Partial claim denial and cash settlement amount after burst pipe caused building movement damage
Text of the determination
Determination
Case number 919811
Financial firm AAI Limited
Determination | Case number: 919811 Page 1 of 8
Case number: 919811 14 September 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim under her home insurance policy held with the financial firm
(insurer) on 14 May 2021 following the discovery of a burst pipe in the bathroom.
The insurer assessed the damage and offered a cash settlement of $40,920.09. That was for
some of the claimed damage only. It says the additional claimed damage is unrelated to the
leak event and was instead caused by factors excluded under the policy.
The complainant says the settlement is insufficient to repair the damage. To resolve the
complaint, she wants the insurer to repair all the claimed damage or provide a cash
settlement based on her expert’s report.
1.2 Issues and key findings
Has the insurer correctly assessed the resultant damage?
No. The insurer has not adequately assessed the claim-related damage. That is because, on
balance, the pipe leak was the proximate cause of some of the additional damage claimed,
and the insurer has not established any policy exclusions apply to those parts of the claim.
Is the insurer ’s proposed cash settlement fair ?
The information indicates it is reasonable for the insurer to cash settle the claim (as it is
entitled to do under the terms of the policy), given other movement issues at the property.
However, the insurer is required to re-attend the property and obtain an updated scope of
work/actionable quote on which to base the cash settlement, including for the additional
damage. It is also required to cover the cost of the complainan t’s expert reports , temporary
accommodation for the extended repair period, as well as the heating costs already offered.
Why is the outcome fair?
The policy covers resultant damage caused by an escape of liquid. The evidence shows, on
balance, the proximate cause of some of the additional damage claimed is the escape of
liquid from a burst pipe. However, any fair cash settlement needs to adequately cover the
likely current repair costs for the complainant as a retail customer, plus contingencies.
1.3 Determination
This determination is substantially in favour of the complainant. Within 14 days of the
complainant accepting this determination, the insurer is required to both reimburse the
complainant the cost of her expert reports (subject to provision of evidence of costs incurred);
as well as arrange a detailed updated scope of works/actionable quote from a suitably
qualified expert for the claim-related damage (as already accepted by the insurer, plus the
additional damage as set out in this determination), and then promptly cash settle that
amount together with an uplift of 20% to allow for contingencies. It is also liable for temporary
accommodation for the period necessary to allow for all claim-related repairs; plus the $300
heating costs as offered.
Determination | Case number: 919811 Page 2 of 8
2 Reasons for determination
2.1 Has the insurer correctly assessed the resultant damage?
Complainant is responsible for establishing she has a ‘ valid ’ claim
The complainant carries the initial onus to establish, on balance, the loss or damage being
claimed falls within the scope of cover under the policy. Only once this is established does the
onus shift to the insurer to show, on the balance of probabilities, an exclusion applies or that it
is otherwise entitled to decline the claim in whole or in part.
The complainant’s policy is an insured events policy. That means it only responds where one
or more of the listed insured events causes the damage. That cover is, however, subject to
the remaining policy terms, conditions and exclusions.
One of the listed insured events is the escape of liquid (from a fixed pipe).
Insurer says not all damage is related to the event
While the insurer accepted there was a valid claim for some damage, it says not all the
damage being claimed was a result of any listed event. Instead, the insurer says the cause of
the declined damage was ongoing ground movement and seasonal changes. Those factors
are excluded under the policy.
The insurer assessed the damage after the claim was lodged and determined the waste
water pipe below the shower drain had come apart, allowing water to leak to the ground.
Based on its experts’ findings, the insurer accepted the leak had ‘ substantially contributed to
the movement of the house’ . However it says the leak is not the sole cause of the claimed
damage.
The insurer assessed the extent of its liability for the claim to be $40,920.09 (which included
repair costs for accepted damage , a contingency allowance , heating and funds for temp orary
accommodation for the duration of claim - related repairs . )
On 15 February 2021 the insurer engaged builder AB who reported on the cause of damage.
AB identified signs of movement at the property, the worst being in the vicinity of the
bathroom. AB’s report also identifies:
bath/shower waste had come away as the waste had been joined together using
silicone
large amounts of water have been leaking from the bath/shower drain below the
house for a prolonged period of time
the bath/shower drain was repaired at the time of the make safe attendance
the ground is saturated in the vicinity of the leak below the house.
While a subsequent CCTV investigation found no issues with the sewer pipe, AB did note:
The issue of water ingress under the house was due to the last leak detection of
the bath/shower waste pipe that had been broken possibly a few years and gone
unnoticed. (Emphasis added)
Determination | Case number: 919811 Page 3 of 8
Engineer IL (in a report dated 3 June 2021) then confirmed there was evidence that the leak
from the shower/bath waste pipe had saturated the soil directly under the bathroom, as well
as a proportion of soil under the kitchen area (following the natural gradient of the subfloor
soils). IL said that clay soil (which is pres ent at the site) is ‘notoriously reactive’ to an increase
in moisture content.
