Home / Suncorp Group / Determination 918777
Determination 918777
Dispute over whether earthquake damage required restumping/underpinning, and delay in the claim
Summary
The complainant's home was damaged in the Victorian earthquake and the insurer accepted the claim but disputed the need to restump. AFCA found the insurer liable for the SSU underpinning and other works, ordered a cash settlement with contingency, porch reinstatement, and $2,500 non-financial loss.
The insurer's own engineer found earthquake damage to the stumps and the insurer had no reasonable basis to reject that evidence, so it must cash settle the SSU quote and compensate for the resulting delay.
Issues
- Claim amount dispute primary · upheld
“The insurer is liable for all damage caused by the earthquake. This includes internal damage and restumping the house.”
- Poor claim handling secondary · upheld
“Insurer mismanaged the claim”
- Inadequate claim investigation secondary · upheld
“BC formed a view that CC's findings could not be correct, with no reasonable basis for this.”
- Delay secondary · upheld
“All of these actions unnecessarily delayed the claim process”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case number 918777
Financial firm AAI Limited
Determination | Case number: 918777 Page 2 of 7
Case number: 918777 31 May 2023
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). The
complainant lodged a claim with the insurer on 25 January 2022 for damage to his property
which he says occurred during the Victorian earthquake on 22 September 2021.
The insurer accepted the claim but a dispute has arisen about whether the property needs to
be restumped as a result of the damage sustained.
The complainant also says the insurer has unnecessarily delayed the claim and seeks
compensation for non-financial loss.
1.2 Issues and key findings
What is the insurer liable for?
The insurer is liable for all damage caused by the earthquake. This includes internal damage
and restumping the house. It also includes paying for the porch to be rebuilt once the house
has been underpinned.
Is the complainant entitled to compensation for non-financial loss?
Yes. The complainant is entitled to $2,500 in non-financial loss for the stress and
inconvenience caused.
Why is the outcome fair?
The outcome is fair because the expert evidence indicated that the stumps of the property
had been damaged in the earthquake. Rather than accepting the evidence of its own expert
and following the recommendations in that report, the insurer, without any reasonable basis,
sought to obtain a further opinion and delayed the claim. It is fair that the complainant be cash
settled for the damage to his property and be paid non-financial loss compensation.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days the insurer should pay the complainant $42,110.95. This is made up of:
$6,724.30 (including GST), for preliminary work, carpentry, plastering and painting as
listed on the PBS quote
$27,720 (including GST) for underpinning the house as set out in the SSU quote
$5,166.65 being a 15% contingency on the cash settlement amount, reflecting the transfer
of risk
$2,500 in non-financial loss compensation.
The insurer is also to pay the complainant the cost of reinstating the porch after the
restumping works have been carried out by SSU upon being provided a receipt by the
complainant.
Determination | Case number: 918777 Page 3 of 7
2 Reasons for determination
2.1 What is the insurer liable for?
The insurer is liable for all damage caused by the earthquake. This includes internal damage
and restumping the house. It also includes paying for the porch to be rebuilt once the house
has been underpinned.
No dispute a valid claim was lodged
The complainant holds an „insured events‟ policy with the insurer. Subject to its terms and
conditions, the policy provides cover for loss and damage caused by a listed insured
event, o ne of which is „earthquake‟ (PDS, page 19). The complainant‟s policy also
includes cover for accidental damage at home (PDS, page 48).
The complainant lodged a complaint with the insurer after the Victorian earthquake on 22
September 2021.
After the claim was lodged the insurer engaged PBS, a builder, to provide an assessment
report. PBS observed cracking damage to the timber flooring and plaster ceilings and walls.
PBS formed a view that the damage was not caused by the earthquake but recommended an
engineer be appointed.
CC, the insurer‟s engineer, prepared a report dated 1 April 2022. He found that the damage
to the property was caused by the earthquake. On that basis, the insurer accepted the claim
for the walls and the ceilings and asked PBS to prepare a scope of works (SOW) based on
CC‟s findings with respect to the stumps.
During the course of PBS‟ attendance to prepare a SOW in July 2022, he identified an issue
with a drainage pipe in the laundry and leak detection testing was conducted. Whilst a leak
was identified, it was agreed that this did not cause the damage at the home.
The insurer has accepted the claim and not argued that any exclusions apply.
Insurer’s expert says stumps damaged in earthquake
The insurer‟s engineer, CC, prepared a report dated 1 April 2022. He said:
an inspection of the stumps shows no structural damage, but movement is present.
after looking at real estate photographs from March 2018, none of the visible damage
was present at that date.
Due to the earthquake on the 22nd of September 2021, the concrete footings
have moved out of alignment, causing creaking sounds in the timber floorboards
throughout the property. The misalignment of the footings has caused the external
timber architraves on the windows to have uneven gaps between the brickwork.
He took photographs of the subfloor which showed that the concrete stumps were out of
alignment.
He recommended that an inspection be arranged with a restumping/reblocking company to
recommend the best way to repair the foundations of the property.
Determination | Case number: 918777 Page 4 of 7
After this, the insurer had the matter reviewed by BC, its internal building consultant. BC
incorrectly formed a view that the experts, CC and PBS, were in disagreement. On that basis,
BC sought clarification from CC about his findings.
