Text of the determination
Determination
Case number 922315
Financial firm AAI Limited
Case number: 922315 9 February 2024
1 Determination overview
1.1 Complaint
The complainants hold a home building and contents policy (policy) with the financial firm
(insurer). On 30 September 2021, the complainants lodged a claim with the insurer for
damage to the insured building, which they say is due to escape of liquid from leaking pipes.
The insurer has declined the claim. The insurer says this is because the damage pre-exists
inception of the policy in May 2018, is due to inadequate building practices and/or is excluded
under the policy.
The insurer says the complainants failed to establish there exists damage which is covered
under the policy. The complainants believe the insurer is obliged to cover the cost to restore
this damage, replace the home‟s concrete slab, reimburse their expert s‟ report fees and to
pay non-financial loss compensation.
1.2 Issues and key findings
Is the insurer’s assessment of its liability under the claim fair ?
No. The panel is not satisfied the insurer has shown an entitlement to decline the
complainants‟ claim in its entirety. The insurer is to accept liability for the new damage shown
to most likely be related to escape of liquid and occurred after inception of the policy.
Subject to being provided with reasonable evidence of payment, the insurer is to reimburse
the complainants for expenses they incurred in sourcing the various consultants‟ reports up to
$5,000.
Are the complainants entitled to non-financial loss compensation (NFL)?
Yes. The insurer is to pay the complainants $1,500 in NFL in line with the AFCA Rules
(Rules).
Why is the outcome fair?
The outcome is fair because it is consistent with the available expert information as well as
the terms and conditions of the policy. It is fair that the insurer be required to cover the
complainants for damage that has been shown to most likely be covered under the policy as
well as NFL for the complainants‟ experience over the life of the claim.
1.3 Determination
This determination is in favour of the complainants.
The insurer is required to cover the complainants for the damage established to be the result
of the leaking pipes. However, the insurer is entitled to decline cover for the remaining
building damage including the concrete slab.
Determination | Case number: 922315 Page 2 of 14
Within 14 days or receiving notice of the complainants‟ acceptance of this determination, the
insurer is:
to reimburse the complainants for the expenses up to $5,000 they incurred in sourcing the
various consultants‟ reports in support of their position (subject to being provided with
reasonable evidence of payment)
pay the complainants $1,500 in NFL in line with the AFCA Rules (Rules).
Determination | Case number: 922315 Page 3 of 14
2 Reasons for determination
2.1 Is the insurer ’s assessment of its liability fair?
No. The panel is not satisfied the insurer has shown an entitlement to decline the
complainants‟ claim in its entirety. The insurer is to accept liability for the damage shown to
be caused by escape of liquid from leaking pipes and associated ground movement.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). The panel accepts the
insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including „ Escape of liquid ‟. Cover under the policy is subject to the
conditions, limitations and exclusions specified in the PDS.
Complainants have the onus to show the claim is covered under the policy
The complainants are first required to show, it is more likely than not, that the loss or damage
claimed triggers cover under the policy. Only if the complainants can do this, will the duty shift
to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording
or otherwise.
Having considered the information from the parties, the panel is of the opinion there is
evidence of movement and cracking damage to most areas of the insured building. In line
with the expert information, the damage to the insured building can be divided into two main
sections, these being:
damage to the east side of the insured building
damage to the west side of the insured building.
The relevant policy terms are extracted in Section 3.2 of this determination.
Insurer says the damage to the east side of the building is not covered
The insurer says the damage to the insured property is a „ whole house ‟ issue and has been
occurring cover an extended period. This has been due to inadequacy of the concrete slab,
ground movement and issues that existed from before the insurer was on risk i.e. predate
inception of the policy.
The insurer acknowledges the presence of leaks and associated escape of liquid, which is an
insured event under the policy. However, based on the investigations and associated reports
from its appointed engineering consultant „MC‟, the insurer says the leaks occurred prior to it
coming on risk in May 2018. It relies on MC ‟s findings to support this position.
MC inspected the premises in 2022 and said all leaks pre-date the purchase of the property
by the complainants in 2018. Its key findings are duplicated in Section 3.2 of this
determination. In summary, these findings are:
the cracking to the walls, wall linings in the bathroom, the extension and the east side of
the house is the result of sanitary and stormwater drain leaks
specifically, the leaks in bedrooms 2, 3 and 4 are the result of plumbing leaks under the
south water tank
Determination | Case number: 922315 Page 4 of 14
the cracking in the east wall of the house is the result of the plumbing leaks under the
south water tank and from a northeast downpipe
the cracking in the southwest corner of the bathroom is the result of a leak from the
sanitary drain in the bathroom
previous real estate listing photographs show evidence of previous repairs to cracks and
an expansion join in the living room/hallway ceiling being added in 2016.
