Determination 920319

Whether flooring damage was covered under the first claim or a new claim with a $25,000 excess, plus legal costs, temporary accommodation and delay compensation

FirmChubb
Decided2023-10-27
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$76,527
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

A lot owner's flooring was damaged by a leak during insurer-arranged repairs; the insurer treated it as a new claim with a $25,000 excess. AFCA found the first claim responsible and ordered payment of the flooring cost, contribution to costs, further temporary accommodation and $4,000 non-financial loss.

The proximate cause was the insurer's builder failing to seal open pipes as the Plumbing Regulations required, so the loss falls under the original claim, with costs and non-financial loss awarded under AFCA Rules D.5.1 and D.3.3.

Issues

Subjects and remedies

home or building damagetravel or overseaspay claimpay compensationpay interestpay non financial loss

Related

All Chubb determinations · Find similar determinations

Text of the determination

Amended Determination Case number 920319 Financial firm Chubb Insurance Australia Limited Amended Determination | Case number: 920319 Page 1 of 18 Case number: 920319 26 October 2023 1 Determination overview 1.1 Complaint The complainant is a lot owner insured under a Strata Insurance Policy held by the Owners Corporation with the financial firm (insurer). He lodged a claim on 10 July 2020 after discovering water damage to his unit‟s bathroom ceiling. The insurer accepted the claim, but dispute arose as to how the damage was to be repaired and associated delays. In August 2022, while under repair, the unit was flooded following a water leak. The complainant says the flooring was damaged due to the insurer‟s builder‟s negligence and should be covered under the first claim. The insurer accepts liability but says a faulty water valve caused the damage and this is a new claim with a $25,000 excess. This dispute relates to whether the flooring is covered under the first or a new claim, the complainant‟s legal costs incurred, temporary accommodation (TA) and compensation for the numerous delays and associated financial loss. 1.2 Issues and key findings Is the insurer liable to pay for the flooring damage under the first claim? Yes. Most likely the timber flooring was damaged by the failure of the insurer‟s trades to seal the bathroom water pipe. The insurer must pay the complainant $67,062.90 plus interest from 6 March 2023 under s.57 Insurance Contracts Act 1984 (Cth) (the Act). Is the complainant entitled to compensation for professional costs incurred? Yes. The policy does not cover a Lot owner‟s legal costs. Pursuant to AFCA Rule D.5.1 the insurer must contribute $5,000 to the complainant‟s legal fees and $2,200 for IE‟s report fee. Is the complainant entitled to further loss of rent/ TA? Yes. The insurer should pay a further $2,263.68 plus any outstanding TA as per section 2.4 Is the insurer required to pay non-financial loss compensation? Yes. The complainant is entitled to $4,000 non-financial loss compensation. Why is the outcome fair? The outcome is consistent with the available evidence and relevant policy terms. 1.3 Determination This determination is in favour of the complainant. Within 14 days of notification of the compla inant‟s acceptance of this determination the insurer is to pay the complainant:  $67,062.90 plus interest from 6 March 2023 pursuant to section 57 of the Act  $7,200 as legal and professional fees plus GM‟s report fee subject to proof of payment.  $2,263.68 plus any outstanding for temporary accommodation as per section 2.4  $4,000 non-financial loss compensation under AFCA rule D.3.3 Amended Determination | Case number: 920319 Page 2 of 18 2 Reasons for determination Numerous submissions and attachments have been provided by the parties, in particular the complainant. Various allegations have been made about the insure r‟ s conduct and, claims handling. The complainant says the insurer fabricated the „second claim‟ , used this to double the premium payable and pressured the complainant to withdraw the claim. He says this conduct impacted on his ability to sell the unit. The complainant also says the insurer engaged in unlawful and or unreasonable conduct, deliberately misled AFCA and that adverse inferences should be made. While I acknowledge the complainant ‟ s comments, I am not satisfied the evidence shows any deliberate attempt to, mislead, engage in unlawful or unreasonable conduct or fabricate the „second‟ claim. This determination is based on the information exchanged and focuses on the relevant issues in dispute. 2.1 Is the insurer liable to pay for the flooring damage under the first claim? Yes. Most likely the cause of damage to the timber flooring of the unit was the failure of the insurer‟s trades to seal the bathroom pipe. The insurer must pay the complainant $67 ,062.90 plus interest from 6 March 2023 under s. 57 Insurance Contracts Act 1984 (Cth) (the Act). Complainant has initial onus to prove damage falls within terms of policy It is established insurance law that an insured has the initial onus to prove, on the balance of probabilities (that is more likely than not), that the loss or damage claimed falls within the terms of the policy. The complainant is a lot owner of a unit (unit 3) that is part of a strata unit development insured by the Owners Corporation under a residential strata insurance policy. The policy provides cover for physical loss or destruction of or damage to the insured