Partial decline of storm damage claim for skylight and waterproofing costs; claim handling
Text of the determination
Determination
Case number 922002
Financial firm AAI Limited
Determination | Case number: 922002 Page 2 of 9
Case number: 922002 6 April 2023
1 Determination overview
1.1 Complaint
The complainants each own property covered under a strata insurance policy held with the
financial firm (insurer). They lodged a claim for storm damage to the properties.
The insurer partially accepted the claim for the resultant internal damage and make safe
repair work. It also agreed to waive the excess. However, it does not accept the cost to
replace the skylight or the cost to replace the waterproofing, because it says these areas of
the building were not damaged by the storm. The insurer agreed to pay $35,600 for make
safe and repair costs the complainants incurred and $8,250 for plumbing and report fees.
The complainants say the cash settlement offered does not include all the costs incurred to
repair the damage. They also raise concerns with the insurer’s handling of the cla im.
1.2 Issues and key findings
Is the insurer’s settlement offer fair ?
Yes. The insurer is not required to cover costs associated with the installation of new
skylights, waterproofing and external repairs resulting from these works. This is because the
complainants have not shown the storm event, or any other accidental event, damaged these
areas.
Are the complainants entitled to compensation for non-financial loss?
Yes. I consider it fair for the insurer to pay the complainants $2,000 in non-financial loss
compensation for the stress its claim handling caused.
Why is the outcome fair?
The complainants have not satisfied their onus to show the storm event, or any other
accidental event, damaged the skylight or other external areas of the property. As the costs to
repair these areas are not covered by the policy, it would be unfair to require the insurer to
cover them. However, I consider it fair to award non-financial loss compensation due to the
insurer’s handling of the claim.
1.3 Determination
This determination is substantially in favour of the insurer.
If the complainants accept this determination, the insurer is to pay them $2,000 in non-
financial loss compensation. However, they are not entitled to any further amounts for the
repair costs claimed.
Determination | Case number: 922002 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer’s settlement offer fair ?
Yes. The insurer is not required to cover costs associated with the installation of new
skylights, waterproofing and external repairs resulting from these works. This is because the
complainants have not shown the storm event, or any other accidental event, damaged these
areas.
No dispute a storm damaged the property
Subject to several conditions and exclusions, t he complainants’ policy covers accidental loss
or damage. The product disclosure statement (PDS) defines this as ‘loss or damage that
occurs without intent and includes loss or damage from the incidents shown on the pages 39
to 52’. The policy also covers storm damage.
There is no dispute a storm damaged the properties as the insurer has partially accepted the
claim. However, there is a dispute regarding the extent of the loss covered under the policy.
Insurer says its offer is fair
The insurer says:
the complainants initially lodged a claim in March 2022 for water damage, and then a
second claim in April 2022 for storm damage
it declined the first claim as being due to seepage, which is excluded under the policy
the insurer closed the first claim and dealt with all damage under the second claim
its engineer (MC) stated the damage was due to stormwater entering through a defective
skylight
it accepts a storm damaged the properties as it has paid the cost of the make safe repairs,
reinstatement and resultant internal damage
however, the storm did not damage the skylight or waterproofing, therefore it is not liable
for these costs
the complainants’ own plumber (LP) stated the water entered through the faulty skylight
and due to lack of waterproofing
MC also considered the skylight was defective and was the cause of the water ingress
the complainants have not shown the storm event damaged the waterproofing
it is not required to install a slab and waterproofing where none existed prior, as this would
constitute an upgrade
the inadequate waterproofing was identified as an issue on 12 April 2021, before it issued
the policy
its offer for the internal resultant damage and waiver of the excess is fair.
The insurer refers to the PDS exclusion for:
any loss or damage to the part of the building with an inherent defect, faulty
design, structural defect or faulty/poor workmanship, whether or not you knew or
should reasonably have known about it.
It also refers to sections of the PDS that state it will not pay extra to replace the building ‘to a
better standard, specification or quality than they were before the loss of damage occurred’.
Determination | Case number: 922002 Page 4 of 9
The insurer agreed to pay $35,600 for make safe and repair costs the complainants incurred
and $8,250 for plumbing and report fees.
