Home / Suncorp Group / Determination 918777

Determination 918777

Dispute over whether earthquake damage required restumping/underpinning, and delay in the claim

FirmSuncorp Group
Decided2023-06-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$39,611
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home was damaged in the Victorian earthquake and the insurer accepted the claim but disputed the need to restump. AFCA found the insurer liable for the SSU underpinning and other works, ordered a cash settlement with contingency, porch reinstatement, and $2,500 non-financial loss.

The insurer's own engineer found earthquake damage to the stumps and the insurer had no reasonable basis to reject that evidence, so it must cash settle the SSU quote and compensate for the resulting delay.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 918777 Financial firm AAI Limited Determination | Case number: 918777 Page 2 of 7 Case number: 918777 31 May 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). The complainant lodged a claim with the insurer on 25 January 2022 for damage to his property which he says occurred during the Victorian earthquake on 22 September 2021. The insurer accepted the claim but a dispute has arisen about whether the property needs to be restumped as a result of the damage sustained. The complainant also says the insurer has unnecessarily delayed the claim and seeks compensation for non-financial loss. 1.2 Issues and key findings What is the insurer liable for? The insurer is liable for all damage caused by the earthquake. This includes internal damage and restumping the house. It also includes paying for the porch to be rebuilt once the house has been underpinned. Is the complainant entitled to compensation for non-financial loss? Yes. The complainant is entitled to $2,500 in non-financial loss for the stress and inconvenience caused. Why is the outcome fair? The outcome is fair because the expert evidence indicated that the stumps of the property had been damaged in the earthquake. Rather than accepting the evidence of its own expert and following the recommendations in that report, the insurer, without any reasonable basis, sought to obtain a further opinion and delayed the claim. It is fair that the complainant be cash settled for the damage to his property and be paid non-financial loss compensation. 1.3 Determination This determination is in favour of the complainant. Within 14 days the insurer should pay the complainant $42,110.95. This is made up of:  $6,724.30 (including GST), for preliminary work, carpentry, plastering and painting as listed on the PBS quote  $27,720 (including GST) for underpinning the house as set out in the SSU quote  $5,166.65 being a 15% contingency on the cash settlement amount, reflecting the transfer of risk  $2,500 in non-financial loss compensation. The insurer is also to pay the complainant the cost of reinstating the porch after the restumping works have been carried out by SSU upon being provided a receipt by the complainant. Determination | Case number: 918777 Page 3 of 7 2 Reasons for determination 2.1 What is the insurer liable for? The insurer is liable for all damage caused by the earthquake. This includes internal damage and restumping the house. It also includes paying for the porch to be rebuilt once the house has been underpinned. No dispute a valid claim was lodged The complainant holds an „insured events‟ policy with the insurer. Subject to its terms and conditions, the policy provides cover for loss and damage caused by a listed insured event, o ne of which is „earthquake‟ (PDS, page 19). The complainant‟s policy also includes cover for accidental damage at home (PDS, page 48). The complainant lodged a complaint with the insurer after the Victorian earthquake on 22 September 2021. After the claim was lodged the insurer engaged PBS, a builder, to provide an assessment report. PBS observed cracking damage to the timber flooring and plaster ceilings and walls. PBS formed a view that the damage was not caused by the earthquake but recommended an engineer be appointed. CC, the insurer‟s engineer, prepared a report dated 1 April 2022. He found that the damage to the property was caused by the earthquake. On that basis, the insurer accepted the claim for the walls and the ceilings and asked PBS to prepare a scope of works (SOW) based on CC‟s findings with respect to the stumps. During the course of PBS‟ attendance to prepare a SOW in July 2022, he identified an issue with a drainage pipe in the laundry and leak detection testing was conducted. Whilst a leak was identified, it was agreed that this did not cause the damage at the home. The insurer has accepted the claim and not argued that any exclusions apply. Insurer’s expert says stumps damaged in earthquake The insurer‟s engineer, CC, prepared a report dated 1 April 2022. He said:  an inspection of the stumps shows no structural damage, but movement is present.  after looking at real estate photographs from March 2018, none of the visible damage was present at that date. Due to the earthquake on the 22nd of September 2021, the concrete footings have moved out of alignment, causing creaking sounds in the timber floorboards throughout the property. The misalignment of the footings has caused the external timber architraves on the windows to have uneven gaps between the brickwork.  He took photographs of the subfloor which showed that the concrete stumps were out of alignment.  