IL noted, however, that the overwhelming majority of the observed damage to the dwelling
(including interior plaster cracks) predated the leak event. IL said this was supported by
evidence of packing in the subfloor and by the extensive pre-existing patch repairs across the
footprint of the dwelling.
IL considered that the original stump subsidence to the interior floor system across the
footprint of the dwelling had been caused by deep soil drying over the life of the building
(estimated to be between 40 to 50 years old). IL recommended certain maintenance work to
be carried out by the complainant (including removal of uncapped garden beds near the
footings).
Engineer MCS also referred to a range of pre-existing/cumulative contributory issues,
including:
ground surface levels graded towards the home allowing surface stormwater run-off to
seep into the underlying soils
absence of an adequate surface stormwater drainage system to collect surface run-off
uncapped perimeter soils
possible stormwater run-off from the neighbouring property
seasonal moisture variations and movement
long-term age-related wear-and-tear.
While the insurer recognised the leak was contributing to the movement damage, together
with several other likely factors, it maintains there is insufficient information to show ‘ a
relatively minor leak ’ was able to cause significant cracking to the property.
The i nsurer’s building coordinator, having reviewed the available reports, then also reported.
They acknowledged the longer-term soil movement issues, but specifically observed that the
earlier reports had failed to take into account the amount of water which would likely have
been escaping from the dislocated shower waste every day (estimated to be from 80 to 100
litres) and the floor level surveys showing resultant damage from the leak.
I also note that, in contrast to the insurer’s reference to a ‘relatively minor leak’, AB had
referred to ‘l arge amounts of water … leaking from the bath/shower drain … for a prolonged
period of time ’.
Complainant’s expert identifies leak as proximate cause of movement/damage
The complainant engaged engineer RC who noted widespread damage and building
movement across most of the house.
RC concluded the ground had heaved in the main areas that were ‘flooded’, and that caused
damage to the bathroom, toilet, bedrooms 2 and 3, laundry, kitchen and dining room. RC
stated the heaving movement has then
… caused the cracking in the archways and distortions of the internal doorframes
(internally) and the security doors and windows to no longer open, pulling away of
the landing outside the laundry and the window and eave gaps and minor cracks
around the south half of the building (externally). The movement appears to be
Determination | Case number: 919811 Page 4 of 8
related predominantly to the failure of the shower waste pipe combined causing
the footings to heave: damage resulting from the insured event.
RC says the nature of the damage and the floor levels suggest:
failure of the shower waste pipe in the bathroom caused significant water to be
released into the underside of the house over a long period of time
that caused significant heave (my emphasis)
heave, movement, pulling away and widespread building movement have
caused significant damage to the house (internally and externally).
as the heave persists, even since the leak was fixed many months ago, it is
likely the deep foundation soils have not yet fully dried out and restabilised.
Some movement may continue as the deep foundation soils slowly dry out.
RC recommended that the building should ideally be allowed at least another 12 months to
restabilise before attempting structural and cosmetic repairs; and went on to say that when
the movement and damage appears to be reasonably stable it would be necessary to relevel
the floors of the house throughout and repack the stumps.
The insurer says RC’s report did not change its position. It says RC’s report has not taken
into consideration all relevant site issues and has ignored the evidence of pre-existing internal
lining repairs, subfloor upgrade works, and external exacerbating factors such as the
significant packing to the subfloor stumps and pre-existing movement and repairs to cracks.
I note RC does address the packing on the stumps, but says that does not appear to be
significant in relation to the heave that has occurred from the leaking.
The complainant is wanting all the identified damage to be covered.
Insurer only liable for part of the additional claimed damage
The insurer says no evidence has been provided as to the cause of damage found in the
areas of the property away from the leak, and which had been patched up. I accept there are
pre-existing and possibly ongoing movement issues at the property, and that there has been
repair work (stump packing and internal patch repairs) undertaken in the past. However, I do
not accept that in itself is sufficient to show any more recent damage is automatically not from
another new identifiable source and should not be covered.
RC carried out a subfloor inspection which detected moisture and efflorescence in the
bathroom, bedrooms 2 and 3, dining room, kitchen and laundry. I note IL also confirms water
following the natural gradient would go under the bathroom and a proportion of the soils
under the kitchen area.
As noted above, whilst the insurer says there is no information to suggest a ‘ relatively minor
leak ’ would cause significant damage, its own assessor has stated it is possible 80-100L of
water would be escaping each day. I do not consider this amount of liquid represents a minor
leak, and while it is also not known exactly how long the leak had been occurring, RC refers
to liquid escaping under the house ‘ over a long period of time ’ and AB says it was ‘for a
prolonged period’.
Having considered all the available evidence , I am not satisfied the insurer should be liable
for all the damage being claimed. However, I do consider the evidence indicates, on balance,
that claim-related damage extends beyond that which it has accepted to date.
