Claim declined for retaining wall damage; temporary fencing costs ordered

FirmQBE
Decided2023-05-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home insurer declined a claim for a leaning sandstone retaining wall, finding the damage was not shown to arise from a single insured storm event and that exclusions applied. AFCA ordered the insurer to reimburse temporary fencing costs with statutory interest, but no other remedy.

The complainant had the onus of showing a single insured event caused the damage; ongoing La Nina rainfall over two years was not one event, and hydrostatic pressure and gradual deterioration exclusions applied, though temporary fencing was fair to cover as an essential make-safe step.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay interest

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 919239 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 919239 Page 1 of 7 Case number: 919239 26 May 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). He received a letter from his local council in June 2022 advising him a sandstone retaining wall on his property was leaning and needed stabilising. The council required the complainant to engage an engineer to assess the wall. Based on the reports he obtained, the complainant lodged a claim under his policy. He believes the condition of the wall is the result of several storm events and an overall increase in rainfall in the previous two years due to the ‘La Nina’ weather phenomenon. The insurer declined the claim. It submits the cause of the damage was a number of factors which are excluded under the policy, including gradual deterioration and hydrostatic pressure. The insurer says, in any case, the complainant has failed to show the damage was the result of a single insured storm event. The complainant believes the claim should be accepted. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The insurer is entitled to decline the claim. That is because the complainant has not established, on balance, the damage was caused by a single insured ‘ storm ’ event. Instead, the evidence shows it is more likely than not the damage arose from hydrostatic pressure from soil saturation over an extended period, and gradual deterioration due to climatic conditions. However, the insurer is required to reimburse the costs incurred by the complainant in erecting temporary fencing around the affected area. That is because that was identified by the insurer’s assessor early in the claim as being a necessary make-safe step given the potential risk to the public from the compromised wall. Why is the outcome fair? It would not be fair to require the insurer to cover a claim for damage which has not been shown to fall within the scope of cover under the policy. It is however fair, in the particular circumstances, that it cover the cost of recommended precautionary actions (temporary fencing) while the claim was being fully investigated and the matter finalised. 1.3 Determination This determination is substantially in favour of the insurer. It is required to reimburse the complainant the cost of temporary fencing, from the date first incurred to the date of this determination, together with statutory interest on the amounts paid, calculated up to the date Determination | Case number: 919239 Page 2 of 7 of settlement. The complainant is required to provide evidence of those costs. The insurer is not required to take any other action. Determination | Case number: 919239 Page 3 of 7 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Onus on complainant to establish a ‘valid’ claim The complainant has the initial onus of establishing, on the balance of probabilities (that it is more likely than not), the loss he is claiming falls within the scope of cover under the policy. That is known as a ‘valid’ or prima facie claim. If he establishes a ‘valid’ claim, then the onus shifts to the insurer to show, on balance, that exclusions apply which entitle it to decline the claim, or that it is otherwise entitled to do so. Policy covers listed insured events, subject to conditions and exclusions The policy covers listed insured events only. One of those events is ‘storm ( including cyclone), rainwater, flood or wind’. The policy defines ‘ Event/Incident ’ as: A single occurrence or a series of occurrences, including an accident or series of accidents, arising out of one event. Cover for the insured building applies to ‘fences, retaining walls, pathways or driveways’. The complainant had also taken out cover for ‘accidental loss or damage’ to the building : that is, damage that is ‘unintended and unexpected’. However, accidental damage cover does not extend to ‘damage caused by an event excluded under any section of this policy’. Cover under the policy is subject to terms and conditions, as well as general exclusions for any loss or damage caused by or arising from a number of factors, including:  hydrostatic pressure  roots of trees, plants or shrubs. Nor is there cover under any section of the policy for any  wear and tear  gradual deterioration due to… atmospheric or climatic conditions  defect, structural fault, design fault or faulty workmanship. Complainant submits rainwater caused the damage The policy was taken out in October 2020. The claim was lodged in July 2022, with the complainant first becoming aware of the damage to the retaining wall(s) on 1 June 2022. The complainant submits that the proximate cause of the damage was rainwater, both building up behind the affected walls and streaming over/through them. When lodging his complaint, h e referred to the ‘very heavy and continual rainfall events [impacting the Sydney area] since September 2020 due to 3 consecutive La Nina weather events’. Determination | Case number: 919239 Page 4 of 7 He has provided undated photographs and videos showing the flow and ponding of water through the rear of the property, over and against the retaining walls. He points out that the damaged sections of wall are where most of the rainwater flows during periods of heavy rain. The evidence also shows movement and cracking in the walls. There is no dispute the area around the complainant’s property has been subjected to periods of protracted and significant rainfall since 2020. The question is, however, whether the damage can be attributed to a single storm/rainfall event, and whether exclusions apply in any case. Expert reports show increased hydrostatic pressure against the affected walls The complainant appointed structural engineers TTW, who inspected the walls and reported on 24 June 2022 . TTW found the upper and lower walls to be in ‘reasonable condition’, although the upper wall showed signs of cracking and movement; while some areas of the middle wall were found to be in a dilapidated condition with mortar loss throughout the joints and a 200mm lean at the southern point. TTW recommended a geotechnical engineer should be appointed. The complainant then appointed geotechnical engineer JKG, who reported on 15 July 2022:  the likely proximate cause of the damage is hydrostatic pressure and an increase in soil weight/strength when it becomes saturated – as has happened due to ‘recent extreme rainfall’  the serviceability of the wall is compromised  the wall requires complete removal and replacement  it could not confirm the construction date other than the wall is ‘several decades’ old  the wall appears ‘generally well constructed’  the observed movement and cracking is ‘recent’  stormwater runoff is generally well managed, but, the site ‘becomes a water course’ during periods of heavy rainfall. JKG