He recommended that an inspection be arranged with a restumping/reblocking company to recommend the best way to repair the foundations of the property. Determination | Case number: 918777 Page 4 of 7 After this, the insurer had the matter reviewed by BC, its internal building consultant. BC incorrectly formed a view that the experts, CC and PBS, were in disagreement. On that basis, BC sought clarification from CC about his findings. On 5 September 2022, CC emailed the insurer and said: More photographs of the substructure are not going to show anything further in regards to my statement of the swaying during seismic activity as this is only physically visible during the earthquake. Nevertheless, I have attached all photographs of the substructure I had taken during my assessment. It is also worth noting that the subfloor appears to be dry – no signs of excessive moisture. It is quite evident the observed damage was not present in photographs from realestate.com.au dated 2018. This damage is newly formed, and I believe as a direct result of the earthquake on the 22 nd of September 2021. I am unsure as to why there is further “concerns” regarding this specific report as all the information provided to [the insurer] is well presented with no questionable findings and CC‟s opinion is clear – this is earthquake related damages. Insurer did not accept its own expert opinion After receiving this email, the insurer again referred the matter to its internal building consultant, BC. BC said in an internal report The engineers have concluded that there has been no structural damage to the concrete stumps to the sub floor. The Engineers have concluded that the concrete stumps have moved out of alignment ( Due to the earthquake on the 22nd of September 2021, the concrete footings have moved out of alignment ), but the photographs supplied as part of the engineer report do not support this statement. I have discussed the report with CC and CC have been unable to validate the statement of concrete stump misalignment with adequate evidence. BC CONCLUSION: There is no evidence of concrete sub floor stump movement/misalignment or damage and as such there is no requirement for concrete stump repair or restumping of the property. In my view, BC‟s comments are clearly not correct. When CC attended the property, he inspected the sub floor and took photographs. These photographs show that the stumps were not aligned. CC was clear in his opinion that this was caused by the earthquake. Despite not having inspected the property himself, BC formed a view that CC‟s findings could no t be correct, with no reasonable basis for this. Determination | Case number: 918777 Page 5 of 7 Insurer should cover cost of repairing damage CC, in his report dated 1 April 2022, recommended that the insurer engage an appropriate professional to comment and quote on the appropriate way of repairing or restumping the property. The insurer did not do this but rather asked PBS to prepare a quote to repair the sub floor. PBS said in its quote dated 23 November 2022: Provided jacking and packing as required in order to and relevel existing subfloor frame to near as practical. (Please note should any stumps require packing of more that 20mm a Building Permit will be required) The complainant did not consider PBS‟s quote would adequately repair the damage to his home. On that basis, he obtained a quote from SSU. SSU are a restumping and underpinning company. SSU prepared a quote dated 18 January 2023 for $27,720. This quote said the property required 4 underpins to be constructed at the rear of the house because of foundations being out of alignment. It also said that in order to do this, areas of the rear porch needed to be demolished to gain access. In my view, the complainant‟s quote from SSU is more compelling and should be paid by the insurer because:  The quote from PBS is from a builder and not a restumping company, which is what was recommended by the insurer‟s own engineer  The PBS quote does not state that the damage will be repaired by undertaking its method, rather that it will relevel the floor to as „near as practical‟. 2.2 Is the complainant entitled to compensation for non- financial loss? Yes. The complainant is entitled to $2,500 in non-financial loss for the stress and inconvenience caused. AFCA may award non-financial loss compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, AFCA may award compensation for non-financial loss (capped at $5,400) where the insurer‟s actions h ave caused an unusual amount of physical inconvenience, time taken to resolve the situation or interference with the complainant‟s expectation of enjoyment o r peace of mind. Where a complainant has contributed to their loss arising fr om the insurer‟s conduct, their level of compensation may be reduced accordingly. Insurer mismanaged the claim The complainant lodged the claim in 25 January 2022. Following this, the insurer investigated and assessed the claim. However, throughout the claims process, the insurer‟s internal building consultant, BC, did not accept the insurer‟s engineer‟ s findings without having any proper basis for doing so. Because of this, the insurer did not adopt CC‟s recommendations in his report to appoint a restumping company to comment on the best way to repair the damage to the property. Instead, the insurer asked its builder, PBS, to quote on the repair costs. PBS, in my view, were not suitably qualified to do this. Determination | Case number: 918777 Page 6 of 7 After this, the complainant submitted his quote from SSU which the insurer did not accept. It is clear from the claim file that the insurer did not accept CC‟s findings and said that CC would no longer be used as an engineer on its panel. The insurer then sought to appoint another engineer to attend the complainant‟s property to comment on whether the property needed to be restumped or not, rather than accepting the earlier recommendation of CC from 1 April 2022. All of these actions unnecessarily delayed the claim process and I acknowledge this would have been stressful and inconvenient for the complainant. The insurer should pay the complainant $2,500 in non-financial loss. 2.3 Why is the outcome fair? The outcome is fair because the expert evidence indicated that the stumps of the property had been damaged in the earthquake. Rather than accepting the evidence of its own expert and follow the recommendations in that report, the insurer, without any reasonable basis, sought to obtain a further opinion and delayed the claim. It is fair that the complainant be cash settled for the damage to his property and be paid non-financial loss compensation. Determination | Case number: 918777 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.