Flood claim: foundation damage excluded, cash settlement amount, temporary accommodation and delay

FirmSuncorp Group
Decided2023-12-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,500
Amount claimed—
SourceAFCA PDF

Summary

Complainants claimed for flood damage to their home; the insurer declined foundation damage as earth movement and offered a cash settlement. AFCA upheld the foundation exclusion but required an updated quote, a 20% contingency uplift, further temporary accommodation, up to $5,000 legal costs and $3,500 non-financial loss.

The storm and flood cover specifically excludes earth movement other than landslide or subsidence, but the insurer's delays and inadequate cash settlement warranted a higher settlement, accommodation costs and compensation.

Issues

Subjects and remedies

home or building damagemental healthnatural disasterpay claimpay compensationpay non financial lossreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 919144 Financial firm AAI Limited Determination | Case number: 919144 Page 1 of 10 Case number: 919144 7 December 2023 1 Determination overview 1.1 Complaint The complainants hold a home and contents policy with the financial firm (insurer). On 6 January 2022, they lodged a claim for flood damage to their home and contents. The insurer partially accepted the claim. It says the foundation damage is not related to a one-off storm event and is therefore excluded. Further, it says it cannot warrant the repairs due to the pre-existing foundation damage and has sought to cash settle the claim. The complainants say the insurer should cover the foundation damage as it was caused by the flood event. The complainants seek that the insurer cover the costs of repairing the foundation damage, complete all repairs to their home and pay compensation for the stress and inconvenience suffered because of the insurer’s handling of the claim. 1.2 Issues and key findings Is the insurer required to cover the foundation damage? No. The insurer has established that the specific exclusion in the storm and flood events cover applies. Therefore, it is not required to cover the foundation damage. Is the insurer required to increase its cash settlement? Yes. The cash settlement offer should be calculated based on an updated actionable quote, a 20% uplift for contingencies and an allowance for temporary accommodation (based on JL’s estimate) for the time required to complete the repairs. The insurer is also required to pay the temporary accommodation costs until the cash settlement is paid and legal fees up to $5,000. Are the complainants entitled to compensation? Yes. The complainants are entitled to $3,500 in non-financial loss compensation for the stress and inconvenience caused by the insurer’s delay in remediating, assessing and cash settling the claim. The panel does not consider the complainants are entitled to compensation for indirect financial loss. Why is the outcome fair? The panel considers the outcome is consistent with the policy terms, law and the available information. Therefore, the panel considers the outcome is fair in all the circumstances. 1.3 Determination This determination is in favour of the complainant. Within 14 days of being notified of the complainants’ acceptance of the determination, the insurer is required to request an updated actionable quote from JL and pay $3,500 in non- financial loss compensation. It must then cash settle the claim within 14 days of receiving the updated quote from JL in accordance with section 2.2 of this determination. Determination | Case number: 919144 Page 2 of 10 2 Reasons for determination 2.1 Is the insurer required to cover the foundation damage? No. The insurer has established that the specific exclusion in the storm and flood events cover applies. Therefore, it is not required to cover the foundation damage. Onus on the complainants to establish a claimable loss The complainants are required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainants must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainants prove there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies. Policy covers insured events subject to exclusions The insurer’s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainant. The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by an insured event, and not subject to an exclusion, is covered. The policy defines an insured event as a ‘single event, accident or occurrence which you did not intend or expect to happen’ . A series of incidents attributable to one source of originating cause is deemed to be the one incident. The insured events are set out in the PDS and include storm and flood. However, the PDS also says that cover for storm and flood do not include: …loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, [the storm or flood] and not because of erosion, structural fault or design fault; Under the general exclusions, the policy excludes loss or damage to, or caused by, connected with or arising from: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: − ‘Storm’ page 42; − ‘Storm surge’ page 43; − ‘Escape of Liquid’ page 45; − ‘Flood’ page 41; − ‘Earthquake and