Insurer declined storm damage claim relying on exclusions for defects, lack of maintenance and earth movement

FirmStrata Community Insurance Agencies Pty Ltd
Decided2023-10-30
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The insurer declined a storm and stormwater damage claim on the basis of defect, maintenance and earth movement exclusions. AFCA found most of the damage was storm-related and covered, except pre-existing horizontal brick cracking, and ordered scope of works, repair or cash settlement plus 10%, and $1,500 non-financial loss.

The storm was the proximate cause of the earth movement, and the insurer did not show exclusions applied for most damage without evidence of standards in place at construction.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 919388 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 919388 Page 2 of 11 Case number: 919388 24 October 2023 1 Determination overview 1.1 Complaint The complainant is a beneficiary of a residential strata insurance policy issued by the financial firm (insurer). The complainant lodged a claim on 30 October 2020 for damage to his home. He says a storm caused a council pipe to leak/overflow and flood his property on 7 February 2020. The claimed damage includes misaligned door frames, cracked plaster on internal walls and ceilings, cracking to external brickwork, damaged kitchen tiles and shifted pavers. The insurer denied the claim saying the damage is due to building and/or construction defects, a lack of maintenance and damage which has occurred gradually over time due to earth movement, which is excluded under the policy. 1.2 Issues and key findings Has the complainant shown damage that is covered under the policy? Yes. The available information shows it is more likely than not that the insured building has experienced damage due the storm event on 7 February 2020, which triggers cover under the policy. Is the insurer ’s assessment of its liability under the policy fair? No. It is fair the insurer accepts liability for the damage shown to be due to the storm event. However, the insurer is entitled to exclude from cover loss or damage it has shown to be due to circumstances excluded under the policy. Is the complainant entitled to compensation for non-financial loss (NFL)? Yes, the insurer is to pay the complainant $1,500 in NFL in line with the AFCA Rules. Why is the outcome fair? I consider this outcome fair as the insurer is liable for losses covered by the policy, which includes loss caused by a storm. However, it is also fair the insurer limits its liability where it has shown an exclusion from cover applies. I consider the award of NFL fair because the complainant experienced an unusual degree of stress, inconvenience and delay because of the insurer’s actions. 1.3 Determination This determination is in favour of the complaint. The insurer must settle the claim as set out in section 2.2 below. Within 14 days of receiving notice the complainant ’s acceptance of this determination, the insurer is to pay $1,500 in NFL. Determination | Case number: 919388 Page 3 of 11 2 Reasons for determination 2.1 Has the complainant shown there is storm damage? Yes. The available information shows it is more likely than not that the insured building has experienced damage due the storm event on 7 February 2020, which triggers cover under the policy. The complainant bears the onus to show a claimable loss The complainant is first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. Policy covers accidental loss or damage not otherwise excluded The policy covers the insured property against accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. The relevant sections of the determination are set out in section 3.2 of this determination. I accept the complainant has shown it is most likely that the external areas including foundations were flooded from the storm event in question including water that leaked/overflowed from a council pipe. I am satisfied that the storm event and associated leaking/overflowing of water from the council pipe can fairly be accepted to be sudden and accidental for the purpose of the policy. I acknowledge the insurer’s reference to loss or damage due to earth movement being excluded under the policy. However, I am not satisfied this assists the insurer in the circumstances. I am satisfied the earth movement relevant to this claim and complaint is due to the storm and related stormwater inundation of the insured property i.e. the proximate cause for the earth movement, unless stated otherwise, is the storm event. Given this, I am satisfied the complainant has shown the insured property has suffered loss or damage which triggers cover under the policy. This means the onus rests with the insurer to show, on balance, the entitlement to decline of limit its liability in line with the policy or otherwise. 