Home / Hollard / Determination 921132
Determination 921132
Delay in completing rectification of defective roof repairs and compensation for delay and poor claims handling
Summary
The insurer's roofing repairs after storm damage were defective and rectification was delayed. AFCA ordered the insurer to complete rectification, appoint an independent loss adjuster, pay $5,400 for non-financial loss and reimburse $3,048 pest control costs.
The insurer accepted the defects needed rectifying and its handling lacked urgency, so under AFCA Rules D.3 non-financial loss was awarded at the cap and pest control costs caused by the incomplete works were reimbursed.
Issues
- Repairs or contractors primary · upheld
“The insurer is required to undertake rectification works; causation report listed 12 defects, insurer acknowledged they must be rectified.”
- Poor claim handling secondary · upheld
“compensation for delays and poor claims handling; $5,400 non-financial loss awarded”
- Delay secondary · upheld
“insurer's overall handling of claim was not done with the appropriate urgency”
Subjects and remedies
home or building damagenatural disasterpay compensationpay non financial lossrepair or rectify
Text of the determination
Determination
Case number 921132
Financial firm Hollard Insurance Partners Limited
Determination | Case number: 921132 Page 2 of 7
Case number: 921132 16 August 2023
1 Determination overview
1.1 Complaint
The complainant had a claim previously accepted with the financial firm (insurer) due to storm
damage to his house. The complainant’s roof was replaced twice as part of the claim, once by
an unlicensed roofer and then by a second roofer, both organized by the insurer.
The complainant is unhappy with the quality of work by the second roofer and requested
rectification works be conducted. A previous AFCA complaint in April 2022 awarded the
complainant rectification works and agreed with compensation offered by the insurer. This
complaint is about the delay in the rectification works and compensation for delays and poor
claims handling.
1.2 Issues and key findings
Is the insurer require to undertake rectification works?
Yes. The insurer is required to undertake rectification works.
Is the complainant entitled to any compensation?
Yes. The complainant is entitled to a further $5,400 compensation for non-financial loss and
$3,048 for pest control expenses incurred by the complainant to date.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of the complainant accepting this determination the insurer is required to:
appoint an independent loss adjuster to the complainant who is required to provide him
with updates every 28 days and act as his primary point of contact until all rectification
works are complete. For avoidance of doubt, the appointed loss adjuster is required to
oversee the entirety of the complainant’s rectification works.
pay the complainant $5,400 compensation for non-financial loss.
pay the complainant $3,048 for pest control expenses incurred by the complainant to date.
Within a reasonable timeframe and as soon as reasonably practicable of the complainant
accepting this determination the insurer is required to:
complete all the works agreed to in the preliminary assessment of 7 April 20 22 in AFCA’s
previous complaint. If the insurer’s appointed builder does not have the required
qualifications and ability to undertake the rectification works, the insurer is required to
allocate a new builder capable to complete the works.
rectify all the defects identified in the causation report dated 24 January 2023, as accepted
by the insurer in its correspondence to AFCA on 24 February 2023. If the insurer’s
appointed builder does not have the required qualifications and ability to undertake the
rectification works, the insurer is required to allocate a new builder to complete the works.
the complainant is required to reasonably cooperate with the insurer to ensure the
rectification works can be completed.
Determination | Case number: 921132 Page 3 of 7
Determination | Case number: 921132 Page 4 of 7
2 Reasons for determination
2.1 Is the insurer require to undertake rectification works?
Yes. The insurer is required to undertake rectification works.
The insurer has agreed to undertake rectification works
The complainant lodged a claim with the insurer following a storm in late 2020. Some of the
initial repairs on the complainant’s property were completed by an unlicensed roofer. The
insurer acknowledged this and agreed to have these rectified. Another builder (PI) was
utilised by the insurer to rectify these works.
An AFCA preliminary assessment issued on 7 April 2022 and accepted by the complainant
and insurer required the insurer to replace the fascia to match the new gutter.
The complainant lodged this complaint with AFCA as, despite the insurer accepting the
preliminary assessment, the complainant says the fascia has not been replaced and
rectification works have not been completed adequately.
The insurer engaged an independent building consultant to attend the complainant’s home to
inspect the rectification works completed by PI. A causation report was completed on 24
January 2023. In its correspondence to AFCA on 24 February 2023, the insurer said this
report was provided to PI advising them of the further rectification needing to be completed.
The causation report listed defects
The causation report dated 24 January 2023 provided a list of 12 defects and
recommendations to rectify them. See section 3.2 of this determination for a summary of all
12 defects and recommendations by the independent building assessor.
In reviewing the report, it appears the assessor has identified all the issues with the works,
including works carried out by the unlicensed roofer and PI. As the insurer has acknowledged
all these defects are required to be rectified, it is required to complete these rectification
works as soon as practicable.
I note the complainant has not obtained any reports to establish defects with the repairs.
However, AFCA acknowledges the complainant lodged a case with the Queensland Building
and Construction Commission (QBCC) which AFCA does not have any jurisdiction over.