Tsunami’ page 44; − ‘Explosion’ page 48 … Determination | Case number: 919144 Page 3 of 10 Parties disagree on cause of foundation damage The insurer appointed a restorer, RS, to assess and remediate the property. RS says remediation works included removing all vinyl, carpet and chipboard and plyboard flooring, door trims and jambs and all wall linings to 1200mm. All timber framing and flooring was abrasively cleaned and treated, and dehumidifiers and air movers were installed to assist with drying. There appear to have been delays in the remediation works. That is, RS did not complete the works, including the strip out, until September 2022. This could have further contributed to the damage. Nevertheless, it appears that the foundation damage is relatively minor. That is, there is no significant damage, such as rotation of footings or significant movement of floor levels outside acceptable ranges, bearing in mind the reactivity of the soil. The insurer also obtained a report from a civil engineer, VC, dated 13 May 2022. Based on this, the insurer says the foundation issues were not a result of landslide or subsidence caused by a single storm event. It says the complainants have not provided any floor level survey results to suggest the damage was localised or that the damage was not pre-existing prior to the flood event. The complainants engaged a structural engineer, EF, who provided a report dated 14 March 2023. They say they have established a claimable loss and the insurer has not established that any exclusions apply. Therefore, the insurer should cover the foundation damage component of the claim. The complainants also say VC ’s assessment is flawed because it is based on the following assumptions for which there is no reasonable basis. Therefore, the statements below are mere assertions and not supported by evidence:  it assumes the floodwater inundation would have been for relatively short duration before draining away;  it assumes due to the land’s topography that the sub-floor would be subject to regular rain/runoff. However, there is no evidence of this;  it has not conducted any research or made any findings regarding the amount of water that flooded the property; and  a soil report was not obtained. Summaries of the reports from VC and EF are set out in section 3.2 of this determination. On balance, complainants have established a claimable loss The available evidence confirms that the property was inundated with flood water to approximately 400mm above the internal floor level causing damage. The weather event was significant and widely reported as a catastrophic event. Therefore, it is not in dispute that a flood event did occur and that there was damage to the property. Accordingly, the panel is satisfied the complainants have established a claimable loss. However, the question to be considered is the extent of the flood related damage. The insurer says the foundation damage has not been caused by a one-off storm event. Instead, it says the earth movement damage has been occurring over a period of time and is therefore excluded. The complainants disagree. They say that after the debris was cleaned up and the carpet removed, they noticed movement in the master bedroom and that the skirting board corners in the hallway have opened. They also rely on their expert evidence which shows the timber joists and stumps have signs moisture ingress. Determination | Case number: 919144 Page 4 of 10 On balance, foundation damage is excluded under the policy The onus is on the insurer to establish that the foundation movement is excluded under the policy. The insurer refers to the report from VC. It relies on differential settlement of stumps since restumping, poor site drainage and previous cosmetic repairs as its basis to conclude that the foundation movement is ongoing. It acknowledges that the storm event may have exacerbated the movement but says it was not the proximate cause. Conversely, EF inspected the subfloor and says: … there is separation in the timber floor and signs of deteriorating timber below the studs in the living room and bedrooms with rotten timber floors in some areas. There are signs of moisture ingress to the timber joists in the subfloor. There are also water marks in the concrete stumps closer to the timber bearers’. Further, EF says the ‘ storm event is the dominant cause that has created the possibility of saturation and slumping in the reactive clay soils … which has contributed to the movement and deterioration of the building elements. The storm and flood insured event covers specifically exclude ‘loss or damage caused by…earth movement [unl ess the] loss or damage [has been] caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of [the storm or flood]’. There is no evidence whatsoever from any of the experts that the foundation damage has been caused by landslide or subsidence. Rather, the experts appear to agree that any foundation movement was due to heave. Therefore, even if the proximate cause of the earth movement is flood or storm, there is no cover for the foundation damage. This is because the specific exclusion in the storm and flood events cover for earth movement will apply and there is no evidence of a landslide or subsidence. Given this, it is not necessary to consider whether the earth movement occurred within 72 hours of the storms/flood. The above is the only plausible interpretation of the specific exclusion. Any alternate interpretation would mean that the specific exclusion was of no effect. This type of wording must also be distinguished from the general exclusions in the policy. In the circumstances, the insurer has established the specific exclusion for earth movement in the storm and flood event covers applies. Therefore, the insurer is entitled to decline cover for the foundation damage. 