, the insurer has not established that the tiling was faulty or defective.
The insurer says the tiles have no movement joints. Movement joints are required by current
regulations, but were not required by regulations when the tiles were laid in 1986. The tiling
did not breach any regulations when it was installed, and it performed well for about 35 years
before it was damaged by the earthquake in 2021.
The insurer must accept the claim. It is not entitled to limit its liability to 20% of the cost of
repairs.
How should the claim be settled?
The claim should be settled in accordance with section 2.3 of this determination.
1.3 Determination
This determination is in favour of the complainant.
The insurer must accept the claim and settle it in accordance with the policy terms and
section 2.3 of this determination.
Within 14 days of receiving notice that the complainant accepts this determination, the insurer
must tell the complainant how it intends to settle the complaint. If the insurer is not willing to
repair the damage, it must explain why.
Determination | Case number: 923191 Page 3 of 7
2 Reasons for determination
2.1 Was the damage caused by an earthquake?
Yes. The damage was caused by an earthquake.
Complainant must establish claimable loss
A party making an insurance claim must establish they suffered a loss that is covered under
the insurance policy. They must establish this on the balance of probabilities (i.e. that it is
more likely than not).
If a claimable loss is established, the insurer must accept the claim, unless it can establish
the application of a relevant exclusion. The insurer must establish the exclusion on the
balance of probabilities.
Policy covers accidental damage
The cover provided by the policy is set out in the product disclosure statement. Relevant
policy terms are quoted in section 3.2 of this determination.
The policy is an ‘accidental damage’ policy, meaning it covers all accidental damage during
the period of insurance, unless it is specifically excluded. There is no dispute that damage
caused by an earthquake is accidental damage.
Complainant’s home incurred accidental damage
On 22 September 2021, an earthquake occurred in Victoria. The complainant says the
earthquake cracked and loosened floor tiles in one room.
The complainant and the insurer appointed experts to inspect the tiles. Two builders
appointed by the insurer, two builders appointed by the complainant, and an engineer
appointed by the complainant all said the earthquake damaged the tiles.
An engineer appointed by the insurer said the earthquake ‘may have precipitated the damage
to the floor tiles’, but the damage ‘would not have occurred if the tiles had been installed
adequately’.
The available information clearly shows the tiles were damaged by an earthquake. This is
accidental damage. Therefore, the complainant has established a claimable loss. The insurer
must accept the claim, unless it can establish the application of a relevant exclusion.
2.2 Is the insurer entitled to deny the claim?
No. The insurer has not established the application of any relevant policy exclusion.
Policy excludes cover for some kinds of damage
The policy excludes cover for damage caused by certain factors, including:
defects or faulty workmanship
wear and tear.
The insurer says it is entitled to apply these exclusions to deny the claim.
Determination | Case number: 923191 Page 4 of 7
Insurer has not established exclusion for faults or defects
The policy excludes cover for damage caused by: ‘ A defect in an item, faulty workmanship,
structural defects or faulty design .’ To establish the application of this exclusion, the insurer
must establish:
there was a fault or defect
the fault or defect caused the damage.
The policy does not define ‘fault’ or ‘defect’ . When a term in a policy is not defined, AFCA will
interpret it in accordance with its plain and ordinary meaning. I would consider a building (or
part of a building) to be faulty or defective if it breached the regulations in force when it was
built, or if it was manifestly unsuitable for its intended purpose.
The insurer’s engineer said the floor tiling had no flexible perimeter joints around it, and no
expansion/movement joints within the tiles. They said this did not comply with the Australian
Standard, which was introduced in 2007.
The complainant says the tiling was installed in 1986. The insurer’s engineer says providing
movement joints within tiles was not required by regulations in 1986, but it was ‘ considered to
be the acceptable and good building practice ’.
The complainant’s engineer said the tiling was laid with ‘ clear gaps below the skirtings and
allowing for partial internal articulation ’ , and ‘ primarily performed well’ until it was damaged by
the earthquake.
The insurer’s engineer did not agree that the tiling ‘ primarily performed well’ before the
earthquake. They said some tiles had east-west cracks, and implied these cracks pre-dated
the earthquake (as opposed to the more severe north-south cracks, which they admit may
have been ‘precipitated’ by the earthquake). However, photographs of the east-west cracks
show they were minor, and there is no suggestion they impaired the function of the floor. I
agree with the complainant’s engineer that the tiling primarily performed well before the
earthquake.
The tiling did not breach any regulations in force when it was installed, and it performed well
for about 35 years before it was damaged by the earthquake. Therefore, I do not think it was
faulty or defective.
Insurer has not established exclusion for wear and tear
The policy excludes cover for damage caused by wear and tear. Wear and tear is the
deterioration of an object caused by its ordinary use, and the ordinary effects of natural forces
such as weather.
