Cash settlement amount for storm and mould damage to building, plus other policy benefits and non-financial loss

FirmIAG
Decided2023-11-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$242,239
Non-financial loss$5,400
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted a storm claim but offered a cash settlement for building and mould repairs that the complainant disputed. AFCA required settlement based on the complainant's builder's quote plus extras, additional benefits and $5,400 non-financial loss.

The insurer's settlement was not based on actionable quotes and did not cover all claim-related damage or policy benefits, and its claims handling caused unusual inconvenience and stress.

Issues

Subjects and remedies

home or building damagemental healthnatural disasterpay claimpay compensationpay non financial lossrefund fees or charges

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 921656 Financial firm Insurance Australia Limited Determination | Case number: 921656 Page 1 of 12 Case number: 921656 23 November 2023 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer). She lodged a claim after her home and contents were damaged in a storm on 4 March 2022. The insurer accepted the claim and cash settled the full sum insured for contents. The parties disagree on the scope of works for building repairs and the proposed cash settlement amount for that. The complainant wants to settle by reference to her quote(s), plus compensation for non-financial loss. She also says the insurer has not adequately addressed several other issues, such as storage and temporary accommodation (including for her dogs). 1.2 Issues and key findings Is the insurer’s cash settlement offer reasonable ? No. The insurer’s cash settlemen t offer is not reasonable or sufficient in the circumstances. The quotes on which it is based are not shown to be actionable by the complainant as a retail customer; nor is it clear that the scope of work covers all claim-related damage. It is fair that the settlement for building damage be based on the scope/quote of CH ( the complainant’s builder), with a requirement for additional payments to be made as necessary for further mould remediation (and certification on completion) and for asbestos identification/removal. As set out in detail in section 2.1 below, the insurer is also liable for the cost of electrical goods not already included in CH’s quote, kitchen vinyl flooring, temporary accommodation for the complainant’s family and her pets, contents storage, skip hire, and CH’s fee. Is non-financial loss compensation warranted? Yes. The insurer’s claims handling caused the complainant an unusual degree of physical inconvenience and stress. Non-financial loss compensation of $5,400 is appropriate. Why is the outcome fair? The insurer’s proposed cash settlement for building damage/mould remediation was not shown to be based on current actionable quotes, nor, on balance, did it include all claim- related damage or allow for the other policy benefits to which the complainant was entitled. It is therefore fair that the cash settlement be increased. It is also fair that the insurer compensates the complainant for significant avoidable upset and inconvenience caused by its claims handling, given her particular circumstances. 1.3 Determination This determination is substantially in favour of the complainant. Within 14 days of the insurer receiving notification that the complainant accepts this determination, it is required to pay the amounts set out in section 2 below, and promptly take the other stated actions at the relevant times. Determination | Case number: 921656 Page 2 of 12 2 Reasons for determination 2.1 Is the insurer’s cash settlement offer reasonable ? No. The insurer’s cash settlement offer was not based on current actionable quotes, nor, on balance, did it adequately cover all claim-related damage. The insurer is required to increase its cash settlement to cover the following (subject to the specific conditions/requirements set out in more detail below): Building damage/mould remediation – builder CH’s quote increased by 5%, plus the reasonable costs of further mould assessment and remediation (not otherwise addressed by the work outlined in CH’s scope), post -remediation certification, and asbestos assessment and removal (if any) as required. Kitchen vinyl flooring - $4,000 Electrical goods not otherwise included in CH’s quote - $6,075 Skip hire - $850 Builder CH’s fee - $550 Temporary accommodation for complainant/her family – up to a maximum period of 29 months from the date the complainant moved out of the home after the event until the home is able to be reoccupied (being the policy limit of 24 months plus a further 5 months to allow for delays already suffered) Pet accommodation – costs already incurred (if any), and ongoing costs incurred until the home is able to be reoccupied, as above Contents storage - $3,534 plus further costs already incurred, and ongoing costs until the home is able to be reoccupied, as above. Complainant has shown a claimable loss under the policy The complainant is required to show, on the balance of probabilities (that it is more likely than not), that she suffered a claimable loss under the policy. This means she must show the loss was caused by a risk for which she is insured. Subject to the terms and conditions set out in the policy documents – the product disclosure statement (PDS) and certificate of insurance (COI) – the policy covers damage to the property caused by a listed insured event. Amongst those listed events are ‘ s torm’ and ‘ra inwater run- off’ . If the complainant can show she has a claimable loss, the insurer is liable for the loss unless it establishes, on balance, that an exclusion or limiting condition applies. The insurer accepts that the complainant has shown she suffered a claimable loss under the policy. However, it does not accept that all the claimed damage was caused by the storm. Where there are multiple potential causes of loss, it is necessary to determine the proximate cause. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the only cause. It is a question of fact that depends on the circumstances of each case and requires a common-sense evaluation of the evidence. Determination | Case number: 921656 Page 3 of 12 Insurer made cash settlement offer based on its experts’ quotes/scopes The complainant ’s policy was effective from 2 November 2021 to 2 November 2022. On 3 May 2022, she lodged her claim for the water damage to her home and contents because of the storm that occurred on 4 March 2022. The insurer accepted the contents claim and cash settled it as a total loss. The parties do not dispute the cash settlement of the contents claim. On 30 August 2022, the insurer agreed to accept the complainant’s home building claim, however, the claim is not yet settled. The dispute has arisen over the cost of repairs, because the complainant says the insurer’s cash settlement offer is not actionable and does not include all necessary work. The insurer considered that the damage to the property was caused by a combination of stormwater runoff and atmospheric conditions. The insurer’s builder SW reported on 18 August 2022: We consider the cause of moisture within the subfloor area is due to amount of rainfall experienced within January, February and March 2022 which has elevated moisture and dampness in the surrounding and associated ground, sub-floor, subterranean and environmental humidity to on-set and propagate moisture and mould issues to the property. The insurer points out the policy excludes damage caused by atmospheric conditions, and by mould unless that arises from an insured event. However, in this case, as it is unable to confirm how much damage was caused by stormwater runoff and how much was from atmospheric conditions, it agreed to accept the claim for both storm damage and mould remediation. It is relevant to note, however, that the insurer’s hygienist R commented that by March 2023 (a year after the event): most of the visible mould identified throughout the property is consistent with prolonged periods of high indoor humidity due to lack of remediation and humidity control throughout the property. In other words, it is not clear that either the initial or progressive subsequent mould was entirely from the normal or usual atmospheric conditions affecting the property (in which case it might be excluded), as opposed to it being the result of atmospheric conditions arising from the insured storm event and the lack of prompt remediation (in which case the exclusion would not apply). The insurer has not proposed a specific apportionment of responsibility, as between those suggested contributing causes, for the mould damage. However, I am satisfied that the mere fact that initial storm damage has gone untreated for a lengthy period (thereby exacerbating the situation) means it is fair that the mould damage be covered under the claim. The insurer says, based on reports from its experts (builder SW and hygienist R), it is not willing to perform repairs at the property as the mould may reappear due to the usual atmospheric conditions affecting the property. Builder N also identified features of the property which are likely to contribute to pre-existing atmospheric conditions amenable to mould growth. The insurer therefore says it is unable to provide a lifetime guarantee on the Determination | Case number: 921656 Page 4 of 12 mould-related repairs and can only offer a cash settlement for the claim. In the circumstances I agree a cash settlement is appropriate. The insurer’s most recent quotes provided by its building consultant, N, are based on its builder SW’s scope of works (dated 14 March 2023, after a re-inspection on 8 March 2023, following their initial inspection on 12 August 2022). N had initially quoted in July 2022. N’s 17 April 2023 quote for storm damage was for $22,836.24 (covering only damage in the laundry, bathroom, bedroom 1, walk-in robe) and the 4 May 2023 quote for mould remediation was for $84,814.37. This totals $107,650.61. The insurer proposed cash settling on that basis, but also agreed to provide a 15% uplift on the total amount to allow for any contingences and to acknowledge that as it is cash settling the claim, there will be no lifetime warranty for the repairs. On 12 June 2023, the insurer offered to pay the complainant $123,798.20 as a final cash settlement for the building damage/mould remediation. Complainant says the insurer’s offer is inadequate Full extent of mould is unclear The complainant maintains that the insurer’s cash settlement offer for the home building claim is inadequate. She says the damage and necessary repairs were inadequately scoped by the insurer’s expert SW, who observed the ‘damage is contained to internal linings relating to mould and moisture damage and is not structural in nature’. I note SW did acknowledge the limitations of their scope: This document does not constitute nor is it intended to be a fully detailed schedule of works or detailed specification covering each and every item in the minutiae of the remediation works required at the above property. This document is designed to be a Scope of Works outlining the major and critical aspects of the remediation required. It is not a delineated