Home / IAG / Determination 918190
Determination 918190
Settlement amount, scope of works and handling of storm damage claim including mould remediation
Summary
The complainant's storm damage claim was accepted but the cash settlement, scope of works and mould remediation were disputed. AFCA ordered payment of $169,882.54 for repairs (with a 25% uplift), $5,400 non-financial loss, $4,885 report costs and interest.
The insurer's scope and cash settlement were inadequate and it mismanaged the claim, so fairness required it to pay the reasonable cost of repairs with a larger uplift, compensation and expert costs.
Issues
- Claim amount dispute primary · upheld“insurer's scope of repairs and cash settlement were inadequate; 10% uplift neither reasonable nor fair, 25% uplift ordered”
- Poor claim handling secondary · upheld“insurer has not handled the claim well, has not been proactive and has been inefficient”
- Inadequate claim investigation secondary · upheld“insurer did not assess the damage adequately”
- Delay secondary · upheld“insurer mismanaged the claim by its delays and lack of responsiveness”
- Repairs or contractors secondary · upheld“make safe mould remediation did not appear completed to an acceptable standard”
Subjects and remedies
health or medicalhome or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss
Related
Text of the determination
Determination
Case number 918190
Financial firm Insurance Australia Limited
Determination | Case number: 918190 Page 2 of 8
Case number: 918190 13 June 2023
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy with the financial firm
(insurer) and lodged two claims for damage to her property due to a storm event, which the
insurer accepted.
However, a dispute has arisen about the settlement of the claim, scope of works (SOW)
necessary to repair the damage to an appropriate standard, the reasonable cost of repairs,
poor workmanship and the way in which the insurer handled the claim.
Further, the complainant says the insurer’s delay and mishandling of the mould remediat ion
has caused further damage to the property, which requires further assessment and
remediation.
1.2 Issues and key findings
Has the insurer assessed the claim correctly?
The available information does not show that the insurer has assessed the claim correctly.
Several aspects of the claim remained unresolved.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer mismanaged the claim by its delays and lack of responsiveness; this caused
the complainant an undue degree of stress and inconvenience. Compensation for non-
financial loss is warranted.
Is the complainant entitled for professional costs?
Yes. The insurer should pay $4,885 for the complainant ’ s cost of obtaining the mould
assessment reports subject to the complainant providing proof of payment.
Why is the outcome fair?
It is fair that the insurer meets its policy obligations and pays the claim.
1.3 Determination
This determination is in favour of the complai nant. Within 14 days of the complainant’s
acceptance of this determination, the insurer must pay the complainant:
$169,882.54 for building repairs,
$5,400 for non-financial loss compensation
$4,885 costs of obtaining mould assessment reports
The insurer must pay interest on the settlement sum of $179,534.41 in accordance with
section 57 of the Insurance Contacts Act 1984 (the Act) from 9 February 2021, until the date
of payment.
Determination | Case number: 918190 Page 3 of 8
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes of this
determination and each party has had the opportunity to address any issues raised by the
other.
This complaint has been determined based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous decisions
where applicable.
While the parties have raised numerous issues in their submissions, for the purposes of this
determination commentary has been restricted to those issues considered directly relevant to
the outcome only.
The complainant is represented. For the purposes of this determination, the complainant will
refer to both the complainant and her representative.
2.1 Has the insurer assessed the claim correctly?
The available information does not show that the insurer has assessed the claim correctly.
Several aspects of the claim remained unresolved
Circumstances of the loss and claim
The complainant lodged her claim with the insurer on 9 February 2020, advising that the
property had been damage by storm on the same day.
The exchanged material confirms that the storm has caused damage to the building and
contents.
The process of the claim
By letter dated 18 October 2022, the insurer offered the complainant a cash settlement of
$84,936.53, representing $77,215.03 repair cost and a 10% uplift of $7,721.50. This cash
settlement is for both claims.
The insurer confirmed that upon review of further documentation, the offer may be different.