2.2 Is the insurer ’s assessment of its liability fair? No. It is fair the insurer accepts liability for the damage shown to be due to the storm event. However, the insurer is entitled to exclude from cover loss or damage it has shown to be due to circumstances excluded under the policy. Information from the engineering consultant ‘S’ is more persuasive The insurer has appointed and provided reports from various consultants including its internal assessor ‘IA’, loss adjusters ‘P’ and S. I have considered all the reports provided by the Determination | Case number: 919388 Page 4 of 11 parties. Having considered the information and opinions from these consultants, I find the information from engineers’ S to be more persuasive. This is because not only is S the most appropriately qualified, but it has provided compelling photographs, diagrams and explanations regarding causation. In saying that, I also note S in providing some opinions has relied (and referred) to the Australian Standards (Standards) and National Building Codes (Code). However, neither S or the insurer has provided the relevant Standards or Codes, with the available information showing the Standards and Codes referred to were not in place at the time the insured building was constructed in or about 1981. I note S provides: Our method of visual and non-destructive inspection, assessment and reporting has been completed with reference to the National Building Code of Australia (NCC BCA 2019), relevant Australian Standards, manufacture’s specifications and/or NSW Fair Trading Guide to Standards and Tolerances 2017 where applicable. ... ... We advise that any reference made to current NCC Building Code of Australia (BCA) 2019, Australian Standards and/or guidelines has ONLY been made to clarify and explain the mechanism of damage/occurrence unless clearly stated otherwise. ... In cases where the age of building and construction predates the above- mentioned adoption dates of BCA, we advise any reference made to BCA should not be used for assessment of either design, construction and/or workmanship defects. Given this, and in the absence of the relevant building standards or codes in place at the time of the construction of the insured building, I am not satisfied the insurer’s reference to and/or reliance upon the 2019 Standards and Codes assists its position. S’s investigations confirm damage that is covered under the policy S attended the insured property on 15 April 2021 to investigate the cause and extent of damage to the insured building. Having considered S’s conclusions in its report and email dated 7 December 2021, I am satisfied it is fair to accept there exists damage that is covered as well as some damage which is excluded under the policy. This is considered in more detail under the below sub-headings: Damage due to foundation reactivity S concludes that the flooding event resulting from the storm and associated leaking/overflowing council pipe has triggered reactivity within the dwellings foundation materials. This has resulted in the movement of the supporting dwarf brick walls and subsidence of the concrete slab supporting the walls around the affected areas. S says the pattern and mechanism of the damage for the below noted damage is consistent with the movement and settlement within the supporting foundation material:  movement, damage and cracking to the Bedroom 2 and Bathroom cornices  movement and uplift the Bedroom 2 and W/C timber door frame  localised damage to kitchen tiles  subsidence and movement within the pavers about the south-east alignment of the backyard. Determination | Case number: 919388 Page 5 of 11 I am satisfied, in the absence of persuasive information to the contrary, that it is fair that the insurer be required to cover the cost to repair the above noted areas of storm damage under the claim. I acknowledge S’s says the foundation reactivity occu rred gradually over a prolonged period. However, I am satisfied this relates to the time between the date of loss (7 February 2020) and S’s assessment on 15 April 2021. This is supported by S’s comment that the insured event is what triggered (my emphasis) the reactivity within the dwellings foundation. I accept the term trigger refers to commencement of activity within the foundation material. Also, as discussed above, I am satisfied it is the storm event which resulted in the earth movement, and therefore the policy exclusion relating to earth movement does not apply to defeat the claim for the above noted damage. Damage to Ceiling lining S says the cause of the noted cracking within the ceiling lining relates to the below deficiencies in the original plasterboard design and installation:  the direct fixing of the plasterboard ceiling lining to the roof trusses bottom chord in lieu of battens which imposes any structural and thermal movement and displacement directly into the plasterboard sheets and fixings  plasterboard sheet and fixings are not designed to withstand stress due to excessive structural movement or temperature changes  omission of sarking installation beneath the roof tiles to control the extent of temperature fluctuation resulting in excessive thermal movement within roof framing. I accept the policy includes exclusion provisions relating to faulty or defective materials or faulty or defective workmanship. However, neither the insurer or S have provided any information in the form of the relevant Standards, Code or manufacturer installation requirements in place at the time of the building’s construction. I note S has referred to Standards and Codes in place in 2019, however, these are not relevant in the circumstances. Accordingly, in the absence of supporting information, I am not satisfied the insurer has established the damage caused by the stormwater ingress is due to faulty or defective materials or faulty or defective workmanship. Accordingly, the insurer is required to accept this damage under the claim. Vertical cracking to the external walls S says the location, pattern and mechanism of below listed cracking to external walls is consistent with the damage due to the differential building movement subject to an absence or inadequate provision of control joints within the wall to account for such