specification schedule of precise fixtures, fittings and finishes. SW also identified the possibility of wet area linings containing asbestos, but they did not include an allowance for dealing with any associated costs. In their August 2022 report, SW recommended a qualified hygienist be engaged to provide a scope of works to remediate the mould, including recommendations to mitigate future onset development due to environmental conditions. I note too that N explained their recent mould quote was only ‘based on visible issues regardless of pre-existing appearance not considering what lies beneath linings, finishes, contamination etc ’ . N acknowledged that ‘ since initial inspection [in May 2022] damages may have increased ’ [sic]. N also stated that ‘this quote cannot be a ‘fixed price’ as there are too many unknowns regarding the extent of mould contamination or damage to the property’ ; and they clarified that ‘our rates are based on Insurance industry rates and are generally more competitive. Our scope is conservative until we confirm the extent of the issue’. Hygienist R reported on 28 September 2022 and 21 March 2023, noting in the latter that the ‘entire property’ was affected by mould. The only areas identified by R as showing evidence of pre-existing issues unrelated to the claimed event were in the far-right side bedroom, and the kitchen vinyl flooring and adjoining timber architrave. Determination | Case number: 921656 Page 5 of 12 Like N, R clarified t heir assessment was ‘limited to areas and materials that were able to be inspected and specifically excludes any inaccessible areas unless otherwise listed’. They specifically suspected hidden mould growth in the ceiling cavity of the walk-in robe, and the wall cavity of the far right-side bedroom. The insurer has accepted the possibility that there may be mould inside the wall cavities. It has said that if the complainant discovers that in the course of repairs, then she should stop work and allow the insurer the chance to assess any such additional damage. It says it would be unfair for it to include a ’hypothetical’ cost at this stage. Extent of building damage in dispute The complainant says the insurer’s more recent scopes and quotes also omit some building damage identified in previous reports. However, I am not satisfied just because certain damage was identified at the property in initial or subsequent inspections, that means it was caused by the storm or should automatically be covered. For example, in their March 2023 report N pointed out that damage in the far-right bedroom (to the wall lining and flooring) was due to ongoing water ingress through the external brick wall. The complainant arranged for her own builder, CH, to inspect the damage and provide a quote for the repairs. CH first visited the property in August 2022 and provided a comprehensive scope of works and quote for $197,276.64 , stated simply as being for ‘mould and water damage’ (with an estimated repair time of 4 months). CH reattended the property in June 2023 and updated his quote to $215,932.64, including new damage to other rooms. The complainant also provided a new quote for $245,339.38 (dated 15 June 2023) from another independent builder, T (and that quote specifically excludes the cost of removal of asbestos, if any). The insurer disagreed with the quotes received from CH and T on the basis they were not in line with its hygienist R’s report and builder SW’s scope of works , and did not clarify how all the damage related to the claimed event. It notes, in particular, that both quotes allow for a strip-out of the entire house. In addition to quotes from CH and T, the complainant provided a report from builder JL who had visited the property on 9 July 2022. JL provided a scope of works and a ‘baseline cost for rectification’ quote of $79,348.50 (which did not include the cost of new kitchen flooring). JL referred to the likelihood of the walls containing asbestos given the age of the building (and indicated an additional $3,000 might be allowed for an asbestos report, with extra needed for actual asbestos removal by a qualified person). Having identified there was visible mould ‘throughout [the] house’, JL also questioned the possibility of there being further mould behind the wall linings. JL recommended a mould assessment (and obtaining a clearance from a licensed hygienist), noting the associated costs were not included their estimate. The insurer acknowledges JL’s quote, however, it says JL has made an allowance for the vinyl flooring to the kitchen but has not identified the cause of damage to the same. The insurer maintains that it has considered all the damage caused by storm in its cash settlement offer. Insurer’s experts say further claimed damage not storm-related The insurer’s builder, SW, in its report dated 4 March 2023 , stated that the damage to the property relates to mould mitigation and removal, so a hygienist should make recommendations about mitigating damage due to environmental conditions. Determination | Case number: 921656 Page 6 of 12 The insurer’s hygienist R, in its report dated 21 March 2023 , says there was ‘ evidence of historical water ingress entering through the exterior brick wall ’ . That relates to the far right- side bedroom. I do accept the evidence (including photos) indicates there has likely been historic water/moisture impacting that area of the property. However, given the acknowledged widespread impact of the storm event and resultant mould (which, on balance, would have caused damage in any case), I am not satisfied the insurer is entitled to exclude cover for that room in its settlement. Also, with