property arising from an event in the period of insurance. An event is defined under the policy to be an occurrence or accident causing or resulting in sudden and unforeseen, physical loss or destruction of or damage to the insured property. Circumstances of claim The original claim was lodged on 10 July 2020 after a tenant reported damage to the bathroom ceiling. The insurer accepted liability for the damage caused by long term water ingress from the bathroom in the unit (unit 6) above the complaint‟s unit. Issues arose as to the method of repairs with further damage caused by the insurers builder AA to the concrete ceiling slab. This caused considerable delays as noted in the chronology in section 3.2 of this determination. After various attempts and further delays appointing a structural engineer, the insurer appointed AB to repair slab and bathroom damage in the complainant‟s unit. Work commenced in May 2022, with slab rectification completed by July 2022. It was anticipated Amended Determination | Case number: 920319 Page 3 of 18 bathroom repairs would be completed by December 2022, but the repairs were not completed until February 2023. In August 2022, during the repair process, a water leak occurred resulting in the flooding of the complainant‟s unit. The wooden floor of the unit was damaged and required replaceme nt. There is no dispute the damage to the flooring is covered under the policy. The dispute arises as to whether it should be covered under the first claim or as a new claim under the 2022/2023 policy that would attract a $25,000 excess. Parties dispute who is liable for the damage The insurer says the proximate cause, that is the dominate or effective cause of the damage was a shut off faulty valve. The water supply to unit 3 had to be isolated during bathroom repair works. The valve that shut off the water failed, mainly due to its age and excessive building water pressure. The insurer says the valve relied on a rubber washer to shut the water off which had perished over time. The insurer relied on AB‟s advice that the valve had failed. The insurer also obtained a report from SR, a plumber, who confirmed a valve inside the property had failed, causing water damage. It also said there was evidence the valve had previously been over-tightened and was in poor condition prior to the flooding event. The insurer t says this should be treated as a new claim under the terms of the policy applicable from 1 May 2022 to 1 May 2023. Under this policy the applicable excess is $25,000. It offered to settle the claim less the policy excess. The complainant says the insurer should be liable for the flooring damage under the existing claim as the damage was caused by AB‟s negligence. The complainant says the damage would not have occurred if AB had engaged a licensed plumber to turn off the stop-tap and seal the open end of a copper pipe in bathroom as required by the Victorian Plumbing Regulations (the Regulations). He says it is unfair and unreasonable for the insurer to apply the $25,000 excess in these circumstances. Complainant provided persuasive evidence to support his position The complainant‟s expert GM, a licensed plumber, provided a comprehensive report on 16 December 2022. Relevant particulars are set out under section 3.3 of this determination. GM‟s key findings were:  AB was required to isolate the water supply to unit 3 by turning off the stop tap through which mains water flows to the pipes in the unit. AB did not use a licensed plumber to do this, which is a breach of the Regulations.  AB (also) punctured holes into a copper water pipe connected to the toilet when removing bathroom tiles with a jackhammer in May 2022.  AB sealed off most of the pipes in the bathroom, as required by the Regulations. However, the damaged copper pipe was left unsealed.  On 10 August 2022, an uncontrolled discharge flowed through the stop tap and discharged from the unsealed pipe, flooding the complainant‟s unit .  Similar flooding occurred in the bathroom of unit 6, where AB had (also) failed to seal an open pipe.  If the open end of these pipes were sealed as required, the escape of liquid would not have occurred. Amended Determination | Case number: 920319 Page 4 of 18  GM could not complete a forensic investigation on the stop-tap itself, as SR had dismantled it despite the complainant‟s prior written instructions to leave it untouched (to facilitate investigations). In a supplementary report GM says that by failing to seal the open end of the copper pipe, AB had relied solely on turning off the stop-tap to prevent a mains water leak into Unit 3. GM considers this is reckless because stop-taps can often leak, even when turned off. Further, the stop-tap was in the building‟s garage and anyone could have turned it on, or off. Proximate cause of flooring damage is most likely unsealed pipes. The escape of liquid occurred during the repair process. There is no dispute AB was required to isolate the water supply. Neither the insurer or its experts have responded to the specific points raised in GM‟s reports, including alleged non-compliance with the Regulations. A review of the Regulations extract provided by the complainant confirms a licensed plumber should have been used by AB to isolate the water supply to unit 3 and seal all open pipes. The evidence indicates while the stop tap was closed an unsealed pipe was left in the bathroom. SP confirms the leak occurred from a valve inside the property, but it fails to consider the possibility of a leak from the unsealed pipe inside the bathroom. SP did