On 5 September 2022, CC emailed the insurer and said:
More photographs of the substructure are not going to show anything further in
regards to my statement of the swaying during seismic activity as this is only
physically visible during the earthquake. Nevertheless, I have attached all
photographs of the substructure I had taken during my assessment. It is also
worth noting that the subfloor appears to be dry – no signs of excessive moisture.
It is quite evident the observed damage was not present in photographs from
realestate.com.au dated 2018. This damage is newly formed, and I believe as a
direct result of the earthquake on the 22 nd of September 2021.
I am unsure as to why there is further “concerns” regarding this specific report as
all the information provided to [the insurer] is well presented with no questionable
findings and CC‟s opinion is clear – this is earthquake related damages.
Insurer did not accept its own expert opinion
After receiving this email, the insurer again referred the matter to its internal building
consultant, BC. BC said in an internal report
The engineers have concluded that there has been no structural damage to the
concrete stumps to the sub floor.
The Engineers have concluded that the concrete stumps have moved out of
alignment ( Due to the earthquake on the 22nd of September 2021, the
concrete footings have moved out of alignment ), but the photographs supplied
as part of the engineer report do not support this statement.
I have discussed the report with CC and CC have been unable to validate the
statement of concrete stump misalignment with adequate evidence.
BC CONCLUSION:
There is no evidence of concrete sub floor stump movement/misalignment or
damage and as such there is no requirement for concrete stump repair or
restumping of the property.
In my view, BC‟s comments are clearly not correct. When CC attended the property, he
inspected the sub floor and took photographs. These photographs show that the stumps were
not aligned. CC was clear in his opinion that this was caused by the earthquake. Despite not
having inspected the property himself, BC formed a view that CC‟s findings could no t be
correct, with no reasonable basis for this.
Determination | Case number: 918777 Page 5 of 7
Insurer should cover cost of repairing damage
CC, in his report dated 1 April 2022, recommended that the insurer engage an appropriate
professional to comment and quote on the appropriate way of repairing or restumping the
property. The insurer did not do this but rather asked PBS to prepare a quote to repair the
sub floor. PBS said in its quote dated 23 November 2022:
Provided jacking and packing as required in order to and relevel existing subfloor
frame to near as practical. (Please note should any stumps require packing of
more that 20mm a Building Permit will be required)
The complainant did not consider PBS‟s quote would adequately repair the damage to his
home. On that basis, he obtained a quote from SSU. SSU are a restumping and underpinning
company. SSU prepared a quote dated 18 January 2023 for $27,720. This quote said the
property required 4 underpins to be constructed at the rear of the house because of
foundations being out of alignment. It also said that in order to do this, areas of the rear porch
needed to be demolished to gain access.
In my view, the complainant‟s quote from SSU is more compelling and should be paid by the
insurer because:
The quote from PBS is from a builder and not a restumping company, which is what was
recommended by the insurer‟s own engineer
The PBS quote does not state that the damage will be repaired by undertaking its method,
rather that it will relevel the floor to as „near as practical‟.
2.2 Is the complainant entitled to compensation for non-
financial loss?
Yes. The complainant is entitled to $2,500 in non-financial loss for the stress and
inconvenience caused.
AFCA may award non-financial loss compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, AFCA may award compensation for non-financial
loss (capped at $5,400) where the insurer‟s actions h ave caused an unusual amount of
physical inconvenience, time taken to resolve the situation or interference with the
complainant‟s expectation of enjoyment o r peace of mind.
Where a complainant has contributed to their loss arising fr om the insurer‟s conduct, their
level of compensation may be reduced accordingly.
Insurer mismanaged the claim
The complainant lodged the claim in 25 January 2022. Following this, the insurer investigated
and assessed the claim. However, throughout the claims process, the insurer‟s internal
building consultant, BC, did not accept the insurer‟s engineer‟ s findings without having any
proper basis for doing so.
Because of this, the insurer did not adopt CC‟s recommendations in his report to appoint a
restumping company to comment on the best way to repair the damage to the property.
Instead, the insurer asked its builder, PBS, to quote on the repair costs. PBS, in my view,
were not suitably qualified to do this.
Determination | Case number: 918777 Page 6 of 7
After this, the complainant submitted his quote from SSU which the insurer did not accept. It
is clear from the claim file that the insurer did not accept CC‟s findings and said that CC
would no longer be used as an engineer on its panel.
The insurer then sought to appoint another engineer to attend the complainant‟s property to
comment on whether the property needed to be restumped or not, rather than accepting the
earlier recommendation of CC from 1 April 2022.
All of these actions unnecessarily delayed the claim process and I acknowledge this would
have been stressful and inconvenient for the complainant. The insurer should pay the
complainant $2,500 in non-financial loss.
2.3 Why is the outcome fair?
The outcome is fair because the expert evidence indicated that the stumps of the property
had been damaged in the earthquake. Rather than accepting the evidence of its own expert
and follow the recommendations in that report, the insurer, without any reasonable basis,
sought to obtain a further opinion and delayed the claim. It is fair that the complainant be cash
settled for the damage to his property and be paid non-financial loss compensation.
Determination | Case number: 918777 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.