subsequently confirmed in a letter of 20 December 2022 that ‘ hydrostatic pressure from extreme rainfall during the recent La Nina storms is, on the balance of probabilities, the proximate cause of the failure of the retaining wall ’ . In reaching that conclusion, JKG noted the wall had been in place for decades, with no previous signs of instability; and stated it was impossible not to connect the temporal factors (of exceptional rainfall in the period leading up to the failure) in concluding that saturation of the soils behind the wall led to its distress. TWW likewise (in letters of 30 September 2022 and 12 December 2022) had confirmed their view that ‘ on the balance of probabilities, the likely cause of the recent failure of the wall is due to the increased build-up of hydrostatic pressure behind the existing sandstone retaining wall exceeding the residual capacity of the structure ’, together with over -ground flow across the southern end of the site. Insurer’s expert raised other possible contributory causes The insurer appointed consulting engineer LA, whose scope appears to have been only to report on and recommend required make safe works, rather than to assess the cause of damage. LA’s report of 27 August 2022 nonetheless notes: Determination | Case number: 919239 Page 5 of 7  the wall has been gradually leaning over time (since at least 2014 according to Google images)  there are/were potential vegetation and root growth issues  water pressure builds up behind the wall  mortar joints have deteriorated over time  the wall is aged  the wall is poorly designed/constructed (although they appear to acknowledge there were no retaining structure codes or standards in place prior to 1991, and the wall was constructed before then). The various experts have responded to each other’s reports , and maintained their respective positions. With regard to the issues raised by LA, I am not persuaded the insurer has shown potential root or vegetation issues did actually cause or contribute to the claimed damage. With regard to the suggestion of construction or design defects, the insurer has also not established there were in fact any ‘defects’, given the lack of evidence of the applicable building standards at the time of construction. Although I do not consider the 2014 Google image provided by LA conclusively shows the wall structure was leaning in the past (and prior to policy inception), I do consider the evidence indicates there were signs of deterioration (namely the deteriorated mortar joints) and previous repairs, which is reasonably to be expected given the age of the wall. However, I am not satisfied the evidence shows any such general deterioration was the result of a single storm event. Instead, it is more likely to have been occurring over time. The insurer appears to concede LA’s report lacks detail. It has requested to re -attend site on several occasions to complete a more comprehensive report, however, the complainant has refused any further site visits. Complainant has not shown, on balance, damage from single insured event It is not disputed that there have been periods of extreme and unusual weather (including heavy rainfall) since 2020, specifically from the effect of La Nina (which, in simple terms, is a complex weather pattern impacting the global climate, and which can cause higher than normal rainfall). The experts agree hydrostatic (water) pressure is a/the major factor behind the damage to the complainant’s retaining walls. The complainant believes this supports his position that the proximate cause of the damage is rainwater, which is an insured event under the policy. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause. The courts have said that if one cause would have resulted in the harm in any case, and the other would not have done so in the absence of the first, then the first is the proximate cause. The complainant submits that if it were not for the rainfall, then there would not have been a build-up of hydrostatic pressure. However, as already noted above, in order to establish he has a ‘valid’ claim under the policy, the complainant needs to show, on balance, the damage was caused by a single insured rainfall event. The complainant has not been able to identify the specific occasion on which the damage occurred (and I appreciate it will not always be possible to pin-point a precise date). Even though the La Nina phenomenon – with its accompanying significant rainfall – would have been impacting th e complainant’s property from late 2020 to June 2022 (when the damage was discovered), I do not consider that any series of storm occurrences over that Determination | Case number: 919239 Page 6 of 7 almost 2 year period can be said to have arisen from ‘one event’ for the purposes of the policy. That is because I do not accept that La Nina represents one event: it is instead a broader climatic situation which can, in turn, trigger a range of different weather responses. (I note also that the meteorological reporting provided by the complainant refers to 3 separate occurrences of La Nina since 2020.) On that basis, I am not satisfied the complainant has met his onus of establishing the damage was caused by a single insured event. Exclusions apply in any case In any case, the available evidence indicates the damage arose from hydrostatic pressure, which is a policy exclusion. I also consider the damage was, more likely than not, developing gradually over time from repeated rainfall events (including from the La Nina climatic phenomenon), causing a cumulative build-up of water and therefore of soil saturation and water pressure, as well as from the influence of recurring run-off. Gradual deterioration due to climatic conditions is a policy exclusion. Insurer is not liable for the claim Having regard to all the available evidence, I do not consider the insurer is liable for the claimed damage. Fair that insurer covers temporary fencing costs However, I consider it fair and appropriate in the circumstances that the insurer reimburses the complainant for temporary fencing costs he has incurred during the life of the claim. Temporary fencing was one of the make safe actions recommended by the insurer’s attending expert, however the complainant arranged and has been paying for it. Pending finalisation of the claim, the policy prevented the complainant from authorising or undertaking repairs without the insurer’s consent. Particularly given the significant nature and cost of the required repairs in this case, it is understandable that no invasive remedial action would be taken in the meantime. However, because of the potential risk to the public from the compromised retaining wall, temporary fencing was essential in the interim period. The complainant will need to provide an updated invoice(s) for the temporary fencing costs incurred up to the date of this determination. The insurer is liable for those costs, together with statutory interest calculated from the date the costs were incurred to the date of settlement. 2.2 Why is the outcome fair? It would not be fair to require the insurer to cover a claim for damage which has not been shown to fall within the scope of cover under the policy. At the same time, however, it is fair that it covers the complainant’s temporary fencing costs incurred while the claim was being finalised, since he was not able to proceed with any substantive repairs or remediation work during until such time investigations and a final decision was concluded. Determination | Case number: 919239 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.