The cracking along the east side of the house is worse than the other cracks observed
throughout the property. MC does not attribute the cracks in other sections to the various
leaks.
Plumbing reports do not confirm proximate cause of failures
The plumbing leaks were identified by the complaina nt‟s p lumber BP in February 2022 and
MC‟s plumber JP in May 2022.
The bathroom sanitary drain is located under the bathroom. JP‟s report confirms there were
breaks in the main line which was in fair condition overall, with evidence repairs were
previously completed in 1987. It does not comment on the proximate cause of these breaks.
MC says it is likely this was caused by earth movement.
The sanitary and stormwater drain runs adjacent to the east wall. The areas of damage are
located adjacent to the stormwater tank which was installed in or around 2010. MC says the
tank was installed in 2010, and it was likely this damage was caused by the tank.
After a CCTV inspection JP concluded:
the front left tank overflow had severe collapse at base of the down pipe, where it
connected to the main junction in the earth ware pipework. This was undermining the
footings
there was a severe break present in the sewerage line under the rear left rainwater tank in
proximity to the footings
there was visible ground water along the entire rear footing.
Panel accepts the damage to the east side triggers cover under the policy
Having closely reviewed the available evidence, the panel accepts there exists some
evidence of prior repairs to the east side of the house. The evidence is included in MC ‟s
original report from June 2022 and additional report prepared in February 2023.
However, the panel is not persuaded this information alone establishes the new damage
noted post inception of the policy is not due to the escape of liquid from leaking pipes. Also,
this information does not include persuasive evidence to support MC‟s assertion that the
leaking pipes existed prior to the complainants arranging the policy.
The panel is satisfied it is fair to accept the available information shows the cracking/structural
damage now present to the east side did not exist at the time of the pre-purchase report and
therefore the complainants purchasing the property. It is entirely plausible that the previous
repairs relate to general movement damage, consistent with other areas of the insured
building (and not escape of liquid).
The panel is not satisfied the insurer, or its appointed consultants have provided any
persuasive information to show the damage noted since late 2018 was pre-existing or is not
due to the escape of liquid. Also, as noted above, there is an absence of any persuasive
information to show the escape of liquid had been occurring before May 2018.
Determination | Case number: 922315 Page 5 of 14
The panel is not satisfied there is reasonably persuasive information establishing the sanitary
and stormwater pipes were leaking before the insurer coming on risk. On balance, it is fair to
accept the leaks and associated damage occurred after inception of the policy and became
evident towards the end of 2018.
Further, the complainants advise that they had lodged a couple stormwater ingress damage
claims with the insurer before the claim subject of this complaint. The insurer sent out
consultants to assess the damage. The complainants say no issues relating to pre-existing
damage or damage to the structure were identified by these consultants. Further, it is
reasonable to expect, had all this damage been pre-existing, these consultants would have
identified and noted such damage being present in previous assessments.
While the panel accepts the site soil conditions (classified as highly reactive) are conducive to
create natural ground movement from seasonal changes, it is satisfied the noted leaks are
more likely to have been the proximate (effective) cause of the east side building damage.
The panel has considered the insurer‟s reference to the general policy exclusion for loss or
damage caused by, arises from or involves ground movement. However, the panel is not
satisfied this applies to the new damage noted on the east side.
Given the panel is satisfied the proximate cause for the damage to the east side is an escape
of liquid, any resultant ground movement is a consequence of the proximate cause (escape of
liquid) and not itself the dominant cause for the damage.
Insurer to cover the complainants for the east side damage as set out below
The policy covers damage caused by an escape of liquid. Given this, and in the absence of
persuasive information to the contrary, the panel is not satisfied the insurer has shown an
entitlement to decline cover for the east side damage in line with the policy or otherwise.
The parties have not provided any information relating to the required scope of works or
estimated costs to repair the east side damage. Therefore, within 14 days of receiving notice
of the complainants‟ acceptance of this determination:
the insurer is to arrange for an appropriately qualified and licensed consultant to prepare a
scope of works to repair the damage to the east side of the insured building (including the
main bathroom)
within seven days or receiving the scope of works, the insurer is to arrange for two suitably
qualified and licensed consultants to provide actionable repair quotes
the insurer is to cash settle the complainants based on the higher of these two repair
quotes plus an additional 15% to allow for contingencies and the transfer of risk in
arranging the repairs
Information supports damage to the west side is due to ground movement
MC says the cracking and movement damage at the west side of the house occurred due to
ground movement occurring naturally because of seasonal changes in soil moisture
conditions. MC says there is no indication that the escape of liquid from the leaking pipes has
caused or contributed to damage noted to the west side of the building.