regard to the kitchen, R reported there was no evidence to indicate that moisture from the subfloor space related to the storm event had evaporated into the flooring above, affecting the building materials. R said there was evidence of an historical escape of liquid or wetting event in the kitchen, with water staining on the timber architrave directly adjacent to the affected vinyl flooring in front of the cabinetry/dishwasher. The insurer recommended, to establish the cause of that water damage, a leak detection test in the kitchen to determine if there is a leak to the dishwasher or other pipework. It says if there is no leak found in the leak detection test, it is prepared to accept the damage to the flooring and timber architraves under this claim. The complainant did not agree to the insurer undertaking a leak detection test. However, N had already reported that there were ‘no leaks detected’ and no maintenance related issues…that are contributing to any loss’. I note, however, JL observed that while the first floor did not flood, it was severely affected by rising damp; noting also that all carpets on the first floor were covered by the insurer. In restorer C’s second report in May 2022, they said the kitchen vinyl flooring was non- restorable, while in their first report it had been noted as ‘restorable’. Even if there had been some historic leaking /damage to the kitchen flooring and timber architrave, I am satisfied it is more likely than not that the storm event has caused further damage (at least in the form of mould growth) which, in itself, now means the flooring and affected architrave should be covered under the claim. The complainant has provided a September 2022 quote ($3,568) for vinyl flooring (including the necessary underlay). I consider it appropriate that the insurer pays $4,000 for the kitchen flooring. The increase from the quote is to allow for the fact the quote is now over 1 year old and costs are likely to have increased. Insurer’s scope of work/quotes inadequate for cash settlement On the available information, I consider, on balance, that the insurer’s cash settlement offer for building damage/mould repairs is inadequate and does not cover the full range of claim- related damage or represent the likely cost to the complainant of having all necessary work completed. I appreciate that the scopes of work and quotes on which the complainant relies are more far- reaching. The quotes of CH and T are effectively to strip out the entire home to perform repairs, rather than simply to deal with currently obvious mould by cleaning. They include areas not individually shown to have been damaged in the storm itself, but which I consider, on balance, would have been since affected by the spread of mould. On the available evidence, I consider it is more likely than not that a more complete strip-out is necessary to properly and conclusively deal with the mould. I note, for example, that in their final report in May 2022 (about 18 months ago), restorer C had already identified that mould Determination | Case number: 921656 Page 7 of 12 in 6 rooms of the house meant the areas (including walls, ceilings, door and window frames etc) were non- restorable. Given that hygienist N stated mould has since spread to the ‘entire property’, I am not persuaded the scop e of work proposed by CH is unreasonable in the circumstances. However, the complainant’s quotes do not allow for the possible presence (and necessary removal) of asbestos. Nor do they include costs for a new more invasive and conclusive mould assessment, any further mould remediation required in addition to the proposed quoted stripping out and the required post-remediation certification. In the particular circumstances, and in order to facilitate finalisation of this matter, I consider it fair and reasonable that the insurer makes an immediate cash settlement payment of $226,729.92 (being CH’s June 2023 quoted cost of $215,932.64 increased by 5% to allow for the age of the original quote). The insurer is also required to cover the reasonable cost of a new mould assessment and any further mould remediation reasonably necessary (and not otherwise dealt with by CH’s scope of work), as well as post-remediation certification. In addition, the insurer is liable for an asbestos assessment/report and for any asbestos removal necessitated by the repair work. The cost of that mould and asbestos-related work is not currently known. I also appreciate that the mould and asbestos assessments (and any required removal/remediation work) may only be able to be carried out once some of the stripping out/repair work has commenced. When the complainant’s builder’s work has progressed to an appropriate stage so as to enable those assessments to be carried out, the complainant is required to provide the insurer in a timely manner with evidence of the respective scopes/costs of the mould and asbestos assessments and remediation work identified (if any) by her appointed experts. The insurer is then required to promptly pay the complainant the cost of that work, to enable repairs to proceed as expeditiously as possible. Other issues not addressed in insurer’s offer In its settlement offer the insurer failed to clearly address other issues claimed, as set out below. The evidence indicates the complainant was still trying to obtain clarity, assistance and interim payments from the insurer regarding certain of these issues in February 2023. Electrical items The complainant has provided a February 2023 quote ($7,375) for the following household goods which she says were damaged by mould and should be replaced: Air Conditioning unit ($1499) Cooktop ($1399) Oven ($1099) Fireplace ($2999) Rangehood ($379). The insurer says it should not pay extra for these items because it has already settled for the full contents sum insured. It also points out that R said there was no visible mould growth on those items. Determination | Case number: 921656 Page 8 of 12 The policy clarifies that under the home building, it covers ‘fixtures or items permanently attached or fixed to your home’. Under ‘contents’, the policy covers electrical items kept in and around the home, and gives the examples of fridges and washing machines. I am satisfied the items listed above should be covered as part of the insured building (rather than as contents). I am satisfied, on balance, they would have been affected by mould from the storm event, and that cleaning (rather than replacement) would be insufficient to return them to safe functionality. I note, however, that removal and replacement of the wall oven ($900) and rangehood ($400) is already included in CH’s June 2023 quote. In the circumstances, I consider it appropriate that the insurer pays a further $6,075 for the remaining electrical items. Skip hire The complainant has claimed for the cost of 4 skips (at $850 each) used to remove damaged contents. The insurer points out that cost falls within the sum insured for contents (which has already been paid in full), however, based on the invoice it received, it has offered to pay $850. The insurer is required to pay a further $850 for skip hire, as offered. Builder CH fee Under our Rules, AFCA may require the insurer to cover the reasonable professional costs incurred by a complainant in the course of a complaint. In providing their comprehensive scope and quote, builder CH charged the complainant $550 (invoice provided). It is fair in the circumstances that the insurer covers that cost, since I am satisfied CH’s input assisted in clarifying more likely overall costs and in a fair resolution being reached. Temporary accommodation for complainant and family The complainant’s policy entitles her to up to 24 months ‘reasonable and appropriate’ temporary accommodation if the house cannot be lived in and they need to move out to allow repairs. The policy states that period runs from the date of the insured event. The benefit is payable in addition to the building sum insured. I understand the complainant had a rental arrangement until May 2023, after which she needed to find alternative accommodation. The evidence does not indicate what the insurer has paid to date for her temporary accommodation. However, I am satisfied it is fair that the insurer should be liable for her reasonable accommodation costs from the date she and her family moved out of the house following the storm event (rather than from the date of the event itself), until the house is repaired and they are able to move back in, for up to a maximum period of 29 months. To be clear, given the delays in finalising the claim (including the period since the insurer’s inadequate cash settlement offer in June 2023), cover for temporary accommodation should extend for up to a further 5 months beyond 24 months from the date they moved out if (despite the complainant taking all reasonable steps to expedite and finalise repairs) the house is still unliveable at the expiration of that 24 month period. It is relevant to note that the policy states the insurer will not be liable for any unreasonable delays by the complainant or any of her repairers/suppliers in completing the claim-related work. Determination | Case number: 921656 Page 9 of 12 Pet accommodation The policy also provides that temporary accommodation extends to the complainant’s pets which live at the insured property. That benefit (included in the building sum insured) is stated to apply for the reasonable time that the insurer agrees it should take to make the home safe for the pets to move back in. In an email to the complainant on 19 January 2023, the insurer confirmed it would cover the cost of accommodation required for her 2 dogs. However, the evidence does not show the insurer took any further steps in this regard since the complainant obtained and provided a quote. The complainant says she has been relying on family members to assist with the dogs in the meantime, but this is not satisfactory and cannot continue. She provided a quote from June 2022 which indicates a then current rate of $46 per day per dog. She is claiming cover for 6 months based on that amount, which totals $16,744. The complainant has not shown she has actually incurred those costs to date, although it is assumed she has been co ntributing to the cost of her family member’s care of the animals (such as food, which she would have incurred in any case). If she has already incurred pet accommodation costs since moving out of her home, then the insurer is required to reimburse those costs (subject to the complainant providing evidence of payments made). The insurer is also liable for ongoing pet accommodation costs up until the house is liveable again for the complainant and her pets after repairs, in line with the period/limitations applying for temporary accommodation set out above. The complainant is required to provide evidence of costs incurred/to be incurred so that the insurer can make the appropriate payments. Storage of contents Cover under the temporary accommodation benefit includes the cost to remove (then return) contents from the damaged home and store them in the meantime. The insurer confirmed to the complainant on 19 January 2023 that it would cover the cost of contents storage while she was out of the home pending repairs. However, it