Complainants say the insurer has not covered all costs under the claim
The complainants say:
the insurer was extremely difficult to contact and slow to respond
they had to source their own plumber to undertake urgent make safe work due to the
insurer’s actions
the insurer’s repairer left the impacted sections of the houses uninhabitable, including
open walls, no power and missing doors
the insurer’s cash settlement offer does not even cover the make safe costs they paid, let
alone the rest of the work required under the claim
they are out of pocket tens of thousands of dollars
the insurer’s quote does not reflect current market rates due to material and labour supply
issues
given the insurer’s slow response and the threat of storms, they had to proceed with
repairs and incurred additional costs
the insurer initially declined the claim based on incorrect information and they were
required to obtain expert advice to show it was storm damage
the insurer took months to accept the storm damage.
The complainants say they experienced close to 200mm of heavy rain in 24 hours, and the
skylight was unable to withstand it. The complainants provided rainfall data for March and
April 2022, saying if the skylights were damaged or faulty before the storm on 7 April 2022,
they would have already experienced flooding or water penetration, which is not the case.
They say all external repair work, including reinstating the skylights, re-waterproofing and
retiling the surrounding area, must be covered under the storm provision of the policy.
The complainants say they incurred total repair costs of $112,512.84. This includes all repairs
undertaken by their plumber (LP) and costs to replace plants and trees because of excavation
and repair work.
Insurer provided reports on cause of damage
The insurer’s plumber (RC) provided a report dated 11 April 2022. RC stated after record
rainfall conditions, water has penetrated and flooded the basement level of both properties.
RC stated water flooding into the basement areas of both properties relates to surface water
leaking into subsoil surfaces and penetrating wall surfaces. It stated there is no surface
drainage down either side of the passageways.
The insurer appointed an engineer (MC) to attend the property on 19 July 2022. MC stated:
the water damage was due to leaks in the skylight during the storms in April 2022
the damage has been caused by defective construction of the skylight, with flashings not
being properly installed or missing
since the ingress of water, the complainant’s plumber had removed the s kylight and
covered the hole with plastic and despite heavy rain there was no evidence of water
ingress into the basement.
The complainants provided a Hydraulic Inspection Report dated 13 April 2022 from an
engineer (YA), stating an inspection on 12 April 2021 found the basement of the property is
not structurally sound, with the subsoil drainage visually poor. It stated upon flood testing
heavy leaking can be seen around the concrete slabs and it suspects poor drainage and
damaged/no waterproofing.
Determination | Case number: 922002 Page 5 of 9
None of these reports show, on balance, the storm event or any other event damaged the
skylight or surrounding external areas. However, the complainants say the insurer’s expert
reports as well as the report from YA are based on incomplete information. They say their
plumber ’s (LP) reports are based on correct information.
Invoices do not show, on balance, the storm damaged external areas
I acknowledge the complainants’ concerns regarding the insurer’s reports, including the fact
MC inspected the property after the skylight had been removed. However, I do not consider
the information the complainants provided is persuasive in showing the external areas of the
property were damaged by the storm event, or any other accidental event.
LP provided invoices for works completed at the properties. An invoice dated 20 May 2022
states it investigated the cause of flooding to the basement below the skylight and found:
[LP] can confirm entry point of water penetration is through 2 different sources,
From our flood testing investigation no pool water or over flow has increased or
impact on the water penetration to basement area
#1 main course of water penetration and flooding to basement area
Faulty installation of skylight
Photos and videos attached will show from flood testing water penetration,
No waterproof to slab also frame installation is of poor quality which had allowed
to flow through its structure,
…
#2
Ground water
Penetration through footing and slab
This invoice shows, on balance, the water entered the property due to the faulty installation of
the skylight and there was no waterproofing to the area.
The complainants provided another invoice dated 26 September 2022, which states:
[LP] can confirm entry point of water penetration is through 2 different sources.
From our flood testing investigations, no pool water or overflow has increased or
impacted on the water penetration to basement area.
1. Main course of water penetration and flooding to basement area.
Skylight area was unable to withstand such a significant volume and force of
water (200mm in 24 hours) from a major storm event on 7/8 April. There was no
evidence of water penetration before or after this weather event.
Photos and videos attached will show from flood testing water penetration
…
2. Ground water
Penetration through footing and slab.
The complainants then provided a further email from LP dated 23 March 2023. LP stated:
the skylights and surrounding areas were damaged as a result of a severe storm
on 7 / 8 April 2022. This has caused extensive flooding and water damage to the
basements of both properties.
Determination | Case number: 922002 Page 6 of 9
Given there has been no indication of flooding or water penetration before this
event, there has been no evidence to suggest the faulty installation or operation of
the skylights for both properties
LP does not explain why it changed its conclusions in the subsequent reports. The
statements are also very brief and lacking in detail to support the changes in view. For
example, the second invoice does not explain why the skylight could not withstand the
significant volume of water. The email from 23 March 2023 also does not explain how the
storm caused the damage to the skylight. I consider LP’s conclusion that the storm damaged
the skylight is not persuasive given the lack of explanation as to these points.
