Home / Allianz Australia / Determination 919569

Determination 919569

Partial decline of storm damage claim to roof; decline of flood-related stumps/foundations and contents claims within 72-hour flood cover exclusion period; delay

FirmAllianz Australia
Decided2023-11-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

Mr D's home insurer declined parts of his storm and flood claims. AFCA found the insurer had not proved the roof damage was excluded and ordered it to accept the roof claim and pay $2,000 for non-financial loss, but upheld the decline of the flood-related and stumps/foundations claims.

The insurer bore the onus of proving an exclusion and failed for the roof, but proved the flood occurred within the 72-hour waiting period and that the stump damage was long-term movement.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 919569 Financial firm Allianz Australia Insurance Limited Determination | Case number: 919569 Page 1 of 13 Case number: 919569 23 November 2023 1 Determination overview 1.1 Complaint The complainant (Mr D) held a home and contents insurance policy with the financial firm (the insurer). This complaint is about the following claims and claim outcomes:  Claim xxx132 – made on 9 March 2022 for storm damage to his home’s roof, ceilings and wall linings in the kitchen, lounge and laundry that occurred on 26 February 2022. The insurer accepted the damage to the ceilings and wall linings was caused by a storm and cash settled that part of the claim in October 2022. The insurer denied the claim in relation to the roof damage.  Claim xxx674 – made on 6 June 2022 for damage to the insured dwelling’s stumps a nd foundations. This claim was declined by the insurer because it found the damage related to a flood event that occurred within 72 hours of flood cover being added to the policy. It also found the proximate cause of the damage was long term movement and wear and tear, which are policy exclusions.  Claim xxx675 – made on 6 June 2022 for damage to contents that were stored in the laundry. The insurer declined the claim as it found the damage related to a flood event that occurred within 72 hours of flood cover being added to the policy.  Claim xxx361 – made on 8 July 2022 for damage to the insured dwelling’s stumps and foundations as well as the loss of contents that Mr D says occurred on 4 March 2022. The insurer is of the view this claim is a duplicate of claims xxx674 and xxx675. It appears this claim was withdrawn in September 2022. Mr D wants the insurer to fully accept his claims and cover:  the replacement of his roof  repairs to the laundry  restumping the dwelling, and  replacement of lost contents. 1.2 Issues and key findings Was the insurer entitled to partially decline claim xxx132? The insurer has not proved the roof damage was excluded from cover. Was the insurer entitled to decline claims xxx674 and xxx675? Yes. The insurer has proved:  the claimed damage to the stumps and foundations and loss of contents was related to a flood event that occurred with 72 hours of flood cover being added to Mr D’s policy  the claimed damage to the dwelling’s stumps and foundations were not c aused by a storm or flood event but had been occurring over a long period of time. Should the insurer compensate Mr D for non-financial loss? Yes. The insurer admits there were de lays in handling Mr D’s claims. I am satisfied these delays caused Mr D undue stress and inconvenience. Determination | Case number: 919569 Page 2 of 13 Why is the outcome fair? The outcome is fair because the insurer has not proved the damage to Mr D’s roof was excluded from cover. However, the insurer has proved the damage to the stumps and foundations and loss of contents was caused by a flood that occurred within 72 hours of flood cover being added to the policy. 1.3 Determination This determination is partly in favour of the complainant. The complainant has 30 days to accept the determination. If he accepts the determination, the insurer must, within 14 days of being notified of the acceptance, do the following things:  accept liability for the damage to the roof of the complainant’s home and either authorise the replacement of the roof or cash settle the claim  pay $2,000 to Mr D for non-financial loss. Determination | Case number: 919569 Page 3 of 13 2 Reasons for determination 2.1 Was the insurer entitled to partially decline claim xxx132? The insurer has not proved the roof damage was excluded from cover. The insurer does not dispute Mr D has a valid claim The insurer does not dispute Mr D has a valid claim as it has accepted liability and cash settled internal damages to the interior of the dwelling. This means the insurer has the onus of proving (on the balance of probabilities) the damage to the roof and guttering of Mr D’s home is subject to a policy exclusion or otherwise not covered by the policy. The insurer declined to cover roof and gutter damage The insurer informed Mr D it would not cover the damage to his home’s roof and guttering in a letter dated 4 July 2022, which relevantly stated: To assist with the assessment of your claim we appointed [S Loss Adjusters] who engaged [Builder