2.2 Is the insurer required to increase its cash settlement? Yes. The cash settlement offer should be calculated based on an updated actionable quote, a 20% uplift for contingencies and an allowance for temporary accommodation (based on JL’s estimate) for the time required to complete the repairs. The insurer is also required to pay the temporary accommodation costs until the cash settlement is paid and legal fees up to $5,000. Insufficient information to show the claim is a total loss The complainants building is insured for $339,900. The insurer has to date paid $15,180 for the fence repairs and $22,377.85 to RS for remediation costs. Determination | Case number: 919144 Page 5 of 10 The insurer also obtained a quote from JL for the accepted repairs to the property. JL’s quote dated 6 October 2022 totalled $121,645.98 . This included a 15% builder’s margin. The insurer offered to settle the complainants based on this quote plus a 15% uplift for contingencies as it was unable to warrant repairs. Accordingly, the cash settlement offered for the agreed repairs is $139,892,87. The insurer says the total cost of repairs under the claim is $159,203.83 ($15,180 plus $22,377.85 plus $121,645.98). Even if the 15% uplift is added to this, the total settlement is well below the sum insured. Given the above, and the fact that there is no cover for the foundation damage, the panel does not consider the claim is a total loss. Insurer can cash settle but must obtain an updated actionable quote The policy allows the insurer to decide the way in which the claim is settled. In circumstances where the insurer has stated it is unable to warrant the repairs, it is entitled to cash settle the claim. The JL quote is over 12 months old. In the circumstances, the insurer is required to obtain an updated actionable quote from JL. The quote should also include an estimate of the time required to complete the repair works. The quote should be actionable in the sense it should be based on market rates available to the complainants. Once an updated actionable quote is obtained from JL, the insurer must cash settle the complainant with a 20% uplift for contingencies and the loss of a lifetime guarantee on repairs. It is appropriate to increase the 15% uplift offered by the insurer to take into account the higher chance of variances on a repair of this scale. Insurer must pay further temporary accommodation costs The insurer confirmed that it settled the complainants $33,990 for the temporary accommodation costs. Given this, it says it would not be liable to cover any further accommodation costs. The complainants’ policy entitles them to temporary accommodation up to 10% of the sum insured, or $33,990. The panel accepts this sum has been paid. However, the panel does not consider this is a sufficient allowance for temporary accommodation in the circumstances. The panel acknowledges there were several delays, particularly around the remediation process, strip out and further assessment of the property. This greatly impacted the time taken to respond to the claim. This meant the complainants remained in temporary accommodation while waiting for the insurer to finalise the claim decision. The insurer’s notes show that it had approved remediation in January 2022. However, the strip out only commenced in June 2022 and the remediation works were not completed until September 2022. The insurer’s IDR decision is also dated 10 August 2022, before the final report from RS was received (which confirmed all remediation works had been completed). Arguably, it was only after such time that a proper assessment of the claim should have been conducted and a decision issued. In the circumstances, the panel considers the insurer is liable to pay the complainants temporary accommodation costs from the date the claim was lodged until time the cash settlement is paid. The insurer should also include in its cash settlement, an allowance for Determination | Case number: 919144 Page 6 of 10 temporary accommodation at a rate of $500 per week for the duration of the estimate provided by JL. Insurer not req uired to pay complainants’ professional costs Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. The complainants seek reimbursement for professional costs, specifically towards their legal costs of $5,000. The panel is satisfied the matter was sufficiently complex that the complainants needed help with managing the claim. This is particularly so in circumstances where they are suffering adverse mental health issues because of the stress caused by the claim. The panel considers it fair that the insurer pay the complainants up to $5,000 for their legal costs subject to a copy of the invoice(s) and proof of payment being provided. The report obtained from EF has not assisted the complainants to establish their claim. Therefore, the panel is not satisfied that the insurer should have to reimburse the complainants the cost of this report. 