The panel has considered the consultants‟ reports from FE and SE appointed by the
complainants. The panel is not satisfied the information from these consultants establishes
that the damage to the west side of the building is related to or arises from the leaking pipes
and associated escape of liquid.
Determination | Case number: 922315 Page 6 of 14
FE says it is likely that clogged gutters, blocked grated drains, poor site drainage, backed up
storm water drains and possibly leaking grey water and sewer drains were contributing to
variations in soil moisture levels under the footings. However, FE has not provided any
compelling information or explanation to establish this to be case or more importantly this
being the dominant or proximate cause for the damage to the west side of the building.
SE says the cause for the damage to the walls, ceilings and concrete slab is the inadequate
footings under the slab, lack of internal beams and the low bearing capacity of the site which
has caused settlement and sagging of the slab. SE says the damage has been occurring
since construction of the residence.
The panel accepts the concerns identified with the home‟s concrete slab‟s constr uction would
render it defective in line with the current building Standards. However, these Standards were
not in place at the time of the concrete slab ‟ s construction i.e. the current Standards do not
apply to the construction of the concrete slab.
However, given the location of the insured property and soil classification (highly reactive),
the panel acknowledges the method of construction of the concrete slab is not adequate. This
means it is likely that the concrete slab is more susceptible to and has been impacted by
seasonal ground movement and associated movement damage across the insured building.
Such damage is excluded under the policy.
The panel is not satisfied the available information provides any compelling evidence that
connects the west side damage to the escape of liquid or any other insured event covered
under the policy. Rather, it more likely that the damage to the west side is consistent with
ongoing long-term issues with the inadequacy of the concrete slab and ground movement.
The policy excludes cover for ground movement unless it can be established it has arisen
from a specific insured event.
Accordingly, without evidence to the contrary, the panel is satisfied the insurer is entitled to
decline cover for the damage identified to the west side of the insured building.
Insurer not required to cover the cost to replace the slab
The complainants say they must demolish and completely rebuild the premises because the
slab is not compliant with current construction codes. Accordingly, they say the claim must be
considered a total loss. They have not provided a quote or scope of works for these repairs.
The panel does not accept it would be fair or consistent with the insurer‟s obligations under
the policy to require it to address the concerns noted with the concrete slab.
As discussed above, the panel accepts the concerns identified with the concrete slab‟s
construction. However, these issues with its construction and need for rectification/upgrade
are not due to factors which trigger cover under the policy.
Although the insurer is not entitled to rely on policy exclusions relating to defective
construction of the concrete slab, it is fair to accept it can decline cover for the concrete slab
because:
the issue relating to the concrete slab have been present from the time of its construction
and therefore pre-date the complainants arranging the policy
loss or damage due to general ground movement is excluded under the policy
the damage and or issued with the concrete slab do not arise from an event covered under
the policy.
Determination | Case number: 922315 Page 7 of 14
The responsibility to arrange any necessary works to manage the concrete slab and prevent
any further damage to the insured building rests with the complainants, now that they are
aware of the issues.
Insurer to reimburse the complainants for professional costs
Under the AFCA Rules, we can require an insurer to reimburse a complainant‟s costs
incurred in making their complaint. This includes legal costs and expert report fees.
Unless there are exceptional reasons, we will not require an insurer to contribute more than
$5,000 towards these costs. Usually, we will award such costs where we are satisfied the
assistance provided was relevant, useful and assisted in resolving the complaint.
In the given circumstances, the panel is satisfied it is fair that the insurer be required to
reimburse the complainants for the costs they incurred in sourcing expert reports in support of
their position.
The available information shows these expert reports were utilised and relied on by the
insurer in its assessment of the claim. Further, that these reports have assisted the
complainants in establishing their entitlement to cover under the claim.
Accordingly, subject to be provided with reasonable proof of payment by the complainants,
the insurer is to reimburse the complainants for these costs up to $5,000. This is to be paid
within 14 days of receiving notice of the complainants‟ acceptance of this determination.
2.2 Are the complainant’s entitled to NFL?
Yes. The insurer is to pay the complainants $1,500 in NFL.
Rules allow for an award of NFL in certain circumstances
The AFCA Rule D 3.3 allows for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
In this instance and considering AFCA‟s approach to compensation, the panel is satisfied the
insurer‟s management of the complainants‟ claim did cause them to experience undue leve ls
of stress, anxiety and delays over the life of the claim.