Determination | Case number: 919811 Page 5 of 8
2.2 Is the insurer ’s proposed cash settlement fair ?
Insurer liable for additional damage
In the circumstances, the insurer is required to cover:
the work already identified in AB’s scope ( including hall, whole of bathroom, toilet,
bedroom 2 and bedroom 3, external brickwork, and subfloor and
stumps/underpinning for those areas)
the dining room, kitchen and laundry, together with corresponding subfloor and
stumps/underpinning
timber flooring for the relevant areas above (and in accordance with the policy terms).
That means the insurer’s settlement offer needs to be increased to take account of the
additional claim-related damage.
Information suggests the insurer is unable to warrant the works
The complainant has stated the repair quote the insurer provided is not actionable and the
settlement offered is, in any case, too low for all the claim-related damage. Given her
particular situation, she wants the insurer to undertake the repairs rather than having to
manage that herself.
However, the available information shows that the property is on highly reactive soil, some
packing has been done incorrectly and that there are existing (and likely ongoing) movement
issues at the property which are unrelated to the leak. That means any claim-related repairs
the insurer undertakes, to comply with its obligations under the policy, risk being
compromised by other current or future issues for which it is not responsible.
In circumstances where the insurer cannot guarantee the claim-related repairs, and as
provided in the policy provisions, it is not unreasonable for the insurer to choose to cash settle
the claim rather than authorise the work itself.
In this case, the insurer is entitled to cash settle the complainant for the claim-related work.
New scope of work/quote to be arranged as basis for updated cash settlement
However, any cash settlement needs to cover all the claim-related repairs and be sufficient to
allow the complainant to carry out those claim-related repairs herself. That is, it needs to be
based on a quote that is actionable by her as a retail customer. It also needs to allow for
contingencies and for the transfer of risk.
The insurer requested a further inspection to allow it to evaluate the damage at the property.
That is not unreasonable, as the information suggests the proposed cash settlement is not
reflective of the current claim-related damage present at the property (nor the likely current
cost of repairs), since this was calculated in July 2022.
As well, it is relevant to note that the proposed cash settlement of $40,020.09 (less the policy
excess) also included an allowance for heating and for 6 weeks’ temporary accommodation,
both of which are separate from and in addition to its liability for the building damage. The July
2022 cash settlement total of $40,920.09 is made up as follows:
Description Amount
Determination | Case number: 919811 Page 6 of 8
Cost of buil di ng repai rs as per the A B scope of
works
$29,478.34
15 % conti ngency for the l oss of the li feti m e repai r guarant ee and transfer
of risk
$4,421.75
Te mporary accom mo dati on for 6 we eks for the durati on of the cl ai m
re l ated repairs @ $160 per ni ght (i ncl udes 3 we eks conti ngency)
$6,720.00.
All owa nce for addi ti onal he ati ng to th e ho m e $300.00
Total cash settl em ent p ayabl e $40,920.09
So I consider it is reasonable and appropriate for the insurer to arrange a suitably qualified
and experienced builder to attend the property to review all claim-related damage (that
includes all the damage the insurer has previously accepted plus the additional damage
required to be covered under this determination). The insurer will then need to obtain from
that builder a full scope of work and costings for the claim-related repairs. To be clear, the
builder needs to provide an itemised repair quote which would be actionable by the
complainant as a retail customer.
The insurer is required to cash settle the complainant for the claim-related damage to the
property in accordance with the policy terms and conditions, based on the amount quoted by
the builder plus a further 20% of that amount to cover the transfer of risk and any
contingencies that may arise in the repair process. The insurer should include amounts for
any additional policy benefits which may apply.
It is also required to cover temporary accommodation, increased to take account of the
additional damage which is claim-related and the additional time that will be needed to
complete that.
As well, the insurer is required to pay for the $300 for heating which it has already offered.
The insurer may deduct from the final settlement figure any amounts which it has already paid
toward the costs above.
Insurer required to cover cost of complainant’s expert report
Under the AFCA Rules, we may require an insurer to reimburse the complainant’s
professional costs of pursuing the complaint (up to a maximum of $5,000).
I am satisfied the evidence provided by the complainant’s engineer, RC, assisted in re solving
this complaint. It is therefore fair that the insurer cover RC’s professional fees (up to the
stated maximum above), subject to the complainant providing evidence of costs incurred and
paid.
2.3 Why is the outcome fair?
The policy provides cover for resultant damage caused by an escape of liquid. The
exchanged evidence indicates, on balance, the proximate cause of some of the claimed
damage is a result of the burst pipe, and so that damage should be covered by the insurer.
It is also fair that the ou tdated quote on which the insurer’s proposed settlement is based be
updated by reference to a new scope of works (incorporating all claim-related damage,
including that already accepted by the insurer plus the additional damage required to be
Determination | Case number: 919811 Page 7 of 8
covered under this determination) to be carried out by a suitably qualified builder. That is
because any cash settlement needs to be fair and sufficient to allow the complainant to carry
out the claim-related work, while also allowing for contingencies.
Determination | Case number: 919811 Page 8 of 8
2.4 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.