Despite the exchange of information and consideration by the insurer, several issues between
the parties remain unresolved.
I understand that the insurer has offered a further $1,650 to account for the laundry ceiling
and bamboo fence
Parties disagree on reasonable cost of repair
The complainant says after lodging the claim, the property was not safe to live in due to the
mould damage caused by the storm. The insurer moved her to temporary accommodation
and engaged a mould specialist who attended to make safe repairs.
The complainant says, however, when she moved back to her property, the make safe
repairs were inadequate and she had to pay additional cost to remediate the mould damage,
to the extent it could be liveable, as the insurer was not forthcoming with repairs.
The complainant says large sections of the property still requires mould remediation, which
the insurer has refused to attend to.
Determination | Case number: 918190 Page 4 of 8
In support of the claim, the complainant provided a mould assessment report from SESA, a
mould specialist, who concluded in part:
Active mould growth of water damage indicator Aspergillus sp. mould was
identified to the kitchen downlight ceiling space timber. The timber framing
requires remediation by light sanding and fungicide treatment.
Airborne mould concentrations indicative of “Possible Mould Contamination”
(<1,000 spores/m 3 ) were detected in samples collected from the kitchen ceiling
space and family downlight ceiling space. Detailed inspection of concealed ceiling
space areas to the kitchen and living/family areas (previously noted as impacted
by water ingress) is required to be undertaken and remediated accordingly.
All remaining airborne mould samples returned levels within the normal fungal
ecology. Minor trace level of Aspergillus/Penicillium-Like and Cladosporium sp.
were identified.
Based on the above, the mould remediation and rectification did not appear to
have been completed to an acceptable standard with the above-mentioned work
required to the ceiling space areas. These works include
o Light sanding and fungicide treatment to kitchen ceiling space timber
o Detailed inspection of concealed locations with suspected mould contamination
to the ceiling space of kitchen and living/family areas.
The complainant says the insurer’s inadequate mould testing and remediation has caused a
significant delay in processing the claim and further damage to her property.
In addition to the insurer ’s repair quote and cash settlement offer, the complainant is seeking
the following that were omitted from the insurer’s quote :
Damaged contents disposed by the insurer $9,050
Cost of mould remediation to the kitchen cabinetry and window seals $3,849
Insulation replacement and vacuuming of the ceiling $12,000
Repair to the spongy gyprock $3,599
Air conditioner mould remediation $550
Laundry ceiling painting $540
Timber floor repair $2,475
Damaged external umbrella cover $179
External awning replacement $2,578
Mould remediation $23,871
Total amount $58,691.
I note with regards to the insulation replacement and ceiling vacuuming, the insurer initia lly
offered $12,000. However, the insurer retracted its offer and has not provided any information
as to the basis for retracting the offer.
Determination | Case number: 918190 Page 5 of 8
Insurer must pay reasonable cost of repairs
Based on the exchanged information, I am not able to reconcile the differences in the figures
quoted by the parties.
The insurer has said it was willing to consider the additional claim as noted above.
The insurer has been given all supporting information from the complainant and has had the
opportunity to provide submissions regarding the additional costs.
The insurer has not responded to AFCA ’s information request and has not provided any
information in its possessi on that could confirm or refute the complainant’s position, neither
has it submitted that the complainant’s estimate is unreasonable.
Given the insurer’s scope of works appear s not to include all the items that need attention, I
am satisfied it is fair that the insurer includes these additional items in its settlement proposal.
The insurer seeks to cash settle the claim. I am satisfied that the complainant’s policy entitles
the insurer to pay the complainant the reasonable cost to repair or rebuilt the home (page 73
of the Product Disclosure Statement).
However, if the insurer intends to cash settle the claim it must do so fairly and have regard to
(amongst other things):
The transfer of the risk, inconvenience and stress of the repairs, from the insurer to
the complainant,
The loss to the complainant of the insurer’s life time guarantee on repairs,
The risk of further damage being discovered after repairs have commenced,
The likely increase in the cost of repairs since the quotations were obtained,
The extent of repairs required in this instance and
The age and medical condition of the complainant.