2.3 Are the complainants entitled to compensation? Yes. The complainants are entitled to $3,500 in non-financial loss compensation for the stress and inconvenience caused by the insurer’s delay in remediating, assessing and cash settling the claim. The panel does not consider the complainants are entitled to compensation for indirect financial loss. Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Under paragraph D.2 of the AFCA Rules, we may also award compensation for indirect financial loss (capped at $5,400). Indirect loss may include the loss of use of a damaged item, the cost of renting a replacement item or loss of income. However, the indirect loss claimed must be caused by the insurer’s error or incorrect handling of the claim. Complainants have suffered unreasonable stress and inconvenience The insurer accepts the claim took longer to progress than expected. It has offered $1,000 in non-financial loss compensation in recognition of this. The complainants seek the maximum non- financial loss because of the insurer’s handling of the claim. This is because one of the complainants was unable to continue working and ceased her employment and both complainants have required counselling and medical treatment. Furthermore, the complainants remain in temporary accommodation. Therefore, Determination | Case number: 919144 Page 7 of 10 they are required to pay both their mortgage repayment and rent. This has had a further negative impact on their mental health and financial circumstances. The insurer says the claim involved large amount of damage. As a result, it required many different suppliers and repairers to inspect and provide reports in relation to the cause of the damage, confirm the remediation required and provide a scope of repair. The panel acknowledges this. However, it considers the insurer’s handling was less than ideal, particularly the length of time it took to remediate the property and the direct impact this has had on the foundation. Having considered the insurer’s notes, the panel is not persuaded that the available information supports the insurer’s explanation. While it is not in dispute that the claim was complex in nature, its correspondence was mainly with its panel builder, JL, and VC, its engineer. There are no details of the supposed many different suppliers and/or repairers it required. The panel is satisfied that the complainants suffered an unusual degree of stress, inconvenience and delay because the insurer ’s handling of the claim. The panel also notes that the insurer did not pay the cash settlement to the complainants and, therefore, they could not commence the repairs. It also notes the complainants will have been out of their home for over two years by the time the repairs are completed. Given this, the insurer should pay the complainants $3,500 in non-financial loss compensation. Insurer not required to pay indirect financial loss The complainants seek compensation for indirect financial loss. This is because they have been unable to live in their house and continue to incur costs associated with alternative living arrangements. As discussed above, the insurer is to pay further temporary accommodation due to the delays it has caused. The panel has also awarded the complainants compensation for the stress and inconvenience caused. In the circumstances, the panel does not consider the complainants are entitled to any compensation for indirect financial loss. 2.4 Why is the outcome fair? The panel considers the outcome is consistent with the policy terms, law and the available information. Therefore, the panel considers the outcome is fair in all the circumstances. Determination | Case number: 919144 Page 8 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Engineering reports VC says ‘subfloor observations was limited due to the access’. However, it considers the foundation damage is an ongoing issue. The flood event may have exacerbated the damage, however not to the extent of it being the dominant cause. VC says:  the foundation damage has likely occurred due to: > differential settlement of stumps since restumping due to seasonal soil moisture variations of moderately reactive founding soils; Determination | Case number: 919144 Page 9 of 10 > poor external drainage which encourages runoff to flow towards and through the subfloor; > a likely history of excessive runoff/flood events inundating the subfloor stumps;  the land slopes naturally west to east and the subfloor had a mixture of dry and wet areas. This indicates some areas of the subfloor were subject to surface runoff on an ongoing basis and that the drainage around the property was poorly maintained. This is contributing to the differential