ABG], [G Roofing] and [E & LS] to report on the cause of damage. A copy of their reports are attached for your information. Based on the information obtained, it is our understanding rainwater is entering your property via various maintenance related issues. The roof sheets were observed to be depreciated, with a point of fatigue directly above a water entry point. The gutters were found to be rusted, and the vent pipe is inadequately maintained, allowing back flooding to occur down the lower roof at the downpipe. As is evidenced in the photos provided, no prevention of water back flooding is installed between the roof sheets, allowing water to enter the cavity and dwelling. Two cracked areas of the roof barge were identified which are aged, evidenced by staining and mould. The water stains above the windows in the living area are due to the vent pipe directly above and cracked roof sheeting. No storm created openings were identified during the assessment. We understand you commissioned a builder to assess your roof, however, no photo evidence has been provided to confirm the damages are event related and not the result of deterioration that is clear from the images provided by [Builder AGB]. Although weather conditions will have exacerbated the condition of the roof, if the roof was adequately maintained, water ingress would not have occurred. The letter goes on to say the roof and guttering claim was declined because the damage to the roof and guttering was the result of depreciation, gradual deterioration, wear and tear, which is excluded under the policy. The relevant policy exclusion is set out in section 3.2 below. Determination | Case number: 919569 Page 4 of 13 The insurer relied on expert reports As noted above, the insurer relied on expert reports provided by Builder ABG, G Roofing and E&LS as the basis of it s decision to decline Mr D’s claim for storm damage to his home’s roof and guttering. I note the E&LS reports relate solely to possible asbestos contamination issues and doesn’t make any findings about the cause of the damage to the roof. E&LS noted the roof was in “reasonable condition”. The report prepared by Builder ABG, insofar as it comments on the roof, merely states the “roof needs replacement” and “the roof has detached in a number of areas”. The report does not contain any comments about the gutters. G Roofing’s report observed: Roof is in typical condition of its age. There are no storm related damages and recommended (amongst other things) Repair fatigued sheets … G Roofing’s observation about the condition of the roof is supported by photographs . Those photographs show some cracking to the asbestos sheets, but no findings are made about how the cracks may have occurred. Specifically, there was no finding about whether the cracks were caused by a storm. S Loss Adjuster’s report was based on Builder ABG’s and G Roofing’s reports and concludes: … our office is of the opinion that the roof is suffering from wear and tear, and the insured should have been reasonably aware of the poor condition of the roof. The insurer has not proved a policy exclusion applies I am not satisfied the expert reports relied on by the insurer are sufficient to prove, on the balance of probabilities, the damage to the roof was the result of “depreciation, gradual deterioration, wear and tear”. None of the reports make any findings about the cause of the cracks in the roof sheeting. There is an absence of analysis about how and when the cracks may have formed. The insurer’s expert reports do not dispel the findings in the builder’s report (from Builder MHI) obtained by Mr D which relevantly states: 1. Several roof sheets are not secured down properly and fixings have lift between 1 and 4 cm. sheets are moving up and down on original fixings when roof is walked over. Heavy winds may have lifted sheets and loosened fixings. 2. The sheet laps are all facing [name of Road] which is due west and south. The prevailing winds and storms come from the south west. This would explain how the recent flood event and storms have caught the sheet edges Determination | Case number: 919569 Page 5 of 13 and lifted sheets. This would correlate with the banging sound the roof was making during the storm event as you reported to me. 3. Most lift sheets are at the front over entry way (south) and left hand side (west) where you have reported roof leaks to me. There is also some on the north west corner. 4. The wind has lifted some sheeting at the front and cracked the sheets due to movement up and down on loose screws. 