The panel is satisfied it is reasonable to accept the insurer‟s assessment of its liability for a
portion of the damage to the insured building has not been fair or consistent with its
obligations under the policy. The panel accepts this failure did result in the complainants
experiencing undue and unnecessary levels of stress and anxiety.
Further, that this failure to fairly assess its liability under the claim caused under delay in
bringing this matter to conclusion.
Accordingly, the panel is satisfied it is fair that the insurer pays the complainants $1,500 in
NFL in line with the Rules. This is to be paid within 14 days of the insurer receiving notice of
the complainants‟ acceptance of this determination.
Determination | Case number: 922315 Page 8 of 14
2.3 Why is the outcome fair?
The outcome is fair because it is consistent with the available expert information as well as
the terms and conditions of the policy. It is fair that the insurer be required to cover the
complainants for damage that has been shown to most likely be covered under the policy as
well as NFL for the complainants‟ experience over the life of the claim.
Determination | Case number: 922315 Page 9 of 14
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
The complainants are represented. Any reference to the complainant is a reference to the
complainants and their representatives where relevant.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as an industry expert.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 922315 Page 10 of 14
3.2 Policy and Report Extracts
Policy Extracts
What you are covered for – Insured events
If you have a Classic, Classic Extras or Classic Advantages insurance policy, we
cover your home and contents when covered under this policy for loss or damage
at the insured address caused by an insured event during the period of insurance.
There are some things we do not cover and these are shown on the „We do not
cover‟ section of the following tables on pages 17 to 25 and in the „General
exclusions‟ on pages 58 to 62.”
Escape of liquid
We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of the
following:
– ...
– any drain, fixed pipes, roof gutters or guttering and rainwater downpipes,
drainage and sewage systems;
– fixed tanks; ...
General exclusions
You are not covered under any section of this policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, but we will cover landslide or subsidence that is
specifically covered under the following insured events:
– „Storm‟ (see page 18);
– „Flood‟ (see page 17);
– „Earthquake and Tsunami‟ (see page 19);
– „Explosion‟ (see page 25).
Determination | Case number: 922315 Page 11 of 14
Report Extracts
Record Key points
R (Builder) Report
5 - 10 - 21
Extensive cracking internally and externally to walls on all elevations.
After reading engineering reports and a thorough site inspection it
appears evident the dwelling is sinking and there is major ground
movement.
The IO has addressed drainage and dug up the back patio, had
concrete scans and engineers repots done at their own expense to
try to resolve issues but problems continue.”
FE Report
8 - 4 - 20
6.0 CAUSES OF CRACKING
6.1 Foundation soil movements.
Our local experience indicates that soils of the area are known to
have a very high to extreme high shrink - s well capacity and this can
cause footings and slabs to settle and lift subject to moisture
variations. Footing and slab settlements can also occur i f the soils
become saturated.
6.2 Leaking drains & other i ssue s
We identified clogged gutters, blocked grat ed drains, poor site
drainage and evidence of backup of storm water drains. Grey water
and sewer drains are also likely to be leaking.
It is high ly likely that this is contributing significantly to variations in
soil moisture under the footings and slab and movements and
damages.
BP Report
10 - 12 - 22
CCTV sewer inspection
inspect all drains at the property
entry point laundry disconnector trap external through to council
connection point
- main line is earthenware pipe in fair condition there is a PCV repair
that has been done
at the rear of the property leading to the toilet
- inspect from main bathroom from shower waste through to main line
show er trap has total break showing large gap to void
was able to get past and found second total break under the bath
section close to wall, both breaks are large and the whole section of
the pipe is damaged
the drainage in this section is not usable
drain w as completed in 1971
pvc repair was done in 1987 all drainage seems to be as per
submitted drawings
Determination | Case number: 922315 Page 12 of 14
Record Key points
JP Report John has requested a CCTV ins pection of their sewerage and branch
lines of stormwat er overflows from tanks and has agreed to carry out
CCTV camera inspection. Explanation of work has been provided,
quotation has been accepted verbally and works have proceeded.
STORMWATER TANK OVERFLOWS.
Front left tank overflow has severe collaps e at base of down pipe on
connection to main junction in earthenware pipework. This would be
severely undermining footing.
Rear left tank overflow was in stable and sound condition. C amera
could not push beyond junction in main line.
SEWERAGE LINE.
Camera accessed main sewerage line from top ORG outside
laundry. Identified upgraded 100mm DWV PVC sewerage line under
extension on rear left corner of house has been replaced over 3
meter distance. New connections to existing earthenware were
sound.
Severe break was present in sewerage line directly under rear left
rainwater tank in very close proximity to footings where largest crack
is visible.