movement;  the foundation soil in the area is moderately reactive and seasonal changes in the moisture contents of soil of this type can cause 20-40mm movement at the surface;  it acknowledges that no soil report has been obtained.;  the site level survey recorded a maximum difference of 30mm in the floor level across the building. This was widespread and there was no pattern of localised movement;  when a leak occurs in a reactive soil, localised expansion occurs. Therefore, it is not unreasonable to expect a certain level of heave in that location. The swelling of soil creates an upward force on the footings of the building and, if the moistures level is excessive, the bearing strength weakens causing the footings to settle. This is generally limited to a localised influence zone depending on the amount of water released, the site topography and the drying conditions;  it anticipates the flood water inundation would have been for a relatively short duration, before draining away (given the apparent gradual slope across the site). Due to the slope, it considers the sub-floor would have been subject to regular rainfall runoff;  in its opinion, the movement observed is more likely a result of the ongoing foundation issues rather than a one-off flood event. It also observed previously patched cracks to the interior of the dwelling which are typically caused by foundation movement/differential settlement. This also indicates the foundation movement has been an ongoing issue; and  the external floors of the subfloor were higher than the subfloor in some areas. This may serve to both encourage moisture into the subfloor and prevent moisture from leaving the subfloor on an ongoing basis. With a significant rainfall event, this moisture ingress and ponding is believed to contribute to the differential movement observed. EF’s report dated 14 March 2023 says:  there is separation in the timber floor and signs of deteriorating timber below the studs in the living room and bedrooms with rotten timber floors in some areas. There are signs of moisture ingress to the timber joists in the subfloor. There are also water marks in the concrete stumps closer to the timber bearers;  foundation movement is due to the one of the following factors - bearing failure, settlement or reactivity;  no soil testing has been conducted to determine if the soils have experienced bearing failure resulting in footing movement. If bearing failure was a contributing factor in foundation movement, you would expect to see bouncy or squeaky floors, distress to bearer and joist connections, stumps out of plumb, or deflection of the floor visible to the naked eye. None of these indicators were noted during EF’s inspection;  no soil testing has been conducted to determine the nature of the soil profile to rule out a long-term settlement of the building. However, EF considers long-term settlement is very rare in the case of stumped houses and is more common for concrete slabs constructed on fill soils. EF does not consider long-term settlement is a contributing factor in this case;  as settlement and bearing failure have been ruled out as probable contributing factors to the current movement in the floor, it leaves reactive soil movement as the likely cause;  moisture meter readings were recorded at various locations of the property as follows - 16% in the living room, 15% in the hallway, 10.8% in the laundry, 6.6% in the bathroom, 9.4% in bedroom 3, 14.8% in bedroom 2, 10.9% in the wall corner near the doorway, Determination | Case number: 919144 Page 10 of 10 24.1% in the other wall corner of bedroom 1 and 23.1% in the subfloor timber joist below the bathroom floor;  according to the Australasian Timber and Flooring Association and Australian Standard 2796, the allowable moisture content range for timber flooring is between 9% and 14%. The observed moisture levels indicate that some locations have slightly higher moisture content, and the subfloor joist is still moist. This indicates that water has likely entered the foundation;  a floor level survey showed a differential of 36mm across the property. This is consistent with a central heave. Externally, there is poor drainage;  from the observed floor level contour pattern, the source of soil swelling is localised and the proximate cause is the flood event;  the claimed storm event with severe rainfall for 3 consecutive days is considered as the dominant cause of the swelling in this area. With the severe rainfall intensity noted and the topography of the land observed it is unlikely that rainfall runoff was possible within the short term;  poor site drainage allowing stormwater runoff to make its way under the house and a natural low point where the overland flow can pool and allow water to soak into the foundation soils are the other factors that have contributed to the soil swelling and some weaknesses to develop previously; and  the storm event, however, is the dominant cause that has created the possibility of saturation and slumping in the reactive clay soils (developing closer to a full soil wedge) which has contributed to the movement and deterioration of the building elements.