5. The roof was previously painted and generally free from defects in other areas, further indicating the damage occurred in the most recent weather events. [Emphasis added] The insurer’s reliance on the Beaufort Scale of Wind Force is noted but is unconvincing on its own . The Beaufort Scale information is intended to be a guide only. It does not dispel the real possibility that a moderate gale of 57km (which occurred on 27 February 2022) may have caused the roof sheets to lift and crack due to up and down motion. More weight would have been given to the Beaufort Scale information it was supported by (for example) expert findings about the age and the cause of the cracks in the roof. The insurer was not entitled to decline Mr D’s roof damage claim For the reasons set out above, I consider the insurer was not entitled to decline Mr D’s roof damage claim. However, I am satisfied the photographs of the guttering (which are visibly rusted) are sufficient to show a storm was not a cause of any damage to them. This is supported by Builder MHI, engaged by Mr D: The guttering on the home while sound is suffering from heavy internal surface rust and this is a maintenance issue, not as a result of storm damage. The insurer must accept Mr D’s claim for damage to the roof. 2.2 Was the insurer entitled to decline claims xxx674 and xxx675? Yes. The insurer has proved:  the claimed damage to the stumps and foundations and loss of contents was related to a flood event that occurred with 72 hours of flood cover being added to Mr D’s policy  the claimed damage to the dwelling’s stumps and foundations were not caused by a storm or flood event but had been occurring over a long period of time. The insurer declined claims xxx674 and xxx675 It is convenient to deal with claims xxx674 and xxx675 together as they relate to the same event. The insurer declined to accept liability for the damage to the stumps and foundations of Mr D’s home (claim xxx674) and the loss of contents (claim xxx675) as it says the damage and Determination | Case number: 919569 Page 6 of 13 loss occurred within 72 hours of the flood cover being added to the policy at 11:50am on 26 February 2022. The insurer could decline cover if the flood occurred before 11:50am 1 March 2022 There is no dispute a flood event occurred. However, the parties disagree as to when the flood that caused the damage and loss occurred. The question of when the flood occurred is important because:  Mr D’s policy d id not include flood cover until he added it at 11:50am on 26 February 2022  the policy excluded cover for loss and damage caused by a flood the occurs during the first 72 hours after the cover is added to a policy (the 72-hour exclusion period). If the ins urer can prove, on the balance of probabilities, Mr D’s home was flooded and damaged and contents lost before 11:50am on 1 March 2022 it was entitled to deny claims xxx674 and xxx675. The relevant policy terms are set out in section 3.2 below The insurer obtained a hydrologist report The insurer engaged the services of a hydrologist to report on the probable date Mr D’s home was flooded (and damaged) and the contents lost. The report, dated 14 February 2022, was prepared by Mr L, an engineer with hydrology, hydraulic modelling and flood-risk assessment experience, following a physical inspection of Mr D’s property on 25 January 2023. Mr L made the following relevant observations:  the ground level of the property is between 6.7 m Australian Height Datum (AHD) at the northern end and 8.9 m AHD  the laundry ground level is about 7.8 m AHD and the dwelling ground level at 8.9 m AHD  Mr D had indicated the water reached a height of 600mm above the concrete slab at the rear of his home (where the laundry is located)  the property is located about 200 m southwest of RWCreek, which is a tributary of Oxley Creek  Oxley Creek is located about 1.2 km to the west of the property  the recorded water levels of O Creek at [Location C] (about 2.2 km southwest of the property) upstream from the confluence of RW Creek experienced a peak water level of 8.11 m AHD at 5:00am Monday 28 February 2022  the recorded water levels of the mouth of O Creek (where it meets B River) had a peak level of 7.63 m AHD between 9am and 11am on Monday 28 February 2022  water levels at M Avenue Alert Station (located about 600 m upstream on RW Creek from the property) had a peak water level of 8.04 m AHD between 6am and 7am on Monday 28 February 2022  the peak time for rainfall occurred on 28 February 2022. Mr L’s report made the following conclusions  based on the timing of short-duration rainfall and the topographical characteristics of the site, local stormwater runoff did not inundate the indoor areas of the property  inundation and subsequent damage to the property was driven by flooding. Determination | Case number: 919569 Page 7 of 13 Mr D says the flood occurred on 3 March 2022 It is Mr D’s position a flood inundated his property on 3 March 2022. In support of his positio n, Mr D says there was “a lot of news about hydrologist data not proven accurate.” He further states: The report was (sic) clearly stated that the flood water reached Oxley creek and Rocky Water holes creek on 28 th of February, however the distance between those creeks to our house were over 600m and our house had a ground elevation of 8.2m- logically and reality, this will take days to reach our house to be inundated, hence 4 th of March was the correct date of loss. [The insurer] claimed it was 28 th of February due to rise of water of those creeks, however, this report wasn’t reliable due to its not the house that was flooded, but the creeks at that time. March 4 was the actual time that this water got entered to our property. This was also supported by