Therefore, any findings from the case with the QBCC would not be dealt with by AFCA and
should be raised directly with the insurer by the complainant.
2.2 Is the complainant entitled to any compensation?
Yes. The complainant is entitled to a further $5,400 compensation for non-financial loss and
$3,048 for pest control expenses incurred by the complainant to date.
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400) where the insurer’s actions have caused an unusual amoun t of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Determination | Case number: 921132 Page 5 of 7
When considering non-financial loss compensation AFCA looks at what is reasonable and fair
in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to
factor the overall claims experience rather than focusing on specific individual events.
The complainant is entitled to $5,400 compensation for non-financial loss
On 24 February 2023, the insurer offered the complainant $5,000 in recognition of the
complainant’s claim experience. The complainant declined the insurers offer on 5 March
2023.
In his correspondence to AFCA the complainant has outlined the impact the delay in repairs
have had on both him and his family. In addition to this, I have considered the overall claims
experience and the impact of the insurer’s actions on the complainant.
I acknowledge some of the time it has taken to resolve this claim was outside the i nsurer’s
control. However, I am satisfied the insurer’s overall handling of claim was not done with the
appropriate urgency having regard to the complainant’s personal circumstances.
Having considered all the available information, I am satisfied the insu rer’s actions had a high
impact on the complainant’s expectation of enjoyment or peace of mind over a period of
several months. In the circumstances I am satisfied the complainant is entitled to $5,400
compensation for non-financial loss. This is the maximum amount AFCA can award for non-
financial loss.
The complainant paid for regular pest control
In his correspondence to AFCA on 5 March 2023 the complainant said he has been paying
regular amounts for pest control due to the insurer’s uncompleted rect ification works.
The complainant has provided AFCA with two invoices and an internet banking screenshot
totalling $3,048 for pest control expenses.
In his correspondence to AFCA on 5 March 2023 the complainant said:
Due to the not installed soffits and open access to the roof cavity, I have been
paying regularly ( every 3 to 4 weeks) to an exterminator to do pest control;
however, I was advised this does not guarantee the risk of pest damage. I want
[insurer] to compensate for this as well – I can provide evidence if required.
The insurer is required to compensate the complainant for the $3,048 evidenced to AFCA as I
am satisfied this is a financial cost incurred by the complainant because of the insurer’s
uncompleted rectification works. Furthermore, the insurer is required to compensate the
complainant for any further evidenced pest control expenses until the soffits are installed and
roof access rectified. The complainant is required to provide these invoices directly to the
insurer for compensation.
Determination | Case number: 921132 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 List of defects
Defect Description Asse ssor’ s recommendation
1 The quotation supplied by PI has
allowed for tie down straps to top
plate and rafter connection and
this has not been carried out .
We recommend that the builder provide a
negative variation for this aspect.
2 New soft linings poorly installed
and there are marks all over the
walls where they have scraped the
sheets.
The builder will need to clean all external wall
elevations and possible re - paint depending on if
they cleaning is successful or if the paint is
affected during the cleaning process.
Determination | Case number: 921132 Page 7 of 7
Defect Description Asse ssor’ s recommendation
3 Soffits don’t sit into the fascia as
required and there are gaps
around the entire perimeter.
The builder will be required to attend site and
ensure all soffit linings have been installed
correctly ensuring they extend into the receiver
channel as required.
4 Downpipe support brackets have
been removed and some broken
and not re - installed.
Builder to attend and reinstate or replace all
downpipe support brackets.
5 Downpipes not installed hard up to
the gutter dropper; bare met al can
be seen.
The builder attend and ensure all downpipes are
securely fixed and are hard up to the underside of
the gutter.
6 Plastic cover strips have been
installed to [sic] long and go into
the fascia slot causing a gap in the
sheet.
Builder to attend and ensure soffits sheets sit into
the fascia as required and cover strips sit flush
with the fascia.
7 Timber mould is cut short with
small section installed at the
corner and it is already not secure
and falling away.
Builder to atten d and replac e ensuring it is
securely fixed and flush with the adjoining mitre
section.
8 End of roll top ridge capping and
Barge has a section rivetted onto
the face at the end.
No work required.
9 Gaps bet ween the fascia and the
rendered wall where the fascia has
been installed at a different height.
Builder re attend and ensure fascia has been
installed flush with the existing rendered wall and
has been installed straight and level as required
by the manufacturer.
10 Timber cladding to gable end not
i nstalled correctly, with gap in the
joint visible.
We recommend that the builder re - attend the
Residence and ensure it is adequat ely secured
and all joints are tight.
11 Swarf on roof sheets in various
locations.
Builder to attend site and clean the entire roof
area of all swarf using the BlueScope
recommended procedure ensure no swarf is
remaining on completion.
12 Parapet capping is too wide and
was not like this originally. Insured
advis e builder is telling him it has
to be this wide now.
The builder to replace the parapet capping and
ensure it is installed in accordance with HB 39.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.