not address the need to seal all pipes. GM is a suitably qualified expert to comment on what caused the escape of liquid to occur. GM‟s findings are logical, compelling and cons istent with the circumstances and evidence. GM confirms that if AB had sealed all the unsealed water pipes as required the flooding would not have occurred. I am persuaded the leak would not have occurred if AB had isolated water supply to Unit 3 in the manner required by the Regulations and confirmed by GM. I am satisfied the proximate cause, that is the dominant or effective cause of the damage was the failure by AB to seal all unsealed pipes. The damage is properly assessed under the original claim and does not attract any excess. Insurer to cash settle the cost of the flooring repairs The flooring has been replaced by the complainant‟s contractor TKC with work completed and invoiced on 6 March 2023 for $67,062. The complainant moved back into the unit on 29 March 2023. The complainant paid TKC a deposit to commence repairs in January 2023, and the remainder of the cost on completion of repairs in March 2023. The insurer accepts the cost charged were reasonable. It is fair in the circumstances the insurer pays the complainant $67,062 plus interest from 6 March 2023 under Section 57 of the Act until payment of the claim. It is also fair, if the insurer has not already done so, that it pays the complainant loss of rent until 29 March 2023 when the complainant moved back into the unit. Amended Determination | Case number: 920319 Page 5 of 18 2.2. Is the insurer liable for the complainant’s professional costs? Yes. While the policy does not include cover for a unit holder‟s legal costs, under AFCA‟s Rule D.5.1 the insurer should contribute $5,000 to the complainants legal and reimburse the complainant $2,200 for the expert report fee. Complainant engaged lawyer to deal with claim while overseas When the original claim was lodged in July 2020 the complainant was living and working overseas. The building‟s insurance broker W arranged a quote from AA to remove a damaged pipe inside the slab. The insurer ‟s agent L approved these works in July 2020. The complainant insisted AA cease work after discovering it proceeded without his approval, causing invasive damage to the slab and further damage to his bathroom from concrete debris. He notified the insurer‟s agent L that any work involving a concrete slab must be undertaken by a specialist builder with experience in concrete works, under a structural engineer‟s supervision. After L refused to appoint either as requested, the complainant says he engaged a lawyer (U) to represent him until he returned to Australia and took over management of the claim, and the subsequent complaint to AFCA. It is not clear whether he requested any assistance from the owner‟s corporation to pursue these issues. In total, the complainant incurred $54,574.14 in legal costs. He says he was compelled to seek legal advice because the insurer authorised AA‟s work without ensuring the required approvals were in place. Further he says the insurer and its agents were liable for multiple delays in as sessing the claim and approving repairs. He says the insurer ignored U‟s requests for over a year until it finally accepted cover for the additional damage AA caused. He seeks cover for his legal expenses under section1, clause 4.1 or alternatively clause 9.2. The relevant clauses are set out under section 3.2 of this determination. In the alternative the complainant says the insurer has breached its duty of utmost good faith under section 13 of the Act and should not be able to rely on the terms of the policy to limit its liability. Insurer did not breach duty of utmost good faith The statutory duty of utmost good faith requires an insurer to act consistently with commercial standards of decency and fairness and with due regard to the interests of an insured. An insurer is no entitled to rely on a provision of the policy if to do so would amount to a breach of duty of utmost good faith. The insurer acknowledges there were delays. However, it says these were largely outside its control because:  the claim involved complex circumstances and repairs, which in turn required advice from numerous experts and variations to the scope of works  it was not evident that an engineer was needed to assist with slab repairs, until (after) it received the complainant‟s consulting engineer IM‟s report in October 2020  its builder AB could not start repairs until an engineering scope of works was prepared, which was only available in June 2021 due to difficulties experienced by its structural engineers  building permits could not be obtained until April 2022, which it blamed on industry-wide disruption arising from the COVID-19 pandemic and government restrictions Amended Determination | Case number: 920319 Page 6 of 18  it acknowledged its surveyor SP delayed this process throughout the latter part of 2021 and had to be replaced. The insurer authorised the quote from AA, which led to additional damage. This may have been avoided if the insurer took prudent steps to mitigate against such risk, by appointing a structural engineer at the assessment stage. The failure to do so falls short of good industry practice in the circumstances. The available information confirms the repairs and scope of works required multiple experts and revisions to the repair scope of work and methodology. Despite the additional damage the insurer acted on i ts builder S‟s advice and did not appoint a structural engineer. It is not unreasonable to have acted on