I am satisfied that in the circumstances of this claim and complaint, the insurer’s offer of a
10% uplift is neither reasonable nor fair.
The insurer is to add a 25% uplift to the cash settlement for repairs.
Therefore, the insurer is to settle the claim for repairs in the amount of $169,882.54,
representing the insurer’s offer o f $77,215.03 for repairs (not including the 10% uplift offered),
together with the additional items of $58,691, plus the 25% uplift.
The insurer is required to pay interest in accordance with the Act, on $169,882.54, from 9
February 2021, until the date of payment.
2.2 Is the complainant entitled to non-financial loss
compensation?
Yes. The insurer mismanaged the claim by its delays and lack of responsiveness; this caused
the complainant an undue degree of stress and inconvenience. Compensation for non-
financial loss is warranted.
AFCA can award compensation
Under the AFCA Rules, compensation of up to $5,400 can be awarded for non-financial loss
where a complainant suffers an unusual degree of physical inconvenience or time taken to
Determination | Case number: 918190 Page 6 of 8
resolve a situation or interference with a complainant’s enjoyment of life or peace of mind or
delay.
AFCA expects a complainant to be moderately robust and will not award compensation for
the ordinary degree of inconvenience that comes with making a claim.
Compensation for non-financial loss is warranted
Having reviewed all the exchanged material, I accept the complainant was confused and
inconvenienced by the insurers handling of the claim and the various pieces of contradicting
information she was provided with by the insurer.
The insurer is entitled to assess its liability under a claim. However, the complainant should
not have to second-guess the validity, thoroughness and fairness, of a proposal put forward
by the insurer.
This is especially so given the insurer does not appear to have given due consideration to the
information provided by the complainant.
I am satisfied that the insurer has not handled the claim well, has not been proactive and has
been inefficient.
Given the circumstances and in view of the stress and inconveniences caused, the insurer
should pay the complainant $5,400 compensation for non-financial loss.
2.3 Is the complainant entitled for professional costs?
Yes. The insurer should pay $4,885 for the complainant ’ s cost of obtaining the mould
assessment reports subject to the complainant providing the relevant invoices.
AFCA’s approach to professional costs
Under the AFCA Rules, we may require an insurer to reimburse a complainant for
professional costs incurred regarding their claim. However, we will not require an insurer to
contribute more than $5,000 to these costs, unless exceptional circumstances apply
AFCA provides a service which is free for complainants. It is not usually necessary for them
to be represented. We decide whether the insurer should contribute to these kinds of claimed
costs by considering what is fair in the circumstances, considering the complexity of the
complaint and whether the complainant genuinely required expert assistance.
The complainant is seeking $4,885 for mould expert reports and inspection.
Insurer to contribute to professional costs
The insurer has acknowledged it was prepared to work with the complainant and has had
enough time to review the costs she incurred in engaging experts for the mould assessment
and report.
Significantly, the report from SESA assisted to establish there is mould manager at the
property.
In the circumstances I consider it fair that the insurer reimburses the complainant $4,885, for
the cost of obtaining the mould assessment reports and inspection.
The complainant is to provide proof of payment.
Determination | Case number: 918190 Page 7 of 8
The insurer is to pay interest, in accordance with the Act, from the date the complainant paid
for the reports, until the date paid by the insurer.
2.4 Why is the outcome fair?
The outcome is fair because the exchanged information shows:
the insurer did not assess the damage adequately
the insurer’s scope of repairs and cash settlement were inadequate
the insurer generally mismanaged the claim, causing the complainant a degree of stress
and inconveniences
It is therefore fair that the insurer meets its policy obligations and pays the claim.
Determination | Case number: 918190 Page 8 of 8
3 Supporting information
3.1 The AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.