the report from the hydrologist as you can see the graph from them that the water continues to arise till early March and it rained also on the 3 rd of March which assisted the water to come up. Mr D’s property was inundated in the morning of 28 February 2022 Mr L’s observations support a conclusion that Mr D’s property was inundated in the morning of 28 February 2022, most likely between 7am and 11am, as peak water levels exceeded 7.8 m AHD (the laundry ground level) at O Creek at Location C and M Avenue during that timeframe. This is before 11:50am on 1 March 2022 and therefore within the 72-hour exclusion period from when Mr D had added flood cover. I acknowledge Mr D’s submission about when he says the flood water reached his property. However, in the absence of a hydrologist report in support of his position, I consider the findings in Mr L’s report as being reliable based on the available data and his observations. Mr D has not proved the damage and loss was caused by a storm Mr D also disputes claims xxx674 and xxx675 were claims for flood damage. He says the claims related to storm damage, not flood damage. Unfortunately, the available information does not support his position. I accept Mr L’s finding stormwater run-off did not inundate the indoor areas of the property. I also accept the findings of the builder appointed by the insurer that the damage to the laundry was consistent with water flooding the area. The damage to the stumps and foundations is not covered by the policy The insurer also declined claim xxx674 as it formed the view the proximate cause of the damage to the dwelling’s stumps and foundations was long term ground movement and wear and tear. In support of its position, the insurer has provided a report prepared by a builder. The builder conducted a subfloor inspection of the dwelling and observed stumps that were capped with multiple masonry and timber packers to the timber bearers. It was the builder’s opinion the damage to the stumps and foundations was not related to the flood event. The pre-purchase inspection report (dated July 2021) provided by Mr D also does not assist him. The report: Determination | Case number: 919569 Page 8 of 13  confirmed existing uneven/undulating flooring within the house and poor surface drainage under the house  noted surface drainage needs improving to avoid the risk of footing movement and other moisture related issues. An engineer appointed by the insurer also provided a report in relation to the damage to the stumps and foundations. That report noted:  the presence of packers on the stumps and the recent installation of Besser block piers which were installed prior to “the claimed event”  the older stumps were out of plumb by almost 45mm/m while newer Besser block piers were relatively plumb  there was no scouring or erosion around the stumps  uneven floor levels. It was the engineer’s opinion the above matters supported a conclusion the stumps had a long history of movement and the damage was not caused by a flood or storm event. The insurer was entitled to decline claims xxx674 and xxx675 On the available information, the insurer has proved (on the balance of probabilities) the claimed damage and loss occurred within the 72-hour exclusion period. I am also satisfied the insurer has proved on the balance of probabilities the damage to the stumps and foundations were not caused by a flood or storm event, but had occurred over a long period of time. The insurer was entitled to decline claims xxx674 and xxx675. 2.3 Should the insurer compensate Mr D for non-financial loss? Yes. The insurer admits there were delays in handling Mr D’s claims. I am satisfied these delays caused Mr D undue stress and inconvenience. The insurer admits it has delayed its assessment of Mr D’s claims The insurer admits it has delayed in the assessment of the claim and has offered $2,000 compensation for non-financial loss on 8 March 2022. I consider the $2,000 off to be reasonable in the circumstances and adequately compensates Mr D for the stress and inconvenience caused by the delays. 2.4 Why is the outcome fair? The outcome is fair The outcome is fair because the insurer has not proved the damage to Mr D’s roof was excluded from cover. However, the insurer has proved the damage to the stumps and foundations and loss of contents was caused by a flood that occurred within 72 hours of flood cover being added to the policy. Determination | Case number: 919569 Page 9 of 13 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness I have determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). There has been a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all information the provided by the parties. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 919569 Page 10 of 13 3.2 Relevant Policy Terms Policy schedule – 10 August 2021 Policy schedule – 26 February 2022 Determination | Case number: 919569 Page 11 of 13 Page 11 of the PDS Page 44 of the PDS Determination | Case number: 919569 Page 12 of 13 Page 17 of the PDS Pages 54 and 55 of the PDS Determination | Case number: 919569 Page 13 of 13

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.