S‟s advice in the absence of other information. On receiving the complainant‟s expert (IM), report in October 2020 the insurer acted reasonably and ob tained a structural engineer‟s advice in December 2020, after reviewing IM‟s report and accepting its findings. There was then a further 3-month delay until the premises were inspected, given two of the structural engineers the insurer appointed had to be replaced. After its engineering expert TG inspected the premises in February 2021, it delayed providing the scope of works until June 2021. L described TG‟s conduct as “appalling”. In hindsight the insurer could have appointed one of 3 structural engineers nominated by the complainant in November 2020. However, L and its loss adjuster CL preferred to use their own, which ultimately caused further delay. All this occurred during a period where there were significant restrictions imposed on movement in metropolitan Melbourne during Covid – 19 closures. This impacted on the availability of trades and assessment of claims. I accept that taking more than 30 months to repair the damage is an exceedingly long time and some circumstances might be considered a breach of duty of utmost good faith. While I accept the claims handling did not meet industry standards I do not accept, in the circumstances of this case, this amounted to a breach of duty of utmost good faith. The issues did not involve acceptance of liability but decisions as to repair methodology and proximate cause. Numerous experts were contracted and no doubt the unusual circumstances in place during the repair period due to Covid-19 restrictions would have significantly contributed to the delays. I am not satisfied the circumstances establish a breach of duty of utmost good faith. I accept the insurer is entitled to rely on the terms of the policy in determining liability for the legal costs incurred. Policy does not cover Lot owner’s legal or pro fessional expenses in pursuing claim. While the complainant has relied on Section 1, clauses 4.1 and 9.2 neither clause applies to legal costs incurred by Lot owners. The policy defines You / Your / Insured as the Owners Corporation, Strata Corporation, Community Title, Body Corporate or like entity stated in the Policy Schedule. Lot owners are only included as You/Your or Insured in respect of additional benefits 5.10, 5.16 and 6.8; and optional Covers 7.1 and 7.2. under Section 1. Amended Determination | Case number: 920319 Page 7 of 18 Clause 4.1 refers to legal and professional fees necessarily and reasonably incurred in the reinstatement or replacement of Your insured property (emphasis added). While I understand the complainant‟s submission that the legal costs were necessarily and reasonably incurred, clause 4.1 extends to costs reasonably and necessarily incurred by the body corporate, not to the Lot owners. Clause 9.2 refers to expenses for preparation of claims that You (emphasis added) reasonably and necessarily incur with Our consent and which are not otherwise recoverable under this Policy. Again, under this clause cover is provided to the body corporate not the Lot owners. There is no suggestion the costs were incurred by the complainant on behalf of the body corporate. I can find no other section in the policy that extends to provide cover for a Lot owners professional costs incurred in pursuing the claim. AFCA can require Insurer contributes to professional costs reasonably incurred. Under AFCA rule D.5.1 AFCA can determine an insurer contributes to a complainant‟s legal or professional costs incurred during the course of a complaint. Unless special circumstances apply, the compensation payable is limited to $5,000. There is no automatic right to payment of legal or professional costs. In determining whether costs should be awarded we will consider the complexity of the complaint and whether the complainant needed to incur the costs to understand or establish the claim. Legal costs incurred as complainant The complainant says he appointed his solicitor (U) after L refused to appoint a structural engineer following the additional damage caused by AA. He appointed U as he was living overseas. He claims U‟s services were regularly required to negotiate issues, deal with ongoing delays and settle the scope of works. U was required to regularly follow up on loss of rent, given there was no regular arrangement in place for payment and in certain instances, the insurer either missed payment or directed payment to the incorrect parties. He says U was also required to step in after AB and the insurer refused to accept liability for the flooring damage. I note the complainants brother, in his statement, confirmed he had on numerous occasions attended the unit after July 2021 to discuss the unit and slab rectification works. He had met with the site inspectors. This seems to be in addition to U‟s representation. The issues in dispute essentially involve decisions as to how to complete the repairs (and liability for the second event). The issues do not involve complex legal issues. I would not normally require an insurer to contribute to legal costs in these circumstances. However, while the complainant appears to have had assistance from his brother, the complainant was overseas and covid-19 had resulted in numerous lockdowns and restrictions on travel. It was not unreasonable in these circumstances for the complainant to obtain legal support in dealing with the claim. I am satisfied the complainant reasonably required the assistance of U while overseas during the claim process. I consider it fair