has also separately said that it would not cover storage of newly purchased items which had not been affected by the event. That was in response to the complainant reportedly advising that (at least some of) the items in storage were new replacements for those damaged and had been bought in readiness to move back into the home. However it is not clear on the available evidence just how much of the contents in storage were originally from the house and which are new. I appreciate that, on a narrow reading, the intention of the policy provision is to allow for storage of items that had been in the house and had to be removed pending repairs. However, in the particular circumstances, I consider it not unreasonable of the complainant to have attempted to prepare for a prompt return to her home by replacing, in advance, certain basic household items which had been damaged in the storm event. At the same time, I do not consider the insurer should be liable for increased storage costs if any more new items are purchased. I note the complainant has already provided evidence of payment of $3,534 for the period up to 5 February 2023. The insurer is required to reimburse that amount. She has also provided Determination | Case number: 921656 Page 10 of 12 evidence that the monthly cost would be increased to $645 per month from that date. I am satisfied it is fair in this case that the insurer promptly reimburses the complainant for the additional storage costs already incurred (subject to provision of updated evidence of those current costs). I am also satisfied the insurer should continue to cover storage costs (for the same currently stored contents items) until the complainant is able to move back into the home after repairs: that is, for the period for which temporary accommodation applies (as set out above). 2.2 Is non-financial loss compensation warranted? Yes. The insurer’s claims handling caused the complainant an unusual degree of physical inconvenience and stress. Non-financial loss compensation of $5,400 is fair in the circumstances. AFCA can award non-financial loss compensation AFCA can award compensation of up to $5,400 for non-financial loss if the insurers claims handling causes an unusual degree of physical inconvenience or time taken to resolve the claim or interference with the complainants’ expectation of enjoyment or peace of mind. However, AFCA takes a conservative approach to awarding this type of compensation and expects complainants to accept a normal degree of inconvenience associated with a claim. Complainant’s particular circumstances warrant recognition The complainant says the insurer’s c laim handling has caused stress, inconvenience and delays. The insurer acknowledged there were delays in it confirming the building damage it was prepared to cover, and it apologised to the complainant for the level of service provided. It offered to reimburse the policy excess ($750) and pay $1,000 in recognition of the claim handling experience. However, the complainant has said that in the course of the claim, she advised the insurer of particular issues impacting her family and so she had been deemed by the insurer to be a ‘vulnerable customer’. Those issues include serious pre-existing mental health issues of a family member, and the fact that the time taken to deal with the claim has meant unsatisfactory alternative living arrangements have had to be made. The complainant feels the service she received since then does not properly recognise or respect her situation. Insurer must pay $5,400 for compensation for non-financial loss Having reviewed all the exchanged material and the timeline of the claim (from May 2022 when the claim was lodged up to June 2023 when the insurer made its latest cash settlement offer, and up to the present date), I am satisfied the insurer's conduct caused the complainant significant upset and inconvenience, and did not appropriately respond to her particular circumstances. I accept the claim was delayed due to the additional onsite appointments required to complete the insurer’s final scope of works and quote. However, I do not consider the insurer’s offer of compensation adequately reflects the impact of its claim handling overall on the complainant. I consider that the insurer could have done more to obtain the required reports/quotes (ensuring that they correctly encompassed all the necessary claim-related repairs) and then to make a fair cash settlement offer earlier than May 2023, which is almost a year after the claim lodgement. During that time the complainant has had, not least, the uncertainty of her Determination | Case number: 921656 Page 11 of 12 ongoing accommodation arrangements (including the impact of that on her vulnerable family member and the care of the family pets). In the circumstances, I am satisfied it is fair and appropriate that the insurer be required to pay the complainant $5,400 in non-financial loss compensation. To be clear, the insurer is entitled to retain the policy excess. 2.3 Why is the outcome fair? It would not be fair for the insurer to cash settle for building damage/mould based on the amount offered, since that does not adequately reflect the likely cost of repairs/remediation to the complainant as a retail customer. Nor does that amount take account of additional benefits to which the complainant is entitled under the policy. It is fair that the insurer pays compensation for the significant upset and inconvenience its claims handling has caused the complainant, having regard to her particular circumstances. Determination | Case number: 921656 Page 12 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.