movement:  vertical cracking to the external wall directly above the top corner of the external kitchen door frame  vertical cracking to the southern external brick skin directly below the external window. S refers to Standard AS 4773.1 - Masonry in Small Buildings and says articulation joints shall be used in masonry walls to limit the potential cracking or distress that could be caused by contraction/expansion of the masonry units or by footing movement. S further provides that it is plausible that such damage due to the building movement has been exacerbated by the experienced foundation reactivity. I am not satisfied S, or the insurer have provided any persuasive information to show this damage is due to previous inherent building movement. Further, as discussed above, reference to the Standards relates to those in place in 2019 and not the time of construction Determination | Case number: 919388 Page 6 of 11 of the insured building. I am not satisfied the insurer has established there exists or an entitlement to rely on the policy exclusion relating to a building defect or poor workmanship. Accordingly, without persuasive information to the contrary, I am satisfied it is fair that the insurer be required to cover the cost to repair this damage under the claim. Horizontal crack to the southern external brick wall With respect to claimed damage to the southern external brickwork, S says its investigations did not find stepped/diagonal cracking to indicate subsidence of the supporting wall foundation. S says in principle, settlement within the supporting foundation results in stepped/diagonal cracking within the brickwork, which varies in width with height. Given S did not observe any cracking consistent with settlement it says the observed cracking about the damp proof course is not a result of settlement. S says that the long-term deterioration of the damp proof course has imposed expansive force on the surrounding mortar, causing the surrounding mortar to crack. S concludes this cracking is pre-existing and resulted from the deteriorated damp proof course and lack of periodical maintenance. I am satisfied, without information to the contrary, that S is clear in its opinion that this cracking damage is pre-existing and arises from long term deterioration. The policy excludes such damage from cover, and therefore it is fair that the insurer be allowed to decline cover for the cost to repair this area of damage. Cause of Water Ingress Damage In assessing the cause and source of water ingress from the insured building’s roof, S says it completed an aerial drone survey and noted no visual evidence of storm created openings. S says the absence of sarking, gaps and void along the roof tiles have allowed directional rainfall to penetrate into the roof cavity and subsequently onto the plasterboard ceilings below. I note S focuses heavily on the absence of sarking as the cause for the water staining and damage to the ceiling linings. Similarly, S says the cause of collapsed cornice is also due to this water ingress and sarking membrane. I note the insurer says it has verbally confirmed with S that the water ingress to the ceilings will have been an ongoing issue for many years and not due to one event. However, the insurer has not provided any evidence to support such communication from S or the opinion that this has been a long-term issue. S does not state this in its detailed assessment report or subsequent email provided to AFCA for consideration. I have not been provided with any information that shows the absence of sarking is a defect or poor workmanship in line with the Standards and Codes in place at the time of the insured building’s constructions. Therefore, I am not satisfied the insurer has shown the policy exclusions relied on applies to the exclude this damage. I am satisfied it is fair that the insurer covers the complainant for the cost to repair the water ingress damage to the insured building. Concrete Steps In its report S confirms noting damage to:  steps about the front porch entry  steps in front of the kitchen external door to rear backyard Determination | Case number: 919388 Page 7 of 11 S says in its opinion, the cause for the cracking damage in these areas is building movement through contraction and expansion between two different building elements in the absence of an isolation joint. Further, that this damage could have been exacerbated due to the experienced foundation reactivity. Similar to matters considered above, neither the insurer or S have provided any persuasive information to show the absence of an isolation joint is a building defect or defective workmanship. Further, neither the insurer or S have provided any information that shows this damage existed before the storm event or can conclusively be accepted to be old damage. Accordingly, given the insurer has not shown an entitlement to decline cover for this damage in line with policy exclusions, it is fair that the insurer covers the complainant for the cost to repair this damage under the claim. Insurer not unfairly prejudiced by late lodgement of claim On balance, I am not satisfied the insurer has been unfairly prejudiced in its assessment of the claim due to the complainant’s delay in lodging the claim . The complainant has provided a reasonable explanation for delaying his direct contact with the insurer. It is reasonable to accept that it was his neighbour managed the insurance for both properties covered under the policy, and that he was not aware a claim had not been lodged for the damage. I