The insurer’s engineer said the tiles were stressed by ‘ long term movement of the
footing/slab ’. They conducted a floor level survey showing the floor level varied by up to
44mm. They said the floor level variations were ‘notable’. They did not say whether the floor
was level when the tiles were installed, or how much movement they would expect the tiles to
withstand.
The complainant’s engineer said the slab had gradually moved over the life of the building,
but this had not caused any damage. They said the wall framing showed ‘no visible signs of
increased articulation movement or footing related wall cracking’.
The available information does not show wear and tear contributed to the damage caused by
the earthquake.
Determination | Case number: 923191 Page 5 of 7
Insurer must accept claim
The complainant has established a claimable loss. The insurer has not established the
application of any relevant policy exclusion. Therefore, the insurer must accept the claim and
settle it in accordance with the policy terms.
The policy says the insurer can settle the claim by repairing the damage, or by payin g the
cost of repairs. The insurer is not entitled to limit its liability to 20% of the cost of repairs.
2.3 How should the claim be settled?
The insurer must settle the claim in accordance with the policy terms.
Insurer must advise how it will settle claim
The policy says the insurer can settle a claim for building damage by:
repairing the damaged part of the building (to the same condition as when it was new); or
paying the complainant the cost of repairing the damaged part of the building (to the same
condition as when it was new).
The complainant says she wants the insurer to repair the damage. The insurer has not said
whether it would prefer to repair the damage or pay the complainant the cost of repairs.
Within 14 days of receiving notice that the complainant accepts this determination, the insurer
must tell the complainant how it intends to settle the claim.
The insurer must be fair in deciding how to settle the claim. It must fairly consider the
complainant’s preference to have it repair the damage. If it is not willing to repair the damage,
and insists on cash-settling the claim, it must explain why. Any cash-settlement offer by the
insurer must fairly compensate the complainant for the disadvantages of a cash settlement,
including the loss of the insurer ’s guarantee on repairs.
If the complainant is not satisfied with the insurer’s proposed settlement, and th e matter
cannot be resolved by negotiation, the complainant may lodge another AFCA complaint.
Settlement must cover replacement of entire tiled floor
The complainant’s builders said the entire tiled floor needed to be replaced. The insurer has
not provided any information to refute this.
The insurer’s settlement of the claim must cover the replacement of the entire tiled floor.
Insurer must pay cost of movement joints
The policy says the insurer will pay any additional costs (up to $25,000) required to comply
with ‘ government or local authority bylaws ’, unless the complainant breached those bylaws
before the damage occurred.
The replacement tiling will need movement joints to comply with regulations that did not exist
when the original tiling was laid.
If the insurer replaces the tiling, it must incorporate movement joints. If the insurer pays the
complainant the cost of repairs, it must pay any additional costs (up to $25,000) required to
incorporate movement joints in the replacement tiling.
Determination | Case number: 923191 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant policy terms
Product Disclosure Statement
SECTION 1 – YOUR BUILDINGS AND CONTENTS (pages 17 – 29 )
Accidental damage cover
What is covered
…
We will cover Your Buildings and/or Your Contents as set out on Your Policy Schedule for
accidental destruction, accident al loss or accidental damage. However some instances of
destruction, l oss and damage are only covered under specific conditions as set out below.
Landslide or subsidence.
The c over for landslide or subsidence only applies if the loss or damage occurs within 72 hours of,
and as a direct result of, one of the following:
…
‒ earthquake or tsunami;
…
What We will not pay for
We will not pay for Your Buildings or Cont ents which are destroyed, lost or damaged by:
Landslide or subsidence, except as described above.
Settling, shrinkage or any movement of earth.
…
Rust, corrosion, gradual deterioration, depreciation, wear or tear.
…
A defect in an item, faulty workmanship, structural def ects or faulty design.
…
In addition, see also ‘General terms and conditions’ on pages 36 - 39.
Determination | Case number: 923191 Page 7 of 7
How We pay a claim for Your Buildings
When destruction, loss or damage occurs to Your Buildings, We will do one of the following:
We will rebuild Your Building to the same condition as when they were new;
We will repair the damaged portions of Your Buildings to the same condition as when they were
new; or
We will pay You the cost of rebuilding or repairing Your Buildings to the same condition as when
they were n ew. We will decide which one We will do.
We will also pay any additional costs required for Your Buildings to comply with government or local
authority bylaws. We will not however pay these additional costs if You were required to comply
with these bylaws, and had not done so, before the destruction, loss or damage occurred. The most
that We will pay for costs required for Your Buildings to comply with requirements of any authority in
any one period of insurance is $25,000.
GENERAL TERMS AND CONDITIONS (p ages 36 – 38)
General exclusions applying to all Sections of thi s Policy
…
3. This Policy also excludes claims for loss, damage, destruction or liability arising from:
…
g. Landslide or subsidence except as described in Section 1 of this Policy.
h. Any event that does not occur within the period of insuranc e.
…