I consider the first invoice from LP dated 20 May 2022 is to be preferred as it is more
contemporaneous to the event. LP states it carried out an investigation into the cause of
damage and this showed the water penetration was caused by the faulty installation of the
skylight, no waterproof to the slab, and frame installation being of poor quality and allowing
water to flow through the structure.
This finding is also supported by LP’s invoices on the works carried out. For example, the
invoice dated 14 December 2022 states the works include: ‘Increase of skylight pitch and
thickness to suite’ and ‘Supply and installa tion of upgrading of internal plaster and frame
works required to skylight void’. The wording used indicates the repairs constituted upgrades.
This supports the finding that the external works required were due to the faulty installation of
the skylight, lack of waterproofing and poor quality framing.
Fair for the insurer to decline the cover for external damage
For coverage under the policy, the complainants must show, on balance, there is loss or
damage to the property, either from accidental damage, or one of the insured events. There is
insufficient information provided which shows, on balance, the storm event or any other
accidental event, damaged the skylight or external waterproofing. The reports provided show,
on balance, there were issues with the skylight allowing water to enter the property and a lack
of waterproofing to the external areas.
The policy does not cover the costs for the complainants to upgrade the property. I am
satisfied the costs to install a new skylight and install waterproofing constitute upgrade works
at the property, which are not covered under the policy.
This means the complainants have not established the claimed costs for the repairs to the
skylight and the associated external works for the waterproofing and landscaping are covered
under the policy. It is therefore fair for the insurer to decline coverage for these costs.
Accordingly, I consider the insurer’s offer of settlement is fair and it is not required to pay the
complainants any further amount.
2.2 Are the complainants entitled to compensation for non-
financial loss?
Yes. I consider it fair for the insurer to pay the complainants $2,000 in non-financial loss
compensation for the stress its claim handling caused.
Compensation may be awarded in certain circumstances
Under our Rules, AFCA may award compensation for non-financial loss where there has
been an unusual amount of:
Determination | Case number: 922002 Page 7 of 9
physical inconvenience
time taken to resolve the situation
interference with a complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during a complaint.
Complainants are dissatisfied with the level of service
The complainants raise several concerns with the insurer’s claims handling, including:
delays
bullying and intimidation
slow responses and failure to meet timeframes
broken commitments, such as a failure to reimburse all costs claimed
failure to respond to requests for information such as expert reports
ignoring basic facts and being legalistic
issues at all levels of management despite escalating their concerns
unprofessional behaviour.
The complainants also say they were forced to engage their own expert to complete repairs
due to the insurer’s failure to act, and some of this work was shown to be unnecessary after
the insurer eventually overturned its decision. However, it was too late as the work was
largely completed.
The complainants want $5,400 in compensation for non-financial loss.
Insurer waived the claim excess of $1,000
The insurer admits it should not have declined the claim without obtaining the report from MC.
The insurer also apologised for not attending to the make safe repairs as quickly as expected
by the complainants. The insurer says the delays were caused by large volumes of flood and
storm claims, combined with the impacts of COVID-19. It also admits its communication fell
short of the standard the complainants expected.
The insurer waived the $1,000 excess on the claim.
Fair for the insurer to pay compensation in the circumstances
I acknowledge the insurer was dealing with an increase in claims and other issues outside its
control. However, having reviewed the file and the complainants’ submissions, I consider an
award of non-financial loss compensation is warranted in the circumstances.
I acknowledge the complainants ’ concerns given the extensive water damage occurring to
their property and their urgency in requiring repairs to take place. Whilst I accept not all the
damage is covered, the insurer could have done more on the claim to limit the complainants’
inconvenience. This included the failure to appoint an engineer earlier in the claim, which
could have resolved the claim earlier. I consider the claim could have been handled better
overall and this led to delays and an interference with the complainants ’ expectation of
enjoyment or peace of mind.
Whilst I do not consider the insurer is liable for further repair costs due to its actions on the
claim, and I do not consider there is evidence of bullying or intimidation, I consider there were
errors in the insurer’s ha ndling of the claim. I consider it fair for the insurer to pay the
complainants $2,000 in non-financial loss compensation.
Determination | Case number: 922002 Page 8 of 9
Determination | Case number: 922002 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.