am satisfied the appointed consultants were able to complete comprehensive investigations and come to informed conclusions regarding the cause and extent of the damage to the insured building. The insurer has accepted and based its decision to decline the claim on these assessments as opposed to concluding that it could not come to an informed decision due to the delay experienced and any associated prejudice. I am not satisfied it would be fair to allow the insurer to decline indemnity under the policy in these circumstances. Insurer to accept liability in line with this determination I have not been provided with adequate information from the parties to assist in concluding what the required scope of works or cost of these repairs will be for the damage determined to be covered under the policy. Accordingly, within 21 days of receiving notice of the comp lainant’s acceptance of this determination, the insurer is to:  arrange for a suitably qualified and licenced consultant to prepare a scope of works and actionable quote for the required repairs accepted to be covered under the policy within section 2.2 of this determination  the insurer is to determine whether it will arrange the repairs or cash settle the complainant for the cost to repair the damage to be accepted under the policy within 7 days of receiving the above noted scope of works and repair quote  in the instance the insurer elects to cash settle its liability, it is to increase the final cash settlement by a further 10% to allow for contingencies and transfer of risk in arranging the repairs. 2.3 Is the complainant entitled to NFL? Yes, the insurer is to pay the complainant $1,500 in NFL in line with the AFCA Rules. Determination | Case number: 919388 Page 8 of 11 AFCA Rules allow for an award of NFL in certain circumstances AFCA Rule D 3.3 allows for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. Insurer to pay the complainant $1,500 in NFL I am satisfied an award of non-financial loss is warranted. S identified areas of damage which trigger cover under the policy, and which P brought to the insurer’s attention in its report dated 30 April 2021. Despite this, the insurer proceeded to decline the claim in its entirety which was not reasonable in the circumstances. I am satisfied it was reasonably obvious there was damage to the insured building which triggers cover under the policy. Although, it may not have been to the extent accepted under this determination, there was clearly damage to which the policy responds. I am of the opinion the insurer’s attempt to separate the earth movement from the storm event and associated decision to decline indemnity was unreasonable. I believe it is reasonably clear the proximate cause is the storm even and the insurer’s poor approach to this fact has significantly contributed to the unreasonable delays and stress experienced under the claim. Accordingly, I am satisfied a moderate non-financial loss award is warranted. This means the insurer must pay the complainant $1,500 NFL within 14 days of being notified of the complainant accepting this determination. 2.4 Why is the outcome fair? I consider this outcome fair as the insurer is liable for losses covered by the policy, which includes loss caused by a storm. However, it is also fair the insurer limits its liability where it has shown an exclusion from cover applies. I consider the award of NFL fair because the complainant experienced an unusual degree of stress, inconvenience and delay because of the insurer’s actions . Determination | Case number: 919388 Page 9 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy provisions Loss or Damage means direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by this Policy. Flood means the covering of normally dry land by water that has escaped or been released from the normal confines of any of the following: Determination | Case number: 919388 Page 10 of 11 (a) a lake (whether or not it has been altered or modified); (b) a river (whether or not it has been altered or modified); (c) a creek (whether or not it has been altered or modified); (d) another natural watercourse (whether or not it has been altered or modified);.. ... Exclusions - What we do not cover under Parts A, B, and C: 1. We will not pay for Loss or Damage: ... (c) (i) ... (ii) caused by wear, tear, ..., gradual deterioration or developing flaws; (iii) caused by lack of maintenance or failure to maintain your Insured Property in a reasonably good state of repair. However, we will pay if any of these causes directly results in Loss or Damage from any other Event claimable under Section 1 such as fire or glass breakage. (d) caused by non-rectification of an Insured Property defect, error or omission that you were aware of or should reasonably have been aware of. (g) caused by vibration or from the removal or weakening of or interference with the support of land or buildings or any other property Erosion or Earth movement. However, we will pay if the Loss or Damage is due to: (i) .... (ii) bursting, leaking or overflowing of water tanks, pipes, drains, gutters or other water or liquid carrying apparatus; and (iii) flood if optional cover 1 is shown as included on your schedule. (m) due to normal settling, creeping, heaving, seepage, shrinkage or expansion in buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders, and other structural improvements. Determination | Case number: 919388 Page 11 of 11 2. We will not pay for: (b) the cost of rectifying faulty or defective materials or faulty or defective workmanship.