the insurer contributes $5,000 to the legal fees incurred pursuant to AFCA rule D5.1. Amended Determination | Case number: 920319 Page 8 of 18 Insurer should contribute to c omplainant’s report fees The complainant is also seeking to recover $2,200 paid to his engineer IE. The insurer acknowledges this was an assessment of the structural integrity of the slab above the bathroom in unit 3. The insurer accepted the repair scope of work and methodology the complainant was seeking after reviewing IE‟s recommendations and findings. It is reasonable for the insurer to agree to cover the report fee. I am also satisfied the insurer should pay the report fees, if any, incurred in obtaining the plumbers report from GM. This report was required to respond to the insurer and has been relied upon in determining this complaint. Given this, I am satisfied this cost the insurer should reimburse the complainant $2,200 for IE‟s report a nd costs incurred from GM, subject to the complainant providing a copy of the relevant invoicing or proof of payment. 2.3 Should the insurer pay non-financial loss compensation? Yes. The complainant is entitled to $4,000 non-financial loss compensation. AFCA can award compensation for non-financial loss Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Complainant entitled to compensation for non-financial loss The insurer could have and should have dealt with the claim in a more timely manner. It should have given some explanation for the delays and the need to change its appointed experts. Not all delays can be attributed to the insurer‟s claims handling given the Melbourne metropolitan Covid-19 orders that existed during the claim and repair process. However, the repairs took nearly three years to complete with completion dates regularly missed. I am satisfied the insurer and its agents mishandled the claim at different stages, and this has contributed to the delays in completion of the repairs. The insurer ‟ s communication with the complainant was at times poor and often required further follow up through the complainant‟s legal representative. It failed to ensure the complainant received regular and consistent payments for loss of rental income. I am satisfied the complainant suffered significant stress and inconvenience, including psychological distress because of the insurers claims handling. I am satisfied this entitles the complainant to compensation at the higher level. In the circumstances I consider it fair that the insurer pays the complainant $4,000 non-financial loss compensation. Amended Determination | Case number: 920319 Page 9 of 18 2.4 Is the complainant entitled to further loss of rent/ temporary accommodation? Yes, the insurer should pay the complainant an additional $2,263.68 for temporary accommodation plus any outstanding temporary accommodation benefit from 4 January 2023 until 29 March 2023 as set out below. Complainant says he suffered indirect financial loss The complainant is seeking cover for the following loss:  the difference between his monthly loss of rent reimbursement and his rent in Tokyo, Japan between August 2021 and October 2022 ($28,560), on the basis the repairs should have been complete within a year, and he was compelled to delay his return to Australia  the difference between his monthly loss of rent and his alternative accommodation in Melbourne following his return to Australia in September 2022. No evidence complainant forced to stay overseas Although the complainant says he incurred additional expenses as he was required to stay overseas due to the delay in the repairs there is no evidence to support this. There is no claim related reason why the complainant could not have returned to Australia and sought rental accommodation (as he eventually did) while waiting for the repairs to be completed. The insurer was paying loss of rent during this period and I am satisfied this met the insurers obligations at the time. Policy provides for calculation of loss of rent/ temporary accommoda tion. Under the terms of the policy loss rent is payable is an amount of money for lost rent calculated based on the Annual Rentable Value that applied immediately prior to the event . The complainant‟s loss of rental income was calculated at a daily rate of $66.79 based on that rent payable. The complainant claimed temporary accommodation costs from 19 September 2022 after his return to Australia. Temporary Accommodation costs are calculated as the amount of money for temporary accommodation based on similar accommodation located in the vicinity of the location. Although payment was at times not regular, there no dispute that payment was to be made up to 29 March 2023. The complainant says the no payment has been received to date for the 84 days from 4 January 2023 until 29 March 2023. The insurer advised on 13 April 2023 that the rent will be paid until 29 March 2023. If it has not already done so, then the insurer should pay the outstanding rent for the 84 days plus interest on the outstanding amount from 29 March 2023 pursuant to section 57 of the Act until payment is made. Payment should be calculated at the rate of $66.79 per day for 84 days being a total of $5,610.36. The temporary accommodation obtained when he returned to Melbourne on 19 September 2022 was not similar accommodation located within the vicinity of the location. It was not a unit but a house. The insurer continued to pay the temporary accommodation at the rate of $66.79 per day. There is no evidence the insurer assessed this rate based on similar accommodation in the vicinity of the unit. The insurer argues the temporary accommodation is not comparable to the unit. I do not accept this is a reasonable position. The complainant returned to Melbourne during the rental Amended Determination | Case number: 920319 Page 10 of 18 crisis. There is no evidence to indicate the temporary accommodation facilities are excessive or unreasonable. The complainant‟s alternate accom modation monthly rate was $2,390 (daily rate of $78.58). Given this, I am satisfied it is fair that the insurer should also pay the complainant an additional $2,263.68 being the excess temporary accommodation cost ($11.79 a day), from 19 September 2022 until 29 March 2023 (192 days). 