Remainder of sewerage line is aged but sound.
Identified visible ground water trickling int o earthenware joints in
kitchen and bathroom ORG shaft outside. This indicates ground is
charged with w at er along entire rear footing.
SE Report
12 - 6 - 21
Cause of damage
In our opinion, the cause of damage to the residence walls, ceiling
and slab is inadequat e footings under the slab.
It‟s our opinion that the lack of internal slab beams combined wit h the
existence of site low bearing capacity ground has caused the
settl ement/sagging of the slab. PCSC and TS reports support our
opinion.
In our opinion the damage to the slab wasn‟t caused primarily by
inadequate surface drainage as the ground to the east, west, south
and northwest of the residence was concrete paved and the ground
to the northeast of the residence sloped away from the residence
since at least March 2009. We also note that RW1 wall has strip
drain adjacent to the lower side of the wall since at least March 2009.
It‟s our opinion, if the damage to the slab was caused primarily by
inadequate surface drainage then we would expect the slab levels to
be higher in the middle (heaving) and lower at the edges, however
slab levels indicate the opposite as per FE report.
Timeline
It‟s our opinion that the damage to the residenc e occurred since the
construction of the residenc e.
Determination | Case number: 922315 Page 13 of 14
Record Key points
MC Report
7 - 7 - 22
7.2.1. In my opinion, the observed cracking to wall linings
(plasterboard and tile) and masonry walls in the bathroom, the
extension and the East wall of the hous e is the result of leaks to the
sanitary and stormwater drains.
7.2.2. In my opinion, crackin g of brickwork on the West side of the
house is attribut able to a lack of movement joints in the brick wall
along with general movement of foundations in the area and is not
related to the plumbing leaks.
7.2.3. In my opinion, the plumbing leaks and much of the observed
cracking pre - date the purchase of the property by the Insured.
7.3.9.1. Internal cracking East side of hous e – The most significant
observed cracks are located along the East wall of the house in
bedrooms 2, 3 and 4 and are considered to b e the res ult of plumbing
leaks under the South water tank.
7.3.9.2. Internal cracking bathroom – A significant, although fine
crack was observed in the Southwest corner of the bathroom, along
with cracks to 2x wall tiles. These cracks are considered to b e related
to the observed leaks in the bathroom.
7.3.9.3. External cracking West wall – The largely vertical cracks in
the West brick wall of the house are considered to be the res ult of a
complete lack of movement joints in the wall. AS4773: Masonry in
small buildings requires joints at a maximum spacing of 7m along this
almost 10m long wall.
7.3.9.4. External cracking East wall and extension - The most
significant observed cracks are located along the East wall of the
house and to the walls of the ext ension and are considered to be the
result of plumbing leaks under the South water tank and at the
Nort heast downpipe.
7.3.9.4.1. The observed cracking is considered to be exacerbated by
the lack of movement joint between the original house and the
exten sion as required by AS2870.
7.3.9.5. Remainder of Internal and external cracking – The majority of
the remaining cracks are considered to be minor and expected in a
region of reactive soil with foundations designed prior to the
implementation of AS2870 w hich came into force in 1986. Such
cracks (<5mm for masonry and <7.5mm for plasterboard) are
described in AS2870 as “noticeable but easily filled” and are
assigned to “Damage Class 2 – Slight”.
7.3.16. In my opinion, the design and construction of the hous e
foundation are unsuitable for the soil conditions at the subject
property, resulting in the observed substantial foundation motion on
the property. 7.3.16.1. Note that earthenware piping is hi ghly
susceptible to damage from soil motion.
7.3.16.1. Note that earthenware piping is highly susceptible to
damage from soil motion.
7.3.16.2. AS2870 requires that plumbing drains in highly reactive
soils emerging from underneat h a building (i.e. bath room and
extension) “ incorporate flexible joints immediately outside the footing”
in order to prevent damage to such drains. No such joints were
observed in the CCTV video footage. This is particularly important for
brittle piping material is used, such as eart henware. This omission
has further contributed to the breakage of the drain lines.
Determination | Case number: 922315 Page 14 of 14
Record Key points
MC Supplementary Report
10 - 2 - 2023 MC disagrees with the statement that “there was no evidence of
building damage at the time that they purchased the property”.
Along the East side of the property, i mmediat ely to the South of the
South water tank, a significant diagonal crack was observed (ref
Image 1 below). An old repair was clearly visible along with a clear
differenc e in the texture of the render in the wall panel at that
location.
The repairs to previous damage shown in Images 1 - 3 are
considered to be very noticeable and, in my opinion, constitute
evidence of distress to the building prior to purchase by the Insured.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.