2.5 Is the outcome fair? Outcome is fair in all the circumstances I have considered all the information exchanged and recognise the issues that have been raised. While numerous issues have been raised the determination covers the relevant issues. In reaching this determination I have carefully considered the terms of the policy, good industry practice, relevant codes of practice and what is fair in all the circumstances. Amended Determination | Case number: 920319 Page 11 of 18 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms 4 Additional Benefits A Following loss, destruction or damage covered under this Section 1 of the Policy and provided the Sum Insured is not otherwise exhausted, We will also pay the following costs and expenses incurred in consequence of the loss, destruction or damage: 4.1 Architects and Other Fees Architects‟, surveyors‟, consulting engineers‟, legal and other professional fees, clerk of works salaries and bank imposed charges as necessarily and reasonably incurred in the reinstatement or replacement of loss, destruction or damage to Your Insured Property. These fees include legal fees incurred in making submissions or applications to any public or statutory authority, licensing board or court. Amended Determination | Case number: 920319 Page 12 of 18 9 Conditions Applying To This S ection 9.2 Claims Preparation Fees We will pay up to $50,000 or any higher amount shown in the Policy Schedule for professional fees and other expenses for preparation of claims that You reasonably and necessarily incur with Our consent and which are not otherwise recoverable under this Policy. 3.3 Event Chronology Date Item June 2020 Complainant‟s paint er discovered damage in his unit‟s bathroom (Unit 3). A leak detection undertaken by S, an insuranc e panel builder uncovered water damage to the concrete slab bet ween the bathroom‟s ceiling and a bathroom above (belonging to a separate unit, Unit 6). Complainant notified the building‟s strata insurance broker W. July 20 20 W lodged a claim with L, who act on behalf of the insurer on a binder authority. On 22 July 2020, L accepted a quot e from AA, organised by W, to remove and replac e a damaged pipe inside the concret e slab. AA started work in July 2022, and broke a hole (30cm wide) through the concrete slab between Unit 3 and the unit above (Unit 6), leading to furt her damage inside Unit 3‟s bathroom from falling debris. AA stopped work after the complainant insisted the insurer engage a structural engineer to consult on the repair, and a specialist builder to complete repairs. August 2020 L acted on S‟s advice, wh o said an engineer was not required. L advised W the r esultant damage from the pipe inside the concrete was c overed, as well as loss of rent. The complainant appoint ed a consulting structural engineer IM to inspect the slab. October 2020 The complainant engaged a lawyer (U) to liaise with L and the other agents acting for the insurer. U wrote to L and advised the slab was at risk of collapse, required urgent removal and replac ement, and a structural engineer to consult on the repair methodology (including whet her a partial or full replacement was required) . Amended Determination | Case number: 920319 Page 13 of 18 November 2020 CL, a loss adjuster appointed by L, confirmed indemnity had been granted for the building damage inside unit 3. U asked CL and L to confirm if this extended to the additional damage caus ed by AA, and if repairs would be undertaken in accordance with IM‟s recommendations. December 2020 The complainant offered 3 structural engineers he said were readily available to inspect the damage. This offer was rejected, and CL appointed its preferred structural engineer CR. CR were removed by CL, who appointed another structural engineer MF. January 2021 CL removed MF and appointed another structural engineer, TG February 2021 TG inspected the unit and undertook to provide a report and scope of works . It accepted AA‟s work had further compromised the slab‟s integrity, and that the slab needed to be replaced. June 2021 U complained to L about the delay in progre ssing repairs, given TG was yet to provide its slab design and scope of works for the required repairs. L wrote to U and acknowledged TG‟s service was “appalling”. TG‟s scope of works was received shortly after. July 2021 L appointed its panel builder AB to provide repa ir quot e/scope of works, and a surveyor SP to prepare and manage the building permit process . Further to U‟s efforts, L (also) agreed to instruct AB to amend the quote to include the resultant damage to the bathroom caused by AA‟s repai r work. August 2021 AB advised it was considering a partial slab replacement. U recommended the complainant‟s consent was obtained as this was contrary to TG‟s advice. September 2021 L obtained further advice from another structural engineer, FS which s upported AB‟s repair methodology October 2021 The complainant communic ated his agreement to AB and FS‟s proposal through U. L advised AB was arranging building permits . February 2022 L replaced SP with another survey or, IB . March 2022 In response to U‟s complaint, AB advised it was yet to receive the required building permits and highlighted the significant disruption to the construction industry arising from the COVID - 19 pandemic and Amended Determination | Case number: 920319 Page 14 of 18 government restrictions . April 2022 Building permits received . May 2022 Slab rectification works started . June 2022 CL estimated repairs would be completed by December 2022 . July 2022 In accordance with advice from another structural engineer, FS, a half slab removal and replacement were completed by July 2022. FS agreed with IM‟s advice that AA further compromised the slab, and that its work was very poor building practice. August 2022 While bathroom rectification work was ongoing, water had flooded the unit and the timber floor had been damaged. U wrote to L seeking it accept liability for the timber floor damage. This was rejected, L advised it was the complainant‟s responsibility to attend to these repairs, and a new complaint could be lodged if the claim cost exceeded the $25,000 excess. Dece mber 2022 AB completed bathroom reinstatement works. After the complainant‟s inspection uncovered inc omplet e works, AB agreed to complete this. February 2023 AB completed all bathroom reinstatement works. The insurer agreed to cover loss of rent up unti l the date of completion. March 2023 The complainant‟s builder TK complet ed all flooring reinstatement work, at the cost of $67,062.90. The insurer offered to consider this as a separate insurance claim, subject to the $25,000 water damage excess, and loss of rent up to the date the flooring works were completed. 3.4 Report Extracts Record Key points Amended Determination | Case number: 920319 Page 15 of 18 Record Key points SR Report 25.08. 2022 During repair works, a valve within the property has failed causing water damage. I have been asked to attend the property inspected valve and report. I inspected the valve in question and noticed that the original handle had been broken off, indicating this valve has had to have been tightened excessively to prevent water from continually on - running. …….. Given an excessively high - water pressure, valves that I would estimate to be 50 years old and evidence that the valve has been over tightened (prior to it being used to isolate the water to an apartment before the valve failed), I can confirm that the valve was in poor condition prior t o the flooding event. With the excessively high - water pressure additionally contributing, water entry has occurred to an apartment under construction. ……… GM Report 16 - 12 - 2022 I have attached a pictorial which visually illustrates the plumbing issues subject to my opinion, namely the locations of the mains water supply, the isolation valve (also referred to as a “stop - tap” and the water supply pipes whic h carry water from the ma ins water supply through to the water outlets within Units 3 and 6. With the mains water supply to Unit 3 shut off, in mid - May 2022, AB then commenced removing bat hroom wall tiles from Unit 3 with a jackhammer. With the jackhammer, AB accidentally punctur ed holes into a copper water pipe connected to the toilet cistern. AB did not repair the holes and left the damaged water pipe in situ for the next 3 months leading up to the flooding emergency in August 2022. Once tapware attached to the ends of water pi pes were removed, AB was required to seal off their "open" ends with caps in accordance with applicable Plumbing Regulations. In Unit 6, AB did this in relation to all water pipes except one, which AB left unsealed and "open" for the next 3 months leading up to the flooding emergency. In Unit 3, AB did this in relation to all wat er pipes except, as noted above, the damaged copper wat er pipe which AB left unsealed and "open". Leaving these two water pipes "open" was in breach of the Plumbing Regulations whi ch require water popes to be sealed during these works. This also left Unit 3 badly exposed to the risk of an uncontrolled discharge of water. …….. The failure by AB to seal the two "open" water pipes means that, over a period of months, AB had relied so lely upon the turned OFF Amended Determination | Case number: 920319 Page 16 of 18 Record Key points stop - tap to prevent mains water from entering Unit 3. AB's sole reliance upon the stop - tap breached the Performance Requirement to avoid an uncontrolled discharge of water int o Unit 3 by exposing Unit 3 to a high risk of flooding. This is becaus e:  it is well - known that stop - taps (in the OFF position) often leak;  and such relianc e was reckless given the location of the stop - tap meant that, for 3 months It is also irrelevant to proximat e cause as to why mains water passed through the stop - tap in August 2022. This is because had AB's licensed plumber duly sealed off the two "open" water pipes in the Units in May 2022 as required by the Plumbing Regulations, then any water that passed through the stop - tap in August 2022 would have be en prevented from flooding out Unit 3, regardless of the reason such water was able to pass through the stop - tap at that time. After the flooding emergency, AB engaged a plumber Stewart Rose Plumbing) (SR) who ins pected and pulled apart the stop - tap and p repared a report on the cause of the flooding. This prevented the parties from having the stop - tap forensically examined by an independent third - party plumbing failure specialist which is the normal practice in severe flooding inci dents such as the present case. Rose Report concludes that the cause of the flooding was the sudden failure of the stop - tap ( due to "overtightening") to hold back the mains water notwithstanding that the stop - tap had been turned OFF by AB from May 2022 until the floo ding emergency . Significantly, Rose Report does not mention the two water pipes that AB had left "open" from which the flood waters discharged. I do not believe that the Rose Report can sensibly reach a conclusion about the proximate cause of the flooding without consid ering the two "open" water pipes. As explained in paragraph 61 below, even if there had been "overtightening" of the stop-tap and/or high mains water pressure which damaged the stop - tap as suggested in the Rose Report (whic h I consider to be implausible), and these factors had caused flooding to Unit 3 (again, I consider this implausible), this does not change my conclusion as to the proximate cause of the flooding. This is because had the two "open" water pipes wit hin the Units been duly sealed off by AB in May 2022 as was required by the Plumbing Regulations, then any water that would have flowed through the stop - tap in August 2022 due to such hypot hetical "overtightening" and/or high mains water pressure would have been blocked from entering into Unit 3, thus preventing any flooding of Unit 3. Amended Determination | Case number: 920319 Page 17 of 18 Record Key points GM Supplementary Report 03 - 04 - 23 At the top of page 2 of the Rose Report, there is a photograph of the dismantled stop - tap (the " Rose Report Photo") with the not ation "The rubber section of the washer was completely missing". Whilst the Rose Report does not state it, I am instructed that Mr. John Riske of AB says that the washer within this stop - tap must have been perished and "washed away" up the water pipe on or around 10 August 2022, thus allowing the mains wat er to flow past the stop - tap. There is no was her visible in the Rose Report Photo. The washer within this stop - tap would have been positioned between the nut visible at the t op of the stop - tap in the Ros e Report Photo, and the circular brass seat immediately underneath it. In my first report, I concluded that, for various reasons, the evidence points to the stop - tap in this case being in good working order at all material times and that it had no role in the ca use of the flooding incident. It therefore follows that there would have been a washer present within the stop - tap at all material times, including during the time the mains water passed through the stop - tap to then d ischarge from the "open" water pipes within Units 3 and 6, causing flooding. In addition, even if hypothetically there had been "overtightening" of the stop - tap and/ or high mains water pressure which damaged the stop - tap as suggested in the Rose Report (w hich I consider implausible for reaso ns set out in my first report), or even if the washer was very old, I consider it implausible that the washer would have "was hed away" up the wat er pipe and gone "missing". This is because wash ers are made of tough mate rials and are lodged tightly between two precision - machined brass seats within the enveloping brass body of the stop - tap assembly. VBA Advice 24 - 05 - 23 “What you have described sounds like an element or part of a building or structure that carries or tr ansfers a load between intermediate floors in addition to its own weight. Pri or to any building work being undertaken I can confirm that any proposed modifications, alterations and any repairs to [this] would require an application for a building permit t o be submitted to a registered building surveyor. The building surveyor will then assess the compliance requirements and guide you through the process…”. VBA Advice 19 - 05 - 2023 “Based on your description I would recommend contacting a registered endorsed structural engineer to undert ake a site Amended Determination | Case number: 920319 Page 18 of 18 Record Key points inspection to check whether the concrete floor between your unit and the one above requires remedial work due to the water ingress… I can confirm that before any remedial works are undertaken, if the work r elates to a structural alternation or repair for instance, this type of work would require a building permit to be issued by a registered building surveyor prior to any building work”. FES Engineering Report 27 - 09 - 21 FES understands renovations were carr ied out to the unit 6 bathroom in July 2020. During these works, a section of concrete fell f om the underside of the second floor slab into unit 3 bathroom, with a void / hole being formed in the suspended slab. This loss of concrete occurred in the vici nity where the new PVC pipe was connected into the retained original discharge pipe which is located within the external (eastern) wall. It appears that the contractor for this work did not engage a structural engineer, prior to the works being carried out. It is unknown if a Building Permit was obtained for the works. FES has not been provided with any evidenc e showing that a structural engineer specified, or inspected the works carried out to the reinforcement during the unit 6 bat hroom refurbishment w orks. It is recommended, however, that AAA Above Group be requested to provide evidence in relation to a building permit, including building surveying related documents.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.